| Administrative Score (SA) | Reason | ||||
|---|---|---|---|---|---|
| 0022320832911000 | Rp 39,020,800 | 82 | 83.75 | - | |
| 0015138076911000 | Rp 354,200,000 | 71.18 | 76.94 | - | |
| 0017281908904000 | Rp 389,565,000 | 69.9 | 74.1 | - | |
CV Total Design Consultant | 0017844374911000 | - | - | - | tidak memasukkan penawaran |
| 0027544972908000 | - | - | - | tidak memasukan dokumen penawaran | |
| 0316292143911000 | - | - | - | - | |
Alam Sejahtera | 0011168073915000 | - | - | - | - |
PT Saranabudi Prakarsaripta | 0011395159911001 | - | - | - | - |
Plassa Consultant | 0011443819911001 | - | - | - | - |
PT Indra Utama Putra Rinjani | 00*2**8****11**0 | - | - | - | - |
CV Geo Techno Design | 0027207661911000 | - | - | - | - |
Bumi Satu | 00*3**0****11**0 | - | - | - | - |
| Authority | |||
|---|---|---|---|
| 24 July 2015 | Penyusunan Rencana Induk Sitem Penyediaan Air Minum (Rispam) Kabupaten Sumbawa | Pemerintah Kabupaten Sumbawa | Rp 600,000,000 |
| 18 May 2021 | Penyusunan Perencanaan Rispam | Kab. Lombok Timur | Rp 500,000,000 |
| 7 May 2024 | Ded Unit Produksi, Distribusi, Dan Layanan Ai Ngelar | Kab. Sumbawa | Rp 400,000,000 |
| 4 May 2015 | Studi Kinerja Daerah Irigasi Gde Bongoh, Lombok Tengah | ULP Provinsi NTB/PPK | Rp 300,000,000 |
| 18 June 2019 | Biaya Perencanaan Teknis Paket I | Pemerintah Daerah Kabupaten Lombok Timur | Rp 300,000,000 |
| 4 May 2015 | Studi Kinerja Daerah Irigasi Gebong, Lombok Barat | ULP Provinsi NTB/PPK | Rp 300,000,000 |
| 8 April 2016 | Perencanaan Penyediaan Sarana Air Bersih Kab. Lombok Tengah | Rp 297,000,000 | |
| 11 September 2019 | Biaya Penyusunan Ukl Paket II | Pemerintah Daerah Kabupaten Lombok Timur | Rp 250,000,000 |
| 22 February 2016 | Studi Kinerja Jaringan Irigasi Di Kadindi, Dompu | Rp 250,000,000 | |
| 25 January 2021 | Konsultansi Perencanaan Penyusunan E-Paksi | Kab. Lombok Timur | Rp 220,000,000 |