Pembuatan Jalan Utama Di Dalam Lingkungan Siht

Basic Information
Type: Public Tender
Tender Code: 10033204000
Date: 14 May 2025
Year: 2025
KLPD: Kab. Lombok Tengah
Work Unit: Dinas Perindustrian Dan Perdagangan
Procurement Type: Pekerjaan Konstruksi
Method: Tender - Pascakualifikasi Satu File - Harga Terendah Sistem Gugur
Contract Type: Harga Satuan
Financial Information
Value (Nilai Pagu): Rp 1,618,560,000
Estimated Value (Nilai HPS): Rp 1,618,560,000
Winner (Pemenang): CV Pabila Bangun Perkasa
NPWP: 019466028915000
RUP Code: 55393376
Work Location: Praya - Lombok Tengah (Kab.)
Participants: 33
Applicants
0019466028915000Rp 1,537,557,681
0011265659914000Rp 1,539,217,927
0923323489912000Rp 1,572,302,491
0017057597912000-
CV Harapankita
00*1**6****15**0-
0318212545915000-
0317026953913000-
CV Kita Uangkan
10*0**0****55**4-
Family Nuansa Abadi
09*5**9****15**0-
0023929813915000-
0015135171915000-
0431268846911000-
0029242880914000-
CV Kiral Miqdad
03*7**8****15**0-
0844056051912000-
CV Azzam Lombok
05*6**3****15**0-
Mulia Karya
07*1**0****16**0-
0019452143915000-
0023339427912000-
0027202365911000-
Katikuntung
09*3**5****14**0-
CV Rezeki Mulia
0746549674915000-
0963152038915000-
Anugerah Sarana Cipta
06*5**8****15**0-
0014139000912000-
0412696494915000-
Bangun Kelana
06*2**9****15**0-
CV Sempane Karya
04*5**7****15**0-
0801173998915000-
CV Gala Fanisa
00*2**9****15**0-
0719228033806000-
0668450026915000-
0029245057915000-
Attachment
PEMERINTAH   KABUPATEN   LOMBOK  TENGAH                   
                                                                           
                 DINAS PERINDUSTRIAN   DAN PERDAGANGAN                     
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
        RENCANA            ANGGARAN              BIAYA                     
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                           PERENCANA                                       
                          REKAPITULASI                                       
                      PERKIRAAN HARGA PEKERJAAN                              
                                                                             
Program  : PERENCANAAN DAN PEMBANGUNAN INDUSTRI                              
Kegiatan : PENYUSUNAN DAN EVALUASI RENCANA PEMBANGUNAN INDUSTRI KABUPATEN/KOTA
Pekerjaan : BELANJA PERENCANAAN PEMBANGUNAN SARANA DAN PRASARANA SIHT LANJUTAN (DBHCHT)
           (PEMBUATAN JALAN UTAMA DI DALAM LINGKUNGAN SIHT)                  
Lokasi   : DESA BARABALI KEC. BATUKLIANG KABUPATEN LOMBOK TENGAH             
                                                                             
                                                    Jumlah Harga             
 No. Divisi                Uraian                    Pekerjaan               
                                                      (Rupiah)               
    1      Umum                                             -                
    2      Drainase                                         -                
    3      Pekerjaan Tanah Dan Geosintetik                  -                
    4      Pekerasan Berbutir Dan Perkerasan Beton Semen    -                
                                                                             
    5      Perkerasan Aspal                                 -                
    6      Struktur                                         -                
    7      Pekerjaan Harian Dan Pekerjaan Lain-Lain         -                
    8      Pekerjaan Pemeliharaan Kinerja                   -                
                                                                             
 (A) Jumlah Harga Pekerjaan ( termasuk Biaya Umum dan Keuntungan ) -         
                                                                             
 (B) PAJAK PERTAMBAHAN NILAI (PPN) = 11% x (A)              -                
 (C) JUMLAH TOTAL HARGA PEKERJAAN = (A) + (B)               -                
  Terbilang :                                                                
                                                                             
                                                                             
                                                                             
            Disetujui Oleh:                     Dibuat :                     
   KPA. SELAKU PEJABAT PEMBUAT KOMITMEN    KONSULTAN PERENCANA               
   DINAS PERINDUSTRIAN DAN PERDAGANGAN        CV. REPLICA                    
       KABUPATEN LOMBOK TENGAH                                               
                                                                             
                                                                             
                                                  \\                         
        BQ. YULIANA SAPRIANI, ST          IRWAN SYAMSURIAWAN, ST             
        NIP. 1977070922007012016               DIREKTUR                      
                                                                             
                                                                             
                             Mengetahui :                                    
                KEPALA DINAS PEKERJAAN UMUM DAN PENATAAN RUANG               
                        KABUPATEN LOMBOK TENGAH                              
                                                                             
                                                                             
                                                                             
                                                                             
                          Ir. LALU RAHADIAN, M.Si.                           
                         NIP. 196712311992031117                             
                         PERKIRAAN HARGA PEKERJAAN                           
                                                                             
Program : PERENCANAAN DAN PEMBANGUNAN INDUSTRI                               
Kegiatan : PENYUSUNAN DAN EVALUASI RENCANA PEMBANGUNAN INDUSTRI KABUPATEN/KOTA
Pekerjaan : BELANJA PERENCANAAN PEMBANGUNAN SARANA DAN PRASARANA SIHT LANJUTAN (DBHCHT)
         (PEMBUATAN JALAN UTAMA DI DALAM LINGKUNGAN SIHT)                    
Lokasi  : DESA BARABALI KEC. BATUKLIANG KABUPATEN LOMBOK TENGAH              
                                                                             
  No. Mata              Uraian             Satuan Perkiraan Harga Jumlah     
 Pembayaran                                     Kuantitas Satuan Harga-Harga 
                                                        (Rupiah) (Rupiah)    
   a                     b                   c    d      e       f = (d x e) 
         DIVISI 1. UMUM                                                      
   1.2   Mobilisasi                                                          
   1.2   Mobilisasi                         LS     1.00      -        -      
         SKH SISTEM MANAJEMEN KESELAMATAN KONSTRUKSI (SMKK)                  
   1     Penyiapan dokumen penerapan SMKK :                                  
SKh-1.1.22.(1a) Pembuatan dokumen RKK, RKPPL, RMLLP, RMPK Set 1.00 -  -      
SKh-1.1.22.(1b) Pembuatan prosedur dan instruksi kerja Set 1.00 -     -      
SKh-1.1.22.(1c) Penyusunan pelaporan penerapan SMKK Set 1.00 -        -      
   2     Sosialisasi, promosi dan pelatihan :                                
SKh-1.1.22.(2a) Induksi Keselamatan Konstruksi (Safety Induction) Org 8 .00 - -
SKh-1.1.22.(2b) Pengarahan Keselamatan Konstruksi (Safety Briefing) Org 8.00 - -
SKh-1.1.22.(2c) Pertemuan keselamatan (Safety Talk dan/atau Tool Box Meeting) Org 8.00 - -
SKh-1.1.22.(2g) Simulasi Keselamatan Konstruksi Ls                           
SKh-1.1.22.(2h) Spanduk (Banner)            Lbr    1.00     -         -      
 SKh-1.1.22.(2j) Papan Informasi Keselamatan konstruksi Bh 1.00 -     -      
   3b    APD, antara lain :                                                  
SKh-1.1.22.(3b1) Topi pelindung (Safety Helmet) Bh 8.00     -         -      
SKh-1.1.22.(3b7) Sarung tangan (Safety Gloves) Psg 8 .00    -         -      
SKh-1.1.22.(3b8) Sepatu keselamatan (Safety Shoes, rubber safety shoes and toe cap) Psg 8 .00 - -
SKh-1.1.22.(3b11) Rompi keselamatan (Safety Vest) Bh 8.00   -         -      
 SKh-1.1.22.(5f) Petugas P3K                Org    1.00     -         -      
SKh-1.1.22.(5h) Petugas pengatur lalu lintas Org   1.00     -         -      
   6     Fasilitas sarana, prasarana, dan alat kesehatan :                   
SKh-1.1.22.(6a) Peralatan P3K               Set    1.00     -         -      
   7     Rambu dan Perlengkapan lalu lintas yang diperlukan atau manajemen lalu lintas :
SKh-1.1.22.(7a) Rambu petunjuk              Bh     2.00     -         -      
SKh-1.1.22.(7b) Rambu larangan              Bh     2.00     -         -      
SKh-1.1.22.(7c) Rambu peringatan            Bh     2.00     -         -      
SKh-1.1.22.(7h) Kerucut lalu lintas (traffic cone) Bh 2.00  -         -      
   9     Kegiatan dan peralatan terkait Pengendalian Risiko Keselamatan Konstruksi :
SKh-1.1.22.(9a1) Alat Pemadam Api Ringan (APAR) Bh 2.00     -         -      
SKh-1.1.22.(9a4) Bendera K3                 Bh     1.00     -         -      
SKh-1.1.22.(9c) Pengujian Baku Mutu Udara Ambien Lengkap Set 1.00 -   -      
         Jumlah Harga Pekerjaan DIVISI 1 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) -
         DIVISI 2. DRAINASE                                                  
  2.3.(2) Gorong-gorong Pipa Beton Tanpa Tulangan diameter dalam 25 cm       
                                            M1                               
                                                   14.50    -         -      
  2.3.(22) Saluran berbentuk U Tipe DS 1                                     
                                            M1                               
                                                   23.15    -         -      
   Ls.   Gutter Grill anyaman besi Lebar 40 cm (Penutup Saluran)             
                                            M1                               
                                                   23.15    -         -      
        Jumlah Harga Pekerjaan DIVISI 2 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) -
         DIVISI 3. PEKERJAAN TANAH DAN GEOSINTETIK                           
  3.1.(1) Galian Biasa                                                       
                                            M3                               
                                                   24.18    -         -      
  3.3.(1) Penyiapan Badan Jalan                                              
                                            M2                               
                                                  3,349.29  -         -      
        Jumlah Harga Pekerjaan DIVISI 3 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) -
  No. Mata              Uraian             Satuan Perkiraan Harga Jumlah     
 Pembayaran                                     Kuantitas Satuan Harga-Harga 
                                                        (Rupiah) (Rupiah)    
   a                     b                   c    d      e       f = (d x e) 
         DIVISI 5. PERKERASAN BERBUTIR                                       
  5.1.(1) Lapis Pondasi Agregat Kelas A                                      
                                            M3                               
                                                  557.64    -         -      
        Jumlah Harga Pekerjaan DIVISI 5 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) -
         DIVISI 6. PERKERASAN ASPAL                                          
  6.1 (1) Lapis Resap Pengikat - Aspal Cair/Emulsi Liter 2,759.41 -   -      
  6.3(6a) Laston Lapis Antara (AC-BC)       Ton   4 56.17   -         -      
  6.3.(8) Bahan anti pengelupasan           Kg    502.39    -         -      
                                                                             
        Jumlah Harga Pekerjaan DIVISI 6 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) -
                                                                             
         DIVISI 7. STRUKTUR                                                  
  7.1 (8) Beton , fc’15 Mpa                 M3              -         -      
  7.1 (10) Beton, fc’10 Mpa                 M3     4.91     -         -      
  7.16.(2a) Pipa Drainase Baja diameter 150 mm M1  12.50    -         -      
  7.16.(3a) Pipa Drainase PVC diameter 150 mm M1  146.62    -         -      
  7.16.(4) Pipa Penyalur PVC                M1      -       -         -      
        Jumlah Harga Pekerjaan DIVISI 7 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) -
                                                                             
         DIVISI 9. PEKERJAAN HARIAN & PEKERJAAN LAIN-LAIN                    
                                                                             
  9.2(10a) Kerb Pracetak Jenis 1 (Peninggi/Mountable)                        
                                            M1                               
                                                    -       -         -      
  9.2.(10b) Kereb Pracetak Jenis 2 (Penghalang/Barrier)                      
                                            M1                               
                                                  586.94    -         -      
        Jumlah Harga Pekerjaan DIVISI 9 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) -
         DIVISI 10. PEKERJAAN PEMELIHARAAN KINERJA                           
  10.1.(17) Pengecatan Kereb pada Trotoar atau Median                        
                                            M1                               
                                                  586.94    -         -      
        Jumlah Harga Pekerjaan DIVISI 10 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) -
                          HARGA DASAR SATUAN UPAH                            
                                                                             
                                             HARGA  HARGA                    
      No.          U R A I A N     KODE SATUAN YG DIGUNAKAN SATUAN KETERANGAN
                                             ( Rp.) ( Rp.)                   
       1. Pekerja                  (L01) Jam   0.00     - Sesuai dengan peraturan
       2. Tukang                   (L02) Jam   0.00     - dan ketentuan yang 
       3. M a n d o r              (L03) Jam   0.00     - berlaku            
       4. Operator                 (L04) Jam   0.00     - (Perda yg berlaku) 
       5. Pembantu Operator        (L05) Jam   0.00     - contoh :           
       6. Sopir / Driver           (L06) Jam   0.00     - Perbub Loteng No. ...
       7. Pembantu Sopir / Driver  (L07) Jam   0.00     - Tahun 2023         
       8. Mekanik                  (L08) Jam   0.00     -                    
       9. Pembantu Mekanik         (L09) Jam   0.00     -                    
      10. Kepala Tukang            (L10) Jam   0.00     -                    
      11.                                               -                    
      12 Tenaga Ahli Muda S1 (1 Tahun) (L11) Jam 0.00   -         -          
      13 Tenaga Ahli Muda S1 (5 Tahun) (L12) Jam 0.00   -         -          
      14                                                -                    
      15                                                -                    
      16                                                -                    
      17 CAD / CAM OPERATOR        (L16) Jam   0.00     -         -          
      18 SOFTWARE PROGRAMMER / IMPLEMENTER (L17) Jam 0.00 -       -          
      19 HARDWARE TECHNICIAN       (L18) Jam   0.00     -         -          
      20 FACILITATOR               (L19) Jam   0.00     -         -          
      21 SENIOR ASSISTANT PROFESSIONAL STAFF (L20) Jam 0.00 -     -          
      22 ASSISTANT PROFESSIONAL STAFF (L21) Jam 0.00    -         -          
      23 SPECIAL TECHNICIAN / INSPECTOR (L22) Jam 0.00  -         -          
      24 TECHNICIAN                (L23) Jam   0.00     -         -          
      25 INSPECTOR                 (L24) Jam   0.00     -         -          
      26 SURVEYOR                  (L25) Jam   0.00     -         -          
      27                                                                     
      28                                                                     
      29                                                                     
      30                                                                     
                                     DAFTAR                                  
                             HARGA DASAR SATUAN BAHAN                        
                                                                             
                                                     HARGA                   
               No.          U R A I A N     KODE SATUAN SATUAN KETERANGAN    
                                                      ( Rp.)                 
               1  Pasir Pasang (Sedang)     M01b M3     0.00 Base Camp       
               2  Pasir Beton (Kasar)       M01a M3     0.00 Base Camp       
               3  Pasir Halus (untuk HRS)   M01c M3     0.00 Base Camp       
               4  Pasir Urug (ada unsur lempung) M01d M3 0.00 Base Camp      
               5  Batu Kali                 M02 M3      0.00 Lokasi Pekerjaan
               6  Agregat Pecah Kasar       M03 M3      0.00 Base Camp       
               7  Agg. Halus LP A           M04 M3      0.00 Base Camp       
               8  Agregat Lolos # 1 "       M38 M3      0.00 Base Camp       
               9  Lolos screen1 ukuran ( 0 - 5) M89a M3 0.00 Base Camp       
               10 Lolos screen2 ukuran ( 0 - 5) M89b M3 0.00 Base Camp       
               11 Lolos screen2 ukuran ( 5 - 9,5) M89c M3 0.00 Base Camp     
               12 Lolos screen2 ukuran ( 9.5 - 19,0) M89d M3 0.00 Base Camp  
               13 F i l l e r (non semen) (limestone dust, kapur padam, dolomit, fly ash) M05 Kg 0.00 Proses/Base Camp
               14 Batu Belah / Kerakal      M06 M3      0.00 Lokasi Pekerjaan
               15 G r a v e l               M07 M3      0.00 Base Camp       
               16 Bahan Tanah Timbunan      M08 M3      0.00 Borrow Pit/quarry
               17 Bahan Pilihan             M09 M3      0.00 Quarry          
               18 Aspal                     M10 Kg      0.00 Base Camp       
               19 Kerosen / Minyak Tanah    M11 LITER   0.00 Base Camp       
               20 Semen / PC (50kg)          -  Zak     0.00 zak 50 kg       
               21 Semen / PC (kg)           M12 Kg      0.00                 
               22 Besi Beton                M13 Kg      0.00 Lokasi Pekerjaan
               23 Kawat Beton               M14 Kg      0.00 Lokasi Pekerjaan
               24 Kawat Bronjong            M15 Kg      0.00 Lokasi Pekerjaan
               25 S i r t u                 M16 M3      0.00 Lokasi Pekerjaan
               26 S i r t u (4 ≤ PI ≤10 ; LL ≤ 35 %) M3 0.00                 
               27 S i r t u (4 ≤ PI ≤15 ; LL ≤ 35 %) M3 0.00                 
               28 Cat Marka (Non Thermoplas) M17a Kg    0.00 Lokasi Pekerjaan
               29 Cat Marka (Thermoplastic) M17b Kg     0.00 Lokasi Pekerjaan
               30 P a k u                   M18 Kg      0.00 Lokasi Pekerjaan
               31 Kayu Perancah             M19 M3      0.00 Lokasi Pekerjaan
               32 Bensin (Pertamax)         M20 LITER   0.00 Pertamina       
               33 S o l a r                 M21 LITER   0.00 Pertamina       
               34 Minyak Pelumas / Oli      M22 LITER   0.00 Pertamina       
               35 Plastik Filter            M23 M2      0.00 Lokasi Pekerjaan
               36 Pipa Galvanis Dia. 1.6"   M24 Batang  0.00 Lokasi Pekerjaan
               37 Pipa Porus diameter 4"    M25  M'     0.00 Lokasi Pekerjaan
               38                                       0.00                 
               39 Agr. Kelas A (analisis)   M26 M3      0.00 Base Camp       
               40                                       0.00                 
               41 Agr. Kelas B (analisis)   M27 M3      0.00 Base Camp       
               42                                       0.00                 
               43                                       0.00                 
               44 Arg. Kelas S (analisis)   M29 M3      0.00 Base Camp       
               45 Lapis Drainase (analisis)     M3      0.00 Base Camp       
               46 Geotextile                M30 M2      0.00 Lokasi Pekerjaan
               47 Aspal Emulsi              M31 Kg      0.00 Base Camp       
               48 Gebalan Rumput            M32 M2      0.00 Lokasi Pekerjaan
               49 Thinner                   M33 LITER   0.00 Lokasi Pekerjaan
               50 Glass Bead                M34 Kg      0.00 Lokasi Pekerjaan
               51 Pelat Rambu (Eng. Grade)  M35a BH     0.00 Lokasi Pekerjaan
               52 Pelat Rambu (High I. Grade) M35b BH   0.00 Lokasi Pekerjaan
               53 Rel Pengaman              M36  M'     0.00 Lokasi Pekerjaan
               54 Beton Struktur Fc' 25 Mpa M37 M3      0.00 Lokasi Pekerjaan
               55 Baja Tulangan (Polos) U24 M39a Kg     0.00 Lokasi Pekerjaan
               56 Baja Tulangan (Ulir) D32  M39b Kg     0.00 Lokasi Pekerjaan
               57 Kapur                     M40 M3      0.00 Hasil Proses    
               58 Chipping                  M41 M3      0.00 Base Camp       
               59 Chipping (kg)             M41kg Kg    0.00 Base Camp       
               60 Cat                       M42 Kg      0.00 Base Camp       
               61 Pemantul Cahaya (Reflector) M43 Bh.   0.00 Base Camp       
               62 Pasir Urug                M44 M3      0.00 Base Camp       
               63 Arbocell                  M45 Kg.     0.00 Base Camp       
               64 Baja Bergelombang         M46 Kg      0.00 Lokasi Pekerjaan
               65 Beton Fc' 10 MPa          M47 M3      0.00 Lokasi Pekerjaan
               66 Baja Struktur             M48 Kg      0.00 Pelabuhan terdekat
               67 Tiang Pancang Baja        M49  M'     0.00 Lokasi Pekerjaan
               68 Tiang Pancang Beton Pratekan M50 M3   0.00 Pelabuhan terdekat
               69 Kawat Las                 M51 Dos     0.00 Lokasi Pekerjaan
               70 Pipa Baja                 M52 Kg      0.00 Pelabuhan terdekat
               71 Minyak Fluks              M53 Liter   0.00 Base Camp       
               72 Bunker Oil                M54 Liter   0.00 Base Camp       
               73 Asbuton Halus             M55 Ton     0.00 Base Camp       
               74 Baja Prategang            M56 Kg      0.00 Base Camp       
               75 Baja Tulangan             M57a Kg     0.00 Lokasi Pekerjaan
               76 Baja Tulangan (Ulir) D39  M39c Kg     0.00 Lokasi Pekerjaan
               77 Baja Tulangan (Ulir) D48  M39d Kg     0.00 Lokasi Pekerjaan
               78 PCI Girder L=17m          M58a Buah   0.00 Pelabuhan terdekat
               79 PCI Girder L=21m          M58b Buah   0.00 Pelabuhan terdekat
               80 PCI Girder L=26m          M58c Buah   0.00 Pelabuhan terdekat
               81 PCI Girder L=32m          M58d Buah   0.00 Pelabuhan terdekat
               82 PCI Girder L=36m          M58e Buah   0.00 Pelabuhan terdekat
               83 PCI Girder L=41m          M58f Buah   0.00 Pelabuhan terdekat
                                                     HARGA                   
               No.          U R A I A N     KODE SATUAN SATUAN KETERANGAN    
                                                      ( Rp.)                 
               84 Beton Struktur Fc' 30 MPa M59 M3      0.00 Lokasi Pekerjaan
               85 Beton Struktur Fc' 15 MPa M60 M3      0.00 Lokasi Pekerjaan
               86 Cerucuk                   M61  M      0.00                 
               87 Elastomer                 M62 buah    0.00                 
               88 Bahan pengawet: kreosot   M63 liter   0.00                 
               89 Mata Kucing               M64 buah    0.00                 
               90 Anchorage                 M65 buah    0.00                 
               91 Anti strpping agent       M66 Kg      0.00                 
               92 Bahan Modifikasi          M67 Kg      0.00                 
               93 Beton Struktur Fc' 50 MPa M68 M3      0.00                 
               94 Beton Struktur Fc' 40 MPa M69 M3      0.00                 
               95 Ducting (Kabel prestress) M70  M'     0.00                 
               96 Ducting (Strand prestress) M71 M'     0.00                 
               97 Beton Fc' 35 MPa          M72 M3      0.00                 
               98 Multipleks 12 mm          M73 Lbr     0.00                 
               99 Elastomer jenis 1         M74a buah   0.00 Base Camp       
               100 Elastomer jenis 2        M74b buah   0.00 Base Camp       
               101 Elastomer jenis 3        M74c buah   0.00 Base Camp       
               102 Expansion Tipe Joint Asphaltic Plug M75d M 0.00 Base Camp 
               103 Expansion Join Tipe Rubber M75e M    0.00 Base Camp       
               104 Expansion Join Baja Siku M75f M      0.00 Base Camp       
               105 Marmer                   M76 Buah    0.00 Base Camp       
               106 Kerb Type A              M77 Buah    0.00 Base Camp       
               107 Paving Block             M78 Buah    0.00 Lokasi Pekerjaan
               108 Mini Timber Pile         M79 Buah    0.00 Lokasi Pekerjaan
               109 Expansion Joint Tipe Torma M80 M1    0.00 Lokasi Pekerjaan
               110 Strip Bearing            M81 Buah    0.00 Lokasi Pekerjaan
               111 Joint Socket Pile 35x35  M82 Set     0.00 Lokasi Pekerjaan
               112 Joint Socket Pile 16x16x16 M83 Set   0.00 Lokasi Pekerjaan
               113 Mikro Pile 16x16x16      M84 M1      0.00 Lokasi Pekerjaan
               114 Matras Concrete          M85 Buah    0.00 Lokasi Pekerjaan
               115 Assetilline              M86 Botol   0.00 Lokasi Pekerjaan
               116 Oxygen                   M87 Botol   0.00 Lokasi Pekerjaan
               117 Batu Bara                M88 Kg      0.00 Lokasi Pekerjaan
               118 Pipa Galvanis Dia 3"     M24a M      0.00                 
               119 Pipa Galvanis Dia 1,5"   M24b M      0.00                 
               120 Agregat Pecah Mesin 0-5 mm M91 M3    0.00                 
               121 Agregat Pecah Mesin 5-10 & 10-20 mm M92 M3 0.00           
               122 Agregat Pecah Mesin 20-30 mm M93 M3  0.00                 
               123 Joint Sealent            M94 Kg      0.00                 
               124 Cat Anti Karat           M95 Kg      0.00                 
               125 Expansion Cap            M96 Kg      0.00                 
               126 Polytene 125 mikron      M97 Kg      0.00                 
               127 Curing Compound          M98  Ltr    0.00                 
               128 Kayu Acuan               M99 Kg      0.00                 
               129 Additive                 M67a Kg     0.00                 
               130 Casing                   M100 M2     0.00                 
               131 Pasir Tailing            M101 M3     0.00 Base Camp       
               132 Polimer                  M102        0.00 Base Camp       
               133 Batubara                 M103 kg     0.00 Base Camp       
               134 Kerb jenis 1             M104 Buah   0.00                 
               135 Kerb jenis 2             M105 Buah   0.00                 
               136 Kerb jenis 3             M106 Buah   0.00                 
               137 Bahan Modifikasi         M107 Kg     0.00                 
               138 Aditif anti pengelupasan M108 Liter  0.00                 
               139 Bahan Pengisi (Filler) Tambahan M109 Kg 0.00              
               140 Asbuton yang diproses    M110 Kg     0.00                 
               141 Elastomer Alam           M111 Kg     0.00                 
               142 Elastomer Sintesis       M112 Kg     0.00                 
               143 Anchorage                M113 Buah   0.00                 
               144 - hidup                  M114 bh     0.00                 
               145 - mati                   M115 bh     0.00                 
               146 Kabel Prategang          M116 Kg     0.00                 
               147 - Selongsong             M117 M'     0.00                 
               148 - Baja Prategang         M118 Kg     0.00                 
               149 - Grouting               M119 M2     0.00                 
               150 Angkur Kabel Prategang, Tipe............... M120 M2 0.00  
               151 Angkur Kabel Prategang, Tipe............ M121 buah 0.00   
               152 Baja Profil              M122 Kg     0.00                 
               153 Baja Tulangan BJTP 24 (epoxy coated) M123 Kg 0.00         
               154 Epoxy coated             M124 Kg     0.00                 
               155 Cairan Perekat (Epoxy Resin) M125 Kg 0.00                 
               156 Epoxy Bahan Penutup (sealant) M126 Kg 0.00                
               157 Alat Penyuntik Anti Gravitasi M127 Kg 0.00 alat penyuntik epoxy
               158 Polymer Mortar           M128 Kg     0.00                 
               159 Anti Korosif Baja        M129 Kg     0.00                 
               160 Acuan/multipleks         M130 M3     0.00                 
               161 Concrete Grouting        M131 Kg     0.00                 
               162 Pipa Galvanis Dia 8"     M132 M      0.00                 
               163 Pelat Baja               M133 Kg     0.00                 
               164 Baut Angkur              M134 Kg     0.00                 
               165 Pipa Aluminium           M135 M'     0.00                 
               166 Cat Galvanis             M136 Kg     0.00                 
               167 Baut Mutu Tinggi         M137 Buah   0.00                 
               168 Baja Struktur Titik leleh 2500 kg/cm2 M138 Kg 0.00        
               169 Baja Struktur Titik leleh 2800 kg/cm2 M139 Kg 0.00        
               170 Baja Struktur Titik leleh 3500 kg/cm2 M140 Kg 0.00        
               171 Bahan Grouting           M141 Kg     0.00                 
               172 Kayu Kelas 1             M142 Kg     0.00                 
                                                     HARGA                   
               No.          U R A I A N     KODE SATUAN SATUAN KETERANGAN    
                                                      ( Rp.)                 
               173 Pelat Baja (Klem)        M143 Kg     0.00                 
               174 Timbunan/urugan Porous   M144 M3     0.00                 
               175 Bahan pengaman tebing galian (kayu) M145 M3 0.00          
               176 Bahan Curing             M146 M2     0.00                 
               177 Gelagar baja             M147 Kg     0.00                 
               178 Fibre jenis e-glass      M148 M2     0.00                 
               179 Bahan Geosynthetic       M149 M2     0.00                 
               180 Bahan Baja Profil        M150 Kg     0.00                 
               181 Bahan Baja Profil, Mutu BJ 32 M151 Kg 0.00                
               182 Bahan Baja Profil, Mutu BJ 41 M152 Kg 0.00                
               183 Bahan Baja Profil, Mutu BJ 52 M153 Kg 0.00                
               184 Petrolium jelly          M154 Kg     0.00                 
               185 Bahan anti rayap         M155 Kg     0.00                 
               186 Pelat Baja Galvanis      M156 Kg     0.00                 
               187 Baja Struktur Lantai Ortotropik M157 Kg 0.00              
               188                                      0.00                 
               189 Aspal Emulsi CSS-1 atau SS-1 M31a Liter 0.00 Base Camp    
               190 Aspal Emulsi CRS-1 atau RS-1 M31b Liter 0.00 Base Camp    
               191 Aspal Emulsi Modifikasi Polimer 1h M31c Liter 0.00 Base Camp
               192 Aspal Emulsi Modifikasi Polimer 2h M31d Liter 0.00 Base Camp
               193 Serat Selulosa           M158 KG     0.00 mulai ganti nomor
               194 Zeolit                   M159 KG     0.00                 
               195 Wax                      M160 KG     0.00                 
               196 Asbuton B 5/20           M161 KG     0.00                 
               197 CPHMA                    M162 Ton    0.00                 
               198 Asbuton B 50/20          M163 KG     0.00                 
               199 Pasir Kasar              M164 M3     0.00                 
               200 Pipa Porus diameter 5"   M25a M'     0.00                 
               201 Pipa Porus diameter 6"   M25b M'     0.00                 
               202 Pipa Porus diameter 8"   M25c M'     0.00                 
               203 Backer rod 3/8 inci      M165 Kg     0.00                 
               204 Cairan Perekat (Epoxy Resin) 2 komponen M166 Ltr 0.00     
               205 Semen alumina            M167 Kg     0.00                 
               206 Semen (OPC)              M168 Kg     0.00                 
               207 Pasir Kasar              M134 M3     0.00                 
               208 AK-2 (10/20)             M169 M3     0.00                 
               209 Air                      M170 Liter  0.00 14650/kubik     
               210 Super plastiziser, maks 0,3 % Sm M171 Kg 0.00             
               211 curing compound (pigmen putih) M172 Ltr 0.00              
               212 BjTP 280                 M173 Kg     0.00                 
               213 Concrete Grouting Non srinkage HWR M174 Kg 0.00           
               214 Plastik membrane polyethylene 125 mikron M175 Kg 0.00     
               215 Mortar semen cepat mengeras (RSC) M176 Kg 0.00            
               216 Mortar pre-packed untuk stiching M177 Kg 0.00             
               217 Termoplastik (sealant tuang panas) M178 Kg 0.00           
               218 Backer rod 1 1/6 inci    M179 M1     0.00                 
               219 Termoseting (sealant tuang dingin) M180 Kg 0.00           
               220 Bahan grouting tersedia jenis preformed M181 Kg 0.00      
               221 Plastizier'              M182 Kg     0.00                 
               222 Rapid Setting Material (Beton Semen Fast Track < 24 jam) M183 M3 0.00
               223 Thermocouple             M184 Buah   0.00                 
               224 Beton Struktur fc' 45 MPa M185 M3    0.00                 
               225 Beton Struktur fc' 20 MPa M186 M4    0.00                 
               226 Baja Struktur Grade 345 (Kuat Leleh 345 MPa) M187 Kg 0.00 
               227 Baja Struktur Grade 485 (Kuat Leleh 485 MPa) M188 Kg 0.00 
               228 Baja Struktur Grade 690 (Kuat Leleh 690 Mpa untuk Tebal Pelat ≤ 2,5 inchM)189 Kg 0.00
               229 Baja Struktur Grade 690 (Kuat Leleh 620 Mpa untuk Tebal Pelat > 2,5 - 4,M0 1in9c0h) Kg 0.00
               230 Casing, diameter 800 mm  M191 Rp/M'  0.00                 
               231 Bahan turap kayu tanpa pengawetan M192 M3/M' 0.00         
               232 Berat H Beam per m'      M193        0.00                 
               233 Strand 1/2 inci          M194        0.00                 
               234 Perancah/ formwoks       M195        0.00                 
               235 Bahan Turap Kayu dengan pengawetan M196 M3/M' 0.00        
               236 Kreosot                  M197 Kg     0.00                 
               237 Bonding Agent            M198 Ltr    0.00                 
               238 Cat dasar beton          M199 Kg     0.00                 
               239 Cat akhir protektif beton M200 Kg    0.00                 
               240 Cat akhir dekoratif beton M201 Kg    0.00                 
               241 Cat dasar baja           M202 Kg     0.00                 
               242 Cat akhir protektif baja M203 M2     0.00                 
               243 FRP jenis E-glass untuk daerah kering M204 M2 0.00        
               244 FRP jenis E-glass untuk daerah basah M205 M2 0.00         
               245 FRP jenis glass untuk daerah kering M206 M2 0.00          
               246 FRP jenis carbon untuk daerah kering M207 M2 0.00         
               247 FRP jenis carbon untuk daerah basah M208 M2 0.00          
               248 Baja untuk pelat buhul dan pelat ganjal M209 Buah 0.00    
               249 Baut mutu tinggi A325 Tipe 1 diameter M25 M210 Buah 0.00  
               250 Baut Mutu Tinggi A490 Tipe 1 diameter M25 M211 Buah 0.00  
               251 Baut Biasa Grade A diameter M25 M212 Buah 0.00            
               252 Baut Biasa Grade B diameter M25 M213 Buah 0.00            
               253 Baut Biasa Grade C untuk anchor bolts diameter M25 M214 Buah 0.00
               254 Elektroda Las SMAW       M215 Kg     0.00                 
               255 Elektroda Las SAW        M216 Kg     0.00                 
               256 Elektroda Las GMAW       M217 Kg     0.00                 
               257 Elektroda Las FCAW       M218 Kg     0.00                 
               258 Pasir untuk sand blasting M219 M3    0.00                 
               259 Baja Grade 250           M220 Kg     0.00                 
               260 Baja Grade 345           M221 Kg     0.00                 
               261 Baja Grade 485           M222 Kg     0.00                 
                                                     HARGA                   
               No.          U R A I A N     KODE SATUAN SATUAN KETERANGAN    
                                                      ( Rp.)                 
               262 Baut dan Mur             M223 Buah   0.00                 
               263 Cat dasar kayu           M224 Kg     0.00                 
               264 Cat akhir protektif kayu M225 Kg     0.00                 
               265 Perkerasan beton fast track <8 jam M226 Kg 0.00           
               266 Silicon Seal             M227 Kg     0.00                 
               267 Karet Pengisi Sambungan Strip Seal M228 M' 0.00           
               268 Karet Pengisi Sambungan Compression Seal M229 M' 0.00     
               269 Sambungan siar muai tipe modular M230 M' 0.00             
               270 Sambungan siar muai tipe finger plate M231 M' 0.00        
               271 Sambungan siar muai tipe dobel siku M232 M' 0.00          
               272 Penutup karet neoprene   M233 M'     0.00                 
               273 Landasan logam berongga (Pot Bearing) M234 Buah 0.00      
               274 Landasan logam jenis Spherical M235 Buah 0.00             
               275 Stopper Lateral dan Horizontal M236 Buah 0.00             
               276 Lem PVC                  M237 Kg     0.00                 
               277 Tiang sandaran baja      M238 M'     0.00                 
               278 Deck Drain               M239 Buah   0.00                 
               279 Pipa PVC                 M240 M'     0.00                 
               280 Pipa Baja                M241 M'     0.00                 
               281 Sambungan Pipa PVC       M242 Buah   0.00                 
               282 Sambungan Pipa Baja      M243 Buah   0.00                 
               283 Baja Tulangan (Furnished) M57b Kg    0.00                 
               284 Bronjong dengan kawat dilapisi galvanis M15a Kg 0.00      
               285 Bronjong dengan kawat dilapisi PVC M15b Kg 0.00           
               286 Turap Beton              M244 Kg     0.00                 
               287 Tiang Pancang Kayu       M245 M3     0.00                 
               288 Plat sepatu tiang pancang / plat sambung M246 Kg 0.00     
               289 Beton strukutr bervolome besar, fc'30 MPa M247 M3 0.00    
               290 Beton struktur bervolume besar, fc’25 Mpa M248 M3 0.00    
               291 Beton strukut bervolume besar, fc’20 MPa M249 M3 0.00     
               292 Beton strukutr memadat sendiri, fc'30 MPa M250 M3 0.00    
               293 Beton struktur memadat sendiri, fc’25 Mpa M251 M3 0.00    
               294 Beton strukut memadat sendiri, fc’20 MPa M252 M3 0.00     
               295 Beton Fc' 35 MPa         M253 M3     0.00                 
               296 BjTS 280                 M254 Kg     0.00                 
               297 Asphaltic plug           M255 Kg     0.00                 
               298 Asphaltic plug Moveable  M256 Kg     0.00                 
               299 accelerator              M256 Kg     0.00                 
               300 Insulasi                 M257 m2     0.00                 
               301 Anyaman Kawat Baja Dilas M258 Kg     0.00                 
               302 Curing membrane          M259 Kg     0.00                 
               303 Sambungan siar muai tipe Karet (Preformed T-shape) M260 Kg 0.00
               304 Bridging Plate PL 125 x 6 M261 Kg    0.00                 
               305 Perletakan logam tipe fixed 150 Ton M262 Buah 0.00        
               306 Perletakan logam tipe movable 150 Ton M263 Buah 0.00      
               307 Elastomer bearing pad; (450x400x45) mm3 M264 Buah 0.00    
               308 Beton c 10 MPa           M265 M3     0.00                 
               309 Marmer                   M266 M2     0.00                 
               310 Baja Tulangan Angkur     M267 Kg     0.00                 
               311 BjTS 420                 M268 Kg     0.00                 
               312 Grauting berbahan dasar semen M269 Kg 0.00                
               313 Graut berbahan dasar Cellular Plastic M270 Kg 0.00        
                HARGA  PEROLEHAN    ALAT                                     
                                                                             
                                Harga     Harga     Sumber                   
        No.      Jenis Alat      yang                Data      Keterangan    
                               digunakan                                     
         1 Asphalt Mixing Plant       0         0 United Tractor 2018 Sesuai dengan peraturan
         2 Asphalt Finisher           0         0 Inkuiri.com dan ketentuan yang
         3 Power Broom                0         0           berlaku          
         4 Bulldozer 100-150 Hp       0         0 United Tractor 2018 (Perpres yg berlaku)
         5 Compressor 4000-6500 L\M   0         0 HK 2018                    
         6 Concrete Mixer 0.3-0.6 M3  0         0                            
         7 Crane 10-15 Ton            0         0 HK 2018                    
         8 Dump Truck 3-4 M3          0         0                            
         9 Dump Truck 10 T atau 8 M3  0         0                            
         10 Excavator 80-140 Hp       0         0           139 hp           
         11 Flat Bed Truck 3-4 M3     0         0           10 ton           
         12 Generator Set             0         0 Perkins. 1006 TAG 180 hp   
         13 Motor Grader >100 Hp      0         0 Alibaba   135 hp           
         14 Track Loader 75-100 Hp    0         0           70 hp            
         15 Wheel Loader 1.0-1.6 M3   0         0 United Tractor 2018 96 hp  
         16 Three Wheel Roller 6-8 T  0         0                            
         17 Tandem Roller 6-8 T.      0         0 HK 2018   74,29 hp         
         18 Tire Roller 8-10 T.       0         0 HK 2018   135 hp Bomag     
         19 Vibratory Roller 5-8 T.   0         0 civil tekno.id             
         20 Concrete Vibrator         0         0 civil tekno.id             
         21 Stone Crusher             0         0 Azp Bukaka                 
         22 Water Pump 70-100 Mm      0         0 civil tekno.id             
         23 Water Tanker 3000-4500 L. 0         0 HK 2018   135 hp hino      
         24 Pedestrian Roller         0         0 civil tekno.id             
         25 Tamper                    0         0 HK 2018                    
         26 Jack Hammer               0         0                            
         27 Fulvi Mixer               0         0                            
         28 Concrete Pump             0         0 HK 2018   150 hp 100m3/jam 
         29 Trailer 20 Ton            0         0                            
         30 Pile Driver + Hammer      0         0                            
         31 Crane On Track 35 Ton     0         0 HK 2018   220 hp           
         32 Welding Set               0         0 tokopedia Daiden           
         33 Bore Pile Machine         0         0                            
         34 Asphalt Liquid Mixer      0         0                            
         35 Trailler 15 Ton           0         0                            
         36 Rock Drill Breaker        0         0           2,7 hp           
         37 Cold Milling              0         0 United Tractor 2018 240 hp 
         38 Cold Recycler             0         0 United Tractor 2018 456 hp 
         39 Hot Recycler              0         0           295 hp           
         40 Aggregat (chip) Spreader  0         0                            
         41 Asphalt Distributor       0         0                            
         42 Split Form Paver          0         0 HK 2018   174 hp 7m        
         43 Concrete Pan Mixer        0         0           15,4 hp 600 liter
         44 Concrete Breaker          0         0                            
         45 Asphalt Tanker            0         0                            
         46 Cement Tanker             0         0                            
         47 Concrete Mixer (350)      0         0                            
         48 Vibrating Rammer          0         0 Alibaba                    
         49 Truk Mixer                0         0 HK 2018   280 hp           
         50 Bore Pile Machine Dia 60  0         0                            
         51 Crane On Track 75 - 100Ton 0        0 HK 2018                    
         52 Blending Equipment        0         0                            
         53 Asphalt Liquid Mixer (kap 20000) 0  0                            
         54 Alat tambahan Batubara Direct 0     0                            
         55 Alat tambahan Gas Batubara 0        0                            
         37 Cold Milling              0         0 United Tractor 2018 240 hp 
         38 Cold Recycler             0         0 United Tractor 2018 456 hp 
         39 Hot Recycler              0         0           295 hp           
         56 Chain Saw                 0         0                            
         57 Bar Bender                0         0 HK 2018                    
         58 Bar Cutter                0         0 HK 2018                    
         59 Breaker                   0         0 Pindad    170 hp           
         60 Grouting Pump             0         0                            
         61 Jack Hidrolic             0         0           10 hp            
         62 Mesin Las                 0         0                            
         63 Pile Driver Leader, 75 Kw 0         0           84 hp            
         64 Pile Hammer               0         0                            
         65 Pile Hammer, 2,5 Ton      0         0                            
                                                0                            
                                                0                            
         66 Stressing Jack            0         0                            
         67 Welding Machine, 300 A    0         0                            
         68 Stressing Machine         0         0                            
         69 Gerinda dan bor beton     0         0                            
         70 Penarik kabel             0         0                            
         71 Alat Grouting             0         0                            
         72 Scalping Screen           0         0                            
                                                0                            
                                                0                            
           Peralatan Pengeboran lengkap 0       0                            
           Peralatan Sondir lengkap   0         0                            
           Tandem Roller 8-10 T.      0         0                            
           AMP (Warm Mix)             0         0 United Tractor 2018        
           AMP (Emulsi, Asbuton)      0         0 United Tractor 2018        
           Flat Bed Truck 3-4 M3      0         0           10 ton           
         ITEM PEMBAYARAN NO. : 1.2                                           
         JENIS PEKERJAAN : MOBILISASI                                        
                                                                             
         % TERHADAP TOTAL BIAYA PROYEK = #DIV/0! %                           
                                                           Lembar 1.2-1      
                                                   HARGA   JUMLAH            
         No.           U R A I A N     SATUAN VOL. SATUAN   HARGA            
                                                    (Rp.)   (Rp.)            
          A. Sewa Tanah                  M2     0       0       0            
                                                                             
          B. PERALATAN                                                       
             Periksa lembar 1.2-2                               0            
                                                                             
          C. Kantor Lapangan dan Fasilitas      0       0       0            
           1 Base Camp                   M2                                  
           2 Kantor                      M2    20       0       0            
           3 Barak                       M2                                  
           4 Bengkel                     M2                                  
           5 Gudang, dan lain-lain       M2                                  
           6 . . . . . . . . . . . . . . . . . . . . . . . . . .             
          D. MOBILISASI FASILITAS LABORATORIUM set 0    0       0            
           1 Ruang Laboratorium (sesuai Gambar) M2 0    0       0            
           2 Soil & Aggregate Testing    LS                                  
             Compaction Test             Set    1       0       0            
             CBR Test                    Set    1       0       0            
             Specific Gravity            Set    1       0       0            
             Atterberg Limits            Set    1       0       0            
             Grain Size Analysis         Set    1       0       0            
             Field Density Test by Sand Cone Methode Set 1 0    0            
             Moisture Content            Set    1       0       0            
             Abrasion of Aggregate by Los Angeles Machine Set 1 0 0          
           3 Bituminous Testing                                              
             Marshall Asphalt Test                                           
             Extraction Test, Centrifuge/Refflux Method                      
             Specific Gravity for Coarse Aggregate                           
             Specific Gravity for Fine Aggregate                             
             Mix Air Viod Content (Accurate Method)                          
             Core Drill                  Set    1       0       0            
             Metal Thermometer           Set    1       0       0            
             Accessories and Tolls       Set    1       0       0            
             Penetration Test            Set    1       0       0            
             Softening Point                                                 
             Refusal Density Compactor                                       
           4 Concrete Testing                                                
             Slump Cone                  Set    1       0       0            
             Cylinder/Cube Mould for Compressive Strength Set 1 0 0          
             Beam Mould for Flexural Strength (RIGID)                        
             Crushing Machine                                                
           5 Pendukung (Periksa Fasilitas Laboratorium) LS 1 0   -           
           6 Operasional (Periksa Fasilitas Laboratorium) LS 1 0 -           
          E. MOBILISASI PERSONIL                                             
         E.I. Personil Sesuai Struktur Organisasi LS 1  0       0            
           1 GS                                                              
           2 Tenaga Ahli Jalan                                               
           3 Tenaga Ahli Jembatan       . . . .                              
           4 . . . . . . . . . . . . . . . . . . . . . . . . . .             
           5 . . . . . . . . . . . . . . . . . . . . . . . . . .             
           6 . . . . . . . . . . . . . . . . . . . . . . . . . .             
         E.II. Personi Lainnya           Set    1       0       0            
           1 Koordinator Manajemen dan Keselamatan Lalu Lintas . . . .       
           2 Manajer Kendal Mutu        . . . .                              
           3 . . . . . . . . . . . . . . . . . . . . . . . . . .             
           4 . . . . . . . . . . . . . . . . . . . . . . . . . .             
           5 . . . . . . . . . . . . . . . . . . . . . . . . . .             
           6 . . . . . . . . . . . . . . . . . . . . . . . . . .             
          F. Manajemen dan Keselamatan lalu lintas LS           0            
          G. DEMOBILISASI                LS     1       0       0            
                                                                             
                                                                             
             Total Biaya Mobilisasi                             0            
         Catatan :Jumlah yang tercantum pada masing-masing item mobilisasi di atas sudah termasuk over-head dan laba
             serta seluruh pajak dan bea (kecuali PPn), dan pengeluaran lainnya.
         ITEM PEMBAYARAN NO. : 1.2                                           
         JENIS PEKERJAAN : M O B I L I S A SI                                
                                                           Lembar 1.2-2      
                                 KODE              HARGA   JUMLAH            
         No.       JENIS ALAT    ALAT  SATUAN VOL. SATUAN   HARGA            
                                                    (Rp.)   (Rp.)            
          B. PERALATAN                                                       
           1 ASPHALT MIXING PLANT E01   Unit    0       0       0            
           2 ASPHALT FINISHER     E02   Unit    1       0       0            
           3 POWER BROOM          E03   Unit    0       0       0            
           4 BULLDOZER 100-150 HP E04   Unit    0       0       0            
           5 COMPRESSOR 4000-6500 L\M E05 Unit  1       0       0            
           6 CONCRETE MIXER 0.3-0.6 M3 E06 Unit 1       0       0            
           7 CRANE 10-15 TON      E07   Unit    0       0       0            
           8 DUMP TRUCK 3 - 4 M3  E08   Unit    2       0       0            
           9 DUMP TRUCK 6-8 M3    E09   Unit    1       0       0            
          10 EXCAVATOR 80-140 HP  E10   Unit    0       0       0            
          11 FLAT BED TRUCK 3-4 TON E11 Unit    0       0       0            
          12 GENERATOR SET        E12   Unit    1       0       0            
          13 MOTOR GRADER >100 HP E13   Unit    1       0       0            
          14 TRACK LOADER 75-100 HP E14 Unit    0       0       0            
          15 WHEEL LOADER 1.0-1.6 M3 E15 Unit   0       0       0            
          16 THREE WHEEL ROLLER 6-8 T E16 Unit  0       0       0            
          17 TANDEM ROLLER 6-8 T. E17   Unit    1       0       0            
          18 TIRE ROLLER 8-10 T.  E18   Unit    1       0       0            
          19 VIBRATORY ROLLER 5-8 T. E19 Unit   1       0       0            
          20 CONCRETE VIBRATOR    E20   Unit    0       0       0            
          21 STONE CRUSHER        E21   Unit    0       0       0            
          22 WATER PUMP 70-100 mm E22   Unit    1       0       0            
          23 WATER TANKER 3000-4500 L. E23 Unit 1       0       0            
          24 PEDESTRIAN ROLLER    E24   Unit    0       0       0            
          25 TAMPER               E25   Unit    0       0       0            
          26 JACK HAMMER          E26   Unit    0       0       0            
          27 FULVI MIXER          E27   Unit    0       0       0            
          28 CONCRETE PUMP        E28   Unit    0       0       0            
          29 TRAILER 20 TON       E29   Unit    0       0       0            
          30 PILE DRIVER + HAMMER E30   Unit    0       0       0            
          31 CRANE ON TRACK 35 TON E31  Unit    0       0       0            
          32 WELDING SET          E32   Unit    0       0       0            
          33 BORE PILE MACHINE    E33   Unit    0       0       0            
          34 ASPHALT LIQUID MIXER E34   Unit    0       0       0            
          35 TRONTON 15 TON       E35   Unit                    0            
          36 COLD MILLING MACHINE E37   Unit                    0            
          37 ROCK DRILL BREAKER   E36   Unit                    0            
          38 COLD RECYCLER        E38   Unit                    0            
          39 HOT RECYCLER         E39   Unit                    0            
          40 AGGREGAT (CHIP) SPREADER E40 Unit                  0            
          41 ASPHALT DISTRIBUTOR  E41   Unit                    0            
          42 SLIP FORM PAVER      E42   Unit                    0            
          43 CONCRETE PAN MIXER   E43   Unit                    0            
          44 CONCRETE BREAKER     E44   Unit                    0            
          45 ASPAHLT TANKER       E45   Unit                    0            
          46 CEMENT TANKER        E46   Unit                    0            
          47 CONDRETE MIXER (350) E47   Unit                    0            
          48 VIBRATING RAMMER     E48   Unit                    0            
          49 TRUK MIXER (AGITATOR) E49  Unit                    0            
          50 BORE PILE MACHINE    E50   Unit                    0            
          51 CRANE ON TRACK 75-100 TON E51 Unit                 0            
          52                                                                 
          53                                                                 
             Total untuk Item B pada Lembar 1                   0            
          ITEM PEMBAYARAN NO. : 2.3.(2)                   Analisa EI-232     
          JENIS PEKERJAAN : Gorong-gorong Pipa Beton Tanpa Tulangan diameter dalam 25 cm
          SATUAN PEMBAYARAN : M1                     URAIAN ANALISA HARGA SATUAN
           No.            U R A I A N      KODE KOEF. SATUAN KETERANGAN      
                                                                             
            I. ASUMSI                                                        
            1 Pekerjaan dilakukan secara mekanik/manual                      
            2 Lokasi pekerjaan : sepanjang jalan                             
            3 Diameter bagian dalam gorong-gorong d 0.25 m                   
            4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 17.50 Km       
            5 Jam kerja efektif per-hari    Tk   7.00 jam                    
            6 Tebal gorong-gorong           tg   3.20 Cm                     
           II. URUTAN KERJA                                                  
            1 Gorong-gorong dicetak di Base Camp                             
            2 Flat Bed Truck mengangkut gorong-gorong jadi                   
              ke lapangan                                                    
            3 Dasar gorong-gorong digali sesuai kebutuhan dan ma-            
              terial backfill dipadatkan dengan Tamper + Rammer              
            4 Tebal lapis porus pada dasar gorong-gorong pipa tp 0.10 M Sand bedding
            5 Material pilihan untuk penimbunan kembali (padat)              
            6 Sekelompok pekerja akan melaksanakan pekerjaan                 
              dengan cara manual dengan menggunakan alat bantu               
           III. PEMAKAIAN BAHAN, ALAT DAN TENAGA                             
           1. BAHAN                                                          
              Untuk mendapatkan 1 M' gorong-gorong diperlukan                
              - Beton 15 MPa = (22/7*((2*tg/100+d)/2)^2)-(22/7*(d/2)^2))*1*1.03 0.0033 M3/M'
              - Timbunan Porus = {(tp*(0.15+2*tg/100+d+0.15)*1)*1.05} 0.0382 M3/M'
              - Material Pilihan = ((2*tg/100+d+0.15)*(0.15+2*tg/100+d+0.15) (M09) 0.5918 M3/M'
                       -(22/7*(0.5*(2*tg/100+d))^2))*1*1.05                  
              Cetakan gorong-gorong beton diameter dalam 25 cm 1.00 bh/M'    
           2. ALAT                                                           
           2.a. TAMPER (tebal lapis porous) (E25)                            
              Kecepatan                     v    1 .00 Km / Jam Diperhitungkan
              Efisiensi alat                Fa   0.83 -  hanya tamper        
              Lebar pemadatan               Lb   0.50 M                      
              Banyak lintasan               n     1 0 lintasan               
              Tebal lapis hamparan          tp   0.10 M                      
              Kap. Prod. / Jam = v x 1000 x Fa x Lb x tp Q1 108.5819 M' / Jam
                               n x (El241)                                   
              Koefisien Alat / m' = 1 : Q1 x Vp (E25) 0.0055 jam             
           2.b. TAMPER (Material pilihan)   (E25)                            
              Kecepatan                     v    1 .00 Km / Jam Diperhitungkan
              Efisiensi alat                Fa   0.83 -  hanya tamper        
              Lebar pemadatan               Lb   0.50 M                      
              Banyak lintasan               n     1 0 lintasan               
              Jumlah lapisan timbunan       N      5                         
              Tebal lapis hamparan          tp   0.10 M                      
              Kap. Prod. / Jam = v x 1000 x Fa x Lb x tp Q1 1.4026 M3 / Jam  
                              n x N x (M09)                                  
              Koefisien Alat / m' = 1 : Q1 x Vp (E25) 0.7130 jam             
           2.c. FLAT BED TRUCK 3-4 M3       (E11)                            
              Kapasitas bak sekali muat     V    10.00 M'                    
              Faktor efisiensi alat         Fa   0.83                        
              Kecepatanrata-rata bermuatan  v1   25.00 Km/Jam                
              Kecepatan rata-rata kosong    v2   35.00 Km/Jam                
              Waktu siklus :                Ts1                              
              - Waktu tempuh isi = (L : v1 ) x 60 T1 42.00 menit             
              - Waktutempuh kosong = (L : v2) x 60 T2 30.00 menit            
              - Muat, bongkar dan lain-lain T3   20.00 menit                 
                                            Ts1  92.00 menit                 
              Kapasitas Produksi / Jam = V x Fa x 60 Q2 5.413 M' / Jam       
                                   Ts1                                       
              Koefisien Alat / m' = 1 : Q2  (E08) 0.1847 jam                 
                                                       Berlanjut ke halaman berikut
          ITEM PEMBAYARAN NO. : 2.3.(2)                   Analisa EI-232     
          JENIS PEKERJAAN : Gorong-gorong Pipa Beton Tanpa Tulangan diameter dalam 25 cm
          SATUAN PEMBAYARAN : M1                     URAIAN ANALISA HARGA SATUAN
                                                              Lanjutan       
           No.            U R A I A N      KODE KOEF. SATUAN KETERANGAN      
           2.d. ALAT BANTU                                                   
              Diperlukan alat-alat bantu kecil             Lump Sump         
              - Sekop                                                        
              - Pacul                                                        
              - Alat-Alat lainnya                                            
           3. TENAGA                                                         
              Produksi menentukan : Flat Bed Truck Q2 5.41 M'/jam            
              Produksi Gorong-gorong Tanpa Tulangan / hari = Tk x Q2 Qt 37.89 M
              Kebutuhan tenaga :                                             
                       - Pekerja            P    14.00 orang                 
                       - Tukang             T    8.00 orang                  
                       - Mandor             M    1.00 orang                  
              Koefisien tenaga / M1 :                                        
                       - Pekerja = (Tk x P) : Qt (L01) 2.5863 Jam            
                       - Tukang = (Tk x T) : Qt (L02) 1.4779 Jam             
                       - Mandor = (Tk x M) : Qt (L03) 0.1847 Jam             
           4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT                        
              Lihat lampiran.                                                
           5. ANALISA HARGA SATUAN PEKERJAAN                                 
              Lihat perhitungan dalam FORMULIR STANDAR UNTUK                 
              PEREKAMAN ANALISA MASING-MASING HARGA                          
              SATUAN.                                                        
              Didapat Harga Satuan Pekerjaan :                               
                     Rp.   0.00 / M'                                         
           6. WAKTU PELAKSANAAN YANG DIPERLUKAN                              
              Masa Pelaksanaan : . . . . . . . . . . . . bulan               
           7. VOLUME PEKERJAAN YANG DIPERLUKAN                               
              Volume pekerjaan : 14.50 M'                                    
                                                          Analisa EI-232     
                                  FORMULIR STANDAR UNTUK                     
                            PEREKAMAN ANALISA MASING-MASING HARGA SATUAN     
                                                                             
               PROYEK          :                                             
               No. PAKET KONTRAK : ………………………………………………                        
               NAMA PAKET      : …………………………………………………………………..                 
                               ………………………………………………………………….                    
               PROP / KAB / KODYA : ………………………………………………                       
               ITEM PEMBAYARAN NO. : 2.3.(2)   PERKIRAAN VOL. PEK. : 14.50   
               JENIS PEKERJAAN : Gorong-gorong Pipa Beton Tanpa Tulangan dTiOamTAeLte Hr dAaRlaGmA 2(R5 pc.m) : 0.00
               SATUAN PEMBAYARAN : M1         0 % THD. BIAYA PROYEK : #DIV/0!
                                         PERKIRAAN HARGA   JUMLAH            
                NO.      KOMPONEN   SATUAN KUANTITAS SATUAN HARGA            
                                                  (Rp.)    (Rp.)             
                 A. TENAGA                                                   
                 1. Pekerja     (L01) jam   2.5863   0.00     0.00           
                 2. Tukang      (L02) jam   1.4779   0.00     0.00           
                 3. Mandor      (L03) jam   0.1847   0.00     0.00           
                                           JUMLAH HARGA TENAGA 0.00          
                 B. BAHAN                                                    
                 1. Beton 15 Mpa     M3     0.0033   0.00     0.00           
                 2. Urugan Porus     M3     0.0382   0.00     0.00           
                 3. Mat. Pilihan (M09) M3   0.5918   0.00     0.00           
                 5  Cetakan diameter 25 cm bh/M' 1.0000 0.00  0.00           
                                            JUMLAH HARGA BAHAN 0.00          
                 C. PERALATAN                                                
                 1. Tamper      (E25) jam   0.0055   0.00     0.00           
                 2. Tamper      (E25) jam   0.7130   0.00     0.00           
                 3  Flat Bed Truck (E11) jam 0.1847  0.00     0.00           
                 4  Alat Bantu       Ls     1.0000   0.00     0.00           
                                                                             
                                          JUMLAH HARGA PERALATAN 0.00        
                 D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 0.00
                 E. OVERHEAD & PROFIT 10.0 % x D              0.00           
                 F. HARGA SATUAN PEKERJAAN ( D + E )          0.00           
                Note: 1 Satuan dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
                    berat untuk bahan-bahan.                                 
                  2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
                    dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
                    terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
                  3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
                  4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
                    yang dibayar dari kontrak) dan biaya-biaya lainnya.      
        ITEM PEMBAYARAN NO. : 2.3.(22)                     Analisa EI - 2322 
        JENIS PEKERJAAN : Saluran berbentuk U Tipe DS 1                      
        SATUAN PEMBAYARAN : M1                                               
         No.             U R A I A N        KODE KOEF. SATUAN KETERANGAN     
                                                                             
         I. ASUMSI                                                           
          1 Pekerjaan dilakukan secara mekanik                               
          2 Lokasi pekerjaan : sepanjang jalan                               
          3 Material untuk pembuatan saluran dari beton berada di Base Camp  
            seperti agregat, pasir, semen dan besi.                          
          4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 17.50 KM         
          5 Jam kerja efektif per-hari       Tk    7.00 Jam                  
            Saluran beton Tipe U DS 1                        Lihat Gambar    
            Lebar bagian dalam               Bo  400.00 mm                   
            Lebar saluran                    B   700.00 mm                   
            Kedalaman saluran                h   400.00 mm                   
            Tebal dinding tegak              t1  150.00 mm                   
            Tebal dasar saluran              t2  150.00 mm                   
            Panjang saluran                  Ln  3,000.00 mm                 
            Volume Saluran per meter         Prf   0.32 M3                   
          6 Perbandingan Campuran fc 25 MPa : Semen Sm 299.0 Kg/M3           
                            : Pasir          Ps   842.0 Kg/M3                
                            : Agregat Kasar  Kr  1,097.0 Kg/M3               
                            : Air            Air  185.0 Kg/M3                
                            : Plasticizer    Plt   0.9 Kg/M3                 
          7 Faktor Kehilangan Bahan (Fh) : Semen Fh1 1.03                    
                            : Pasir + Agregat Fh2  1.05                      
          8 Berat Isi :                                                      
            - Beton                          D1    2.20 T/M3                 
            - Pasir                          D2    1.45 T/M3                 
            - Agregat Kasar                  D3    1.45 T/M3                 
            - Air                            D4    1.00 T/M3                 
         II. URUTAN KERJA                                                    
          1 Galian lokasi saluran sesuai elevasi dan dimensi rencana         
          2 Semen, pasir, agregat dan air diaduk dengan komposisi sesuai     
            rancangan mutu dengan menggunakan beton mixer                    
          3 Beton di-cor ke dalam bekisting dan diratakan dg vibrator        
          4 Penyelesaian dan perapihan setelah pengecoran                    
         III. PEMAKAIAN BAHAN, ALAT DAN TENAGA                               
         1. BAHAN                                                            
            Panjang Saluran dengan Volume Beton per M3 3.00 M1 Lihat Gambar  
         1.a. Semen  = Sm x Fh1 x Prf       (M12) 97.048 Kg sesuai dimensi   
         1.b. Pasir Beton = (Ps/1000 : D2) x Fh2 x Prf (M01) 0.1921 M3       
         1.c. Aggregat Kasar = (Kr/1000 : D3) x Fh2 x Prf (M03) 0.2503 M3    
         1.d. Formworks                     (M195) 1.0000 bh/M'              
         1.e. Air    = Air x Prf            (M170) 58.2972 Liter             
         1.f. Besi Beton                    (M57a) 45.0000 Kg Lihat Gambar   
         1.g. Kawat beton = 10% x Prf       (M14) 0.0315 Kg                  
         2. PERALATAN                                                        
         2.a. BETON MIXER                   (E06)                            
            Kapasitas Alat                   V   500.00 liter                
            Faktor Efisiensi Alat            Fa    0.83 -                    
            Waktu siklus : (T1 + T2 + T3 + T4) Ts                            
            - Memuat                         T1    4.00 Menit                
            - Mengaduk                       T2    4.00 Menit                
            - Menuang                        T3    1.00 Menit                
            - Tunggu, dll.                   T4    1.00 Menit                
                                             Ts   10.00 Menit                
            Kap. Prod. / jam = V x Fa x 60   Q1   2.490 M3                   
                              1000 x Ts                                      
            Koefisien Alat / M3 = 1 : Q1    (E06) 0.4016 Jam                 
                                                         Berlanjut ke halaman berikut
        PAY ITEM NUMBER : 2.3.(22)                         Analisa EI - 2322 
        WORK ITEM    : Saluran berbentuk U Tipe DS 1                         
        UNIT         : M1                                          0         
                                                               next page     
         No.             U R A I A N        KODE KOEF. SATUAN KETERANGAN     
         2.b. WATER TANK TRUCK              (E23)                            
            Volume Tanki Air                 V     4.00 M3                   
            Kebutuhan air / M3 beton         Wc    0.19 M3                   
            Faktor Efiesiensi Alat           Fa    0.83 -                    
            Kapasitas pompa air              n     1.00 Kali                 
            Kap. Prod. / jam = V x Fa x n    Q2   17.95 M3                   
                               Wc                                            
            Koefisien Alat / M3 = 1 : Q2    (E23) 0.0557 Jam                 
         2.c. CONCRETE VIBRATOR             (E20)                            
            Penggunaan concrete vibrator sesuai dengan kapasitas produksi beton
            yang diperlukan dalam pengecoran                                 
            Kap. Prod. / jam = Prod.Ca./hour Concrete Mixer Q3 2.490 M3      
            Koefisien Alat / M3 = 1 : Q3    (E20) 0.4016 Jam                 
         2.c. ALAT BANTU                                                     
            Alat bantu yang diperlukan                                       
            - Sekop                                                          
            - Pacul                                                          
            - Sendok Semen                                                   
            - Ember                                                          
            - Gerobak Dorong                                                 
         3. TENAGA                                                           
            Produksi Beton dalam 1 hari = Tk x Q1 Qt 17.43 M3                
            Kebutuhan tenaga : - Mandor      M     1.00 Orang                
                     - Tukang :              Tb    5.00 Orang                
                     - Pekerja               P    10.00 Orang                
            Koefisien Tenaga / M3 :                                          
                     - Mandor = (Tk x M) : Qt (L03) 0.4016 Jam               
                     - Tukang = (Tk x Tb) : Qt (L02) 2.0080 Jam              
                     - Pekerja = (Tk x P) : Qt (L01) 4.0161 Jam              
         4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT                          
            Lihat lampiran.                                                  
                                                                             
                                                               continued     
        PAY ITEM NUMBER : 2.3.(22)                         Analisa EI - 2322 
        WORK ITEM    : Saluran berbentuk U Tipe DS 1                         
        UNIT         : M1                                          0         
                                                               next page     
         No.             U R A I A N        KODE KOEF. SATUAN KETERANGAN     
         5. ANALISA HARGA SATUAN PEKERJAAN                                   
            Lihat perhitungan dalam FORMULIR STANDAR UNTUK                   
            PEREKAMAN ANALISA MASING-MASING HARGA SATUAN                     
            Didapat Harga Satuan Pekerjaan :                                 
                  Rupiah  0.00 / M1                                          
                                                                             
         6. MASA PELAKSANAAN YANG DIPERLUKAN                                 
            Masa Pelaksanaan : Bulan                                         
         7. VOLUME PEKERJAAN YANG DIPERLUKAN                                 
            Volume pekerjaan : M1                                            
                                                           Analisa EI - 2322 
                                  FORMULIR STANDAR UNTUK                     
                           PEREKAMAN ANALISA MASING-MASING HARGA SATUAN      
                                                                             
             PROYEK                                                          
             No. PAKET KONTRAK                                               
             NAMA PAKET                                                      
             PROP / KAB / KODYA                                              
             ITEM PEMBAYARAN NO. : 2.3.(22)     PERKIRAAN VOL. PEK. : 23.15  
             JENIS PEKERJAAN  : Saluran berbentuk U Tipe DS 1 TOTAL HARGA (Rp.) : 0.00
             SATUAN PEMBAYARAN : M1             % THD. BIAYA PROYEK : #DIV/0!
                                         PERKIRAAN HARGA     JUMLAH          
              NO.    KOMPONEN      SATUAN KUANTITAS SATUAN   HARGA           
                                                   (Rp.)     (Rp.)           
               A. TENAGA                                                     
               1. Pekerja      (L01) Jam    4.0161     0.00     0.00         
               2. Tukang       (L02) Jam    2.0080     0.00     0.00         
               3. Mandor       (L03) Jam    0.4016     0.00     0.00         
                                        Sub Total Tenaga        0.00         
               B. MATERIAL                                                   
                                                                             
               1. Semen        (M12) Kg     97.0475    0.00     0.00         
               2. Pasir Beton  (M01) M3     0.1921     0.00     0.00         
               3. Aggregat Kasar (M03) M3   0.2503     0.00     0.00         
               5. Formworks    (M195) M2    1.0000     0.00     0.00         
               6  Air          (M170) Ltr   58.2972    0.00     0.00         
               7  Besi Beton   (M57a) Kg    45.0000    0.00     0.00         
               8  Kawat beton  (M14) Kg     0.0315     0.00     0.00         
                                       Sub Total Material       0.00         
               C. PERALATAN                                                  
               1. Beton Mixer  (E06) Jam    0.4016     0.00     0.00         
               2. Water Tanker (E23) Jam    0.0557     0.00     0.00         
               3. Concrete Vibrator (E20) Jam 0.4016   0.00     0.00         
               4. Alat Bantu         Ls     1.0000     0.00     0.00         
                                       Sub Total Peralatan      0.00         
               D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 0.00
               E. OVERHEAD & PROFIT  10.0 % x D                 0.00         
               F. TOTAL HARGA PEKERJAAN ( D + E )               0.00         
               G. HARGA SATUAN ( D + E ) Per Meter              0.00         
              Note: 1 Satuan dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
                  berat untuk bahan-bahan.                                   
                2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
                  dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
                  terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
                3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
                4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
                  yang dibayar dari kontrak) dan biaya-biaya lainnya.        
    ITEM PEMBAYARAN NO. : 3.1.(1)                         Analisa EI-311     
    JENIS PEKERJAAN : Galian Biasa                                           
    SATUAN PEMBAYARAN : M3                            URAIAN ANALISA HARGA SATUAN
     No.              U R A I A N        KODE KOEF. SATUAN KETERANGAN        
                                                                             
     I. ASUMSI                                                               
      1 Menggunakan alat berat (cara mekanik)                                
      2 Lokasi pekerjaan : sepanjang jalan                                   
      3 Kondisi Jalan : baik                                                 
      4 Jam kerja efektif per-hari       Tk      7.00 Jam                    
      5 Faktor pengembangan bahan        Fk      1.20 -                      
     II. URUTAN KERJA                                                        
      1 Tanah yang dipotong umumnya berada disisi jalan                      
      2 Penggalian dilakukan dengan menggunakan Excavator                    
      3 Selanjutnya Excavator menuangkan material hasil                      
        galian kedalam Dump Truck                                            
      4 Dump Truck membuang material hasil galian keluar Disesuaikan dengan kondisi
        lokasi jalan sejauh               L      2.00 Km dilapangan sesuai ketentuan
                                                        Pasal 1.5.3          
     III. PEMAKAIAN BAHAN, ALAT DAN TENAGA                                   
     1. BAHAN                                                                
        Tidak ada bahan yang diperlukan                                      
     2. ALAT                                                                 
     2.a. EXCAVATOR                      (E10)                               
        Kapasitas Bucket                  V      0.93 M3                     
        Faktor Bucket                    Fb      1.20 -                      
        Faktor Efisiensi alat            Fa      0.83                        
        Faktor konversi , kedalaman 40 %-75 %, Mudah Fv 0.90                 
        Waktu siklus                     Ts1         menit                   
        - Menggali , memuat (swing 180ᵒ) T1      1.000 menit                 
        - Lain lain                      T2      0.100 menit                 
        Waktu siklus = T1 + T2           Ts1     1.10 menit Permen PUPR      
                                                        No 28/PRT/M/2016     
        Kap. Prod. / jam = V x Fb x Fa x 60 x Fk Q1 67.37 M3/Jam             
                           Ts1 x Fv                                          
        Koefisien Alat / M3 = 1 : Q1     (E10)  0.0148 Jam                   
     2.b. DUMP TRUCK 6- 8 M3             (E09)                               
        Kapasitas bak                     V      6.00 M3                     
        Faktor efisiensi alat            Fa      0.83 -                      
        Kecepatan rata-rata bermuatan    v1      20.00 KM/Jam                
        Kecepatan rata-rata kosong       v2      30.00 KM/Jam                
        Waktu siklus                     Ts2         menit                   
        - Muat           = (V/Q1) x 60   T1      5.34 menit                  
        - Waktu tempuh isi = (L : v1) x 60 T2    6.00 menit                  
        - Waktu tempuh kosong = (L : v2) x 60 T3 4.00 menit                  
        - Lain-lain                      T4      10.00 menit                 
                                         Ts2     25.34 menit                 
        Kapasitas Produksi / Jam = V x Fa x 60 Q2 9.82 M3/Jam                
                              Fk x Ts2                                       
        Koefisien Alat / M3 = 1 : Q2     (E09)  0.1018 Jam                   
     2.d. ALAT BANTU                                                         
        Diperlukan alat-alat bantu kecil                Lump Sump            
        - Sekop                                                              
        - Keranjang                                                          
                                                         Berlanjut ke halaman berikut
    ITEM PEMBAYARAN NO. : 3.1.(1)                         Analisa EI-311     
    JENIS PEKERJAAN : Galian Biasa                                           
    SATUAN PEMBAYARAN : M3                            URAIAN ANALISA HARGA SATUAN
                                                              Lanjutan       
     No.              U R A I A N        KODE KOEF. SATUAN KETERANGAN        
     3. TENAGA                                                               
        Produksi menentukan : EXCAVATOR  Q1      67.37 M3/Jam                
        Produksi Galian / hari = Tk x Q1 Qt     471.56 M3                    
        Kebutuhan tenaga :                                                   
                  - Pekerja               P      2.00 orang                  
                  - Mandor                M      1.00 orang                  
        Koefisien tenaga / M3 :                                              
                  - Pekerja = (Tk x P) : Qt (L01) 0.0297 Jam                 
                  - Mandor = (Tk x M) : Qt (L03) 0.0148 Jam                  
     4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT                              
        Lihat lampiran.                                                      
     5. ANALISA HARGA SATUAN PEKERJAAN                                       
        Lihat perhitungan dalam FORMULIR STANDAR UNTUK                       
        PEREKAMAN ANALISA MASING-MASING HARGA                                
        SATUAN.                                                              
        Didapat Harga Satuan Pekerjaan :                                     
                Rp.    0.00 / M3                                             
     6. WAKTU PELAKSANAAN YANG DIPERLUKAN                                    
        Masa Pelaksanaan : . . . . . . . . . . . . bulan                     
     7. VOLUME PEKERJAAN YANG DIPERLUKAN                                     
        Volume pekerjaan : 24.18 M3                                          
                                            Analisa EI-311                   
                       FORMULIR STANDAR UNTUK                                
                 PEREKAMAN ANALISA MASING-MASING HARGA SATUAN                
                                                                             
      PROYEK        :                                                        
      No. PAKET KONTRAK : ………………………………………………                                 
      NAMA PAKET    : …………………………………………………………………..                            
                    ………………………………………………………………….                               
      PROP / KAB / KODYA : ………………………………………………                                
      ITEM PEMBAYARAN NO. : 3.1.(1) PERKIRAAN VOL. PEK. : 24.18              
      JENIS PEKERJAAN : Galian Biasa TOTAL HARGA (Rp.) : 0.00                
      SATUAN PEMBAYARAN : M3     % THD. BIAYA PROYEK : #DIV/0!               
                            PERKIRAAN HARGA JUMLAH                           
       NO.     KOMPONEN SATUAN KUANTITAS SATUAN HARGA                        
                                    (Rp.)    (Rp.)                           
       A. TENAGA                                                             
        1. Pekerja   (L01) Jam 0.0297  0.00     0.00                         
        2. Mandor    (L03) Jam 0.0148  0.00     0.00                         
                              JUMLAH HARGA TENAGA 0.00                       
       B. BAHAN                                                              
                                                                             
                                                                             
                               JUMLAH HARGA BAHAN 0.00                       
                                                                             
       C. PERALATAN                                                          
        1. Excavator (E10) Jam 0.0148  0.00     0.00                         
        2. Dump Truck (E09) Jam 0.1018 0.00     0.00                         
        3. Alat Bantu    Ls   1.0000   0.00     0.00                         
                                                                             
                             JUMLAH HARGA PERALATAN 0.00                     
       D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 0.00        
       E. OVERHEAD & PROFIT 10.0 % x D          0.00                         
        F. HARGA SATUAN PEKERJAAN ( D + E )     0.00                         
       Note: 1 Satuan dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
          berat untuk bahan-bahan.                                           
         2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
          dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
          terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
         3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
         4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
          yang dibayar dari kontrak) dan biaya-biaya lainnya.                
    ITEM PEMBAYARAN NO. : 3.3.(1)                         Analisa EI-331     
    JENIS PEKERJAAN : Penyiapan Badan Jalan                                  
    SATUAN PEMBAYARAN : M2                            URAIAN ANALISA HARGA SATUAN
     No.              U R A I A N        KODE KOEF. SATUAN KETERANGAN        
                                                                             
     I. ASUMSI                                                               
      1 Pekerjaan dilaksanakan hanya pada tanah galian                       
      2 Pekerjaan dilakukan secara mekanis                                   
      3 Lokasi pekerjaan : sepanjang jalan                                   
      4 Kondisi Jalan : jelek / belum padat                                  
      5 Jam kerja efektif per-hari       Tk      7.00 Jam                    
      6 Faktor Pengembangan Bahan        Fk      1.20                        
     II. URUTAN KERJA                                                        
        A. Penyiapan Badan Jalan di daerah galian                            
      1 Tandem Roller memadatkan permukaan yang telah disiapkan oleh Motor Grader
      2 Motor Grader memotong permukaan sampai elevasi dan penampang         
        sesuai dengan Gambar                                                 
      3 Sekelompok pekerja akan membantu membersihkan top subgrade           
        B. Penyiapan Badan Jalan di daerah permukaan eksisting               
      1 Motor Grader merapikan dan meratakan permukaan eksisting yang sudah rusak
      2 Tandem / Vibro Roller memadatkan permukaan yang telah disiapkan      
        oleh Motor Grader                                                    
      3 Sekelompok pekerja akan membantu membersihkan top grade              
     III. PEMAKAIAN BAHAN, ALAT DAN TENAGA                                   
     1. BAHAN                                                                
        Tidak diperlukan bahan / material                                    
     2. ALAT                                                                 
     2.a. MOTOR GRADER                   (E13)                               
        Panjang operasi grader sekali jalan Lh   50.00 M                     
        Lebar Area Pemadatan              w      3.50 M                      
        Lebar Efektif kerja Blade         b      2.60 M                      
        Lebar overlap                    bo      0.30 M                      
        Faktor Efisiensi Alat            Fa      0.83 -                      
        Kecepatan rata-rata alat          v      4.00 Km / Jam               
        Jumlah lintasan                   n      6.00 lintasan               
        Jumlah lajur lintasan = w/(b-bo)  N      2.00 lajur                  
        Waktu siklus                                                         
        - Perataan 1 kali lintasan = Lh : (v x 1000) x 60 T1 0.75 menit      
        - Lain-lain                      T2      1.00 menit                  
                                         Ts1     1.75 menit                  
        Kapasitas Produksi / Jam = Lh x (n(b-bo)+bo) x Fa x 60 Q1 581.00 M2  
                               N x n x Ts1                                   
        Koefisien Alat / m2 = 1 : Q1     (E13)  0.0017 Jam                   
     2.b. TANDEM / VIBRO ROLLER          (E19)                               
        Kecepatan rata-rata alat          v      4.00 Km / jam               
        Lebar Area Pemadatan              w      3.50 M                      
        Lebar efektif pemadatan           b      1.48 M                      
        Jumlah lintasan                   n      6.00 lintasan               
        Lajur lintasan   = w/(b-bo)       N      3.00 Lajur                  
        Lebar Overlap                    bo      0.30 M                      
        Faktor efisiensi alat            Fa      0.83 -                      
        Kapasitas Produksi / Jam = (b x v x 1000) x t x Fa Q2 40.95 M2       
                               n x N                                         
        Koefisien Alat / m2 = 1 : Q2     (E19)  0.0244 Jam                   
     2.dc ALAT BANTU                                                         
        Diperlukan alat-alat bantu kecil                   Lump Sum          
        Sekop                                                                
     3. TENAGA                                                               
        Produksi menentukan : MOTOR GRADER Q1   581.00 M2/Jam                
        Produksi Pekerjaan / hari = Tk x Q1 Qt  4,067.00 M2                  
        Kebutuhan tenaga :                                                   
                  - Pekerja               P      2.00 orang                  
                  - Mandor                M      1.00 orang                  
        Koefisien tenaga / M2                                                
                  - Pekerja = (Tk x P) : Qt (L01) 0.0034 Jam                 
                  - Mandor = (Tk x M) : Qt (L02) 0.0017 Jam                  
                                                         Berlanjut ke halaman berikut
    ITEM PEMBAYARAN NO. : 3.3.(1)                         Analisa EI-331     
    JENIS PEKERJAAN : Penyiapan Badan Jalan                                  
    SATUAN PEMBAYARAN : M2                            URAIAN ANALISA HARGA SATUAN
                                                              Lanjutan       
     No.              U R A I A N        KODE KOEF. SATUAN KETERANGAN        
     4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT                              
        Lihat lampiran.                                                      
     5. ANALISA HARGA SATUAN PEKERJAAN                                       
        Lihat perhitungan dalam FORMULIR STANDAR UNTUK                       
        PEREKAMAN ANALISA MASING-MASING HARGA                                
        SATUAN.                                                              
        Didapat Harga Satuan Pekerjaan :                                     
                Rp.    0.00 / M2                                             
     6. WAKTU PELAKSANAAN YANG DIPERLUKAN                                    
        Masa Pelaksanaan : . . . . . . . . . . . . bulan                     
     7. VOLUME PEKERJAAN YANG DIPERLUKAN                                     
        Volume pekerjaan : 3,349.29 M2                                       
                                            Analisa EI-331                   
                       FORMULIR STANDAR UNTUK                                
                 PEREKAMAN ANALISA MASING-MASING HARGA SATUAN                
                                                                             
      PROYEK        :                                                        
      No. PAKET KONTRAK : ………………………………………………                                 
      NAMA PAKET    : …………………………………………………………………..                            
                    ………………………………………………………………….                               
      PROP / KAB / KODYA : ………………………………………………                                
      ITEM PEMBAYARAN NO. : 3.3.(1) PERKIRAAN VOL. PEK. : 3,349.29           
      JENIS PEKERJAAN : Penyiapan Badan Jalan TOTAL HARGA (Rp.) : 0.00       
      SATUAN PEMBAYARAN : M2    0 % THD. BIAYA PROYEK : #DIV/0!              
                            PERKIRAAN HARGA JUMLAH                           
       NO.  KOMPONEN    SATUAN KUANTITAS SATUAN HARGA                        
                                    (Rp.)    (Rp.)                           
       A. TENAGA                                                             
        1. Pekerja   (L01) jam 0.0034  0.00     0.00                         
        2. Mandor    (L02) jam 0.0017  0.00     0.00                         
                      JUMLAH HARGA TENAGA       0.00                         
       B. BAHAN                                                              
                                                                             
                                                                             
                                                                             
                      JUMLAH HARGA BAHAN        0.00                         
       C. PERALATAN                                                          
        1. Motor Grader (E13) jam 0.0017 0.00   0.00                         
        2. Tandem / Vibro Roller (E17) jam 0.0244 0.00 0.00                  
        3 Alat Bantu     Ls   1.0000   0.00     0.00                         
                                                                             
                                                                             
                    JUMLAH HARGA PERALATAN      0.00                         
       D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 0.00        
       E. OVERHEAD & PROFIT 10.0 % x D          0.00                         
        F. HARGA SATUAN PEKERJAAN ( D + E )     0.00                         
       Note: 1 Satuan dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
          berat untuk bahan-bahan.                                           
         2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
          dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
          terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
         3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
         4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
          yang dibayar dari kontrak) dan biaya-biaya lainnya.                
        ITEM PEMBAYARAN NO. : 5.1.(1)                      Analisa EI-511    
        JENIS PEKERJAAN : Lapis Fondasi Agregat Kelas A                      
        SATUAN PEMBAYARAN : M3                         URAIAN ANALISA HARGA SATUAN
         No.           U R A I A N      KODE  KOEF. SATUAN KETERANGAN        
                                                                             
         I. ASUMSI                                                           
          1 Menggunakan alat berat (cara mekanik)                            
          2 Lokasi pekerjaan : sepanjang jalan                               
          3 Kondisi existing jalan : sedang                                  
          4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 17.50 KM         
          5 Tebal lapis agregat padat     t      0.20 M   Spesifikasi 5.1.3.2.d)
          6 Berat isi padat              Bip     1.78 ton/m3                 
          7 Jam kerja efektif per-hari   Tk      7.00 jam                    
          8 Proporsi Campuran : - Fraksi Pecah Mesin 5-10 &10-20 & 20-30 2 2 5 0 - & 1 2 0 0 & - 1 3 0 0 - 69.85 % Gradasi harus
                     - Pasir Urug (PI ≤ 6%, LL ≤ 25%) PU 30.15 % memenuhi Spec.
          9 Berat Isi Agregat (lepas)    Bil     1.45 ton/m3                 
            Faktor kehilangan - Agregat A Fh1    1.05                        
         II. URUTAN KERJA                                                    
          1 Penyiapan formasi kondisi eksisting.                             
          2 Wheel Loader memuat material Lapis Fondasi Agregat ke            
            dalam Dump Truck di Base Camp.                                   
          3 Dump Truck mengangkut Lapis Fondasi Agregat Kelas A dng kadar air
            yg memenuhi ke lokasi pekerjaan dan dihampar dengan Motor Grader 
          4 Hamparan agregat dipadatkan dengan Vibratory Roller.             
          5 Selama pemadatan, sekelompok pekerja akan                        
            merapikan tepi hamparan dengan menggunakan Alat Bantu.           
          6 Bahan yang tidak terjangkau mesin gilas, harus dipadatkan dengan 
            trimbis mekanis atau pemadat lain yang disetujui.                
          7 Pemadatan dilanjutkan sampai seluruh lokasi terpadatkan rata.    
         III. PEMAKAIAN BAHAN, ALAT, DAN TENAGA                              
         1. BAHAN                                                            
            - Agregat A = 1 M3 x (Bip/Bil) x Fh (M26) 1.288965517 M3         
         2. ALAT                                                             
         2.a. WHEEL LOADER               (E15)                               
            Kapasitas bucket             V       1.50 M3    (lepas)          
            Faktor bucket                Fb      0.85 -                      
            Faktor Efisiensi alat        Fa      0.83 -                      
            Waktu Siklus :                                                   
            - Memuat dan lain-lain       Ts1     0.80 menit Permen PUPR No 28/PRT/M/2016
            Kap. Prod. / jam = V x Fb x Fa x 60 Q1 64.65 M3                  
                           Ts1 x Bip/Bil                                     
            Koefisien Alat / M3 = 1 : Q1 (E15)  0.0155 jam                   
         2.b. DUMP TRUCK 5-8 M3          (E09)                               
            Kapasitas bak                V       7.75 M3                     
            Faktor Efisiensi alat        Fa      0.83 -                      
            Kecepatan rata-rata bermuatan v1    20.00 KM/jam                 
            Kecepatan rata-rata kosong   v2     40.00 KM/jam                 
            Waktu Siklus :                                                   
            - Waktu memuat = V x 60/Q1 x Bil T1  4.96 menit                  
            - Waktu tempuh isi = (L : v1) x 60 menit T2 52.50 menit          
            - Waktu tempuh kosong = (L : v2) x 60 menit T3 26.25 menit       
            - lain-lain                  T4      3.00 menit                  
                                         Ts2    86.71 menit                  
            Kap. Prod. / jam = V x Fa x 60 Q2    3.63 M3                     
                           Ts2 x Bip/Bil                                     
            Koefisien Alat / M3 = 1 : Q2 (E09)  0.2758 jam                   
                                                         Berlanjut ke hal. berikut
        ITEM PEMBAYARAN NO. : 5.1.(1)                      Analisa EI-511    
        JENIS PEKERJAAN : Lapis Fondasi Agregat Kelas A                      
        SATUAN PEMBAYARAN : M3                         URAIAN ANALISA HARGA SATUAN
                                                           Lanjutan          
         No.           U R A I A N      KODE  KOEF. SATUAN KETERANGAN        
         2.c. MOTOR GRADER               (E13)                               
            Panjang hamparan             Lh     50.00 M                      
            Lebar hamparan total (untuk menetukan jumlah lintasan) W 3.50 M  
            Lebar kerja blade            b       2.60 M                      
            Faktor Efisiensi alat        Fa      0.83 -                      
            Kecepatan rata-rata alat     v       4.00 KM/jam                 
            Jumlah lintasan              n       4.00 lintasan 2 x pp maks (SU 5-7)
            Lebar Overlap                bo      3.00 M                      
            Lajur lintasan (N = W/(b-b )) N      0.30                        
                     o                                                       
            Waktu Siklus :               Ts3                                 
            - Perataan 1 lintasan = Lh : (v x 1000) x 60 T1 0.75 menit       
            - Lain-lain                  T2      3.00 menit                  
                                         Ts3     3.75 menit                  
            Kap. Prod. / jam = Lh x (N(b-bo)+bo) x t x Fa x 60 Q3 59.76 M3   
                            n x Ts3                                          
            Koefisien Alat / M3 = 1 : Q3 (E13)  0.0167 jam                   
         2.d. VIBRATORY ROLLER          (E19a)                               
            Kecepatan rata-rata alat     v       4.00 KM/jam                 
            Lebar lajur lalu lintas      W       3.50 M                      
            Lebar roda alat pemadat      b       1.68 M                      
            Lebar overlap                bo      0.20 M                      
            Lebar efektif pemadatan (be = b - bo) be 1.48 M                  
            Jumlah lintasan              n      10.00 lintasan 5 x pp lintasan
            Lajur lintasan (N = W/(b-b )) N      3.00                        
                     o                                                       
            Faktor Efisiensi alat        Fa      0.83 -                      
            Kap. Prod. / jam = (v x 1000) x (N(b-bo)+bo) x t x Fa Q4 102.70 M3
                            n x N                                            
            Koefisien Alat / M3 = 1 : Q4 (E19)  0.0097 jam                   
         2.e. WATER TANK TRUCK           (E23)                               
            Volume tanki air             V       4.00 M3                     
            Kebutuhan air / M3 agregat padat Wc  0.07 M3                     
            Kapasitas pompa air          pa     100.00 liter/menit           
            Faktor Efisiensi alat        Fa      0.83 -                      
            Kap. Prod. / jam = pa x Fa x 60 Q5  71.14 M3                     
                           1000 x Wc                                         
            Koefisien Alat / M3 = 1 : Q5 (E23)  0.0141 jam                   
         2.g. ALAT BANTU                                                     
            Diperlukan :                                                     
            - Kereta dorong = 2 buah.                                        
            - Sekop  = 3 buah.                                               
            - Garpu  = 2 buah.                                               
         3. TENAGA                                                           
            Produksi menentukan : VIBRATORY ROLLER Q4 102.70 M3/jam          
            Produksi agregat / hari = Tk x Q4 Qt 718.89 M3                   
            Kebutuhan tenaga :                                               
                     - Pekerja           P       7.00 orang Pengendalian kadar air
                     - Mandor            M       1.00 orang                  
            Koefisien tenaga / M3 :                                          
                     - Pekerja = (Tk x P) : Qt (L01) 0.0682 jam              
                     - Mandor = (Tk x M) : Qt (L03) 0.0097 jam               
         4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT                          
            Lihat lampiran.                                                  
                                                         Berlanjut ke hal. berikut
        ITEM PEMBAYARAN NO. : 5.1.(1)                      Analisa EI-511    
        JENIS PEKERJAAN : Lapis Fondasi Agregat Kelas A                      
        SATUAN PEMBAYARAN : M3                         URAIAN ANALISA HARGA SATUAN
                                                           Lanjutan          
         No.           U R A I A N      KODE  KOEF. SATUAN KETERANGAN        
         5. ANALISA HARGA SATUAN PEKERJAAN                                   
            Lihat perhitungan dalam FORMULIR STANDAR UNTUK                   
            PEREKAMAN ANALISA MASING-MASING HARGA                            
            SATUAN.                                                          
            Didapat Harga Satuan Pekerjaan :                                 
                  Rp.   0.00 / M3.                                           
         6. WAKTU PELAKSANAAN YANG DIPERLUKAN                                
            Masa Pelaksanaan : . . . . . . . . . . . . bulan                 
         7. VOLUME PEKERJAAN YANG DIPERLUKAN                                 
            Volume pekerjaan : 557.64 M3                                     
                                                        Analisa EI-511       
                                  FORMULIR STANDAR UNTUK                     
                            PEREKAMAN ANALISA MASING-MASING HARGA SATUAN     
                                                                             
               PROYEK           :                                            
               No. PAKET KONTRAK : ………………………………………………                        
               NAMA PAKET       : …………………………………………………………………..                
                                ………………………………………………………………….                   
               PROP / KAB / KODYA : ………………………………………………                       
               ITEM PEMBAYARAN NO. : 5.1.(1) PERKIRAAN VOL. PEK. : 557.64    
               JENIS PEKERJAAN  : Lapis Fondasi Agregat Kelas A TOTAL HARGA : 0.00
               SATUAN PEMBAYARAN : M3        % THD. BIAYA PROYEK : #DIV/0!   
                                        PERKIRAAN HARGA  JUMLAH              
                NO.      KOMPONEN   SATUAN KUANTITAS SATUAN HARGA            
                                                (Rp.)     (Rp.)              
                A. TENAGA                                                    
                1. Pekerja      (L01) jam 0.0682   0.00      0.00            
                2. Mandor       (L03) jam 0.0097   0.00      0.00            
                                          JUMLAH HARGA TENAGA 0.00           
                                                                             
                B. BAHAN                                                     
                                                                             
                1. Agregat A     M26 M3   1.2890   0.00      0.00            
                                                                             
                                                                             
                                                                             
                                           JUMLAH HARGA BAHAN 0.00           
                C. PERALATAN                                                 
                1. Wheel Loader (E15) jam 0.0155   0.00      0.00            
                2. Dump Truck   (E09) jam 0.2758   0.00      0.00            
                3. Motor Grader (E13) jam 0.0167   0.00      0.00            
          1     4. Vibratory Roller (E19a) jam 0.0097 0.00   0.00            
                5. Water Tanker (E23) jam 0.0141   0.00      0.00            
                6  Alat Bantu        Ls   1.0000   0.00      0.00            
                                         JUMLAH HARGA PERALATAN 0.00         
          5     D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 0.00
                E. OVERHEAD & PROFIT  10.0 % x D             0.00            
                F. HARGA SATUAN PEKERJAAN ( D + E )          0.00            
               Note: 1 Satuan dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
                   berat untuk bahan-bahan.                                  
                 2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
                   dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
                   terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
                 3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
                 4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
                   yang dibayar dari kontrak) dan biaya-biaya lainnya.       
       ITEM PEMBAYARAN NO. : 6.1 (1)                         Analisa EI-611  
       JENIS PEKERJAAN : Lapis Resap Pengikat - Aspal Cair/Emulsi            
       SATUAN PEMBAYARAN : Liter                        URAIAN ANALISA HARGA SATUAN
       No.               U R A I A N        KODE  KOEF. SATUAN KETERANGAN    
                                                                             
        I. ASUMSI                                                            
        1 Menggunakan alat berat (cara mekanik)                              
        2 Lokasi pekerjaan : sepanjang jalan                                 
        3 Jarak rata-rata Base Camp ke lokasi pekerjaan L 17.50 KM           
        4 Jam kerja efektif per-hari         Tk      7.00 Jam                
        5 Faktor kehilangan bahan            Fh      1.03                    
        6 Bahan :                                                            
          - Kadar Residu Aspal Emulsi        Ae      62  %                   
        7 Berat isi bahan :                                                  
          - Aspal Emulsi                     D1      1.01 Kg / liter Referensi
        8 Bahan dasar (aspal emulsi) semuanya diterima di lokasi pekerjaan   
        II. URUTAN KERJA                                                     
        1 Aspal Emulsi dimasukkan ke dalam distributor aspal                 
        2 Permukaan yang akan dilapis dibersihkan dari debu dan kotoran dengan
          2 Air Compressor (awal dan akhir)                                  
        3 Aspal emulsi disemprotkan dengan Asphalt Distributor ke atas permukaan
          yang akan dilapis.                                                 
       III. PEMAKAIAN BAHAN, ALAT DAN TENAGA                                 
       1. BAHAN                                                              
          Untuk mendapatkan 1 liter Lapis Resap Pengikat Aspal Emulsi        
          diperlukan : ( 1 liter x Fh )      PC      1.03 liter              
       1.a. Aspal Emulsi = PC               (M101)  1.6613 Liter             
                      Ae                                                     
       2. ALAT                                                               
       2.a. ASPHALT DISTRIBUTOR             (E41)                            
          Lebar penyemprotan                 b       3.50 M                  
          Kecepatan penyemprotan             V      30.00 Km/jam             
          Kapasitas pompa aspal              pas     100 liter/menit pemakaian efektif 2 %
          Faktor effisiensi kerja            Fa      0.83                    
          Kadar aplikasi                             0.85 liter/m2 Pasal 6.1.4.2).a)
          Kap. Prod. / jam = pas x Fa x 60   Q1    4,980.00 liter            
          Koefisien Alat / Ltr = 1 : Q1     (E41)  0.00020 Jam               
       2.b. AIR COMPRESSOR                  (E05)                            
          Kecepatan                          v1      2.00 km/jam             
          Lebar penyemprotan                 b       3.50 m                  
          Faktor efisiensi alat = 1 : Q2     Fa      0.83                    
          Jumlah penyemprotan                n       2.00 kali               
          Kadar Aspal yang digunakan         Kdr     0.47 liter/m2           
          Kap. Prod. / jam = v1 x 1000 x b x Fa x Kdr / n Q2 1,365.35 liter  
          Koefisien Alat / Ltr = 1 : Q2     (E05)  0.00073 Jam               
                                                            Berlanjut ke hal. berikut.
       ITEM PEMBAYARAN NO. : 6.1 (1)                         Analisa EI-611  
       JENIS PEKERJAAN : Lapis Resap Pengikat - Aspal Cair/Emulsi            
       SATUAN PEMBAYARAN : Liter                        URAIAN ANALISA HARGA SATUAN
                                                                 Lanjutan    
       No.               U R A I A N        KODE  KOEF. SATUAN KETERANGAN    
       3. TENAGA                                                             
          Produksi menentukan : AIR COMPRESSOR Q4  1,365.35 liter            
          Produksi Lapis Resap Pengikat / hari = Tk x Q4 Qt 9,557.45 liter   
          Kebutuhan tenaga :                                                 
                    - Pekerja                P       2.00 orang              
                    - Mandor                 M       1.00 orang              
          Koefisien tenaga / liter :                                         
                    - Pekerja = (Tk x P) : Qt (L01) 0.0015 Jam               
                    - Mandor = (Tk x M) : Qt (L03)  0.0007 Jam               
        4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT                           
          Lihat lampiran.                                                    
        5. ANALISA HARGA SATUAN PEKERJAAN                                    
          Lihat perhitungan dalam FORMULIR STANDAR UNTUK                     
          PEREKAMAN ANALISA MASING-MASING HARGA                              
          SATUAN.                                                            
          Didapat Harga Satuan Pekerjaan :                                   
                 Rp.    0.00 / liter.                                        
        6. WAKTU PELAKSANAAN YANG DIPERLUKAN                                 
          Masa Pelaksanaan : . . . . . . . . . . . . bulan                   
        7. VOLUME PEKERJAAN YANG DIPERLUKAN                                  
          Volume pekerjaan : 2,759.41 Liter                                  
                                                        Analisa EI-611       
                                 FORMULIR STANDAR UNTUK                      
                           PEREKAMAN ANALISA MASING-MASING HARGA SATUAN      
                                                                             
                                                                             
               PROYEK        :                                               
               No. PAKET KONTRAK : ………………………………………………                        
               NAMA PAKET    : …………………………………………………………………..                   
                              ………………………………………………………………….                     
               PROP / KAB / KODYA : ………………………………………………                       
               ITEM PEMBAYARAN NO. : 6.1 (1) PERKIRAAN VOL. PEK. : 2,759.41  
               JENIS PEKERJAAN : Lapis Resap Pengikat - Aspal Cair/EmulsTiOTAL HARGA (Rp.) : 0.00
               SATUAN PEMBAYARAN : Liter    % THD. BIAYA PROYEK : #DIV/0!    
                                      PERKIRAAN HARGA   JUMLAH               
                NO.     KOMPONEN  SATUAN KUANTITAS SATUAN HARGA              
                                               (Rp.)     (Rp.)               
                A. TENAGA                                                    
                1. Pekerja    (L01) Jam 0.0015    0.00       0.00            
                2. Mandor     (L03) Jam 0.0007    0.00       0.00            
                                         JUMLAH HARGA TENAGA 0.00            
                B. BAHAN                                                     
                1. Aspal Emulsi CSS-1 (M31a) Liter 1.6613 0.00 0.00          
                   atau SS-1                                                 
                                                                             
                                         JUMLAH HARGA BAHAN  0.00            
                C. PERALATAN                                                 
                1. Asp. Distributor E41 Jam 0.00020 -        0.00            
                2. Compressor E05  Jam  0.00073    -         0.00            
   pemakaian efektif 2 %                                                     
                                                                             
                                                                             
                                       JUMLAH HARGA PERALATAN 0.00           
                D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 0.00
                E. OVERHEAD & PROFIT 10.0 % x D              0.00            
                F. HARGA SATUAN PEKERJAAN ( D + E )          0.00            
               Note: 1 Satuan dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
                   berat untuk bahan-bahan.                                  
                  2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
                   dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
                   terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
                  3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
                  4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
                   yang dibayar dari kontrak) dan biaya-biaya lainnya.       
       ITEM PEMBAYARAN NO. : 6.3(6a)                         Analisa EI-636a 
       JENIS PEKERJAAN : Laston Lapis Antara (AC-BC)                         
       SATUAN PEMBAYARAN : Ton                          URAIAN ANALISA HARGA SATUAN
       No.  U R A I A N                     KODE  KOEF. SATUAN KETERANGAN    
                                                                             
        I. ASUMSI                                                            
        1 Menggunakan alat berat (cara mekanik)                              
        2 Lokasi pekerjaan : sepanjang jalan                                 
        3 Kondisi existing jalan : rusak                                     
        4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 17.50 KM           
        5 Tebal Lapis (AC-BC) padat          t       0.06 M Tabel 6.3.11     
        6 Jam kerja efektif per-hari         Tk      7.00 Jam                
        7 Faktor kehilanganmaterial : - Agregat Fh1  1.05 -                  
                          - Aspal            Fh2     1.03 -                  
        8 Berat isi Agregat (padat)          Bip     1.45 ton/m3             
        9 Berat Isi Agregat (lepas)          Bil     1.32 ton/m3             
        1 0 Komposisi campuran AC-BC :                                       
          - Agr Pch Mesin 5 - 10 & 10 - 20 mm 5-10&10-20 46.76 % Gradasi harus -
          - Agregat Pecah Mesin 0 - 5 mm     0-5    46.75 % memenuhi -       
          - Semen                            FF      0.94 % Spesifikasi      
          - Asphalt                          As      5.55 %                  
          - Anti Stripping Agent             Asa     0.30 %As                
        1 1 Berat Isi bahan :                                                
          - AC-BC                            D1      2.29 ton / M3           
          - Agr Pch Mesin 5 - 10 & 10 - 20 mm D2     1.32 ton / M3           
          - Agr Pch Mesin 0 - 5 mm           D3      1.32 ton / M3           
        1 2 Jarak Stock file ke cold bin     l       0.05 km                 
        II. URUTAN KERJA / METODE PELAKSANAAN                                
        1 Wheel Loader memuat Agregat dan Asphalt ke dalam Cold Bin AMP      
        2 Agregat dan aspal dicampur dan dipanaskan dengan dengan AMP untuk  
          dimuat langsung ke dalam Dump Truck dan diangkut ke lokasi pekerjaan
        3 Campuran panas AC dihampar dengan Finisher dan dipadatkan dengan   
          Tandem & Pneumatic Tire Roller                                     
        4 Selama pemadatan, sekelompok pekerja akan merapikan tepi hamparan  
          dengan menggunakan Alat Bantu                                      
       III. PEMAKAIAN BAHAN, ALAT DAN TENAGA                                 
       1. BAHAN                                                              
       1.a. Agr 5-10 & 10-20 = ("5-10&10-20" x Fh1) : D2 (M92) 0.3720 M3     
       1.b. Agr 0-5 = ("0-5" x Fh1) : D3    (M91)   0.3719 M3                
       1.c. Semen   = (FF x Fh2) x 1000     (M12)   9.6820 Kg                
       1.d. Aspal   = (As x Fh2) x 1000     (M10)  57.1650 Kg                
        2. ALAT                                                              
       2.a. WHEEL LOADER                    (E15)                            
          Kapasitas bucket                   V       1.50 M3                 
          Faktor bucket                      Fb      0.85 -                  
          Faktor efisiensi alat              Fa      0.83 -                  
          Waktu Siklus T1 + T2 + T3          Ts1     0.45 menit              
          - Kecepatan maju rata rata         Vf     15.00 km/jam panduan     
          - Kecepatan kembali rata rata      Vr     20.00 km/jam panduan     
          - Muat ke Bin = (l x 60) / Vf      T1      0.20 menit              
          - Kembali ke Stock pile = (l x 60) / Vr T2 0.15 menit              
          - Lain - lain (waktu pasti)        T3      0.10 menit              
                                             Ts1     0.45 menit              
          Kap. Prod. / jam = V x Fb x Fa x 60 x Bil Q1 186.25 ton            
                      Ts1                                                    
          Koefisien Alat/ton = 1 : Q1       (E15)   0.0054 Jam               
                                                            Berlanjut ke hal. berikut.
       ITEM PEMBAYARAN NO. : 6.3(6a)                         Analisa EI-636a 
       JENIS PEKERJAAN : L a s t o n Lapis Antara (AC-BC)                    
       SATUAN PEMBAYARAN : Ton                          URAIAN ANALISA HARGA SATUAN
                                                                 Lanjutan    
       No.  U R A I A N                     KODE  KOEF. SATUAN KETERANGAN    
       2.b. ASPHALT MIXING PLANT (AMP)      (E01)                            
          Kapasitas produksi                 V      60.00 ton / Jam          
          Faktor Efisiensi alat              Fa      0.83 -                  
          Kap.Prod. / jam = V x Fa           Q2     49.80 ton                
          Koefisien Alat / ton = 1 : Q2     (E01)   0.0201 Jam               
       2.c. GENERATORSET ( GENSET )         (E12)                            
          Kap.Prod. / Jam = SAMA DENGAN AMP  Q3     49.80 ton                
          Koefisien Alat / ton = 1 : Q3     (E12)   0.0201 Jam               
       2.d. DUMP TRUCK (DT)                 (E09)                            
          Kapasitas bak                      V       8.00 M3                 
          Faktor Efisiensi alat              Fa      0.83 -                  
          Kecepatan rata-rata bermuatan      v1     40.00 Km / Jam           
          Kecepatan rata-rata kosong         v2     60.00 Km / Jam           
          Kapasitas AMP / batch              Q2b     1.00 ton                
          Waktu menyiapkan 1 batch AC-BC     Tb      1.00 menit              
          Waktu Siklus                       Ts2                             
          - Mengisi Bak = (V : Q2b) x Tb     T1      8.00 menit              
          - Angkut  = (L : v1) x 60 menit    T2     26.25 menit              
          - Tunggu + dump + Putar            T3     15.00 menit              
          - Kembali = (L : v2) x 60 menit    T4     17.50 menit              
                                             Ts2    66.75 menit              
          Kap.Prod. / jam = V x Fa x 60 x D1 Q4     13.67 ton                
                      Ts2                                                    
          Koefisien Alat / ton = 1 : Q4     (E09)   0.0732 Jam               
       2.e. ASPHALT FINISHER                (E02)                            
          Kecepatan menghampar               V       5.00 m/menit            
          Faktor efisiensi alat              Fa      0.83 - Normal           
          Lebar hamparan                     b       3.50 meter              
          Kap.Prod. / jam = V x b x 60 x Fa x t x D1 Q5 119.74 ton           
          Koefisien Alat / ton = 1 : Q5     (E02)   0.0084 Jam               
       2.f. TANDEM ROLLER (8 - 10 TON)      (E17a)                           
          Kecepatan rata-rata alat           v       4.00 Km / Jam           
          Lebar efektif pemadatan            b       1.68 M                  
          Jumlah lintasan                    n       6.00 lintasan 2 awal & 4 Akhir
          Jumlah lajur lintasan = w / ( b-bo ) N     3.00                    
          Lebar overlap                      bo      0.20 m                  
          Faktor Efisiensi alat              Fa      0.83 - Normal           
          Kap. Prod./jam(v =x 1000) x (N(b-bo)+bo) x t x Fa x D1 Q6 117.59 ton
                      n x N                                                  
          Koefisien Alat / ton = 1 : Q6     (E17a)  0.0085 Jam               
       2.g. PNEUMATIC TIRE ROLLER           (E18)                            
          Kecepatan rata-rata                v      10.00 KM / Jam           
          Lebar efektif pemadatan            b       2.29 M                  
          Jumlah lintasan                    n      14.00 lintasan           
          Lajur lintasan                     N       2.00                    
          Lebar Overlap                      bo      0.20 M                  
          Faktor Efisiensi alat              Fa      0.83 -                  
          Kap.Prod. / ja(mv x= 1000) x (N(b-bo)+bo) x t x Fa x D1 Q7 178.39 ton
                      n x N                                                  
          Koefisien Alat / ton = 1 : Q7     (E18)   0.0056 Jam               
                                                            Berlanjut ke hal. berikut.
       ITEM PEMBAYARAN NO. : 6.3(6a)                         Analisa EI-636a 
       JENIS PEKERJAAN : Laston Lapis Antara (AC-BC)                         
       SATUAN PEMBAYARAN : Ton                          URAIAN ANALISA HARGA SATUAN
                                                                 Lanjutan    
       No.               U R A I A N        KODE  KOEF. SATUAN KETERANGAN    
       2.h. ALAT BANTU                                                       
          diperlukan :                                      Lump Sum         
          - Kereta dorong                                                    
          - Sekop                                                            
          - Garpu                                                            
          - Tongkat Kontrol ketebalan hanparan                               
       3. TENAGA                                                             
          Produksi menentukan : AMP          Q2     49.80 ton                
          Produksi AC-BC / hari = Tk x Q5    Qt     348.60 ton               
          Kebutuhan tenaga :                                                 
                    - Pekerja                P      10.00 orang              
                    - Mandor                 M       1.00 orang              
          Koefisien Tenaga / ton :                                           
                    - Pekerja = (Tk x P) / Qt (L01) 0.2008 Jam               
                    - Mandor = (Tk x M) / Qt (L03)  0.0201 Jam               
        4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT                           
          Lihat lampiran.                                                    
        5. ANALISA HARGA SATUAN PEKERJAAN                                    
          Lihat perhitungan dalam FORMULIR STANDAR UNTUK                     
          PEREKAMAN ANALISA MASING-MASING HARGA                              
          SATUAN.                                                            
          Didapat Harga Satuan Pekerjaan :                                   
                 Rp.    0.00 / TON                                           
        6. WAKTU PELAKSANAAN YANG DIPERLUKAN                                 
          Masa Pelaksanaan : . . . . . . . . . . . . bulan                   
        7. VOLUME PEKERJAAN YANG DIPERLUKAN                                  
          Volume pekerjaan : 456.17 ton                                      
                                                       Analisa EI-636a       
                             FORMULIR STANDAR UNTUK                          
                       PEREKAMAN ANALISA MASING-MASING HARGA SATUAN          
                                                                             
                                                                             
               PROYEK        :                                               
               No. PAKET KONTRAK : ………………………………………………                        
               NAMA PAKET    : …………………………………………………………………..                   
                              ………………………………………………………………….                     
               PROP / KAB / KODYA : ………………………………………………                       
               ITEM PEMBAYARAN NO. : 6.3(6a) PERKIRAAN VOL. PEK. : 456.17    
               JENIS PEKERJAAN : Laston Lapis Antara (AC-BC) TOTAL HARGA (Rp.) : 0.00
               SATUAN PEMBAYARAN : Ton      % THD. BIAYA PROYEK : #DIV/0!    
                                      PERKIRAAN HARGA JUMLAH                 
                NO.  KOMPONEN     SATUAN KUANTITAS SATUAN HARGA              
                                               (Rp.) (Rp.)                   
                A. TENAGA                                                    
                1. Pekerja    (L01) Jam 0.2008    0.00       0.00            
                2. Mandor     (L03) Jam 0.0201    0.00       0.00            
                                JUMLAH HARGA TENAGA          0.00            
                B. BAHAN                                                     
                1. Agr Pch Mesin 5-10 & 10-20(M92) M3 0.3720 0.00 0.00       
                2. Agr Pch Mesin 0 - 5 (M91) M3 0.3719 0.00  0.00            
                 3 Semen      (M12) Kg  9.6820    0.00       0.00            
                 4 Aspal      (M10) Kg  57.1650   0.00       0.00            
                                JUMLAH HARGA BAHAN           0.00            
                C. PERALATAN                                                 
                1. Wheel Loader E15 Jam 0.0054     -         0.00            
                2. AMP        E01  Jam  0.0201     -         0.00            
                3. Genset     E12  Jam  0.0201     -         0.00            
                4. Dump Truck E09  Jam  0.0732     -         0.00            
                5. Asphalt Finisher E02 Jam 0.0084 -         0.00            
                6. Tandem Roller E17a Jam 0.0085   -         0.00            
                 7 P. Tyre Roller E18 Jam 0.0056   -         0.00            
                 8 Alat Bantu      Ls   1.0000    0.00       0.00            
                              JUMLAH HARGA PERALATAN         0.00            
                D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 0.00
                E. OVERHEAD & PROFIT 10.0 % x D              0.00            
                F. HARGA SATUAN PEKERJAAN ( D + E )          0.00            
               Note: 1 Satuan dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
                   berat untuk bahan-bahan.                                  
                  2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
                   dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
                   terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
                  3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
                  4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
                   yang dibayar dari kontrak) dan biaya-biaya lainnya.       
       ITEM PEMBAYARAN NO. : 6.3.(8)                         Analisa EI-638  
       JENIS PEKERJAAN : Bahan Anti Pengelupasan                             
       SATUAN PEMBAYARAN : Kg                           URAIAN ANALISA HARGA SATUAN
       No.               U R A I A N        KODE  KOEF. SATUAN KETERANGAN    
                                                                             
        I. ASUMSI                                                            
        1 Menggunakan alat berat (cara mekanik)                              
        2 Lokasi pekerjaan : sepanjang jalan                                 
        3 Jarak rata-rata Base Camp ke lokasi pekerjaan L 17.50 KM           
        4 Jam kerja efektif per-hari         Tk      7.00 Jam                
        5 Faktor kehilangan bahan            Fh      1.03 -                  
        6 Bahan :                                                            
          - Bahan anti pengelupasan                                          
        II. URUTAN KERJA                                                     
        1 Bahan anti pengelupasan ditambahkan dalam bentuk cairan di timbangan
          aspal AMP sesaat sebelum dilakukan proses pencampuran di pugmil    
       III. PEMAKAIAN BAHAN, ALAT DAN TENAGA                                 
       1. BAHAN                                                              
          Untuk mendapatkan 1 Kg Bahan Anti Pengelupasan                     
          diperlukan : (1 liter x Fh)        Pc      1.03 Kg                 
        2. ALAT                                                              
          Tidak ada alat yang digunakan     (E41)                            
        3. TENAGA                                                            
          Kebutuhan tenaga :                                                 
                    - Pekerja                P       0.00 orang              
                    - Mandor                 M       0.00 orang              
          Koefisien Tenaga / Ltr :                                           
                    - Pekerja = (Tk x P) / Qt (L01) 0.0000 Jam               
                    - Mandor = (Tk x M) / Qt (L03)  0.0000 Jam               
        4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT                           
          Lihat lampiran.                                                    
        5. ANALISA HARGA SATUAN PEKERJAAN                                    
          Lihat perhitungan dalam FORMULIR STANDAR UNTUK                     
          PEREKAMAN ANALISA MASING-MASING HARGA                              
          SATUAN.                                                            
          Didapat Harga Satuan Pekerjaan :                                   
                 Rp.    0.00 / Liter                                         
        6. WAKTU PELAKSANAAN YANG DIPERLUKAN                                 
          Masa Pelaksanaan : . . . . . . . . . . . . bulan                   
        7. VOLUME PEKERJAAN YANG DIPERLUKAN                                  
          Volume pekerjaan : 502.39 Kg                                       
                                                        Analisa EI-638       
                                 FORMULIR STANDAR UNTUK                      
                           PEREKAMAN ANALISA MASING-MASING HARGA SATUAN      
                                                                             
                                                                             
               PROYEK        :                                               
               No. PAKET KONTRAK : ………………………………………………                        
               NAMA PAKET    : …………………………………………………………………..                   
                              ………………………………………………………………….                     
               PROP / KAB / KODYA : ………………………………………………                       
               ITEM PEMBAYARAN NO. : 6.3.(8) PERKIRAAN VOL. PEK. : 502.39    
               JENIS PEKERJAAN : Bahan Anti Pengelupasan TOTAL HARGA (Rp.) : 0.00
               SATUAN PEMBAYARAN : Kg       % THD. BIAYA PROYEK : #DIV/0!    
                                      PERKIRAAN HARGA   JUMLAH               
                NO.     KOMPONEN  SATUAN KUANTITAS SATUAN HARGA              
                                               (Rp.)     (Rp.)               
                A. TENAGA                                                    
                1. Pekerja    (L01) Jam 0.0000  24,996.34    0.00            
                2. Mandor     (L03) Jam 0.0000  30,066.21    0.00            
                                         JUMLAH HARGA TENAGA 0.00            
                B. BAHAN                                                     
                1. Bahan anti pengelupasan (M66) Kg 1.0300 0.00 0.00         
                                                                             
                                                                             
                                         JUMLAH HARGA BAHAN  0.00            
                C. PERALATAN                                                 
                                                                             
                                                                             
                                                                             
                                                                             
                                                                             
                                       JUMLAH HARGA PERALATAN 0.00           
                D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 0.00
                E. OVERHEAD & PROFIT 10.0 % x D              0.00            
                F. HARGA SATUAN PEKERJAAN ( D + E )          0.00            
               Note: 1 Satuan dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
                   berat untuk bahan-bahan.                                  
                  2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
                   dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
                   terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
                  3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
                  4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
                   yang dibayar dari kontrak) dan biaya-biaya lainnya.       
    ITEM PEMBAYARAN NO. :7.1 (10)                          Analisa El-7110   
    JENIS PEKERJAAN :Beton struktur fc’ = 10 Mpa                             
    SATUAN PEMBAYARAN :M3                            URAIAN ANALISA HARGA SATUAN
    No.               U R A I A N          KODE  KOEF. SATUAN KETERANGAN     
                                                                             
     I. ASUMSI                                                               
     1 Menggunakan alat (cara mekanik)                                       
     2 Lokasi pekerjaan : sepanjang jalan                                    
     3 Bahan dasar (batu, pasir dan semen) diterima                          
       seluruhnya di lokasi pekerjaan                                        
     4 Jarak rata-rata Base camp ke lokasi pekerjaan L 17.50 KM              
     5 Jam kerja efektif per-hari           Tk     7.00 jam                  
     6 Perbandingan Camp.     : Semen       Sm     231.0 Kg/M3 Berdasarkan   
                              : Pasir       Ps     823.0 Kg/M3 Mix Design ACI
                              : Agregat Kasar Kr  1,264.0 Kg/M3              
                              : Air         W       162 Kg/M3                
                              : Plasticizer Plt    0.69 Kg/M3                
     7 Berat Isi :                                                           
       - Beton                              D1     2.20 T/M3 Berdasarkan     
       - Semen                              D2     1.13 T/M3 Panduan Analisis
       - Pasir                              D3     1.45 T/M3 Harga Satuan    
       - Agregat Kasar                      D4     1.45 T/M3                 
       - Air                                D5     1.00 T/M3                 
      8 Faktor kehilangan bahan : Semen    Fh1     1.03                      
                              : Agregat/pasir beton Fh2 1.05                 
     II. URUTAN KERJA                                                        
     1 Semen, pasir, batu kerikil dan air dicampur dan diaduk                
       menjadi beton dengan menggunakan Concrete Mixer                       
     2 Beton di-cor ke dalam bekisting yang telah disiapkan                  
     3 Penyelesaian dan perapihan setelah pemasangan                         
     III. PEMAKAIAN BAHAN, ALAT DAN TENAGA                                   
     1. BAHAN                                                                
    1.a. Semen (PC)           = Sm x 1.03  (M12)  237.930 Kg    864          
    1.b. Pasir Beton          = (Ps/1000 : D3) x 1.05 (M01a) 0.5960 M3 1,327 
    1.c. Agregat Kasar        = (Kr/1000 : D4) x 1.05 (M03) 0.9153 M3        
    1.d. Kayu Perancah dan/atau Bekisting  (M19)  0.1000 M3                  
    1.e. Paku                 = M19 x 12   (M18)  1.2000 Kg                  
     1.f. Air                 = Air x Fh1  (M170) 166.860 Ltr                
    1.g. Plastizier           = Plt x Fh1  (M182)  0.714 Kg                  
     2. ALAT                                                                 
    2.a. CONCRETE MIXER; 500 L; 15 HP      (E43)                             
       Kapasitas Alat                       V     500.00 liter               
       Faktor Efisiensi Alat                Fa     0.83 -                    
       Waktu siklus : (T1 + T2 + T3 + T4)   Ts                               
       - Memuat                             T1     8.00 menit                
       - Mengaduk                           T2     4.00 menit                
       - Menuang                            T3     2.00 menit                
       - Tunggu, dll.                       T4     3.00 menit                
                                            Ts     17.00 menit               
       Kap. Prod. / jam = V x Fa x 60       Q1     1.465 M3/jam              
                      1000 x Ts                                              
       Koefisien Alat / M3 = 1 : Q1        (E43)  0.6827 jam                 
    2.b. CONCRETE VIBRATOR; GX 160; 5,5 HP (E20)                             
       Kebutuhan alat penggetar beton disesuaikan dengan                     
       kapasitas produksi alat pencampur (concrete mixing plant) dibutuhkan n vib 1 buah lihat Spesifikasi
                                                          butuh 1 bh utk 3 m3
       Kap. Prod. / jam = Q1 / n vib        Q3     1.465 M3                  
       Koefisien Alat / M3 = 1 : Q3        (E20)  0.6827 jam                 
                                                          Berlanjut ke hal. berikut.
    ITEM PEMBAYARAN NO. :7.1 (10)                          Analisa El-7110   
    JENIS PEKERJAAN :Beton struktur fc’ = 10 Mpa                             
    SATUAN PEMBAYARAN :M3                            URAIAN ANALISA HARGA SATUAN
                                                               Lanjutan      
    No.               U R A I A N          KODE  KOEF. SATUAN KETERANGAN     
    2.c. WATER TANK TRUCK                  (E23)                             
       Volume Tanki Air                     V      4.00 M3                   
       Kebutuhan air / M3 beton             Wc     0.19 M3                   
       Faktor Efiesiensi Alat               Fa     0.83 -                    
       Kapasitas pompa air                  Pa    100.00 liter/menit         
       Kap. Prod. / jam = pa x Fa x 60      Q3     26.21 M3                  
                      1000 x Wc                                              
       Koefisien Alat / M3 = 1 : Q3        (E23)  0.0382 jam                 
    2.d. ALAT BANTU                                                          
       Alat bantu                                         lumpsum            
       Palu                                                                  
       Alat pemotong, dlsb                                                   
     3. TENAGA                                                               
       Produksi Beton dalam 1 hari = Tk x Q1 Qt    10.25 M3                  
       Kebutuhan tenaga : - Mandor          M      1.00 orang                
                   - Tukang :               Tb     6.00 orang                
                          Tk batu =      3                                   
                          Tk Kayu =      3                                   
                   - Pekerja                P      6.00 orang                
       Koefisien Tenaga / M3 :                                               
                   - Mandor   = (Tk x M) : Qt (L03) 0.6827 jam               
                   - Tukang   = (Tk x Tb) : Qt (L02) 4.0964 jam              
                   - Pekerja  = (Tk x P) : Qt (L01) 4.0964 jam               
     4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT                              
       Lihat lampiran.                                                       
     5. ANALISA HARGA SATUAN PEKERJAAN                                       
       Lihat perhitungan dalam FORMULIR STANDAR UNTUK                        
       PEREKAMAN ANALISA MASING-MASING HARGA                                 
       SATUAN.                                                               
       Didapat Harga Satuan Pekerjaan :                                      
                 Rp.        - / M3                                           
     6. MASA PELAKSANAAN YANG DIPERLUKAN                                     
       Masa Pelaksanaan : ………………… bulan                                      
     7. VOLUME PEKERJAAN YANG DIPERLUKAN                                     
       Volume pekerjaan :   4.91 M3                                          
                                                         Analisa El-717a     
                              FORMULIR STANDAR UNTUK                         
                         PEREKAMAN ANALISA MASING-MASING HARGA SATUAN        
                                                                             
        PROYEK                :                                              
        No. PAKET KONTRAK     : ………………………………………………                           
        NAMA PAKET            : …………………………………………………………………..                  
                               ………………………………………………………………….                    
        PROP / KAB / KODYA    : ………………………………………………                           
        ITEM PEMBAYARAN NO.   :7.1 (10)        PERKIRAAN VOL. PEK. : 4.91    
      8.725 JENIS PEKERJAAN   :Beton struktur fc’ = 10 Mpa TOTAL HARGA (Rp.) : 0.00
       7 SATUAN PEMBAYARAN    :M3              % THD. BIAYA PROYEK : #DIV/0! 
      264                                                                    
      896                                                                    
      1075                               PERKIRAAN HARGA JUMLAH              
      185 NO.        KOMPONEN       SATUAN KUANTITAS SATUAN HARGA            
      0.792                                      (Rp.)    (Rp.)              
         A. TENAGA                                                           
         1. Pekerja            (L01) jam    4.0964  0.00     0.00            
         2. Tukang             (L02) jam    4.0964  0.00     0.00            
         3. Mandor             (L03) jam    0.6827  0.00     0.00            
                                    JUMLAH HARGA TENAGA      0.00            
         B. BAHAN                                                            
         1. Semen              (M12) Kg    237.9300 0.00     0.00            
         2. Pasir Beton        (M01a) M3    0.5960  0.00     0.00            
         3. Agregat Kasar      (M03) M3     0.9153  0.00     0.00            
         4. Kayu Perancah      (M19) M3     0.1000  0.00     0.00            
         5. Paku               (M18) Kg     1.2000  0.00     0.00            
      945 6. Air               (M170) Ltr  166.8600 0.00     0.00            
      1210 7. Plastizier       (M182) Kg    0.7138  0.00     0.00            
                                    JUMLAH HARGA BAHAN       0.00            
         C. PERALATAN                                                        
         1. Concrete Mixer     (E43) jam    0.6827  0.00     0.00            
         2 Concrete Vibrator   (E20) jam    0.6827  0.00     0.00            
         3 Water TankTruck     (E23) jam    0.0382  0.00     0.00            
         4 Alat Bantu                Ls     1.0000   0.00    0.00            
                                  JUMLAH HARGA PERALATAN     0.00            
         D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 0.00      
         E. OVERHEAD & PROFIT         10.0 % x D             0.00            
         F. HARGA SATUAN PEKERJAAN ( D + E )                 0.00            
        Note: 1 Satuan dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
           berat untuk bahan-bahan.                                          
          2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
           dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
           terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
          3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
          4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
           yang dibayar dari kontrak) dan biaya-biaya lainnya.               
    ITEM PEMBAYARAN NO. : 7.16.(2a)                        Analisa EI-7.16.(2a)
    JENIS PEKERJAAN    : Pipa Drainase Baja diameter 150 mm                  
    SATUAN PEMBAYARAN  : M                           URAIAN ANALISA HARGA SATUAN
     No.               U R A I A N         KODE  KOEF. SATUAN KETERANGAN     
     I. DATA DAN ASUMSI                                                      
      1 Pekerjaan dilakukan secara manual                                    
      2 Lokasi Pekerjaan : setiap jembatan                                   
      3 Bahan / material (deck drain) diterima seluruhnya di Lokasi Pekerjaan
      4 Pipa drainase baja dia 150 mm, tebal 2mm                             
      5 Jarak rata-rata Base Camp ke Lokasi Pekerjaan L 17.50 KM             
      6 Jam kerja efektif per-hari          Tk     7.00 jam                  
     II. URUTAN KERJA                                                        
      1 Material dan peralatan tersedia di Lokasi Pekerjaan                  
      2 Pipa cucuran baja dipasang dengan seksama                            
      3 Penyelesaian dan perapihan setelah pemasangan                        
     III. PEMAKAIAN BAHAN, ALAT DAN TENAGA                                   
     1. BAHAN                                                                
     1.a. Pipa baja 150 mm                 (M241)  3.00 M/batang             
       Jumlah per 1 m                              0.33 batang/m'            
     1.b. Baja (ducting, klem)             (M267)  1.00 Kg                   
     1.c. Pengelasan terpasang             (M51)   0.50 m'                   
     2. ALAT                                                                 
     2.a. Welding set                                                        
       Welding Set                                                           
       1 group kerja menghasilkan (Out put) Qt     60.00 M'/hari             
                                            Q1     8.6 M'/jam                
       Koefisien alat  = 1 : Q1             Kl     0 .12 jam                 
     2.b. ALAT BANTU                                                         
       Alat Pertukangan dan lain-lain                                        
     3. TENAGA                                                               
       Produksi pasang deck drain dalam 1 hari Qt   60 M'/hari               
       Kebutuhan tenaga:                                                     
                       - Pekerja            P      12.00 orang               
                       - Tukang             T      3.00 orang                
                       - Mandor             M      1.00 orang                
       Koefisien Tenaga / M :                                                
                       - Pekerja = (Tk x P) : Qt L01 1.4000 jam              
                       - Tukang = (Tk x T) : Qt L02 0.3500 jam               
                       - Mandor = (Tk x M) : Qt L03 0.1167 jam               
     4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT                              
       Lihat lampiran.                                                       
     5. ANALISA HARGA SATUAN PEKERJAAN                                       
       Lihat perhitungan dalam FORMULIR STANDAR UNTUK                        
       PEREKEMAN ANALISA MASING-MASING HARGA                                 
       SATUAN.                                                               
       Didapat Harga Satuan Pekerjaan :                                      
                     Rp.     18,641 / M                                      
     6. MASA PELAKSANAAN YANG DIPERLUKAN                                     
       Masa Pelaksanaan : . . . . . . . . . . . . bulan                      
     7. VOLUME PEKERJAAN YANG DIPERLUKAN                                     
       Volume pekerjaan :     0.00 M                                         
                                                    Analisa EI-7.16.(2a)     
                            FORMULIR STANDAR UNTUK                           
                       PEREKAMAN ANALISA MASING-MASING HARGA SATUAN          
        PROYEK                                                               
        No. PAKET KONTRAK : ………………………………………………                               
        NAMA PAKET        : …………………………………………………………………..                      
                           ………………………………………………………………….                        
        PROP / KAB / KODYA : ………………………………………………                              
        ITEM PEMBAYARAN NO. : 7.16.(2a)    PERKIRAAN VOL. PEK. : 12.50       
        JENIS PEKERJAAN   : Pipa Drainase Baja diameter 150 mm TOTAL HARGA (Rp.) : 0.00
        SATUAN PEMBAYARAN : M              % THD. BIAYA PROYEK : #DIV/0!     
                                      PERKIRAAN HARGA JUMLAH                 
        NO.        KOMPONEN     SATUAN KUANTITAS SATUAN HARGA                
                                              (Rp.)   (Rp.)                  
         A. TENAGA                                                           
         1. Pekerja         (L01) jam   1.4000   0.00    0.00                
         2. Tukang          (L02) jam   0.3500   0.00    0.00                
         3. Mandor          (L03) jam   0.1167   0.00    0.00                
                                 JUMLAH HARGA TENAGA     0.00                
         B. BAHAN                                                            
         1. Pipa baja 150 mm (M241) batang/m' 0 .33 0.00 0.00                
         2. Baja (ducting, klem) (M267) Kg 1.000 0.0     0.00                
         3. Kawat Las       (M51) m'     0.500   0.00    0.00                
                                 JUMLAH HARGA BAHAN      0.00                
         C. PERALATAN                                                        
         1. Welding set     E32b jam    0.1167 1 45,251.75 16,946.04         
         2. Alat Bantu            Ls    1.0000   0.00    0.00                
                               JUMLAH HARGA PERALATAN  16,946.04             
         D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 16,946.04 
         E. OVERHEAD & PROFIT      10.0 % x D           1,694.60             
         F. HARGA SATUAN PEKERJAAN ( D + E )           18,640.64             
        Note: 1 Satuan dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
           berat untuk bahan-bahan.                                          
          2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
           dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
           terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
          3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
          4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
           yang dibayar dari kontrak) dan biaya-biaya lainnya.               
    ITEM PEMBAYARAN NO. : 7.16.(3a)                        Analisa EI-7.16.(3a)
    JENIS PEKERJAAN    : Pipa Drainase PVC diameter 150 mm                   
    SATUAN PEMBAYARAN  : M'                          URAIAN ANALISA HARGA SATUAN
     No.               U R A I A N         KODE  KOEF. SATUAN KETERANGAN     
     I. DATA DAN ASUMSI                                                      
      1 Pekerjaan dilakukan secara manual                                    
      2 Lokasi Pekerjaan : setiap jembatan                                   
      3 Bahan / material (deck drain) diterima seluruhnya di Lokasi Pekerjaan
      4 Pipa drainase baja dia 150 mm, tebal 2mm                             
      5 Jarak rata-rata Base Camp ke Lokasi Pekerjaan L 17.50 KM             
      6 Jam kerja efektif per-hari          Tk     7.00 jam                  
     II. URUTAN KERJA                                                        
      1 Material dan peralatan tersedia di Lokasi Pekerjaan                  
      2 Pipa cucuran PVC dipasang dengan seksama                             
      3 Penyelesaian dan perapihan setelah pemasangan                        
     III. PEMAKAIAN BAHAN, ALAT DAN TENAGA                                   
     1. BAHAN                                      3.00 M/batang             
     1.a. Pipa PVC AW Dia 150 mm           (M240)  0.33 batang/m'            
     1.b. Baja Tulangan (ankur)            (M267)  1.50 Kg                   
     1.c. Lem PVC                          (M237)  0.10 Kg                   
     2. ALAT                                                                 
     2.a. ALAT BANTU                                                         
       Alat Pertukangan dan lain-lain                                        
     3. TENAGA                                                               
       Produksi pasang deck drain dalam 1 hari Qt   20 M'/hari               
       Kebutuhan tenaga:                                                     
                       - Pekerja            P      1.00 orang                
                       - Tukang             T      1.00 orang                
                       - Mandor             M      2.00 orang                
       Koefisien Tenaga / M :                                                
                       - Pekerja = (Tk x P) : Qt L01 0.3500 jam              
                       - Tukang = (Tk x T) : Qt L02 0.3500 jam               
                       - Mandor = (Tk x M) : Qt L03 0.7000 jam               
     4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT                              
       Lihat lampiran.                                                       
     5. ANALISA HARGA SATUAN PEKERJAAN                                       
       Lihat perhitungan dalam FORMULIR STANDAR UNTUK                        
       PEREKEMAN ANALISA MASING-MASING HARGA                                 
       SATUAN.                                                               
       Didapat Harga Satuan Pekerjaan :                                      
                     Rp.       0 / M                                         
     6. MASA PELAKSANAAN YANG DIPERLUKAN                                     
       Masa Pelaksanaan : . . . . . . . . . . . . bulan                      
     7. VOLUME PEKERJAAN YANG DIPERLUKAN                                     
       Volume pekerjaan :     0.00 M                                         
                                                    Analisa EI-7.16.(3a)     
                            FORMULIR STANDAR UNTUK                           
                       PEREKAMAN ANALISA MASING-MASING HARGA SATUAN          
        PROYEK                                                               
        No. PAKET KONTRAK : ………………………………………………                               
        NAMA PAKET        : …………………………………………………………………..                      
                           ………………………………………………………………….                        
        PROP / KAB / KODYA : ………………………………………………                              
        ITEM PEMBAYARAN NO. : 7.16.(3a)    PERKIRAAN VOL. PEK. : 146.62      
        JENIS PEKERJAAN   : Pipa Drainase PVC diameter 150 mm TOTAL HARGA (Rp.) : 0.00
        SATUAN PEMBAYARAN : M'             % THD. BIAYA PROYEK : #DIV/0!     
                                      PERKIRAAN HARGA JUMLAH                 
        NO.        KOMPONEN     SATUAN KUANTITAS SATUAN HARGA                
                                              (Rp.)   (Rp.)                  
         A. TENAGA                                                           
         1. Pekerja         (L01) jam   0.3500   0.00    0.00                
         2. Tukang          (L02) jam   0.3500   0.00    0.00                
         3. Mandor          (L03) jam   0.7000   0.00    0.00                
                                 JUMLAH HARGA TENAGA     0.00                
         B. BAHAN                                                            
         1. Pipa PVC AW Dia 150 mm (M240) batang/m' 0 .33 0.00 0.00          
         2. Baja Tulangan (ankur) (M267) Kg 1 .50 0.0    0.00                
         3. Lem PVC         (M237) Kg    0 .10   0.00    0.00                
                                 JUMLAH HARGA BAHAN      0.00                
         C. PERALATAN                                                        
         1. Alat Bantu            Ls    1.0000   0.00    0.00                
                               JUMLAH HARGA PERALATAN    0.00                
         D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 0.00      
         E. OVERHEAD & PROFIT      10.0 % x D            0.00                
         F. HARGA SATUAN PEKERJAAN ( D + E )             0.00                
        Note: 1 Satuan dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
           berat untuk bahan-bahan.                                          
          2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
           dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
           terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
          3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
          4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
           yang dibayar dari kontrak) dan biaya-biaya lainnya.               
    ITEM PEMBAYARAN NO. : 7.16.(4)                         Analisa EI-7.16.(4)
    JENIS PEKERJAAN    : Pipa Penyalur PVC                                   
    SATUAN PEMBAYARAN  : M'                          URAIAN ANALISA HARGA SATUAN
     No.               U R A I A N         KODE  KOEF. SATUAN KETERANGAN     
     I. DATA DAN ASUMSI                                                      
      1 Pekerjaan dilakukan secara manual                                    
      2 Lokasi Pekerjaan : setiap jembatan                                   
      3 Bahan / material (deck drain) diterima seluruhnya di Lokasi Pekerjaan
      4 Pipa drainase baja dia 150 mm, tebal 2mm                             
      5 Jarak rata-rata Base Camp ke Lokasi Pekerjaan L 17.50 KM             
      6 Jam kerja efektif per-hari          Tk     7.00 jam                  
     II. URUTAN KERJA                                                        
      1 Material dan peralatan tersedia di Lokasi Pekerjaan                  
      2 Pipa cucuran PVC dipasang dengan seksama                             
      3 Penyelesaian dan perapihan setelah pemasangan                        
     III. PEMAKAIAN BAHAN, ALAT DAN TENAGA                                   
     1. BAHAN                                      3.00 M/batang             
     1.a. Pipa PVC AW Dia 8 inch           (M240)  0.33 batang/m'            
     1.b. Baja Tulangan (ankur)            (M267)  1.50 Kg                   
     1.d. Lem PVC                          (M237)  0.10 Kg                   
     2. ALAT                                                                 
     2.b. ALAT BANTU                                                         
       Alat Pertukangan dan lain-lain                                        
     3. TENAGA                                                               
       Produksi pasang deck drain dalam 1 hari Qt   20 M'/hari               
       Kebutuhan tenaga:                                                     
                       - Pekerja            P      1.00 orang                
                       - Tukang             T      1.00 orang                
                       - Mandor             M      2.00 orang                
       Koefisien Tenaga / M :                                                
                       - Pekerja = (Tk x P) : Qt L01 0.3500 jam              
                       - Tukang = (Tk x T) : Qt L02 0.3500 jam               
                       - Mandor = (Tk x M) : Qt L03 0.7000 jam               
     4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT                              
       Lihat lampiran.                                                       
     5. ANALISA HARGA SATUAN PEKERJAAN                                       
       Lihat perhitungan dalam FORMULIR STANDAR UNTUK                        
       PEREKEMAN ANALISA MASING-MASING HARGA                                 
       SATUAN.                                                               
       Didapat Harga Satuan Pekerjaan :                                      
                     Rp.       0 / M                                         
     6. MASA PELAKSANAAN YANG DIPERLUKAN                                     
       Masa Pelaksanaan : . . . . . . . . . . . . bulan                      
     7. VOLUME PEKERJAAN YANG DIPERLUKAN                                     
       Volume pekerjaan :     0.00 M                                         
                                                    Analisa EI-7.16.(4)      
                            FORMULIR STANDAR UNTUK                           
                       PEREKAMAN ANALISA MASING-MASING HARGA SATUAN          
        PROYEK                                                               
        No. PAKET KONTRAK : ………………………………………………                               
        NAMA PAKET        : …………………………………………………………………..                      
                           ………………………………………………………………….                        
        PROP / KAB / KODYA : ………………………………………………                              
        ITEM PEMBAYARAN NO. : 7.16.(4)     PERKIRAAN VOL. PEK. : 0.00        
        JENIS PEKERJAAN   : Pipa Penyalur PVC TOTAL HARGA (Rp.) : 0.00       
        SATUAN PEMBAYARAN : M'             % THD. BIAYA PROYEK : #DIV/0!     
                                      PERKIRAAN HARGA JUMLAH                 
        NO.        KOMPONEN     SATUAN KUANTITAS SATUAN HARGA                
                                              (Rp.)   (Rp.)                  
         A. TENAGA                                                           
         1. Pekerja         (L01) jam   0.3500   0.00    0.00                
         2. Tukang          (L02) jam   0.3500   0.00    0.00                
         3. Mandor          (L03) jam   0.7000   0.00    0.00                
                                 JUMLAH HARGA TENAGA     0.00                
         B. BAHAN                                                            
         1. Pipa PVC AW Dia 8 inch (M240) batang/m' 0 .33 0.00 0.00          
         2. Baja Tulangan (ankur) (M267) Kg 1 .50 0.0    0.00                
         3. Lem PVC         (M237) Kg    0 .10   0.00    0.00                
                                 JUMLAH HARGA BAHAN      0.00                
         C. PERALATAN                                                        
         1. Alat Bantu            Ls    1.0000   0.00    0.00                
                               JUMLAH HARGA PERALATAN    0.00                
         D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 0.00      
         E. OVERHEAD & PROFIT      10.0 % x D            0.00                
         F. HARGA SATUAN PEKERJAAN ( D + E )             0.00                
        Note: 1 Satuan dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
           berat untuk bahan-bahan.                                          
          2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
           dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
           terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
          3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
          4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
           yang dibayar dari kontrak) dan biaya-biaya lainnya.               
        ITEM PEMBAYARAN NO. : 9.2.(10a)                    Analisa El-9210a  
        JENIS PEKERJAAN : Kerb Pracetak Jenis 1 (Peninggi/Mountable)         
        SATUAN PEMBAYARAN : M2                        URAIAN ANALISA HARGA SATUAN
                                                                             
         No.            U R A I A N       KODE  KOEF. SATUAN KETERANGAN      
         I. ASUMSI                                                           
          1 Menggunakan cara manual                                          
          2 Lokasi pekerjaan : sepanjang jalan                               
          3 Bahan dasar kerb pracetak jenis-1 dibuat di base camp, kemudian  
            diangkut dengan Truk ke lokasi pekerjaan                         
          4 Jarak rata-rata Base camp ke lokasi pekerjaan L 17.50 KM         
          5 Jam kerja efektif per-hari     Tk      7.00 jam                  
          6 Faktor kehilangan bahan        Fh      1.03 -                    
         II. URUTAN KERJA                                                    
          1 Tempat lokasi kerb pracetak disiapkan dg elevasi sesuai gambar   
          2 Semen, pasir dan air dicampur dan diaduk menjadi mortar dengan   
            menggunakan alat bantu, digunakan sbg dudukan kerb               
          3 Celah sambungan antar kerb harus diisi dengan mortar dg rapi     
            dan elevasi atas kerb harus rata                                 
         III. PEMAKAIAN BAHAN, ALAT DAN TENAGA                               
         1. BAHAN                                                            
         1.a. Beton Fc' 25 MPa =((0.15*0.25*1)+(0.15*0.1*1)*1.05 (cek lagi) (M37) 0.0551 M3
                                                          Sesuaikan dengan   
         1.b. Mortar = 0.05x0.15xFh               0.0077 M3 Gambar Rencana   
         2. ALAT                                                             
         2.a. Flat Bed Truck              (E11)                              
            Kapsitas Bak                   Cp     40.00 Buah                 
            Waktu Siklus :                 Ts                                
            - Memuat  = naik & atur rata-rata 3 menit/m T1 26.67 menit       
            - Angkut V=30 Km/jam = Lef x V x 60 T2 35.00 menit               
            - Kembali V=50 Km/jam= Lef x V x 60 T3 21.00 menit               
            - Menurunkan = Rata-rata 2 menit/m T4 40.00 menit                
            - Lain-lain = geser, atur, tunggu dll T5 7.00 menit              
                                           Ts     129.67 menit               
            Kap. Prod. / Jam  Cp           Q1     18.509 M                   
                              Ts : 60                                        
            Koefisien Alat / Meter = 1 : Q1 (E11) 0.0540 Jam                 
         2.b. ALAT BANTU                                                     
            - Pacul / Sekop                                                  
            - Cetakan besi                                                   
         3. TENAGA                                                           
            Produksi pasang kerb pracetak / hari = Tk x Q1 Qt 129.56 M'      
            Kebutuhan tenaga : - Mandor    M       1.00 orang                
                      - Tukang             Tb      4.00 orang                
                      - Pekerja            P      10.00 orang                
            Koefisien Tenaga / Buah :                                        
                      - Mandor = (Tk x M) : Qt (L03) 0.0540 jam              
                      - Tukang = (Tk x Tb) : Qt (L02) 0.2161 jam             
                      - Pekerja = (Tk x P) : Qt (L01) 0.5403 jam             
         4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT                          
            Lihat lampiran.                                                  
         5. ANALISA HARGA SATUAN PEKERJAAN                                   
            Lihat perhitungan dalam FORMULIR STANDAR UNTUK                   
            PEREKAMAN ANALISA MASING-MASING HARGA                            
            SATUAN.                                                          
            Didapat Harga Satuan Pekerjaan :                                 
                   Rp.    0.00 / Meter                                       
                                                          Berlanjut ke hal. berikut.
        ITEM PEMBAYARAN NO. : 9.2.(10a)                    Analisa El-9210a  
        JENIS PEKERJAAN : Kerb Pracetak Jenis 1 (Peninggi/Mountable)         
        SATUAN PEMBAYARAN : M2                        URAIAN ANALISA HARGA SATUAN
                                                               Lanjutan      
         No.            U R A I A N       KODE  KOEF. SATUAN KETERANGAN      
         6. MASA PELAKSANAAN YANG DIPERLUKAN                                 
            Masa Pelaksanaan : . . . . . . . . . . . bulan                   
         7. VOLUME PEKERJAAN YANG DIPERLUKAN                                 
            Volume pekerjaan : 0.00 Meter                                    
                                                           Analisa El-9210a  
                                                                             
                                 FORMULIR STANDAR UNTUK                      
                           PEREKAMAN ANALISA MASING-MASING HARGA SATUAN      
                                                                             
           PROYEK                                                            
           No. PAKET KONTRAK   : ………………………………………………                          
           NAMA PAKET          : …………………………………………………………………..                 
           PROP / KAB / KODYA  : ………………………………………………                          
           ITEM PEMBAYARAN NO. : 9.2.(10a)     PERKIRAAN VOL. PEK. : 0.00    
           JENIS PEKERJAAN     : Kerb Pracetak Jenis 1 (Peninggi/Mountable)TOTAL HARGA (Rp.) : 0.00
           SATUAN PEMBAYARAN   : M2            % THD. BIAYA PROYEK : #DIV/0! 
                                         PERKIRAAN HARGA    JUMLAH           
            NO.        KOMPONEN      SATUAN KUANTITAS SATUAN HARGA           
                                                   (Rp.)     (Rp.)           
            A. TENAGA                                                        
       0.0000                                                                
       0.24825 1. Pekerja Biasa (L01) jam    0.54     0.00       0.00        
            2. Tukang           (L02) jam    0.22     0.00       0.00        
            3. Mandor           (L03) jam    0.05     0.00       0.00        
                                            JUMLAH HARGA TENAGA  0.00        
            B. BAHAN                                                         
            1. Beton Fc' 25 MPa (M37) M3    0.0551    0.00       0.00        
            2  Mortar                 M3    0.0077    0.00       0.00        
                                             JUMLAH HARGA BAHAN  0.00        
            C. PERALATAN                                                     
                                                                             
            1. Flat Bed Truck    E11  Jam   0.054      -         0.00        
            2. Alat Bantu             Ls    1.000     0.00       0.00        
                                                                             
                                                                             
                                                                             
                                          JUMLAH HARGA PERALATAN 0.00        
            D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 0.00   
            E. OVERHEAD & PROFIT       10.0 % x D                0.00        
            F. HARGA SATUAN PEKERJAAN ( D + E )                  0.00        
           Note: 1 Satuan dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
               berat untuk bahan-bahan.                                      
             2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
               dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
               terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
             3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
             4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
               yang dibayar dari kontrak) dan biaya-biaya lainnya.           
        ITEM PEMBAYARAN NO. : 10.1.(17)                    Analisis EI-10117 
        JENIS PEKERJAAN : Pengecatan Kereb pada Trotoar atau Median          
        SATUAN PEMBAYARAN : M2                        URAIAN ANALISA HARGA SATUAN
        No.             U R A I A N       KODE  KOEF. SATUAN KETERANGAN      
                                                                             
         I. DATA DAN ASUMSI                                                  
         1  Pekerjaan dilakukan secara manual dan mekanis                    
         2  Bahan diterima di Lokasi Pekerjaan                               
         3  Permukaan kereb yang akan di cat bebas dari kerusakan            
         4  Cat Dasar Kebutuhan           We.Da    0.28 Kg / m2              
                      Berat volume        D.Das    1.30 Ton/m3               
         5  Kebutuhan Cat DekoratiKf ebutuhan We.Pr 0.25 Kg / m2             
                      Berat volume        D.Pr     1.40 Ton/m3               
         6  Jam kerja efektif per-hari     Tk      7.00 Jam                  
         7  Faktor kehilangan bahan termasuk dalam komponen bahan Fh 1.03    
         II URUTAN KERJA                                                     
          1 Permukaan kereb dibersihkan dengan cara mekanik/kimia            
          2 Permukaan kereb dibersihkan lebih lanjut dengan amplas no 60.    
          3 Pengecatan pertama dengan cat dasar setelah komponen binder dan  
            primer dicampur                                                  
          4 Pengecatan kedua dengan cat penutup setelah lapisan cat pertama  
            kering                                                           
          5 Pengecatan ketiga dengan cat penutup setelah lapisan cat kedua   
            kering (jika diperlukan)                                         
         III BAHAN PERALATAN DAN TENAGA KERJA                                
         1  Bahan                                                            
         1.a - Cat Dasar = We1 x Fh       M190     0.288 Kg                  
         1.b - Cat Dekoratif = We2 x Fh   M189     0.258 Kg                  
         1.c - pengencer (thinner) =10% x (Vol dasar+vol cat protektif) M33 0.041 liter
         III Alat                                                            
         2.a Water Jet Blasting            E64                               
            Kapasitas pembersihan          V        20 M2/jam                
            Faktor Efisiensi alat          Fa      0.83 -                    
            Kap. Prod. / jam = Q1 = V x Fa Q1      16.60 M2/Jam              
            Koefisien Alat / M3 = 1 : Q1   E64     0.06 Jam                  
         2b Alat bantu:                                                      
            Kuas cat                                                         
            Sikat kawat                                                      
            Amplas                                                           
            Soda api                                                         
            dsb                                                              
          3 TENAGA KERJA                                                     
            Alat yang mementukan pekerjaan, Q1 Q1  16.60 m2/jam              
            Produksi lubang per hari = Tk x Q1 Qt 116.20 m2                  
            Kebutuhan tenaga:                                                
                      Pekerja              P       5.00 orang                
                      Mandor               M       1.00 orang                
            Koefisien tenaga                                                 
                      Pekerja = (Tk x P) : Qt (L01) 0.3012 jam               
                      Mandor = (Tk x M) : Qt (L03) 0.0602 jam                
                                                          Berlanjut ke hal. berikut.
        ITEM PEMBAYARAN NO. : 10.1.(17)                    Analisis EI-10117 
        JENIS PEKERJAAN : Pengecatan Kereb pada Trotoar atau Median          
        SATUAN PEMBAYARAN : M2                    URAIAN ANALISA HARGA SATUAN
        No.             U R A I A N       KODE  KOEF. SATUAN KETERANGAN      
                                                                             
         5. ANALISA HARGA SATUAN PEKERJAAN                                   
            Lihat perhitungan dalam FORMULIR STANDAR UNTUK                   
            PEREKAMAN ANALISA MASING-MASING HARGA                            
            SATUAN.                                                          
            Didapat Harga Satuan Pekerjaan :                                 
                    Rp.   0.00 / M2                                          
         6. WAKTU PELAKSANAAN YANG DIPERLUKAN                                
            Masa Pelaksanaan : . . . . . . . . . . . . bulan                 
         7. VOLUME PEKERJAAN YANG DIPERLUKAN                                 
            Volume pekerjaan : 1.00 M2                                       
                                                           Analisis EI-10117 
                                 FORMULIR STANDAR UNTUK                      
                          PEREKAMAN ANALISA MASING-MASING HARGA SATUAN       
            PROYEK            : ………………………………………………                           
            No. PAKET KONTRAK : …………………………………………………………………..                  
            NAMA PAKET        : ………………………………………………                           
            PROP / KAB / KODYA : ………………………………………………                          
            ITEM PEMBAYARAN NO. : 10.1.(17)    PERKIRAAN VOL. PEK. : 586.94  
            JENIS PEKERJAAN   : Pengecatan Kereb pada Trotoar atau MTOedTiaAnL HARGA (Rp.) : 0.00
            SATUAN PEMBAYARAN : M2             % THD. BIAYA PROYEK : #DIV/0! 
                                         PERKIRAAN HARGA   JUMLAH            
            NO.       KOMPONEN      SATUAN KUANTITAS SATUAN HARGA            
                                                  (Rp.)     (Rp.)            
             A. TENAGA                                                       
             1. Pekerja Biasa  (L01) jam   0.3012 0.00          0.00         
             2. Mandor         (L03) jam   0.0602 0.00          0.00         
                                           JUMLAH HARGA TENAGA  0.00         
             B. BAHAN                                                        
             1  Cat Dasar      (M199) kg   0.2884     0.00      0.00         
             2  Cat Dekoratif  (M201) kg   0.2575     0.00      0.00         
             3  Thinner        (M33) Liter 0.0406     0.00      0.00         
                                            JUMLAH HARGA BAHAN  0.00         
             C. PERALATAN                                                    
             1  Water Jet Blasting (E64)   0.0602     -         0.00         
                                                                             
                                                                             
                                         JUMLAH HARGA PERALATAN 0.00         
             D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 0.00  
             E. OVERHEAD & PROFIT     10.0 % x D                0.00         
             F. HARGA SATUAN PEKERJAAN ( D + E )                0.00         
            Note: 1 Satuan dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
                berat untuk bahan-bahan.                                     
              2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
                dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
                terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
              3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
              4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
                yang dibayar dari kontrak) dan biaya-biaya lainnya.          
                                                            ANALISA BIAYA SEWA PERALATAN PER JAM KERJA (I)                                                   
                                                                                                                                                             
                   TENAGA KAPASITAS HARGA ALAT YANG DIPAKAI NILAI FAKTOR BIAYA PASTI PER JAM      BIAYA OPERASI PER JAM KERJA          TOTAL                 
                   ALAT  ALAT   ALAT     JAM        SISA PENGEM- BIAYA ASURANSI TOTAL BAHAN BAKAR & PELUMAS WORKSHOP PERBAIKAN dan PERAWATAN UPAH TOTAL BIAYA
                                     UMUR KERJA HARGA ALAT BALIAN PENGEM- DAN BIAYA BAHAN MINYAK                 OPERATOR PEMBANTU BIAYA SEWA ALAT           
                                     ALAT 1 TAHUN ALAT   MODAL BALIAN LAIN-LAIN PASTI / JAM BAKAR PELUMAS BIAYA KOEF. BIAYA KOEF. BIAYA / SOPIR OPERATOR OPERASI PER
                                                              MODAL                                                    / SOPIR / JAM  JAM KERJA              
                   (HP)   -     (Tahun) (Tahun) (Jam) (Rp.) (Rp.) - (Rp.) (Rp.) (Rp.) % % (Rp.) -  (Rp.) -   (Rp.) (Rp.) (Rp.) (Rp.)   (Rp.)  KET.           
No.  JENIS PERALATAN KODE                                                               f1 x HP x                 1 Orang 1 Orang                            
               ALAT                                      i(1+i)^A (B - C) x D 0.002 x B 10 0.25 Harga BBM 0.022 (g1 x B') 0.064 (g1 x B') Per Per            
                                                   (10% X B) ----------- ----------- ----------- (e1 + e2) s / d s / d + s / d ----- s / d ----------- Jam Kerja Jam Kerja F+G+H+I E + J
                                                         (1+i)^A-1 W W          12  0.35 f2 x HP x 0.028 W 0.09 W  =    =                                    
                                                                                        Harga Oli                 Rp0.0 Rp0.0                                
                   HP     Cp     B    A  W    B     C     D    e1   e2    E     f1  f2    F    g1  G    g1   G     H    I     J        K       L             
 1      2       2a  3     4      5    6  7    8      9    10   11   12    13    14  15   16    17  18   17   18   19   20     21       22      23            
 1. ASPHALT MIXING PLANT E01 294.0 60.0 T/Jam 0 10.0 1,500.0 0 0 0.16275 0.00 0.00 0.00 0.1200 0.0004 0.00 0.0280 0 0.0900 0.00 0.00 0.00 0.00 0.00 Pek. Ringan
 2. ASPHALT FINISHER E02 72.4 10.0 Ton 0 6.0 1,400.0 0 0 0.22961 0.00 0.00  0.00 0.1200 0.0004 0.00 0.0022 0.00 0.0900 0.00 0.00 0.00 0.00 0.00 Pek. Ringan  
 3. POWER BROOM E03 12.0 4,000.0 M2/Jam 0 5.0 1,200.0 0 0 0.26380 0.00 0.00 0.00 0.1200 0.0004 0.00 0.0022 0.00 0.0900 0.00 0.00 0.00 0.00 0.00 Pek. Ringan  
 4. BULLDOZER 100-150 HP E04 155.0 - - 0 5.0 2,000.0 0 0 0.26380 0.00 0.00  0.00 0.1000 0.0003 0.00 0.0280 0.00 0.0640 0.00 0.00 0.00 0.00 0.00 Pek. Berat   
 5. COMPRESSOR 4000-6500 L\M E05 75.0 5,000.0 CPM/(L/m) 0 5.0 2,000.0 0 0 0.26380 0.00 0.00 0.00 0.1000 0.0003 0.00 0.0280 0.00 0.0640 0.00 0.00 0.00 0.00 0.00 Pek. Berat
 6. CONCRETE MIXER 0.3-0.6 M3 E06 20.0 500.0 Liter 0 2.0 1,500.0 0 0 0.57619 0.00 0.00 0.00 0.1200 0.0004 0.00 0.0280 0.00 0.0900 0.00 0.00 0.00 0.00 0.00 Pek. Ringan
 7. CRANE 10-15 TON E07 138.0 15.0 Ton 0 5.0 2,000.0 0 0 0.26380 0.00 0.00  0.00 0.1000 0.0003 0.00 0.0280 0.00 0.0640 0.00 0.00 0.00 0.00 0.00 Pek. Berat   
 8. DUMP TRUCK 3 - 4 M3 E08 100.0 4.0 M3 0 5.0 2,000.0 0 0 0.26380 0.00 0.00 0.00 0.1000 0.0003 0.00 0.0280 0.00 0.0640 0.00 0.00 0.00 0.00 0.00 Pek. Berat  
 9. DUMP TRUCK 6-8 M3 E09 190.0 6.0 M3 0 5.0 2,000.0 0 0 0.26380 0.00 0.00  0.00 0.1000 0.0003 0.00 0.0280 0.00 0.0640 0.00 0.00 0.00 0.00 0.00 Pek. Berat   
 10. EXCAVATOR 80-140 HP E10 133.0 0.9 M3 0 5.0 2,000.0 0 0 0.26380 0.00 0.00 0.00 0.1000 0.0003 0.00 0.0280 0.00 0.0640 0.00 0.00 0.00 0.00 0.00 Pek. Berat 
 11. FLAT BED TRUCK 3-4 TON E11 100.0 4.0 ton 0 5.0 2,000.0 0 0 0.26380 0.00 0.00 0.00 0.1000 0.0003 0.00 0.0280 0.00 0.0640 0.00 0.00 0.00 0.00 0.00 Pek. Berat
 12. GENERATOR SET E12 180.0 135.0 KVA 0 5.0 2,000.0 0 0 0.26380 0.00 0.00  0.00 0.1000 0.0003 0.00 0.0280 0.00 0.0640 0.00 0.00 0.00 0.00 0.00 Pek. Berat   
 13. MOTOR GRADER >100 HP E13 135.0 10,800.0 - 0 5.0 2,000.0 0 0 0.26380 0.00 0.00 0.00 0.1000 0.0003 0.00 0.0280 0.00 0.0640 0.00 0.00 0.00 0.00 0.00 Pek. Berat
 14. TRACK LOADER 75-100 HP E14 70.0 0.8 M3 0 5.0 2,000.0 0 0 0.26380 0.00 0.00 0.00 0.1000 0.0003 0.00 0.0280 0.00 0.0640 0.00 0.00 0.00 0.00 0.00 Pek. Berat
 15. WHEEL LOADER 1.0-1.6 M3 E15 96.0 1.5 M3 0 5.0 2,000.0 0 0 0.26380 0.00 0.00 0.00 0.1000 0.0003 0.00 0.0280 0.00 0.0640 0.00 0.00 0.00 0.00 0.00 Pek. Berat
 16. THREE WHEEL ROLLER 6-8 T E16 55.0 8.0 Ton 0 5.0 2,000.0 0 0 0.26380 0.00 0.00 0.00 0.1000 0.0003 0.00 0.0280 0.00 0.0640 0.00 0.00 0.00 0.00 0.00 Pek. Berat
 17. TANDEM ROLLER 6-8 T. E17 74.3 6.9 Ton 0 5.0 2,000.0 0 0 0.26380 0.00 0.00 0.00 0.1000 0.0003 0.00 0.0280 0.00 0.0640 0.00 0.00 0.00 0.00 0.00 Pek. Berat
 18. TIRE ROLLER 8-10 T. E18 135.0 10.9 Ton 0 5.0 2,000.0 0 0 0.26380 0.00 0.00 0.00 0.1000 0.0003 0.00 0.0280 0.00 0.0640 0.00 0.00 0.00 0.00 0.00 Pek. Berat
 19. VIBRATORY ROLLER 5-8 T. E19 82.0 7.1 Ton 0 5.0 2,000.0 0 0 0.26380 0.00 0.00 0.00 0.1000 0.0003 0.00 0.0280 0.00 0.0640 0.00 0.00 0.00 0.00 0.00 Pek. Berat
 20. CONCRETE VIBRATOR E20 5.5 25.0 - 0 4.0 1,000.0 0  0 0.31547 0.00 0.00  0.00 0.1200 0.0004 0.00 0.0022 0.00 0.0900 0.00 0.00 0.00 0.00 0.00 Pek. Ringan  
 21. STONE CRUSHER E21 220.0 60.0 T/Jam 0 5.0 2,000.0 0 0 0.26380 0.00 0.00 0.00 0.1000 0.0003 0.00 0.0280 0.00 0.0640 0.00 0.00 0.00 0.00 0.00 Pek. Berat   
 22. WATER PUMP 70-100 mm E22 6.0 - - 0 3.0 2,000.0 0  0 0.40211 0.00 0.00  0.00 0.1000 0.0003 0.00 0.0280 0.00 0.0640 0.00 0.00 0.00 0.00 0.00 Pek. Berat   
 23. WATER TANKER 3000-4500 L. E23 135.0 4,000.0 Liter 0 5.0 2,000.0 0 0 0.26380 0.00 0.00 0.00 0.1000 0.0003 0.00 0.0280 0.00 0.0640 0.00 0.00 0.00 0.00 0.00 Pek. Berat
 24. PEDESTRIAN ROLLER E24 8.8 835.0 Ton 0 3.0 2,000.0 0 0 0.40211 0.00 0.00 0.00 0.1000 0.0003 0.00 0.0280 0.00 0.0640 0.00 0.00 0.00 0.00 0.00 Pek. Berat  
 25. TAMPER     E25 1.5 121.0 Ton   0 4.0 1,000.0 0    0 0.31547 0.00 0.00  0.00 0.1200 0.0004 0.00 0.0022 0.00 0.0900 0.00 0.00 0.00 0.00 0.00 Pek. Ringan  
 26. JACK HAMMER E26 0.0 1,330.0 -  0 5.0 2,000.0 0    0 0.26380 0.00 0.00  0.00 0.1000 0.0003 0.00 0.0280 0.00 0.0640 0.00 0.00 0.00 0.00 0.00 Pek. Berat   
 27. FULVI MIXER E27 345.0 2,005.0 - 0 4.0 1,000.0 0   0 0.31547 0.00 0.00  0.00 0.1200 0.0004 0.00 0.0022 0.00 0.0900 0.00 0.00 0.00 0.00 0.00 Pek. Ringan  
 28. CONCRETE PUMP E28 150.0 100.00 M3/jam 0 6.0 2,000.0 0 0 0.22961 0.00 0.00 0.00 0.1000 0.0003 0.00 0.0280 0.00 0.0640 0.00 0.00 0.00 0.00 0.00 Pek. Berat
 29. TRAILER 20 TON E29 175.0 20.00 Ton 0 6.0 2,000.0 0 0 0.22961 0.00 0.00 0.00 0.1000 0.0003 0.00 0.0280 0.00 0.0640 0.00 0.00 0.00 0.00 0.00 Pek. Berat   
 30. PILE DRIVER + HAMMER E30 25.0 2.50 Ton 0 5.0 2,000.0 0 0 0.26380 0.00 0.00 0.00 0.1000 0.0003 0.00 0.0280 0.00 0.0640 0.00 0.00 0.00 0.00 0.00 Pek. Berat
 31. CRANE ON TRACK 35 TON E31 125.0 35.00 Ton 0 6.0 2,000.0 0 0 0.22961 0.00 0.00 0.00 0.1000 0.0003 0.00 0.0280 0.00 0.0640 0.00 0.00 0.00 0.00 0.00 Pek. Berat
 32. WELDING SET E32 11.0 250.00 Amp 0 5.0 2,000.0 0   0 0.26380 0.00 0.00  0.00 0.1000 0.0003 0.00 0.0280 0.00 0.0640 0.00 0.00 0.00 0.00 0.00 Pek. Berat   
 33. BORE PILE MACHINE E33 150.0 2,000.0 Meter 0 6.0 2,000.0 0 0 0.22961 0.00 0.00 0.00 0.1000 0.0003 0.00 0.0280 0.00 0.0640 0.00 0.00 0.00 0.00 0.00 Pek. Berat
 34. ASPHALT LIQUID MIXER E34 5.0 1,000.0 Liter 0 4.0 2,000.0 0 0 0.31547 0.00 0.00 0.00 0.1000 0.0003 0.00 0.0280 - 0.0640 0.00 0.00 0.00 0.00 0.00 Pek. Berat
         KETERANGAN : 1 Tingkat Suku Bunga =   10.00 % per-tahun                                                                                             
                2 Upah Operator / Sopir / Mekanik = 0 Rupiah per-orang/jam                                                                                   
                3 Upah Pembantu Operator/Sopir/Mekanik = 0 Rupiah per-orang/jam                                                                              
                4 Harga Bahan Bakar Bensin =     0 Rupiah per-liter                                                                                          
                5 Harga Bahan Bakar Solar =      0 Rupiah per-liter                                                                                          
                6 Minyak Pelumas         =       0 Rupiah per-liter                                                                                          
                7 Pajak Pertambahan Nilai (PPN) diperhitungkan pada Lembar Rekapitulasi Biaya Pekerjaan                                                      
                8 Khusus AMP, biaya bahan bakar ditambah (untuk pemanasan material) sebesar : 12 Liter x (Kapasitas AMP Riil = 0.7 x Kapasitas AMP/Jam) x Harga BBM Solar , (kolom 16)
                                                            ANALISA BIAYA SEWA PERALATAN PER JAM KERJA (II)                                                  
                                                                                                                                                             
                   TENAGA KAPASITAS HARGA ALAT YANG DIPAKAI NILAI FAKTOR BIAYA PASTI PER JAM      BIAYA OPERASI PER JAM KERJA          TOTAL                 
                   ALAT  ALAT   ALAT     JAM        SISA PENGEM- BIAYA ASURANSI TOTAL BAHAN BAKAR & PELUMAS WORKSHOP PERBAIKAN & PERAWATAN UPAH TOTAL BIAYA  
                                     UMUR KERJA HARGA ALAT BALIAN PENGEM- DAN BIAYA BAHAN MINYAK                 OPERATOR PEMBANTU BIAYA SEWA ALAT           
                                     ALAT 1 TAHUN ALAT   MODAL BALIAN LAIN-LAIN PASTI / JAM BAKAR PELUMAS BIAYA KOEF. BIAYA KOEF. BIAYA / SOPIR OPERATOR OPERASI PER
                                                              MODAL                                                    / SOPIR / JAM  JAM KERJA              
                   (HP)   -     (Tahun) (Tahun) (Jam) (Rp.) (Rp.) - (Rp.) (Rp.) (Rp.) Lt/HP/Jam Ltr/HP/Jam (Rp.) - (Rp.) - (Rp.) (Rp.) (Rp.) (Rp.) (Rp.) KET.
No.  JENIS PERALATAN KODE                                                               f1 x HP x                 1 Orang 1 Orang                            
               ALAT                                      i(1+i)^A (B - C) x D 0.002 x B 10 0.25 Harga BBM 0.022 (g1 x B') 0.064 (g1 x B') Per Per            
                                                   (10% X B) ----------- ----------- ----------- (e1 + e2) s / d s / d + s / d ----- s / d ----------- Jam Kerja Jam Kerja F+G+H+I E + J
                                                         (1+i)^A-1 W W          12  0.35 f2 x HP x 0.028 W 0.09 W  =    =                                    
                                                                                        Harga Oli                 Rp0.0 Rp0.0                                
                   HP     Cp     B    A  W    B     C     D    e1   e2    E     f1  f2    F    g1  G    g1   G     H    I     J        K       L             
 1      2       2a  3     4      5    6  7    8      9    10   11   12    13    14  15   16    17  18   17   18   19   20     21       22      23            
 35. TRONTON 15 TON E35 150.0 15.0 Ton 0 10.0 1,500.0 0 0 0.16275 0.00 0.00 0.00 0.1200 0.0004 0.00 0.0280 0.00 0.0900 0.00 0.00 0.00 0.00 0.00 Pek. Ringan  
 36. COLD MILLING MACHINE E37 240.0 1,000.0 m 0 5.0 2,000.0 0 0 0.26380 0.00 0.00 0.00 0.1000 0.0003 0.00 0.0280 0.00 0.0640 0.00 0.00 0.00 0.00 0.00 Pek. Berat
 37. ROCK DRILL BREAKER E36 2.7 0.7 M3 0 10.0 1,500.0 0 0 0.16275 0.00 0.00 0.00 0.1200 0.0004 0.00 0.0280 0.00 0.0900 0.00 0.00 0.00 0.00 0.00 Pek. Ringan  
 38. COLD RECYCLER E38 900.0 2.2 M  0 5.0 2,000.0 0    0 0.26380 0.00 0.00  0.00 0.1000 0.0003 0.00 0.0280 0.00 0.0640 0.00 0.00 0.00 0.00 0.00 Pek. Berat   
 39. HOT RECYCLER E39 400.0 3.0 M   0 5.0 2,000.0 0    0 0.26380 0.00 0.00  0.00 0.1000 0.0003 0.00 0.0280 0.00 0.0640 0.00 0.00 0.00 0.00 0.00 Pek. Berat   
 40. AGGREGAT (CHIP) SPREADER E40 115.0 3.5 M 0 4.0 1,000.0 0 0 0.31547 0.00 0.00 0.00 0.1200 0.0004 0.00 0.0022 0.00 0.0900 0.00 0.00 0.00 0.00 0.00 Pek. Ringan
 41. ASPHALT DISTRIBUTOR E41 115.0 4,000.0 Liter 0 5.0 1,200.0 0 0 0.26380 0.00 0.00 0.00 0.1200 0.0004 0.00 0.0022 0.00 0.0900 0.00 0.00 0.00 0.00 0.00 Pek. Ringan
 42. SLIP FORM PAVER E42 174.0 7.0 M 0 6.0 2,000.0 0   0 0.22961 0.00 0.00  0.00 0.1000 0.0003 0.00 0.0280 0.00 0.0640 0.00 0.00 0.00 0.00 0.00 Pek. Berat   
 43. CONCRETE PAN MIXER E43 15.4 600.0 Liter 0 10.0 1,500.0 0 0 0.16275 0.00 0.00 0.00 0.1200 0.0004 0.00 0.0280 0.00 0.0900 0.00 0.00 0.00 0.00 0.00 Pek. Ringan
 44. CONCRETE BREAKER E44 290.0 20.0 m3/jam 0 5.0 2,000.0 0 0 0.26380 0.00 0.00 0.00 0.1000 0.0003 0.00 0.0280 0.00 0.0640 0.00 0.00 0.00 0.00 0.00 Pek. Berat
 45. ASPAHLT TANKER E45 190.0 4,000.0 liter 0 6.0 2,000.0 0 0 0.22961 0.00 0.00 0.00 0.1000 0.0003 0.00 0.0280 0.00 0.0640 0.00 0.00 0.00 0.00 0.00 Pek. Berat
 46. CEMENT TANKER E46 190.0 4,000.0 liter 0 6.0 2,000.0 0 0 0.22961 0.00 0.00 0.00 0.1000 0.0003 0.00 0.0280 0.00 0.0640 0.00 0.00 0.00 0.00 0.00 Pek. Berat
 47. CONDRETE MIXER (350) E47 20.0 350.0 liter 0 2.0 2,000.0 0 0 0.57619 0.00 0.00 0.00 0.1000 0.0003 0.00 0.0280 0.00 0.0640 0.00 0.00 0.00 0.00 0.00 Pek. Berat
 48. VIBRATING RAMMER E48 4.2 80.0 KG 0 4.0 1,000.0 0  0 0.31547 0.00 0.00  0.00 0.1200 0.0004 0.00 0.0022 0.00 0.0900 0.00 0.00 0.00 0.00 0.00 Pek. Ringan  
 49. TRUK MIXER (AGITATOR) E49 220.0 5.0 M3 0 5.0 2,000.0 0 0 0.26380 0.00 0.00 0.00 0.1000 0.0003 0.00 0.0280 0.00 0.0640 0.00 0.00 0.00 0.00 0.00 Pek. Berat
 50. BORE PILE MACHINE E50 125.0 60.0 CM 0 10.0 1,500.0 0 0 0.16275 0.00 0.00 0.00 0.1200 0.0004 0.00 0.0280 0.00 0.0900 0.00 0.00 0.00 0.00 0.00 Pek. Ringan
 51. CRANE ON TRACK 75-100 TON E51 200.0 75.0 Ton 0 5.0 2,000.0 0 0 0.26380 0.00 0.00 0.00 0.1000 0.0003 0.00 0.0280 0.00 0.0640 0.00 0.00 0.00 0.00 0.00 Pek. Berat
 52. BLENDING EQUIPMENT E52 50.0 30.0 Ton 0 10.0 1,500.0 0 0 0.16275 0.00 0.00 0.00 0.1200 0.0004 0.00 0.0280 0.00 0.0900 0.00 0.00 0.00 0.00 0.00 Pek. Ringan
 53. ASPHALT LIQUID MIXER E34a 40.0 20,000.0 Liter 0 4.0 2,000.0 0 0 0.31547 0.00 0.00 0.00 0.1000 0.0003 0.00 0.0280 0.00 0.0640 0.00 0.00 0.00 0.00 0.00 Pek. Berat
 54. BAR BENDER E53 3.0  0.0 0.0    0 8.0 1,250.0 0    0 0.18744 0.00 0.00  0.00 0.1200 0.0004 0.00 0.0022 0.00 0.0900 0.00 0.00 0.00 0.00 0.00 Pek. Ringan  
 55. BAR CUTTER E54 3.0  0.0 0.0    0 8.0 1,250.0 0    0 0.18744 0.00 0.00  0.00 0.1200 0.0004 0.00 0.0022 0.00 0.0900 0.00 0.00 0.00 0.00 0.00 Pek. Ringan  
 56. BREAKER    E55 170.0 15.0 m3/jam 0 5.0 2,000.0 0  0 0.26380 0.00 0.00  0.00 0.1000 0.0003 0.00 0.0280 0.00 0.0640 0.00 0.00 0.00 0.00 0.00 Pek. Berat   
 57. GROUTING PUMP E56 100.0 15.0 Ton 0 5.0 2,000.0 0  0 0.26380 0.00 0.00  0.00 0.1000 0.0003 0.00 0.0280 0.00 0.0640 0.00 0.00 0.00 0.00 0.00 Pek. Berat   
 58. JACK HIDROLIC E57 10.0 - -     0 5.0 2,000.0 0    0 0.26380 0.00 0.00  0.00 0.1000 0.0003 0.00 0.0280 0.00 0.0640 0.00 0.00 0.00 0.00 0.00 Pek. Berat   
 59. MESIN LAS  E58 3.0  0.2 Ton    0 3.0 900.0  0     0 0.40211 0.00 0.00  0.00 0.1200 0.0004 0.00 0.0022 0.00 0.0900 0.00 0.00 0.00 0.00 0.00 Pek. Ringan  
 60. PILE DRIVER LEADER, 75 kw E59 70.0 75.0 kw 0 5.0 9,600.0 0 0 0.26380 0.00 0.00 0.00 0.1000 0.0003 0.00 0.0280 0.00 0.0640 0.00 0.00 0.00 0.00 0.00 Pek. Berat
 61. PILE HAMMER E60 10.0 0.0 0.0   0 3.0 800.0  0     0 0.40211 0.00 0.00  0.00 0.1200 0.0004 0.00 0.0022 0.00 0.0900 0.00 0.00 0.00 0.00 0.00 Pek. Ringan  
 62. PILE HAMMER, 2,5 Ton E61 1.0 2.50 Ton 0 5.0 8,000.0 0 0 0.26380 0.00 0.00 0.00 0.1000 0.0003 0.00 0.0280 0.00 0.0640 0.00 0.00 0.00 0.00 0.00 Pek. Berat
 63. STRESSING JACK E62 89.0 15.00 Ton 0 5.0 1,800.0 0 0 0.26380 0.00 0.00  0.00 0.1000 0.0003 0.00 0.0280 0.00 0.0640 0.00 0.00 0.00 0.00 0.00 Pek. Berat   
 64. WELDING MACHINE, 300 A E63 5.0 0.00 0 0 5.0 10,000.0 0 0 0.26380 0.00 0.00 0.00 0.1000 0.0003 0.00 0.0280 0.00 0.0640 0.00 0.00 0.00 0.00 0.00 Pek. Berat
 65. ASPHALT MIXING PLANT (WARM MIEX0)1a 294.0 60.0 T/Jam 0 10.0 1,500.0 0 0 0.16275 0.00 0.00 0.00 0.1200 0.0004 0.00 0.0280 0 0.0900 0.00 0.00 0.00 0.00 0.00 Pek. Ringan
 66. ASPHALT MIXING PLANT (MODIFIKAES0I1, bASBUT2O9N4.)0 60.0 T/Jam 0 10.0 1,500.0 0 0 0.16275 0.00 0.00 0.00 0.1200 0.0004 0.00 0.0280 0 0.0900 0.00 0.00 0.00 0.00 0.00 Pek. Ringan
 67. TANDEM ROLLER 8-10 T. E17a 100.0 10.0 Ton 0 5.0 2,000.0 0 0 0.26380 0.00 0.00 0.00 0.1000 0.0003 0.00 0.0280 0.00 0.0640 0.00 0.00 0.00 0.00 0.00 Pek. Berat
 68.                                                                                                                                                         
         KETERANGAN : 1 Tingkat Suku Bunga =   10.00 % per-tahun                                                                                             
                2 Upah Operator / Sopir / Mekanik = 0 Rupiah per-orang/jam                                                                                   
                3 Upah Pembantu Operator/Sopir/Mekanik = 0 Rupiah per-orang/jam                                                                              
                4 Harga Bahan Bakar Bensin =     0 Rupiah per-liter                                                                                          
                5 Harga Bahan Bakar Solar =      0 Rupiah per-liter                                                                                          
                6 Minyak Pelumas         =       0 Rupiah per-liter                                                                                          
                7 Pajak Pertambahan Nilai (PPN) diperhitungkan pada Lembar Rekapitulasi Biaya Pekerjaan                                                      
                8 Khusus AMP, biaya bahan bakar ditambah (untuk pemanasan material) sebesar : 12 Liter x (Kapasitas AMP Riil = 0.7 x Kapasitas AMP/Jam) x Harga BBM Solar , (kolom 16)
                9 AMP , Aspal Sprayer, Aspal Distribusi ditambah bahan bakar untuk pemanasan Aspal = 1/1000 x Kapasitas tangki aspal x harga bahan bakar solar ( lihat E 01 , E 03, E 41)
                   TENAGA KAPASITAS HARGA ALAT YANG DIPAKAI NILAI FAKTOR BIAYA PASTI PER JAM      BIAYA OPERASI PER JAM KERJA          TOTAL                 
                   ALAT  ALAT   ALAT     JAM        SISA PENGEM- BIAYA ASURANSI TOTAL BAHAN BAKAR & PELUMAS WORKSHOP PERBAIKAN & PERAWATAN UPAH TOTAL BIAYA  
                                     UMUR KERJA HARGA ALAT BALIAN PENGEM- DAN BIAYA BAHAN MINYAK                 OPERATOR PEMBANTU BIAYA SEWA ALAT           
                                     ALAT 1 TAHUN ALAT   MODAL BALIAN LAIN-LAIN PASTI / JAM BAKAR PELUMAS BIAYA KOEF. BIAYA KOEF. BIAYA / SOPIR OPERATOR OPERASI PER
                                                              MODAL                                                    / SOPIR / JAM  JAM KERJA              
                   (HP)   -     (Tahun) (Tahun) (Jam) (Rp.) (Rp.) - (Rp.) (Rp.) (Rp.) Lt/HP/Jam Ltr/HP/Jam (Rp.) - (Rp.) - (Rp.) (Rp.) (Rp.) (Rp.) (Rp.) KET.
No.  JENIS PERALATAN KODE                                                               f1 x HP x                 1 Orang 1 Orang                            
               ALAT                                      i(1+i)^A (B - C) x D 0.002 x B 10 0.25 Harga BBM 0.022 (g1 x B') 0.064 (g1 x B') Per Per            
                                                   (10% X B) ----------- ----------- ----------- (e1 + e2) s / d s / d + s / d ----- s / d ----------- Jam Kerja Jam Kerja F+G+H+I E + J
                                                         (1+i)^A-1 W W          12  0.35 f2 x HP x 0.028 W 0.09 W  =    =                                    
                                                                                        Harga Oli                Rp30,066.2 Rp25,803.3                       
                   HP     Cp     B    A  W    B     C     D    e1   e2    E     f1  f2    F    g1  G    g1   G     H    I     J        K       L             
 1      2       2a  3     4      5    6  7    8      9    10   11   12    13    14  15   16    17  18   17   18   19   20     21       22      23            
 68. MINI EXCAVATOR 40-60 HP E10a 0.0 0.2 M3 0 5.0 1,200.0 0 0.26380 0.00 0.00 0.00 0.1200 0.0004 0.00 0.0022 0.00 0.0900 0.00 0.00 0.00 0.00 0.00 Pek. Ringan
 69. BABY VIBRATORY ROLLER 1-2 T. E19a 0.0 1.5 Ton 0 5.0 1,200.0 0 0.26380 0.00 0.00 0.00 0.1200 0.0004 0.00 0.0022 0.00 0.0900 0.00 0.00 0.00 0.00 0.00 Pek. Ringan
 70. WATER JET BLASTING E64 0.0 100.0 Liter 0 3.0 1,200.0 0 0.40211 0.00 0.00 0.00 0.1200 0.0004 0.00 0.0022 0.00 0.0900 0.00 0.00 0.00 0.00 0.00 Pek. Ringan
 71. KUNCI TORSI 200-1000N.M E74 0.0 1.0 buah baut 0 2.0 1,200.0 0 0.57619 0.00 0.00 0.00 0.1200 0.0004 0.00 0.0022 0.00 0.0900 0.00 0.00 0.00 0.00 0.00 Pek. Ringan
 72. POMPA + MIXER EPOXY, 810 Watt E75 1.1 0.8 l/mnt 0 2.0 1,200.0 0 0.57619 0.00 0.00 0.00 0.1200 0.0004 0.00 0.0022 0.00 0.0900 0.00 0.00 0.00 0.00 0.00 Pek. Ringan
 73. CONCRETE CUTTER 130 feet/mnt E76 13.0 39.6 m/menit 0 2.0 1,200.0 0 0.57619 0.00 0.00 0.00 0.1200 0.0004 0.00 0.0022 0.00 0.0900 0.00 0.00 0.00 0.00 0.00 Pek. Ringan
 74. SAND BLASTING E77 75.0 10.0 m2/jam 0 2.0 1,200.0  0 0.57619 0.00 0.00  0.00 0.1200 0.0004 0.00 0.0022 0.00 0.0900 0.00 0.00 0.00 0.00 0.00 Pek. Ringan  
 75. MOBILE CRANE 1 TON E78 190.0 1.0 Ton 0 5.0 2,000.0 0 0.26380 0.00 0.00 0.00 0.1000 0.0003 0.00 0.0280 0.00 0.0640 0.00 0.00 0.00 0.00 0.00 Pek. Berat   
 76. DRUM MIXER E79 20.0 4.0 Ton/jam 0 2.0 1,200.0     0 0.57619 0.00 0.00  0.00 0.1200 0.0004 0.00 0.0022 0.00 0.0900 0.00 0.00 0.00 0.00 0.00 Pek. Ringan  
 77. STAMPER    E81 22.0 60.0 m2/jam 0 2.0 1,200.0     0 0.57619 0.00 0.00  0.00 0.1200 0.0004 0.00 0.0022 0.00 0.0900 0.00 0.00 0.00 0.00 0.00 Pek. Ringan  
 78. JACK HIDROLIK JEMBATAN E82 22.0 50.0 Ton 0 5.0 1,200.0 0 0.26380 0.00 0.00 0.00 0.1200 0.0004 0.00 0.0022 0.00 0.0900 0.00 0.00 0.00 0.00 0.00 Pek. Ringan
 79. HYDROLIC PUMP E83 22.0 30.0 Mpa 0 5.0 1,200.0     0 0.26380 0.00 0.00  0.00 0.1200 0.0004 0.00 0.0022 0.00 0.0900 0.00 0.00 0.00 0.00 0.00 Pek. Ringan  
 80 MANIFOLD    E84 0.0  1.0 0.0    0 2.0 1,200.0      0 0.57619 0.00 0.00  0.00 0.1200 0.0004 0.00 0.0022 0.00 0.0900 0.00 0.00 0.00 0.00 0.00 Pek. Ringan  
 81. THERMOPLASTIC SPREADING MACHE8IN5E 5.5 1,300.0 m/jam 0 5.0 1,200.0 0 0.26380 0.00 0.00 0.00 0.1200 0.0004 0.00 0.0022 0.00 0.0900 0.00 0.00 0.00 0.00 0.00 Pek. Ringan
 82 COLD PAINT SRAY MACHINE E86 5.5 1,300.0 m/jam 0 5.0 1,200.0 0 0.26380 0.00 0.00 0.00 0.1200 0.0004 0.00 0.0022 0.00 0.0900 0.00 0.00 0.00 0.00 0.00 Pek. Ringan
 83 FLAT BED TRUCK 10 TON E11a 190.0 8.0 M3 0 5.0 2,000.0 0 0 0.26380 0.00 0.00 0.00 0.1000 0.0003 0.00 0.0280 0.00 0.0640 0.00 0.00 0.00 0.00 0.00 Pek. Berat
         KETERANGAN : 1 Tingkat Suku Bunga =   10.00 % per-tahun                                                                                             
                2 Upah Operator / Sopir / Mekanik = 30,066 Rupiah per-orang/jam                                                                              
                3 Upah Pembantu Operator/Sopir/Mekanik = 25,803 Rupiah per-orang/jam                                                                         
                4 Harga Bahan Bakar Bensin =   7,000 Rupiah per-liter                                                                                        
                5 Harga Bahan Bakar Solar =    9,800 Rupiah per-liter                                                                                        
                6 Minyak Pelumas         =     42,000 Rupiah per-liter                                                                                       
                7 Pajak Pertambahan Nilai (PPN) diperhitungkan pada Lembar Rekapitulasi Biaya Pekerjaan                                                      
                8 Khusus AMP, biaya bahan bakar ditambah (untuk pemanasan material) sebesar : 12 Liter x (Kapasitas AMP Riil = 0.7 x Kapasitas AMP/Jam) x Harga BBM Solar , (kolom 16)
                9 AMP , Aspal Sprayer, Aspal Distribusi ditambah bahan bakar untuk pemanasan Aspal = 1/1000 x Kapasitas tangki aspal x harga bahan bakar solar ( lihat E 01 , E 03, E 41)
Tenders also won by CV Pabila Bangun Perkasa