| Reason | |||
|---|---|---|---|
| 0945746170127000 | Rp 288,000,111 | - | |
| 0828248435124000 | Rp 294,660,000 | - | |
| 0652602491119000 | Rp 240,000,000 | Tidak hadir klarifikasi teknis. | |
| 0750031866118000 | Rp 284,174,707 | Tidak melampirkan SBU BG 009. | |
| 0210245056122000 | Rp 293,910,000 | Tidak melampirkan SBU BG 009. | |
| 0958687311121000 | - | - | |
| 0315246249122000 | - | - | |
| 0532785151118000 | - | - | |
| 0210043485118000 | - | - | |
| 0029317120128000 | - | - | |
| 0769438078121000 | - | - | |
| 0625397559205000 | - | - | |
CV Render Consultant | 09*1**8****18**0 | - | - |
| 0403335235117000 | - | - | |
CV Marta Infrastruktur | 05*5**1****01**0 | - | - |
| 0022605497118000 | - | - | |
| 0024935348122000 | - | - | |
| 0934190026119000 | - | - | |
CV Putri Lestari | 06*1**7****18**0 | - | - |
| 0211027016119000 | - | - | |
| 0410355143118000 | - | - | |
| 0830042792119000 | - | - | |
| 0032281826124000 | - | - | |
| 0719014714118000 | - | - |
PEMERINTAH KABUPATEN MANDAILING NATAL
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
RENCANA KERJBAI LALN OGFG QARUAANNTITY
(BQ)
PROGRAM :
PENATAAN BANGUNAN GEDUNG
Kegiatan : PENYELENGGARAAN BANGUNAN GEDUNG DI WILAYAH DAERAH
KABUPATEN/KOTA, PEMBERIAN IZIN MENDIRIKAN BANGUNAN (IMB) DAN
SERTIFIKAT LAIK FUNGSI BANGUNAN GEDUNG
Pekerjaan : PEMBANGUNAN PAGAR BAGAS GODANG
Lokasi : Kabupaten Mandailing Natal
Tahun Anggaran : 2023
Sumber Dana : DAU (Dana Alokasi Umum)
Jumlah Biaya : Rp. -
Terbilang : -
REKAPITULASI
(BQ)
Provinsi : Sumatera Utara
Kabupaten : Mandailing Natal
Program : PENATAAN BANGUNAN GEDUNG
Kegiatan : PENYELENGGARAAN BANGUNAN GEDUNG DI WILAYAH DAERAH
KABUPATEN/KOTA, PEMBERIAN IZIN MENDIRIKAN BANGUNAN (IMB) DAN
SERTIFIKAT LAIK FUNGSI BANGUNAN GEDUNG
Pekerjaan : REHABILITASI AULA KANTOR CAMAT BATANG NATAL
Lokasi : Kecamatan Batang Natal
Tahun Anggaran : 2023
JUMLAH HARGA
NO. URAIAN PEKERJAAN
( Rp.)
A. PEKERJAAN PENDAHULUAN
B. PEKERJAAN TANAH
C. PEKERJAAN PASANG BATU KALI
D. PEKERJAAN BETON BERTULANG
E. PEKERJAAN PASANGAN BATA DAN PLESTERAN
F. PEKERJAAN ORNAMEN PAGAR BESI STAINLESSTEEL
G. PEKERJAAN PENGECATAN
I TOTAL HARGA PEKERJAAN (A+B+C+D+E+F+G) 0.00
II DIBULATKAN -
Terbilang :
…............, / …...../…...
Penawar,
PT/CV/…................
…........................
Penanggung Jawab Perusahaan
BILL OF QUANTITY
(BQ)
Provinsi : Sumatera Utara
Kabupaten : Mandailing Natal
Program : PENATAAN BANGUNAN GEDUNG
Kegiatan : PENYELENGGARAAN BANGUNAN GEDUNG DI WILAYAH DAERAH KABUPATEN/KOTA, PEMBERIAN IZIN MENDIRIKAN BANGUNAN (IMB) DAN
SERTIFIKAT LAIK FUNGSI BANGUNAN GEDUNG
Pekerjaan : REHABILITASI AULA KANTOR CAMAT BATANG NATAL
Lokasi : Kecamatan Batang Natal
Tahun Anggaran : 2023
HARGA SATUAN JUMLAH HARGA PPN TOTAL HARGA
NO. URAIAN PEKERJAAN ANALISA VOLUME
(Rp) (Rp) 11% (Rp)
1 2 3 4 5 6 7 8
A. PEKERJAAN PENDAHULUAN
1 Papan Nama Proyek ---- 1.00 Ls - - -
2 Pengukuran Kembali / Bowplank ---- 1.00 Ls - - -
3 Foto Dokumentasi ---- 1.00 Ls - - -
4 Kesehatan dan Keselamatan Kerja (K3) ----
- Helm ---- 8.00 Bh - - - -
- Rompi Pengaman ---- 8.00 Bh - - - -
- Sepatu Karet ---- 8.00 Psg - - - -
- Peralatan P3K ---- 1.00 Set - - - -
- Bendera K3 ---- 1.00 Ls - - - -
- Rambu Petunjuk ---- 1.00 Ls - - - -
- Rambu Larangan ---- 1.00 Ls - - - -
- Rambu Peringatan ---- 1.00 Ls - - - -
- Rambu Informasi ---- 1.00 Ls - - - -
- Rambu Kewajiban ---- 1.00 Ls - - - -
Sub Total A -
B. PEKERJAAN TANAH
1 Galian Tanah AHSP A.2.3.1.1 19.80 m3 - - - -
2 Urugan Tanah Kembali AHSP A.2.3.1.9 6.60 m3 - - - -
3 Urugan Pasir Bawah Pondasi AHSP A.2.3.1.11 1.20 m3 - - - -
Sub Total B -
C. PEKERJAAN PASANG BATU KALI
1 Pondasi Batu Kali 1:4 AHSP A.3.2.1.2 9.60 m3 - - - -
Sub Total C -
D. PEKERJAAN BETON BERTULANG
1 Pondasi Tapak Tipe P1
- Cor Lantai Kerja Beton K-100 AHSP A.4.1.1.1 0.85 m3 - - - -
- Cor Beton Tapak K.150 AHSP A.4.1.1.3 2.70 m3 - - - -
- Pembesian AHSP A.4.1.1.17 362.20 kg - - - -
- Bekisting AHSP A.4.1.1.20 13.20 m2 - - - -
2 Kolom K1 Uk. 35x60cm
- Cor Beton K.150 AHSP A.4.1.1.3 8.61 m3 - - - -
- Pembesian AHSP A.4.1.1.17 652.52 kg - - - -
- Bekisting AHSP A.4.1.1.22 77.90 m2 - - - -
3 Sloof Tipe S1 Uk. 20x45cm
- Cor Beton K.100 Lantai Kerja Sloof AHSP A.4.1.1.1 1.60 m3 - - - -
- Cor Beton K.150 AHSP A.4.1.1.3 4.66 m3 - - - -
- Pembesian AHSP A.4.1.1.17 821.54 kg - - - -
- Bekisting AHSP A.4.1.1.21 20.70 m2 - - - -
4 Sloof Tipe S2 Uk. 20x20cm
- Beton K-150 AHSP A.4.1.1.3 1.22 m3 - - - -
- Pembesian AHSP A.4.1.1.17 108.45 Kg - - - -
Page 3 of 21
- Bekisting AHSP A.4.1.1.21 12.80 m2 - - - -
HARGA SATUAN JUMLAH HARGA PPN TOTAL HARGA
NO. URAIAN PEKERJAAN ANALISA VOLUME
(Rp) (Rp) 11% (Rp)
1 2 3 4 5 6 7 8
5 Kolom Tipe K2 Uk. 20x20cm
- Cor Beton K.150 AHSP A.4.1.1.3 0.52 m3 - - - -
- Pembesian AHSP A.4.1.1.17 55.93 Kg - - - -
- Bekisting AHSP A.4.1.1.22 10.40 m2 - - - -
6 Balok Uk. 15x20cm
- Cor Beton K.150 AHSP A.4.1.1.3 1.14 m3 - - - -
- Pembesian AHSP A.4.1.1.17 128.23 Kg - - - -
- Bekisting AHSP A.4.1.1.23 20.90 m2 - - - -
Sub Total C -
E. PEKERJAAN PASANGAN BATA DAN PLESTERAN
1 Pas. Tembok Bata AHSP A.4.4.1.9 43.70 m2 - - - -
2 Plesteran AHSP A.4.4.2.4 87.40 m2 - - - -
4 Acian - - -
- Acian Pas. Bata AHSP A.4.4.2.27 87.40 m2 - - - -
- Acian Balok Uk. 15x20cm AHSP A.4.4.2.27 20.90 m2 - - - -
- Acian Sloof S1 Uk. 20x45cm AHSP A.4.4.2.27 36.23 m2 - - - -
- Acian Kolom K2 Uk. 20x20cm AHSP A.4.4.2.27 6.50 m2 - - - -
5 Pasang Batu Rooster Upah+Bahan 24.00 Bh - - - -
6 Pasang Batu Alam Pembalut Kolom Pagar (K1) AHSP A.4.4.3.58 52.20 m2 - - - -
Sub Total D -
F. PEKERJAAN ORNAMEN PAGAR BESI STAINLESSTEEL
1 Pagar Tipe A (12 Unit)
- Pipa Besi Stainlessteel Uk. Ø 2" Bahan 255.00 m - - - -
- Pipa Besi Stainlessteel Uk. Ø 1" Bahan 144.00 m - - - -
- Pekerjaan Merakit, Pengelasan dan Pemasangan Pagar AHSP A.4.2.1.5 7 ,920.00 cm - - - -
2 Pagar Tipe A1 (2 Unit)
- Pipa Besi Stainlessteel Uk. Ø 2" Bahan 43.00 m - - - -
- Pipa Besi Stainlessteel Uk. Ø 1" Bahan 24.00 m - - - -
- Pekerjaan Merakit, Pengelasan dan Pemasangan Pagar AHSP A.4.2.1.5 1 ,320.00 cm - - - -
3 Pagar Tipe B (2 Unit)
- Pipa Besi Stainlessteel Uk. Ø 2" Bahan 15.20 m - - - -
- Pipa Besi Stainlessteel Uk. Ø 1" Bahan 7.50 m - - - -
- Pekerjaan Merakit, Pengelasan dan Pemasangan Pagar AHSP A.4.2.1.5 440.00 cm - - - -
4 Pagar Tipe C (1 Unit)
- Pipa Besi Stainlessteel Uk. Ø 2" Bahan 17.50 m - - - -
- Pipa Besi Stainlessteel Uk. Ø 1" Bahan 9.00 m - - - -
- Pekerjaan Merakit, Pengelasan dan Pemasangan Pagar AHSP A.4.2.1.5 520.00 cm - - - -
5 Pekerjaan Relief
- Relief Kepala Kolom Pagar (K1) Upah+Bahan 54.00 m - - - -
- Relief Badan Kolom Pagar (K1) Upah+Bahan 56.00 m - - - -
- Relief Kepala Sloof S1 Upah+Bahan 103.50 m - - - -
6 Dynabolt dan Self Drilling Upah+Bahan 136.00 Bh - - - -
7 Pintu Utama Pagar
- Pipa Besi Stainlessteel Uk. Ø 2" Bahan 126.84 m - - - -
- Pipa Besi Stainlessteel Uk. Ø 1" Bahan 50.40 m - - - -
- Pekerjaan Merakit, Pengelasan dan Pemasangan Pagar AHSP A.4.2.1.5 1 ,850.00 cm - - - -
- Besi Siku Uk. 50x50x5mm Sebagai Rel Pagar Upah+Bahan 24.00 m - - - -
- Pasang Roda Pintu Pagar Upah+Bahan 10.00 Bh - - - -
Sub Total F -
Page 4 of 21
HARGA SATUAN JUMLAH HARGA PPN TOTAL HARGA
NO. URAIAN PEKERJAAN ANALISA VOLUME
(Rp) (Rp) 11% (Rp)
1 2 3 4 5 6 7 8
G. PEKERJAAN PENGECATAN
1 Cat Tembok AHSP A.4.7.1.10 144.53 m2 - - - -
Sub Total F -
I TOTAL HARGA PEKERJAAN (A+B+C+D+E+F+G) -
II DIBULATKAN -
Terbilang : Tiga Ratus Juta Rupiah,-
…............, / …...../…...
Penawar,
PT/CV/…................
…........................
Penanggung Jawab Perusahaan
Page 5 of 21
ANALISA HARGA SATUAN PEKERJAAN (AHSP)
Permen PU No.01 Tahun 2022
Provinsi : Sumatera Utara
Kabupaten : Mandailing Natal
Program : PENATAAN BANGUNAN GEDUNG
Kegiatan : PENYELENGGARAAN BANGUNAN GEDUNG DI WILAYAH DAERAH KABUPATEN/KOTA, PEMBERIAN IZIN
MENDIRIKAN BANGUNAN (IMB) DAN SERTIFIKAT LAIK FUNGSI BANGUNAN GEDUNG
Pekerjaan : REHABILITASI AULA KANTOR CAMAT BATANG NATAL
Lokasi : Kecamatan Batang Natal
Tahun Anggaran : 2023
1 M3 KODE
Penggalian Tanah Biasa Sedalam 1 M AHSP A.2.3.1.1
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
Rp. Rp.
A TENAGA
Pekerja L.01 OH 0 .7500 - -
Mandor L.04 OH 0 .0250 - -
JUMLAH HARGA TENAGA KERJA -
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA PERALATAN -
D JUMLAH (A+B+C) -
E OVERHEAD & PROFIT =10% -
F HARGA SATUAN PEKERJAAN (D+E) -
HARGA SATUAN / m3 Rp. -
1 M3 KODE
Pengurugan Kembali Galian Tanah AHSP A.2.3.1.9
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
Rp. Rp.
A TENAGA
Pekerja L.01 OH 0 .5000 - -
Mandor L.04 OH 0 .0500 - -
JUMLAH HARGA TENAGA KERJA -
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA PERALATAN -
D JUMLAH (A+B+C) -
E OVERHEAD & PROFIT =10% -
F HARGA SATUAN PEKERJAAN (D+E) -
HARGA SATUAN / m3 Rp. -
1 M3 KODE
Pengurugan dengan Pasir Urug AHSP A.2.3.1.11
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
Rp. Rp.
A TENAGA
Pekerja L.01 OH 0 .3000 - -
Mandor L.04 OH 0 .0100 - -
JUMLAH HARGA TENAGA KERJA -
B BAHAN
Pasir Urug m3 1 .2000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA PERALATAN -
D JUMLAH (A+B+C) -
E OVERHEAD & PROFIT =10% -
F HARGA SATUAN PEKERJAAN (D+E) -
HARGA SATUAN / m3 Rp. -
1 M3 KODE
Pengurugan dengan Tanah AHSP A.2.3.1.14.a
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
Rp. Rp.
A TENAGA
Pekerja L.01 OH 0 .2500 - -
Mandor L.04 OH 0 .0250 - -
JUMLAH HARGA TENAGA KERJA -
B BAHAN
Tanah Urug 1 .2000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA PERALATAN -
D JUMLAH (A+B+C) -
E OVERHEAD & PROFIT =10% -
F HARGA SATUAN PEKERJAAN (D+E) -
HARGA SATUAN / m3 Rp. -
1 M3 KODE
Pemasangan Pondasi Batu Kali Bulat Campuran 1 SpP : 4 PP AHSP A.3.2.1.2
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
Rp. Rp.
A TENAGA
Pekerja L.01 OH 1 .5000 - -
Tukang Batu L.02 OH 0 .7500 - -
Kepala Tukang L.03 OH 0 .0750 - -
Mandor L.04 OH 0 .0750 - -
JUMLAH HARGA TENAGA KERJA -
B BAHAN
Batu Kali Bulat m3 1 .2000 - -
Semen Kg 1 63.0000 - -
Pasir Pasang (PP) m3 0 .5200 - -
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA PERALATAN -
D JUMLAH (A+B+C) -
E OVERHEAD & PROFIT =10% -
F HARGA SATUAN PEKERJAAN (D+E) -
HARGA SATUAN / m3 Rp. -
1 M3 KODE
Membuat Beton Mutu F'c = 7,4 Mpa (K.100) Slump (12+2) cm, w/c = 0,87 AHSP A.4.1.1.1
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
Rp. Rp.
A TENAGA
Pekerja L.01 OH 1 .6500 - -
Tukang Batu L.02 OH 0 .2750 - -
Kepala Tukang L.03 OH 0 .0280 - -
Mandor L.04 OH 0 .0830 - -
JUMLAH HARGA TENAGA KERJA -
B BAHAN
Portland Cement (PC) kg 2 47.0000 - -
Pasir Beton (PB) kg 8 69.0000 - -
Kerikil (Maks. 30 mm) kg 9 99.0000 - -
Air Liter 2 15.0000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA PERALATAN -
D JUMLAH (A+B+C) -
E OVERHEAD & PROFIT =10% -
F HARGA SATUAN PEKERJAAN (D+E) -
HARGA SATUAN / m3 Rp. -
1 M3 KODE
Membuat Beton Mutu F'c = 9,8 Mpa (K.125) Slump (12+2) cm, w/c = 0,78 AHSP A.4.1.1.2
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
Rp. Rp.
A TENAGA
Pekerja L.01 OH 1 .6500 - -
Tukang Batu L.02 OH 0 .2750 - -
Kepala Tukang L.03 OH 0 .0280 - -
Mandor L.04 OH 0 .0830 - -
JUMLAH HARGA TENAGA KERJA -
B BAHAN
Portland Cement (PC) kg 2 76.0000 - -
Pasir Beton (PB) kg 8 28.0000 - -
Kerikil (Maks. 30 mm) kg 1 ,012.0000 - -
Air Liter 2 15.0000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA PERALATAN -
D JUMLAH (A+B+C) -
E OVERHEAD & PROFIT =10% -
F HARGA SATUAN PEKERJAAN (D+E) -
HARGA SATUAN / m3 Rp. -
1 M3 KODE
Membuat Beton Mutu F'c = 12,2 Mpa (K.150) Slump (12+2) cm, w/c = 0,72 AHSP A.4.1.1.3
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
Rp. Rp.
A TENAGA
Pekerja L.01 OH 1 .6500 - -
Tukang Batu L.02 OH 0 .2750 - -
Kepala Tukang L.03 OH 0 .0280 - -
Mandor L.04 OH 0 .0830 - -
JUMLAH HARGA TENAGA KERJA -
B BAHAN
Portland Cement (PC) kg 2 99.0000 - -
Pasir Beton (PB) kg 7 99.0000 - -
Kerikil (Maks. 30 mm) kg 1 ,017.0000 - -
Air Liter 2 15.0000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA PERALATAN -
D JUMLAH (A+B+C) -
E OVERHEAD & PROFIT =10% -
F HARGA SATUAN PEKERJAAN (D+E) -
HARGA SATUAN / m3 Rp. -
1 Kg KODE
Pembesian dengan Besi Polos atau Besi Ulir AHSP A.4.1.1.17
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
Rp. Rp.
A TENAGA
Pekerja L.01 OH 0 .0700 - -
Tukang Besi L.02 OH 0 .0700 - -
Kepala Tukang L.03 OH 0 .0070 - -
Mandor L.04 OH 0 .0040 - -
JUMLAH HARGA TENAGA KERJA -
B BAHAN
Besi Beton Polos kg 1 0.500 - -
Kawat Beton kg 0 .150 - -
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA PERALATAN -
D JUMLAH (A+B+C) -
E OVERHEAD & PROFIT =10% -
F HARGA SATUAN PEKERJAAN (D+E) -
HARGA SATUAN / 10 kg Rp. -
HARGA SATUAN / 1 kg Rp. -
1 M2 KODE
Pemasangan Bekisting untuk Pondasi 2 x Pakai AHSP A.4.1.1.20
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
Rp. Rp.
A TENAGA
Pekerja L.01 OH 0 .5200 - -
Tukang Kayu L.02 OH 0 .2600 - -
Kepala Tukang L.03 OH 0 .0260 - -
Mandor L.04 OH 0 .0260 - -
JUMLAH HARGA TENAGA KERJA -
B BAHAN
Kayu Kelas III m3 0 .0400 - -
Paku 5 - 10 cm kg 0 .3000 - -
Minyak Bekisting Liter 0 .1000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA PERALATAN -
D JUMLAH (A+B+C) -
E OVERHEAD & PROFIT =10% -
F HARGA SATUAN PEKERJAAN (D+E) -
HARGA SATUAN / m2 Rp. -
1 M2 KODE
Pemasangan Bekisting untuk Sloof 2 x Pakai AHSP A.4.1.1.21
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
Rp. Rp.
A TENAGA
Pekerja L.01 OH 0 .5200 - -
Tukang Kayu L.02 OH 0 .2600 - -
Kepala Tukang L.03 OH 0 .0260 - -
Mandor L.04 OH 0 .0260 - -
JUMLAH HARGA TENAGA KERJA -
B BAHAN
Kayu Kelas III m3 0 .0450 - -
Paku 5 - 10 cm kg 0 .3000 - -
Minyak Bekisting Liter 0 .1000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA PERALATAN -
D JUMLAH (A+B+C) -
E OVERHEAD & PROFIT =10% -
F HARGA SATUAN PEKERJAAN (D+E) -
HARGA SATUAN / m2 Rp. -
1 M2 KODE
Pemasangan Bekisting untuk Kolom (2 Kali Pakai) AHSP A.4.1.1.22
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
Rp. Rp.
A TENAGA
Pekerja L.01 OH 0 .6600 - -
Tukang Kayu L.02 OH 0 .3300 - -
Kepala Tukang L.03 OH 0 .0330 - -
Mandor L.04 OH 0 .0330 - -
JUMLAH HARGA TENAGA KERJA -
B BAHAN
Kayu Kelas III m3 0 .040 - -
Paku 5 - 12 cm kg 0 .400 - -
Minyak Bekisting Liter 0 .200 - -
Balok Kayu Kelas II m3 0 .015 - -
Plywood Tebal 9 mm Lbr 0 .350 - -
Dolken Kayu (dia. 8-10) cm, Panjang 4 m Batang 2 .000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA PERALATAN -
D JUMLAH (A+B+C) -
E OVERHEAD & PROFIT =10% -
F HARGA SATUAN PEKERJAAN (D+E) -
HARGA SATUAN / m2 Rp. -
1 M2 KODE
Pemasangan Bekisting untuk Balok (2 kali Pakai) AHSP A.4.1.1.23
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
Rp. Rp.
A TENAGA
Pekerja L.01 OH 0 .6600 - -
Tukang Kayu L.02 OH 0 .3300 - -
Kepala Tukang L.03 OH 0 .0330 - -
Mandor L.04 OH 0 .0330 - -
JUMLAH HARGA TENAGA KERJA -
B BAHAN
Kayu Kelas III m3 0 .0400 - -
Paku 5 - 12 cm kg 0 .4000 - -
Minyak Bekisting Liter 0 .2000 - -
Balok Kayu Kelas II m3 0 .0180 - -
Plywood Tebal 9 mm Lbr 0 .3500 - -
Dolken Kayu (dia. 8-10) cm, Panjang 4 m Batang 2 .0000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA PERALATAN -
D JUMLAH (A+B+C) -
E OVERHEAD & PROFIT =10% -
F HARGA SATUAN PEKERJAAN (D+E) -
HARGA SATUAN / m2 Rp. -
1 CM1 KODE
Pengerjaan Pengelasan Dengan Las Listrik AHSP A.4.2.1.5
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
Rp. Rp.
A TENAGA
Pekerja L.01 OH 0 .0400 - -
Tukang Besi Konstruksi L.02 OH 0 .0200 - -
Kepala Tukang L.03 OH 0 .0020 - -
Mandor L.04 OH 0 .0020 - -
JUMLAH HARGA TENAGA KERJA -
B BAHAN
Kawat Las Listrik Kg 0 .4000 - -
Solar Liter 0 .3000 - -
Minyak Pelumas Liter 0 .0400 - -
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA PERALATAN -
D JUMLAH (A+B+C) -
E OVERHEAD & PROFIT =10% -
F HARGA SATUAN PEKERJAAN (D+E) -
HARGA SATUAN / 10 cm Rp. -
HARGA SATUAN / 1 cm Rp. -
1 M2 KODE
Dinding Bata Merah (4,5x9x18) cm Tebal 1/2 Batu Campuran 1 SP : 3 SP AHSP A.4.4.1.8
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
Rp. Rp.
A TENAGA
Pekerja L.01 OH 0 .3000 - -
Tukang Batu L.02 OH 0 .1000 - -
Kepala Tukang L.03 OH 0 .0100 - -
Mandor L.04 OH 0 .0150 - -
JUMLAH HARGA TENAGA KERJA -
B BAHAN
Bata Merah bh 8 0.0000 - -
Potland Cement (PC) kg 1 4.3700 - -
Pasir Pasang (PP) m3 0 .0400 - -
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA PERALATAN -
D JUMLAH (A+B+C) -
E OVERHEAD & PROFIT =10% -
F HARGA SATUAN PEKERJAAN (D+E) -
HARGA SATUAN / m2 Rp. -
1 M2 KODE
Dinding Bata Merah (4,5x9x18) cm Tebal 1/2 Batu Campuran 1 SP : 4 SP AHSP A.4.4.1.9
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
Rp. Rp.
A TENAGA
Pekerja L.01 OH 0 .3000 - -
Tukang Batu L.02 OH 0 .1000 - -
Kepala Tukang L.03 OH 0 .0100 - -
Mandor L.04 OH 0 .0150 - -
JUMLAH HARGA TENAGA KERJA -
B BAHAN
Bata Merah bh 8 0.0000 - -
Potland Cement (PC) kg 1 1.5000 - -
Pasir Pasang (PP) m3 0 .0430 - -
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA PERALATAN -
D JUMLAH (A+B+C) -
E OVERHEAD & PROFIT =10% -
F HARGA SATUAN PEKERJAAN (D+E) -
HARGA SATUAN / m2 Rp. -
1 M2 KODE
Pemasangan Plesteran 1 SP : 4 PP tebal 15 mm AHSP A.4.4.2.4
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
Rp. Rp.
A TENAGA
Pekerja L.01 OH 0 .3000 - -
Tukang Batu L.02 OH 0 .1500 - -
Kepala Tukang L.03 OH 0 .0150 - -
Mandor L.04 OH 0 .0150 - -
JUMLAH HARGA TENAGA KERJA -
B BAHAN
Potland Cement (PC) kg 6 .2400 - -
Pasir Pasang (PP) m3 0 .0240 - -
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA PERALATAN -
D JUMLAH (A+B+C) -
E OVERHEAD & PROFIT =10% -
F HARGA SATUAN PEKERJAAN (D+E) -
HARGA SATUAN / m2 Rp. -
1 M2 KODE
Pemasangan Acian AHSP A.4.4.2.27
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
Rp. Rp.
A TENAGA
Pekerja L.01 OH 0 .2000 - -
Tukang Batu L.02 OH 0 .1000 - -
Kepala Tukang L.03 OH 0 .0100 - -
Mandor L.04 OH 0 .0100 - -
JUMLAH HARGA TENAGA KERJA -
B BAHAN
Potland Cement (PC) kg 3 .2500 - -
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA PERALATAN -
D JUMLAH (A+B+C) -
E OVERHEAD & PROFIT =10% -
F HARGA SATUAN PEKERJAAN (D+E) -
HARGA SATUAN / m2 Rp. -
1 M2 KODE
Pemasangan Dinding Batu Tempel Hitam AHSP A.4.4.3.58
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
Rp. Rp.
A TENAGA
Pekerja L.01 OH 0 .7000 - -
Tukang Batu L.02 OH 0 .3500 - -
Kepala Tukang L.03 OH 0 .0350 - -
Mandor L.04 OH 0 .0350 - -
JUMLAH HARGA TENAGA KERJA -
B BAHAN
Batu Temple hitam m2 1 .1000 - -
Portland Cement (PC) kg 1 1.7500 - -
Pasir Pasang (PP) m3 0 .0350 - -
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA PERALATAN -
D JUMLAH (A+B+C) -
E OVERHEAD & PROFIT =10% -
F HARGA SATUAN PEKERJAAN (D+E) -
HARGA SATUAN / m2 Rp. -
1 M2 KODE
Pengecatan Tembok Baru ( 1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) AHSP A.4.7.1.10
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
Rp. Rp.
A TENAGA
Pekerja L.01 OH 0 .0200 - -
Tukang Kayu L.02 OH 0 .0630 - -
Kepala Tukang L.03 OH 0 .0063 - -
Mandor L.04 OH 0 .0030 - -
JUMLAH HARGA TENAGA KERJA -
B BAHAN
Plamur kg 0 .1000 - -
Cat Dasar kg 0 .1000 - -
Cat Penutup kg 0 .2600 - -
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA PERALATAN -
D JUMLAH (A+B+C) -
E OVERHEAD & PROFIT =10% -
F HARGA SATUAN PEKERJAAN (D+E) -
HARGA SATUAN / m2 Rp. -
…............, / …...../…...
Penawar,
PT/CV/…................
0
0
…........................
Penanggung Jawab Perusahaan
DAFTAR HARGA UPAH
Provinsi : Sumatera Utara
Kabupaten : Mandailing Natal
Program : PENATAAN BANGUNAN GEDUNG
Kegiatan : PENYELENGGARAAN BANGUNAN GEDUNG DI WILAYAH DAERAH KABUPATEN/KOTA, PEMBERIAN IZIN
MENDIRIKAN BANGUNAN (IMB) DAN SERTIFIKAT LAIK FUNGSI BANGUNAN GEDUNG
Pekerjaan : REHABILITASI AULA KANTOR CAMAT BATANG NATAL
Lokasi : Kecamatan Batang Natal
Tahun Anggaran : 2023
KODE U P A H
NO. ANALISA
ANALISA (Rp./Org/Hr)
1 L. 01 Pekerja
2 L. 02 Tukang
3 L. 03 Kepala Tukang
4 L. 04 Mandor
5 L.05 Operator Terlatih
6 L.06 Pembantu Operator
7 L.07 Supir Terlatih
8 L.08 Pembantu Supir
…............, / …...../…...
Penawar,
PT/CV/…................
…........................
Penanggung Jawab Perusahaan
DAFTAR HARGA BAHAN DAN MATERIAL
Provinsi : Sumatera Utara
Kabupaten : Mandailing Natal
Program : PENATAAN BANGUNAN GEDUNG
Kegiatan : PENYELENGGARAAN BANGUNAN GEDUNG DI WILAYAH DAERAH KABUPATEN/KOTA, PEMBERIAN IZIN
MENDIRIKAN BANGUNAN (IMB) DAN SERTIFIKAT LAIK FUNGSI BANGUNAN GEDUNG
Pekerjaan : REHABILITASI AULA KANTOR CAMAT BATANG NATAL
Lokasi : Kecamatan Batang Natal
Tahun Anggaran : 2023
JUMLAH HARGA
NO. JENIS MATERIAL/SEWA SPESIFIKASI SATUAN
( Rp )
1 PASIR
Pasir Pasang m3
Pasir Beton m3
Pasir Beton @ 1 Kg Kg
Pasir urug m3
Sirtu m3
Tanah Urug m3
2 BATU
Batu kali m3
Kerikil dia. 2 - 3 cm m3
Kerikil dia. 2 - 3 cm @ 1 Kg Kg
Batu Pecah dia. 1 - 2 cm M3
Batu Pecah dia. 1 - 2 cm @ 1 Kg Kg
Batu Koral M3
Batu Bata bh
Paving Block Type Segi Enam (42Bh/M2) bh
Batu Rooster Ul. 20x20cm bh
3 GORONG-GORONG
(TANPA TULANGAN) 1/2 Gorong - gorong dia. 0,20 M m1
Gorong - gorong dia. 0,20 M m1
Gorong - gorong dia. 0,30 M m1
Gorong - gorong dia. 0,40 M m1
Gorong - gorong dia. 0,50 M m1
Gorong - gorong dia. 0,80 M m1
Gorong - gorong dia. 1,00 M m1
4 SEMEN
Semen Portland (PCC) @ 50 Kg Zak
Semen Portland (PCC) @ 1 Kg Kg
Semen Putih kg
Air Ltr
5 BESI
Besi Beton Kiloan kg
Besi Ø12 (P=10m) Btg
Besi Plat Strip kg
Page 15 of 21
Besi Plat 4 mm x 4" x 8" kg
Besi Plat 6 mm x 4" x 8" kg
Besi UNP kg
Besi L kg
Pipa Galvanis Uk. 2"T.3.65 (SNI) m1
Pipa Galvanis Uk. 4"T.4.5 (SNI) m1
Rangka Metal Hollow 40.40.2 mm m
Besi Siku 50x50x5mm Btg
Besi Siku 50x50x5mm m1
Roda Pagar Bh
6 KAWAT
Kawat Beton kg
Kawat Bronjong dia. 4MM kg
Kawat Harmonika m1
Kawat Las Argon Ktk
7 PAKU & PISHER
Paku Biasa kg
Baut Ø 0,5'' - 6'' bh
Skrup 10 cm kg
Paku Seng (100 Bh/Ktk) ktk
Paku Asbes Gelombang (Paku Ulir) ktk
Dinabolt Bh
8 KAYU / BROTI / PAPAN
Kayu Klas II m3
Kayu Klas III m3
Kayu Acuan / Beqisting m3
Bambu Pj. 4 m (dia. 10 cm) btg
Dolken Kayu (dia. 8-10) cm, Panjang 4 m btg
Ajir btg
Lem Kayu kg
Ijuk m3
9 PLYWOOD
Tripleks Uk. 120x240 cm x 4 mm Lbr
Tripleks Uk. 120x240 cm x 6 mm Lbr
Tripleks Uk. 120x240 cm x 9 mm Lbr
10 PERLENGKAPAN K3
Helm Bh
Rompi Pengaman Bh
Sepatu Karet Psg
Peralatan P3K Set
Bendera K3 Ls
Rambu Petunjuk Ls
Rambu Larangan Ls
Rambu Peringatan Ls
Rambu Informasi Ls
Rambu Kewajiban Ls
Page 16 of 21
10 KERAMIK
Keramik Polos 40 x 40 cm bh
Keramik Polos 30 x 30 cm bh
Granit 60x60 cm bh
Keramik Warna 30 x 30 cm bh
Keramik Warna 25 x 40 cm bh
Keramik Warna 10 x 20 cm bh
Keramik Artistik 10 x 20 cm bh
Bon-Bon Keramik m1
Batu Alam Bh
Batu Temple Hitam m2
11 PIPA PVC TIPE AW
Pipa PVC Tipe AW 0.5 " (16 mm) 6m btg
Pipa PVC Tipe AW 0.75 " (20 mm) 6m btg
Pipa PVC Tipe AW 1.0 " (25 mm) 6m btg
Pipa PVC Tipe AW 1.5 " (40 mm) 6m btg
Pipa PVC Tipe AW 2.0 " (63 mm) 6m btg
Pipa PVC Tipe AW 3.0 " (90 mm) 6m btg
Pipa PVC Tipe AW 4.0 " (110 mm) 6m btg
Stop Kran 2" bh
Double Nipple 2" bh
Socket Drat Luar 2" bh
Socket Drat Dalam 2" bh
Clamp Sadle 2"x3/4" bh
Socket Drat luar 3/4" bh
Knee 3/4" PVC bh
Pipa Besi Stainless Steel Uk. 2" T=1.2mm m
Pipa Besi Stainless Steel Uk. 1" T=1.2mm m
12 LAT PROFIL KAYU
List Profil 2 x 4 cm Ukir (Pj. 2 M) Btg
13 GYPSUM, PVC
Gypsum Board Uk. 120x240 cm x 9 mm Lbr
List Profil 7 x 7 CM (P. 2 M) m1
Paku Gypsum Board m1
aluminium Hollow 40.40 Btg
aluminium Hollow 40.40 m1
Plafond PVC T=8mm (P=4m) Lbr
Pemasangan Plafond PVC T=8mm m2
14 BAHAN RANGKA ATAP Canal C 75.75 Btg
BAJA RINGAN Canal C 75.100 Tebal 1mm Btg
Reng TS 0,45 m1
Selt Drilling (Truss Screw Ø6 x 20 mm) bh
Selt Drilling (Truss Screw Ø4 x 16 mm) bh
Baut Dynabol Ø 12 x 120 mm bh
Calsiplank ( 20 x 350 x 0,9 cm ) lbr
Skrup Uk. 1" Kg
13 BAHAN ATAP
Seng Gelombang ( 7 KK ) Lbr
Page 17 of 21
Atap Metal Mega Deck MD 35 T.730 m2
Kuda-Kuda Baja Ringan + Atap Megadeck 0.35T m2
14 BAHAN RABUNG
Rabung Seng lbr
Rabung Metal Mega Deck lbr
Markis Seng lbr
15 BAHAN PENGGANTUNG
Kunci Tanam Biasa (Uk. Besar) bh
Engsel Uk. 5" bh
Engsel Uk. 4", Ex. Solid, Dekson, Hampton Bh
Engsel Uk. 3", Ex. Solid, Dekson, Hampton Bh
Grendel Uk 5" (Slot) Pintu Kaca bh
Grendel Uk 4" bh
Grendel Uk 3" bh
Hak Angin Lipat bh
Hak Angin Cantol Biasa bh
Hak Angin Cantol Kuningan bh
Spring Knip bh
Door Closer, Ex. Solid, Dekson bh
Door Holder bh
Door Stop bh
Handel Pintu Kaca bh
Pintu Piber bh
Kunci Tanam Kaca Tempred Bh
16 KACA
Bening Tebal = 5 mm m2
Rayben Tebal = 5 mm m2
Glass Block Uk. 20 x 20 CM bh
Bening Tebal = 8 mm m2
Rayben Tebal = 8 mm m2
Polos Tebal = 12 mm m2
Rayben Tebal = 12 mm m2
Wireglassed Tebal = 5 mm m3
Wireglassed Tebal = 8 mm m4
Wireglassed Tebal = 12 mm m5
Kaca Tempered 12 mm Uk. 90cmx200cm Bh
Kaca Tempered 12 mm m2
19 MEUBILER
Meja 1/2 Biro Kyra bh
Kursi Staff Tanpa Lengan bh
Lemari Arsip Biasa bh
Meja Siswa bh
Kursi Siswa bh
20 HPL,WALL COVER,
Pemasangan Backdrop Multiplek 9mm Finishing HPL+ mRa2ngka
HPL Lbr
HPL m2
Lem Karet Kg
Wallpaper m1
Page 18 of 21
Pemasangan Walpaper Costum m2
Pemasangan Wood Plastik Composite (WPC) m2
Pemasangan Wall Mouled m2
Pemasangan Cover ACP T=4mm + Rangka m2
Teks Akliryc Tebal 4cm cm
Meja Bahan Multipleks = 9mm Fin. HPL m1
Relief m
21 PROFIL ALUMINIUM
Rangka Furing 4 mm m1
Profil Kusen Aluminium Uk. 3" Btg
Profil Kusen Aluminium Uk. 3" m
Profil Aluminium Rangka Pintu (Moher) Btg
Profil Aluminium Rangka Pintu (Moher) m1
Daun Pintu Aluminium Strip bh
Sunscreen Aluminium m1
Alluminium Strip lebar 8 cm m1
Sealant Tube
Skrup Fixer ktk
Kunci Pintu Kaca bh
Handle Pintu Stainless C 2"x11" bh
Engsel Tanam Pintu Kaca Tempred Unit
Venetions Blinds dan Vertical Blinds (Tirai) m2
Handel Jendela Casement Bh
Friction Stay Uk.8", Ex. Solid, Dekson, Hampton Set
Friction Stay Uk.8", Ex. Solid, Dekson, Hampton Bh
Friction Stay Uk.20", Ex. Solid, Dekson, Hampton Set
Friction Stay Uk.20", Ex. Solid, Dekson, Hampton Bh
Rangka Jendela (Beading Casement) Btg
Rangka Jendela (Beading Casement) m
Karet Kusen m
17 BAHAN CAT
Cat Tembok Kualitas Baik kg
Cat Kayu Kualitas Baik kg
Cat Besi Kualitas Baik kg
Cat Menie Kayu/Besi Kualitas Baik kg
Plamuur kaleng
Soda Api kg
Sabun kg
Kuas bh
Thinner kg
Ampelas lbr
Residu Kg
18 BAHAN SANITASI
Wastafel Keramik 1 Set bh
Closet Duduk + Aksesoris bh
Closed Jongkok (Keramik) bh
Floor Drain bh
Pipa Hawa Besar bh
Bak Fiberglass Vol. 0.3m3 bh
Bak Mandi Fiber Uk. 70x200 bh
Page 19 of 21
Urinoir bh
Kran Air 1/2 bh
Sealtape bh
Shipon Set
Bidet 0.5" Bh
Tangki Air Kap. 500 Ltr Penguin Unit
19 BAHAN ELEKTRIKAL
Kabel NYM (3x2.5) mm m1
Kabel NYY 4x6mm m1
Klem Kabel No.10 bh
Pipa Konduit m1
Inbow Dos bh
Isolasi roll
T- Dos bh
L Bow bh
Las Dop bh
Mangkok bh
Fitting Lampu bh
LAMPU PLC 18 Watt set
LAMPU PLC 20 Watt set
LAMPU PLC 30 Watt set
LAMPU PLC 50 Watt set
Lampu flafond LED set
SAKLAR Tunggal IB bh
SAKLAR Ganda IB bh
SAKLAR Triple IB bh
SAKLAR Tunggal OB bh
SAKLAR Ganda OB bh
STOP KONTAK IB bh
STOP KONTAK OB bh
Pompa Booster 125w Kap. 25ltr / Mnt bh
POMPA AIR 125w bh
AC Inverter 0.5PK Unit
Exhauspan Ceiling bh
LED Ceiling Plafond 18W bh
MCB 10A bh
MCB 6A bh
Panel MDP Unit
Panel SDP Unit
Lampu RMI 300 4x18w LED M2 Dummy Savy Unit
Kipas angin gantung 56" KDK Unit
Kabel Tray 300x100mm m1
Plat Wise Elbow Bh
APAR Kap. 3Kg Bh
20 MINYAK Pertalite (non subsidi) ltr
Solar / Bio Solar ltr
Minyak Tanah (non subsidi) ltr
Minyak Beqisting ltr
Minyak Pelumas ltr
Page 20 of 21
21 ALAT BERAT
Hidraulic Excavator 80 - 140 T Unit
Dumpt Truck 3,5 T Unit
Concrete Mixer 03 - 06 m3 Unit
Tamper (E088) 4 HP, 0,2 TON Unit/jam
Concrete Vibrator (E089) 4 HP Unit/jam
22 SEWA ALAT BERAT
Hidraulic Excavator 80 - 140 T Unit/jam
Dumpt Truck 3,5 T Unit/jam
Concrete Mixer 03 - 06 m3 Unit/hr
Tamper (E088) 4 HP, 0,2 TON Unit/jam
Concrete Vibrator (E089) 4 HP Unit/jam
Rakit Unit/hr -
…............, / …...../…...
Penawar,
PT/CV/…................
…........................
Penanggung Jawab Perusahaan
Page 21 of 21