PT Pratama Citra Parama | 02*0**6****23**0 | Rp 25,430,530,710 |
| 0020493367606000 | - | |
PT Ensargus Indra Utama | 02*0**0****01**0 | - |
| 0019049337728000 | - | |
| 0317076057609000 | - | |
Grati Makmur | 00*9**7****24**0 | - |
| 0028070506646000 | - | |
| 0032351421301000 | - | |
| 0013271333008000 | - | |
| 0210069407541000 | - | |
PT Multi Graha Industri | 00*9**4****63**0 | - |
| 0030018774618000 | - | |
Cakra Bimantara Konstruksi | 06*4**4****28**0 | - |
| 0919843680545000 | - | |
| 0403306558625000 | - | |
| 0027158880608000 | - | |
| 0750624512609000 | - | |
PT Tekniko Indonesia | 00*8**5****55**0 | - |
| 0016154247005000 | - | |
PT Epithu Logica Sembada | 09*5**4****15**0 | - |
| 0021099312009000 | - | |
CV Solusi Inti Pembangunan | 08*2**3****06**0 | - |
| 0210649661403000 | - | |
| 0020677464615000 | - | |
CV Tigach Jaya | 00*2**9****21**0 | - |
| 0012169256422000 | - | |
| 0313108771432000 | - | |
| 0903139236644000 | - | |
| 0711323220514000 | - | |
| 0013169297003000 | - | |
CV Tamacho Building Construction | 08*7**6****31**0 | - |
CV Anam Jaya | 00*3**1****09**0 | - |
| 0019210913542000 | - | |
| 0944519164615000 | - | |
| 0828267690615000 | - | |
PT Sinar Inti Persada | 00*6**5****19**0 | - |
PT Nur Alfindo Utama | 0023852205805000 | - |
| 0020159562626000 | - | |
| 0017015611218000 | - | |
| 0027483502008000 | - | |
| 0018528232214000 | - | |
| 0022469191321000 | - | |
| 0815761911629000 | - |
URAIAN PEKERJAAN
LEMBAGA : MAHKAMAH AGUNG REPUBLIK INDONESIA
SATUAN KERJA : PENGADILAN AGAMA TRENGGALEK KELAS 1A
PAKET PEKERJAAN : PEMBANGUNAN GEDUNG PENGADILAN AGAMA TRENGGALEK KELAS 1A
LOKASI PEKERJAAN : JL.BRIGJEN.SOETRAN, KEL.NGANTRU, KEC.TRENGGALEK, KABUPATEN TRENGGALEK, PROVINSI JATIM
TAHUN ANGGARAN : 2025
NO. URAIAN PEKERJAAN
I. PEKERJAAN GEDUNG UTAMA
I.A. PEKERJAAN PERSIAPAN
I.A.1. PEKERJAAN PERSIAPAN PROYEK
I.A.2. PEKERJAAN SMK3 (PERMEN PUPR. NO. 10 TAHUN 2021)
I.B. PEKERJAAN STRUKTUR
I.B.1. PEKERJAAN STRUKTUR LANTAI DASAR
I.B.2. PEKERJAAN STRUKTUR LANTAI 1 (SATU)
I.B.3. PEKERJAAN STRUKTUR LANTAI 2 (DUA)
I.B.4. PEKERJAAN STRUKTUR ATAP/TALANG
I.B.5. PEKERJAAN STRUKTUR RANGKA BAJA ATAP
I.C. PEKERJAAN ARSITEKTUR
I.C.1. PEKERJAAN ARSITEKTUR LANTAI DASAR
I.C.2. PEKERJAAN ARSITEKTUR LANTAI 1
I.C.3. PEKERJAAN ARSITEKTUR LANTAI 2
I.C.4. PEKERJAAN ARSITEKTUR LANTAI ROOFTOP
I.D. PEKERJAAN MEKANIKAL, ELEKTRIKAL DAN PLUMBING
II. PEKERJAAN SARANA DAN PRASARANA LINGKUNGAN GEDUNG
II.A. PEKERJAAN JEMBATAN MASUK / KELUAR AREA (2 UNIT)
A) PEKERJAAN JEMBATAN MASUK/KELUAR (2 UNIT)
II.B. PEKERJAAN DINDING/TEMBOK PENAHAN
A) PEKERJAAN DINDING / TEMBOK PENAHAN (BAGIAN BARAT = 90,40 M')
B) PEKERJAAN PONDASI, DINDING / TEMBOK PASANGAN BATA (BAGIAN BARAT, DISAMPING PARKIR POLRES = 28,50 M')
C) PEKERJAAN DINDING / TEMBOK PENAHAN (BAGIAN UTARA = 25,66 M')
D) PEKERJAAN DINDING / TEMBOK PENAHAN (BAGIAN TIMUR = 95,00 M')
E) PEKERJAAN PONDASI/TALUD DINDING PENAHAN TERMSK PAGAR PAS.BATA (BAGIAN DEPAN & SAMPING KIRI = 98,00 M')
F) PEKERJAAN DINDING / TEMBOK PENAHAN (BAWAH GEDUNG UTAMA BAGIAN DEPAN & RAM KIRI+KANAN)
II.C. PEKERJAAN URUGAN DAN PEMADATAN TANAH (HALAMAN)
A) PEKERJAAN URUGAN DAN PEMADATAN TANAH (HALAMAN/AREA)
II.D. PEKERJAAN PAGAR DEPAN KANTOR, SALURAN AIR, PERKERASAN HALAMAN DAN LANDSCAPE
A) PEKERJAAN PAGAR DEPAN KANTOR (TERMASUK KANAN/KIRI GEDUNG SEBELUM MASUK RAM) DAN PAPAN NAMA
B) PEKERJAAN SALURAN AIR HUJAN DI DALAM AREA
C) PEKERJAAN PERKERASAN HALAMAN, LANDSCAPE DAN TIANG BENDERA
II.E. PEKERJAAN POS JAGA
A) PEKERJAAN POS JAGA
II.F. PEKERJAAN RUMAH GENSET DAN PANEL
A) PEKERJAAN RUMAH GENSET DAN PANEL
II.G. PEKERJAAN GROUND WATER TANK
A) PEKERJAAN GROUND WATER TANK (GWT)
II.H. PEKERJAAN KOLAM RETENSI
A) PEKERJAAN KOLAM RETENSI
Trenggalek, 08 April 2025
Pejabat Pembuat Komitmen
TTD