Pemerintah Kabupaten Mamuju
D I N A S K E S E H A T A N
Jl. Pemuda No.2, Binanga, Kec. Mamuju, Kab. Mamuju, Sulawesi Barat, 91511
PPPEEEMMMBBBAAANNNGGGUUUNNNAAANNN
GGGEEEDDDUUUNNNGGG
PPPUUUSSSKKKEEESSSMMMAAASSS
TTTOOOPPPOOORRREEE
Kecamatan Papalang
Kabupaten Mamuju
Provinsi Sulawesi Barat, Indonesia
2023
AS PLAN DRAWING
Plan & Design Consultant
Prepared By Aprroved By
Herianto Jafar, S.T. Dinas Kesehatan Kab. Mamuju
CV. Wahyu Arsipilah
PEMERINTAH KABUPATEN MAMUJU
D I N A S K E S E H A T A N
Alamat : Jl. Pemuda No.2, Binanga, Kec. Mamuju, Kab. Mamuju, Sulawesi Barat, 91511
L E M B A R P E N G E S A H A N
A S - P L A N D R A W I N G
Pekerjaan:
P E M B A N G U N A N G E D U N G P U S K E S M A S T O P O R E
De sa Top or e K e cama tan P apa la n g , Kabu p at en Mamu ju , Pr ov . S u la we si Ba rat
Tahun Anggaran 2023
Disetujui, Diperiksa, Dibuat,
KUASA PENGGUNA ANGGARAN PEJABAT PELAKSANA TEKNIS KEGIATAN Konsultan Perencana
(KPA) (PPTK) CV. WAHYU ARSIPILAH
FARIDA, S.KM., M.M. TAUFIK HAQ HERIANTO JAFAR, S.T.
Nip. 19800911 200312 2 010 Nip. 19711126 199303 1 003 Direktur
1 2 3 4 5 6 7 8 9 10 11 12
A A
KANTOR CAMAT
PAPALANG
U
J
U
M
B A B
M
-
E
N
E
J
A
KANTOR PPK 2.1. M
S
SULBAR O
R
O
P
J
L. 4331
C KANTOR BPP C
KEC. PAPALANG
LOKASI PUSKESMAS TOPORE
51327 KEC. PAPALANG KAB. MAMUJU
TITIK KOORDINAT :
2°25'31.58"S DAN 119° 9'34.35"T
D D
0
0
5 9
6 5
6 8
5
6 52360
BONGKAR BANGUNAN EXISTING
E E
KOLAM IKAN EXISTING
U
J
U
M
A
M
-
E
N
E
J
A
M
F
O
S 4128 F
R
O
P
L. 0
J 0
0
6
42408
0
0
0
4
5
G G
28960
2000
RENCANA PUSKESMAS
SITE PLAN
H H
U
J
U SKALA 1 : 700
M
A
M
-
E
1 2 3 N 4 5 6 7 8 9 10 11 12
E
J
A
Catatan : Revisi : M Plan & Design Consultant Dibuat : Nama Gambar : Skala : AS PLAN DRAWING
LEGENDA : Deskripsi S Tgl Check Plan & Design Consultant
O (FOR CONSTRUCTION)
T.O.C = TOP OF CONCRETE (MUKA ATAS BETON) R CV. WAHYU ARSIPILAH
O
B.O.C = BOTTOM OF CONCRETE (MUKA BAWAH BETON) P
L. SITE PLAN 1 : 700 Pekerjaan :
F.F.L = FINISH FLOOR LEVEL (MUKA ATAS LANTAI) J
PEMBANGUNAN GEDUNG
C.F.L = CEILING FINISH LEVEL (MUKA ATAS PLAFON)
T.O.R = TOP OF ROOF (MUKA ATAS ATAP) PUSKESMAS TOPORE
DIMENSI PADA GAMBAR MENGGUNAKAN SATUAN MILIMETER
PEMERINTAH KABUPATEN MAMUJU
CV. WAHYU ARSIPILAH Dwg No : Size. Lokasi :
A.3 DINAS KESEHATAN
DESA TOPORE, KEC. PAPALANG
Planning, Design, Management, & Supervisi Consultant DWG - DINKES - PKM - WYA -
HERIANTO JAFAR, S.T.
KAB. MAMUJU
Alamat : Jl. P. Diponegoro, BTN Griya Cahaya Masannang 1 ARS - 001 Rev.
Mamuju, 91512, Sulawesi Barat, Indonesia Direktur - PROV. SULAWESI BARAT Alamat : Jln. Pemuda No.02, Kel. Binanga, Kec. Mamuju, Kab. Mamuju
3200 2500 3200 3200 3200 3000 3800 4700
1 2 3 4 5 6 7 8 9
0054
0042
0005
0042
0054
F
E
D
C
B
A
0054
0051
0052
0043
0051
0052
0054
0042
0005
0042
0054
00881
32600
4000 2400 1800 4300 4300 2000 4650 2000 4650
1300
0001
009
1200 1600
1500 1700 1500
3000 2800
10 11
0081
2500
5402
054
0002
0051
0021
0002
500
0021
3700 2800
0002
1900
2000 3700 3200 2100 2000 4350 4350
0032
500 3050 1000
0051
0051
4000
500 3050 1000
5207
0008
0007
1 2 3 4 5 6 7 8 9 10 11 12
D
1
002
002
A A
SELASAR SELASAR SELASAR
-0.100 -0.100 -0.100
B SPOEL-HOEK WC/KM WC/KM B
±0.000 -0.020 -0.020
R. PERAWATAN (P) R. PERAWATAN (L) GUDANG
R. BERSALIN WC/KM
±0.000 ±0.000 ±0.000
R. STERIL R. ALAT
±0.000 R. PASKA BERSALIN R. LINEN -0.020
±0.000 ±0.000
±0.000 ±0.000
R. TINDAKAN
GAWAT DARURAT
C C
±0.000
KORIDOR KORIDOR KORIDOR
±0.000 ±0.000 ±0.000
R. KAPUS
±0.000
R. LAKTASI
±0.000
A B
2000
D D
002 002
DROP OFF KORIDOR
RUANG MAIN
ADMINISTRASI
-0.020 ANAK ±0.000
R. PERTEMUAN /
RUANG TUNGGU PASIEN ±0.000 PENYULUHAN ±0.000 R. RAPAT 2
±0.000 ±0.000 002
±0.000
E E
NURSE STATION
R. FARMASI
KORIDOR KORIDOR KORIDOR KORIDOR
PEMERIKSAAN
±0.000
±0.000 ±0.000 ±0.000 ±0.000
LOKET
R. VAKSIN LAVATORY JANITOR
DAFTAR
AMBIL SAMPEL ±0.000 ±0.000 -0.020 LAUNDRY
±0.000 DAPUR ±0.000
F GUDANG OBAT REKAM MEDIK KLINIK F
GIGI MULUT ±0.000
±0.000 ±0.000 KLINIK KLINIK
±0.000
WC/KM
±0.000 ±0.000 LABORATORIUM
WC/KM (P) DIFABEL WC/KM (L)
R. DOT
±0.000 R. CUCI
-0.020 -0.020 -0.020
±0.000
-0.120
SELASAR SELASAR SELASAR
-0.100 -0.100 -0.100
G G
DENAH PUSKESMAS
H C H
002 SKALA 1 : 125
1 2 3 4 5 6 7 8 9 10 11 12
Catatan : Revisi : Dibuat : Nama Gambar : Skala :
Plan & Design Consultant AS PLAN DRAWING
LEGENDA : Deskripsi Tgl Check Plan & Design Consultant
(FOR CONSTRUCTION)
T.O.C = TOP OF CONCRETE (MUKA ATAS BETON) CV. WAHYU ARSIPILAH
B.O.C = BOTTOM OF CONCRETE (MUKA BAWAH BETON)
DENAH PUSKESMAS 1 : 125 Pekerjaan :
F.F.L = FINISH FLOOR LEVEL (MUKA ATAS LANTAI)
PEMBANGUNAN GEDUNG
C.F.L = CEILING FINISH LEVEL (MUKA ATAS PLAFON)
T.O.R = TOP OF ROOF (MUKA ATAS ATAP) PUSKESMAS TOPORE
DIMENSI PADA GAMBAR MENGGUNAKAN SATUAN MILIMETER
PEMERINTAH KABUPATEN MAMUJU
CV. WAHYU ARSIPILAH Dwg No : Size. Lokasi :
A.3 DINAS KESEHATAN
DESA TOPORE, KEC. PAPALANG
Planning, Design, Management, & Supervisi Consultant DWG - DINKES - PKM - WYA -
HERIANTO JAFAR, S.T.
KAB. MAMUJU
Alamat : Jl. P. Diponegoro, BTN Griya Cahaya Masannang 1 ARS - 002 Rev.
Mamuju, 91512, Sulawesi Barat, Indonesia Direktur - PROV. SULAWESI BARAT Alamat : Jln. Pemuda No.02, Kel. Binanga, Kec. Mamuju, Kab. Mamuju
1 2 3 4 5 6 7 8 9 10 11 12
A A
PUSKESMAS TOPORE
B B
C C
D D
F E D C B A
TAMPAK A
SKALA 1 : 100 002
E E
F F
G G
TAMPAK B
H H
A B C D E F
SKALA 1 : 100 002
1 2 3 4 5 6 7 8 9 10 11 12
Catatan : Revisi : Dibuat : Nama Gambar : Skala :
Plan & Design Consultant AS PLAN DRAWING
LEGENDA : Deskripsi Tgl Check Plan & Design Consultant
(FOR CONSTRUCTION)
T.O.C = TOP OF CONCRETE (MUKA ATAS BETON) CV. WAHYU ARSIPILAH
B.O.C = BOTTOM OF CONCRETE (MUKA BAWAH BETON)
TAMPAK 1 : 100 Pekerjaan :
F.F.L = FINISH FLOOR LEVEL (MUKA ATAS LANTAI)
PEMBANGUNAN GEDUNG
C.F.L = CEILING FINISH LEVEL (MUKA ATAS PLAFON)
T.O.R = TOP OF ROOF (MUKA ATAS ATAP) PUSKESMAS TOPORE
DIMENSI PADA GAMBAR MENGGUNAKAN SATUAN MILIMETER
PEMERINTAH KABUPATEN MAMUJU
CV. WAHYU ARSIPILAH Dwg No : Size. Lokasi :
A.3 DINAS KESEHATAN
DESA TOPORE, KEC. PAPALANG
Planning, Design, Management, & Supervisi Consultant DWG - DINKES - PKM - WYA -
HERIANTO JAFAR, S.T.
KAB. MAMUJU
Alamat : Jl. P. Diponegoro, BTN Griya Cahaya Masannang 1 ARS - 003 Rev.
Mamuju, 91512, Sulawesi Barat, Indonesia Direktur - PROV. SULAWESI BARAT Alamat : Jln. Pemuda No.02, Kel. Binanga, Kec. Mamuju, Kab. Mamuju
1 2 3 4 5 6 7 8 9 10 11 12
A A
B B
C C
1 2 3 4 5 6 7 8 9 10 11
D D
TAMPAK C
SKALA 1 : 125 002
E E
F F
G G
11 10 9 8 7 6 5 4 3 2 1
TAMPAK D
H H
SKALA 1 : 125 002
1 2 3 4 5 6 7 8 9 10 11 12
Catatan : Revisi : Dibuat : Nama Gambar : Skala :
Plan & Design Consultant AS PLAN DRAWING
LEGENDA : Deskripsi Tgl Check Plan & Design Consultant
(FOR CONSTRUCTION)
T.O.C = TOP OF CONCRETE (MUKA ATAS BETON) CV. WAHYU ARSIPILAH
B.O.C = BOTTOM OF CONCRETE (MUKA BAWAH BETON)
TAMPAK 1 : 125 Pekerjaan :
F.F.L = FINISH FLOOR LEVEL (MUKA ATAS LANTAI)
PEMBANGUNAN GEDUNG
C.F.L = CEILING FINISH LEVEL (MUKA ATAS PLAFON)
T.O.R = TOP OF ROOF (MUKA ATAS ATAP) PUSKESMAS TOPORE
DIMENSI PADA GAMBAR MENGGUNAKAN SATUAN MILIMETER
PEMERINTAH KABUPATEN MAMUJU
CV. WAHYU ARSIPILAH Dwg No : Size. Lokasi :
A.3 DINAS KESEHATAN
DESA TOPORE, KEC. PAPALANG
Planning, Design, Management, & Supervisi Consultant DWG - DINKES - PKM - WYA -
HERIANTO JAFAR, S.T.
KAB. MAMUJU
Alamat : Jl. P. Diponegoro, BTN Griya Cahaya Masannang 1 ARS - 004 Rev.
Mamuju, 91512, Sulawesi Barat, Indonesia Direktur - PROV. SULAWESI BARAT Alamat : Jln. Pemuda No.02, Kel. Binanga, Kec. Mamuju, Kab. Mamuju
1 2 3 4 5 6 7 8 9 10 11 12
A A
B B
700 700 700 700 700 7 8 0 2 0 00 700 700 700 700 700 350 421 700 700 700 700 700 700 700 700 70 1 0 3171 700 700 700 700 700 700 700 700 700 EL. + T. 5 O .5 .R 0 .
C EL. +4.50 C
EL. +4.25 T.O.C.
B.O.C. C.F.L. +4.350 C.F.L. +4.350 EL. +4.00
1200 C.F.L.
C.F.L. +4.000 C.F.L. +4.000 C.F.L. +4.000 C.F.L. +4.000
EL. +3.40
B.O.C. 1000
D EL. +2.10 D
EL. +0.90 EL. +0.90
F.F.L. ±0.000 F.F.L. ±0.000
EL. ±0.00 F.F.L. -0.100 F.F.L. -0.100 F.F.L. -0.100 EL. ±0.00
F.F.L. F.F.L. -0.400 F.F.L. -0.400 F.F.L.
E E
EL. -0.10
F.F.L.
EL. -0.50
EL. -1.00
EL. -1.00
G.L.
G.L.
EL. -1.40 EL. -1.40
EL. -1.90
1100 370 1860 370 1100
EL. -1.90
F F
4500 2400 5000 2400 4500
F E D C B A
18800
G G
POTONGAN 1
SKALA 1 : 80 002
H H
1 2 3 4 5 6 7 8 9 10 11 12
Catatan : Revisi : Dibuat : Nama Gambar : Skala :
Plan & Design Consultant AS PLAN DRAWING
LEGENDA : Deskripsi Tgl Check Plan & Design Consultant
(FOR CONSTRUCTION)
T.O.C = TOP OF CONCRETE (MUKA ATAS BETON) CV. WAHYU ARSIPILAH
B.O.C = BOTTOM OF CONCRETE (MUKA BAWAH BETON)
POTONGAN 1 : 80 Pekerjaan :
F.F.L = FINISH FLOOR LEVEL (MUKA ATAS LANTAI)
PEMBANGUNAN GEDUNG
C.F.L = CEILING FINISH LEVEL (MUKA ATAS PLAFON)
T.O.R = TOP OF ROOF (MUKA ATAS ATAP) PUSKESMAS TOPORE
DIMENSI PADA GAMBAR MENGGUNAKAN SATUAN MILIMETER
PEMERINTAH KABUPATEN MAMUJU
CV. WAHYU ARSIPILAH Dwg No : Size. Lokasi :
A.3 DINAS KESEHATAN
DESA TOPORE, KEC. PAPALANG
Planning, Design, Management, & Supervisi Consultant DWG - DINKES - PKM - WYA -
HERIANTO JAFAR, S.T.
KAB. MAMUJU
Alamat : Jl. P. Diponegoro, BTN Griya Cahaya Masannang 1 ARS - 005 Rev.
Mamuju, 91512, Sulawesi Barat, Indonesia Direktur - PROV. SULAWESI BARAT Alamat : Jln. Pemuda No.02, Kel. Binanga, Kec. Mamuju, Kab. Mamuju
1200 4250
EL.+8.10
T.O.ACP.
EL.+6.10
EL.+5.60
EL.+4.50
EL.+3.60
C.F.L.
EL.+0.90
EL.±0.00 F.F.L. -0.020 F.F.L.±0.000 F.F.L.±0.000 F.F.L. -0.050 F.F.L.±0.000 F.F.L.±0.000 F.F.L.±0.000 F.F.L. -0.100
F.F.L. F.F.L. -0.400 F.F.L. -0.500
EL. -0.35
EL. -1.00
G.L.
EL. -1.40
EL. -1.90
900 1100 370 5560 370 1100
4000 3200 2500 3200 2100 1100 3200 3000 3400 400 1500 3200 3000 2800
1 2 3 4 5 6 7 8 9 10 11
32600
EL. -0.02
EL.
EL.
EL. -0.35
EL. -0.40 EL.
EL. -1.00 EL.
EL.
EL.
05
006
033
002
-1.20
056
PAS. BATA ROLLAG
F.F.L. -0.020
PAVING BLOCK SEGI 6 -0.10
T = 8 cm
URUGAN PASIR -0.14
T = 5 cm
URUGAN TANAH
-1.00
PAS. BATU KOSONG -1.10
T = 15 cm
URUGAN PASIR RABAT SALURAN
T = 5 cm
T = 5 cm
URUGAN PASIR
T = 5 cm
50 250 50 200
300 200 300 200
370 500 500 370
062
001
04
069
-0.40
006
PAS. BATA ROLLAG
F.F.L. -0.020
PAVING BLOCK SEGI 6
T = 8 cm
URUGAN PASIR
T = 5 cm
F.F.L. -0.400 F.F.L. -0.400
URUGAN TANAH
URUGAN TANAH
PONDASI BATU
KALI/GUNUNG
URUGAN TANAH
PAS. BATU KOSONG RABAT SALURAN
T = 15 cm
T = 5 cm
URUGAN PASIR URUGAN PASIR
T = 5 cm T = 5 cm
007
005 005
007
G.L.
055
067
1 2 3 4 5 6 7 8 9 10 11 12
A A
B B
A B
C C
D D
POTONGAN 2
SKALA 1 : 125 002
E E
F F
G G
H DETAIL A DETAIL B H
SKALA 1 : 20 007 SKALA 1 : 20 007
1 2 3 4 5 6 7 8 9 10 11 12
Catatan : Revisi : Dibuat : Nama Gambar : Skala :
Plan & Design Consultant AS PLAN DRAWING
LEGENDA : Deskripsi Tgl Check Plan & Design Consultant
(FOR CONSTRUCTION)
T.O.C = TOP OF CONCRETE (MUKA ATAS BETON) CV. WAHYU ARSIPILAH
POTONGAN 1 : 125
B.O.C = BOTTOM OF CONCRETE (MUKA BAWAH BETON)
Pekerjaan :
F.F.L = FINISH FLOOR LEVEL (MUKA ATAS LANTAI) DETAIL 1 : 20
PEMBANGUNAN GEDUNG
C.F.L = CEILING FINISH LEVEL (MUKA ATAS PLAFON)
T.O.R = TOP OF ROOF (MUKA ATAS ATAP) PUSKESMAS TOPORE
DIMENSI PADA GAMBAR MENGGUNAKAN SATUAN MILIMETER
PEMERINTAH KABUPATEN MAMUJU
CV. WAHYU ARSIPILAH Dwg No : Size. Lokasi :
A.3 DINAS KESEHATAN
DESA TOPORE, KEC. PAPALANG
Planning, Design, Management, & Supervisi Consultant DWG - DINKES - PKM - WYA -
HERIANTO JAFAR, S.T.
KAB. MAMUJU
Alamat : Jl. P. Diponegoro, BTN Griya Cahaya Masannang 1 ARS - 006 Rev.
Mamuju, 91512, Sulawesi Barat, Indonesia Direktur - PROV. SULAWESI BARAT Alamat : Jln. Pemuda No.02, Kel. Binanga, Kec. Mamuju, Kab. Mamuju
3200 2500 3200 3200 3200 3000 3800 4700
1 2 3 4 5 6 7 8 9
0054
0042
0005
0042
0054
F
E
D
C
B
A
0054
0051
0052
0043
0051
0052
0054
0042
0005
0042
0054
00881
32600
4000 2400 1800 4300 4300 2000 4650 2000 4650
1300
0001
009
1200 1600
1500 1700 1500
3000 2800
10 11
0081
2500
0051
0021
0002
B B
C
A A
A A A A A
B
A C
A A A A
RABAT BETON FIN. ACIAN A
B
A A A A B
A
A
RABAT BETON FIN. ACIAN
A A A A
A
A A A A A A A A
B
B B
NAICA
.NIF
NOTEB
TABAR
NAICA
.NIF
NOTEB
TABAR
1 2 3 4 5 6 7 8 9 10 11 12
A A
C
B B
C C
D D
E E
C
F F
C
G G
KODE AREA MATERIAL UKURAN MOTIF / TIPE AREA
A Lantai Homogenous Tile (Terang) 60 x 60 (cm) POLISHED RUANG KERJA & LOBBY
B Lantai Homogenous Tile (Terang) 60 x 60 (cm) UNPOLISHED / SLIP STOP SELASAR & TERAS
DENAH LANTAI
H C Lantai Homogenous Tile (Gelap) 60 x 60 (cm) UNPOLISHED / SLIP STOP WC / KM H
D Dinding WC Homogenous Tile (Terang) 30 x 60 (cm) POLISHED WC / KM
SKALA 1 : 125
E Plint Lantai Homogenous Tile (Terang) 10 x 60 (cm) POLISHED DINDING WC, RUANG KERJA & LOBBY
1 2 3 4 5 6 7 8 9 10 11 12
Catatan : Revisi : Dibuat : Nama Gambar : Skala :
Plan & Design Consultant AS PLAN DRAWING
LEGENDA : Deskripsi Tgl Check Plan & Design Consultant
(FOR CONSTRUCTION)
T.O.C = TOP OF CONCRETE (MUKA ATAS BETON) CV. WAHYU ARSIPILAH
B.O.C = BOTTOM OF CONCRETE (MUKA BAWAH BETON)
DENAH LANTAI 1 : 125 Pekerjaan :
F.F.L = FINISH FLOOR LEVEL (MUKA ATAS LANTAI)
PEMBANGUNAN GEDUNG
C.F.L = CEILING FINISH LEVEL (MUKA ATAS PLAFON)
T.O.R = TOP OF ROOF (MUKA ATAS ATAP) PUSKESMAS TOPORE
DIMENSI PADA GAMBAR MENGGUNAKAN SATUAN MILIMETER
PEMERINTAH KABUPATEN MAMUJU
CV. WAHYU ARSIPILAH Dwg No : Size. Lokasi :
A.3 DINAS KESEHATAN
DESA TOPORE, KEC. PAPALANG
Planning, Design, Management, & Supervisi Consultant DWG - DINKES - PKM - WYA -
HERIANTO JAFAR, S.T.
KAB. MAMUJU
Alamat : Jl. P. Diponegoro, BTN Griya Cahaya Masannang 1 ARS - 007 Rev.
Mamuju, 91512, Sulawesi Barat, Indonesia Direktur - PROV. SULAWESI BARAT Alamat : Jln. Pemuda No.02, Kel. Binanga, Kec. Mamuju, Kab. Mamuju
3200 2500 3200 3200 3200 3000 3800 4700
1 2 3 4 5 6 7 8 9
0054
0042
0005
0042
0054
F
E
D
C
B
A
0054
0051
0052
0043
0051
0052
0054
0042
0005
0042
0054
00881
32600
4000 2400 1800 4300 4300 2000 4650 2000 4650
1300
0001
009
1200 1600
1500 1700 1500
3000 2800
10 11
0081
2500
0051
0021
0002
1 2 3 4 5 6 7 8 9 10 11 12
A A
+4.350 +4.350 +4.350
B +4.000 +4.000 +3.500 +3.500 B
+4.000 +4.000 +4.000 +4.000 +4.000
8
1
6
1
+4.000 +4.000 +3.500
+4.000 +4.000
C C
+4.000 +4.000 +4.000 +4.000
+4.000
ALUMINIUM COMPOSITE PANEL
(ACP)
D D
+4.000 +4.000
+3.600
+4.000
+4.000
+4.000
+5.015
E E
+4.000 +4.000 +4.000 +4.000 3 2
1
3
1
+3.500
+4.000
+4.000
+4.000 +4.000
F F
+4.000 +4.000 +4.000 +4.000 +4.000 +4.000
+4.000
+3.500 +3.500 +3.500 +4.000
+4.350 +4.350 +4.350
G 1100 G
KETERANGAN :
DENAH PLAFOND
AREA MATERIAL TEBAL FINISHING
H H
Plafond PVC 9 mm CAT
SKALA 1 : 125
Plafond ACP Exterior - -
1 2 3 4 5 6 7 8 9 10 11 12
Catatan : Revisi : Dibuat : Nama Gambar : Skala :
Plan & Design Consultant AS PLAN DRAWING
LEGENDA : Deskripsi Tgl Check Plan & Design Consultant
(FOR CONSTRUCTION)
T.O.C = TOP OF CONCRETE (MUKA ATAS BETON) CV. WAHYU ARSIPILAH
B.O.C = BOTTOM OF CONCRETE (MUKA BAWAH BETON)
DENAH PLAFOND 1 : 125 Pekerjaan :
F.F.L = FINISH FLOOR LEVEL (MUKA ATAS LANTAI)
PEMBANGUNAN GEDUNG
C.F.L = CEILING FINISH LEVEL (MUKA ATAS PLAFON)
T.O.R = TOP OF ROOF (MUKA ATAS ATAP) PUSKESMAS TOPORE
DIMENSI PADA GAMBAR MENGGUNAKAN SATUAN MILIMETER
PEMERINTAH KABUPATEN MAMUJU
CV. WAHYU ARSIPILAH Dwg No : Size. Lokasi :
A.3 DINAS KESEHATAN
DESA TOPORE, KEC. PAPALANG
Planning, Design, Management, & Supervisi Consultant DWG - DINKES - PKM - WYA -
HERIANTO JAFAR, S.T.
KAB. MAMUJU
Alamat : Jl. P. Diponegoro, BTN Griya Cahaya Masannang 1 ARS - 008 Rev.
Mamuju, 91512, Sulawesi Barat, Indonesia Direktur - PROV. SULAWESI BARAT Alamat : Jln. Pemuda No.02, Kel. Binanga, Kec. Mamuju, Kab. Mamuju
1 2 3 4 5 6 7 8 9 10 11 12
A A
Keterangan
No Kode Jumlah (Unit)
J-2 J-1 J-1 J-2 J-2 V-1 J-2 V-1 J-2 J-1
1 PJ - 1 1 Unit
B B
P-5 P-2 P-5 2 P - 1 3 Unit
3 P - 2 18 Unit
4 P - 2' 1 Unit
P-7 P-7
5 P - 3 6 Unit
J-3 V-4
P-7 6 P - 4 4 Unit
P-5 P-5 P-5
7 P - 5 5 Unit
8 P - 6 1 Unit
C C
9 P - 7 6 Unit
P-1 P-2 P-1 P-1 P-2
10 P - 8 1 Unit
P-4
11 P - 9 1 Unit
P-2
J-4 P-4 P-4 12 J - 1 11 Unit
P-2
13 J - 2 11 Unit
P-3
P-2 14 J - 2' 1 Unit
J-1 J-2 J-2 15 J - 3 1 Unit
D D
16 J - 4 1 Unit
J-1
P-4 P-2' 17 J - 5 1 Unit
18 V - 1 2 Unit
P-3
R-3
19 V - 2 3 Unit
J-5
P-2
20 V - 3 3 Unit
J-2'
21 V - 4 1 Unit
PJ-1
J-2 22 R - 1 1 Unit
E 23 R - 2 1 Unit E
24 R - 3 1 Unit
R-1 R-2 R-4
25 R - 4 1 Unit
V-3
26 LK 1 Unit
P-3 P-3 P-3 LK P-2 P-2
P-2 P-2 P-2 P-2 P-2 P-2
P-2 P-7
F V-3 F
J-1
P-7 P-8 P-7
P-3
V-3
P-9
P-6 P-2
G J-1 J-1 J-2 J-2 J-2 J-1 J-1 V-2 V-2 V-2 J-1 G
DENAH PERLETAKAN KUSEN
H H
SKALA 1 : 125
1 2 3 4 5 6 7 8 9 10 11 12
Catatan : Revisi : Dibuat : Nama Gambar : Skala :
Plan & Design Consultant AS PLAN DRAWING
LEGENDA : Deskripsi Tgl Check Plan & Design Consultant
(FOR CONSTRUCTION)
T.O.C = TOP OF CONCRETE (MUKA ATAS BETON) CV. WAHYU ARSIPILAH
B.O.C = BOTTOM OF CONCRETE (MUKA BAWAH BETON)
DENAH PERLETAKAN KUSEN 1 : 125 Pekerjaan :
F.F.L = FINISH FLOOR LEVEL (MUKA ATAS LANTAI)
PEMBANGUNAN GEDUNG
C.F.L = CEILING FINISH LEVEL (MUKA ATAS PLAFON)
T.O.R = TOP OF ROOF (MUKA ATAS ATAP) PUSKESMAS TOPORE
DIMENSI PADA GAMBAR MENGGUNAKAN SATUAN MILIMETER
PEMERINTAH KABUPATEN MAMUJU
CV. WAHYU ARSIPILAH Dwg No : Size. Lokasi :
A.3 DINAS KESEHATAN
DESA TOPORE, KEC. PAPALANG
Planning, Design, Management, & Supervisi Consultant DWG - DINKES - PKM - WYA -
HERIANTO JAFAR, S.T.
KAB. MAMUJU
Alamat : Jl. P. Diponegoro, BTN Griya Cahaya Masannang 1 ARS - 009 Rev.
Mamuju, 91512, Sulawesi Barat, Indonesia Direktur - PROV. SULAWESI BARAT Alamat : Jln. Pemuda No.02, Kel. Binanga, Kec. Mamuju, Kab. Mamuju
4750
762 763 763 763 828 872
057
3011
7411
057
0522
0063
763 763 763 1655
4750
006 006
1 2 3 4 5 6 7 8 9 10 11 12
A A
B B
C C
D D
E E
F F
G G
807
KUSEN TYPE PJ-1 (1 UNIT)
KUSEN : Kusen Aluminium 4"
H DAUN : Daun Jendela Kaca Rangka Aluminium, Daun Pintu Kaca Tempered 12 mm H
KACA : Kaca Rayban (Biru) 5 mm (Jendela), Kaca Tempered 12 mm (Pintu)
JENIS BUKAAN : Swing 180° (Engsel Pivot)
1 2 3 4 5 6 7 8 9 10 11 12
Catatan : Revisi : Dibuat : Nama Gambar : Skala :
Plan & Design Consultant AS PLAN DRAWING
LEGENDA : Deskripsi Tgl Check Plan & Design Consultant
(FOR CONSTRUCTION)
T.O.C = TOP OF CONCRETE (MUKA ATAS BETON) CV. WAHYU ARSIPILAH
B.O.C = BOTTOM OF CONCRETE (MUKA BAWAH BETON)
DETAIL KUSEN 1 : 20 Pekerjaan :
F.F.L = FINISH FLOOR LEVEL (MUKA ATAS LANTAI)
PEMBANGUNAN GEDUNG
C.F.L = CEILING FINISH LEVEL (MUKA ATAS PLAFON)
T.O.R = TOP OF ROOF (MUKA ATAS ATAP) PUSKESMAS TOPORE
DIMENSI PADA GAMBAR MENGGUNAKAN SATUAN MILIMETER
PEMERINTAH KABUPATEN MAMUJU
CV. WAHYU ARSIPILAH Dwg No : Size. Lokasi :
A.3 DINAS KESEHATAN
DESA TOPORE, KEC. PAPALANG
Planning, Design, Management, & Supervisi Consultant DWG - DINKES - PKM - WYA -
HERIANTO JAFAR, S.T.
KAB. MAMUJU
Alamat : Jl. P. Diponegoro, BTN Griya Cahaya Masannang 1 ARS - 010 Rev.
Mamuju, 91512, Sulawesi Barat, Indonesia Direktur - PROV. SULAWESI BARAT Alamat : Jln. Pemuda No.02, Kel. Binanga, Kec. Mamuju, Kab. Mamuju
0043
055
006
0531
009
1400
900
953 447
0043
055
006
0531
009
1200
0043
055
006
0531
009
1 2 3 4 5 6 7 8 9 10 11 12
A A
B B
C C
ENGSEL ENGSEL ENGSEL
D D
PINTU PINTU PINTU
ENGSEL ENGSEL ENGSEL
PINTU PINTU PINTU
E E
F F
ENGSEL ENGSEL ENGSEL
PINTU PINTU PINTU
G G
KUSEN TYPE P-1 (3 UNIT) KUSEN TYPE P-2 (18 UNIT) KUSEN TYPE P-3 (6 UNIT)
KUSEN : Kusen Aluminium 4" KUSEN : Kusen Aluminium 4" KUSEN : Kusen Aluminium 4"
H DAUN : Daun Pintu & Jendela Kaca Rangka Aluminium DAUN : Daun Pintu & Jendela Kaca Rangka Aluminium DAUN : Daun Pintu & Jendela Kaca Rangka Aluminium H
KACA : Kaca Rayban 5 mm (Warna Biru) KACA : Kaca Rayban 5 mm (Warna Biru) KACA : Kaca Rayban 5 mm (Warna Biru)
JENIS BUKAAN : Swing 90° JENIS BUKAAN : Swing 90° JENIS BUKAAN : Swing 90°
1 2 3 4 5 6 7 8 9 10 11 12
Catatan : Revisi : Dibuat : Nama Gambar : Skala :
Plan & Design Consultant AS PLAN DRAWING
LEGENDA : Deskripsi Tgl Check Plan & Design Consultant
(FOR CONSTRUCTION)
T.O.C = TOP OF CONCRETE (MUKA ATAS BETON) CV. WAHYU ARSIPILAH
B.O.C = BOTTOM OF CONCRETE (MUKA BAWAH BETON)
DETAIL KUSEN 1 : 20 Pekerjaan :
F.F.L = FINISH FLOOR LEVEL (MUKA ATAS LANTAI)
PEMBANGUNAN GEDUNG
C.F.L = CEILING FINISH LEVEL (MUKA ATAS PLAFON)
T.O.R = TOP OF ROOF (MUKA ATAS ATAP) PUSKESMAS TOPORE
DIMENSI PADA GAMBAR MENGGUNAKAN SATUAN MILIMETER
PEMERINTAH KABUPATEN MAMUJU
CV. WAHYU ARSIPILAH Dwg No : Size. Lokasi :
A.3 DINAS KESEHATAN
DESA TOPORE, KEC. PAPALANG
Planning, Design, Management, & Supervisi Consultant DWG - DINKES - PKM - WYA -
HERIANTO JAFAR, S.T.
KAB. MAMUJU
Alamat : Jl. P. Diponegoro, BTN Griya Cahaya Masannang 1 ARS - 011 Rev.
Mamuju, 91512, Sulawesi Barat, Indonesia Direktur - PROV. SULAWESI BARAT Alamat : Jln. Pemuda No.02, Kel. Binanga, Kec. Mamuju, Kab. Mamuju
1800
900 900
0043
055
006
0531
009
700
0032
900
0582
006
0531
009
900
055
006
0531
009
1 2 3 4 5 6 7 8 9 10 11 12
A A
B B
C C
D D
ENGSEL ENGSEL ENGSEL
PINTU PINTU PINTU
ENGSEL ENGSEL ENGSEL
PINTU PINTU PINTU
E E
GESER
F F
ENGSEL ENGSEL ENGSEL
PINTU PINTU PINTU
G G
KUSEN TYPE P-4 (4 UNIT) KUSEN TYPE P-5 (5 UNIT) KUSEN TYPE P-6 (1 UNIT) KUSEN TYPE P-2' (1 UNIT)
KUSEN Kusen Aluminium 4" Kusen Aluminium 4" Kusen Aluminium 4" Kusen Aluminium 4"
H DAUN Daun Pintu & Jendela Kaca Rangka Aluminium Daun Pintu & Jendela Kaca Rangka Aluminium Daun Pintu & Jendela Kaca Rangka Aluminium Daun Pintu & Jendela Kaca Rangka Aluminium H
KACA Kaca Rayban 5 mm (Warna Biru) Kaca Rayban 5 mm (Warna Biru) Kaca Rayban 5 mm (Warna Biru) Kaca Bening 5 mm + Finish Stiker Sandblast (Buram)
JENIS BUKAAN Swing 90° Geser (Sliding) Swing 90° Swing 90°
1 2 3 4 5 6 7 8 9 10 11 12
Catatan : Revisi : Dibuat : Nama Gambar : Skala :
Plan & Design Consultant AS PLAN DRAWING
LEGENDA : Deskripsi Tgl Check Plan & Design Consultant
(FOR CONSTRUCTION)
T.O.C = TOP OF CONCRETE (MUKA ATAS BETON) CV. WAHYU ARSIPILAH
B.O.C = BOTTOM OF CONCRETE (MUKA BAWAH BETON)
DETAIL KUSEN 1 : 25 Pekerjaan :
F.F.L = FINISH FLOOR LEVEL (MUKA ATAS LANTAI)
PEMBANGUNAN GEDUNG
C.F.L = CEILING FINISH LEVEL (MUKA ATAS PLAFON)
T.O.R = TOP OF ROOF (MUKA ATAS ATAP) PUSKESMAS TOPORE
DIMENSI PADA GAMBAR MENGGUNAKAN SATUAN MILIMETER
PEMERINTAH KABUPATEN MAMUJU
CV. WAHYU ARSIPILAH Dwg No : Size. Lokasi :
A.3 DINAS KESEHATAN
DESA TOPORE, KEC. PAPALANG
Planning, Design, Management, & Supervisi Consultant DWG - DINKES - PKM - WYA -
HERIANTO JAFAR, S.T.
KAB. MAMUJU
Alamat : Jl. P. Diponegoro, BTN Griya Cahaya Masannang 1 ARS - 012 Rev.
Mamuju, 91512, Sulawesi Barat, Indonesia Direktur - PROV. SULAWESI BARAT Alamat : Jln. Pemuda No.02, Kel. Binanga, Kec. Mamuju, Kab. Mamuju
GESER
0012
1000
0012
700
800
0032
0052
055
006
0531
1 2 3 4 5 6 7 8 9 10 11 12
A A
B B
700 700
ELEV. +3.400
C C
ENGSEL
ENGSEL
PINTU
PINTU
ENGSEL
ENGSEL
D PINTU D
PINTU
E E
ENGSEL
ENGSEL
PINTU
PINTU
F F
ELEV. +0.900
1400
G G
KUSEN TYPE P-7 (6 UNIT) KUSEN TYPE P-8 (1 UNIT) KUSEN TYPE P-9 (1 UNIT) KUSEN TYPE J-1 (11 UNIT)
KUSEN Kusen Aluminium 4" Kusen Aluminium 4" Kusen Aluminium 4" Kusen Aluminium 4"
H DAUN Daun Pintu Aluminium Daun Pintu Aluminium Daun Pintu Aluminium Daun Pintu Aluminium H
KACA - - - Kaca Rayban 5 mm (Warna Biru)
JENIS BUKAAN Swing 90° Swing 90° Geser (Sliding) Swing 90°
1 2 3 4 5 6 7 8 9 10 11 12
Catatan : Revisi : Dibuat : Nama Gambar : Skala :
Plan & Design Consultant AS PLAN DRAWING
LEGENDA : Deskripsi Tgl Check Plan & Design Consultant
(FOR CONSTRUCTION)
T.O.C = TOP OF CONCRETE (MUKA ATAS BETON) CV. WAHYU ARSIPILAH
B.O.C = BOTTOM OF CONCRETE (MUKA BAWAH BETON)
DETAIL KUSEN 1 : 20 Pekerjaan :
F.F.L = FINISH FLOOR LEVEL (MUKA ATAS LANTAI)
PEMBANGUNAN GEDUNG
C.F.L = CEILING FINISH LEVEL (MUKA ATAS PLAFON)
T.O.R = TOP OF ROOF (MUKA ATAS ATAP) PUSKESMAS TOPORE
DIMENSI PADA GAMBAR MENGGUNAKAN SATUAN MILIMETER
PEMERINTAH KABUPATEN MAMUJU
CV. WAHYU ARSIPILAH Dwg No : Size. Lokasi :
A.3 DINAS KESEHATAN
DESA TOPORE, KEC. PAPALANG
Planning, Design, Management, & Supervisi Consultant DWG - DINKES - PKM - WYA -
HERIANTO JAFAR, S.T.
KAB. MAMUJU
Alamat : Jl. P. Diponegoro, BTN Griya Cahaya Masannang 1 ARS - 013 Rev.
Mamuju, 91512, Sulawesi Barat, Indonesia Direktur - PROV. SULAWESI BARAT Alamat : Jln. Pemuda No.02, Kel. Binanga, Kec. Mamuju, Kab. Mamuju
0052
055
006
0531
655 620 620 605
1051 1051 1051 1096
2500
0002
008
0021
4250
0531 0531
1 2 3 4 5 6 7 8 9 10 11 12
655 620 620 605
A A
ELEV. +2.250
B B
ELEV. +3.400
ELEV. +0.900
C C
2500
KUSEN TYPE J-2' (1 UNIT)
Kusen Aluminium 4"
Daun Jendela Aluminium
Kaca Rayban 5 mm (Warna Biru)
D D
Sliding / Geser
ELEV. +3.600
E E
ELEV. +0.900
F F
G G
ELEV. +1.600
KUSEN TYPE J-2 (12 UNIT) KUSEN TYPE J-3 (1 UNIT)
KUSEN Kusen Aluminium 4" Kusen Aluminium 4"
H DAUN Daun Jendela Aluminium Daun Jendela Aluminium H
KACA Kaca Rayban 5 mm (Warna Biru) Kaca Rayban 5 mm (Warna Biru)
JENIS BUKAAN Swing 90° Swing 90°
1 2 3 4 5 6 7 8 9 10 11 12
Catatan : Revisi : Dibuat : Nama Gambar : Skala :
Plan & Design Consultant AS PLAN DRAWING
LEGENDA : Deskripsi Tgl Check Plan & Design Consultant
(FOR CONSTRUCTION)
T.O.C = TOP OF CONCRETE (MUKA ATAS BETON) CV. WAHYU ARSIPILAH
B.O.C = BOTTOM OF CONCRETE (MUKA BAWAH BETON)
DETAIL KUSEN 1 : 25 Pekerjaan :
F.F.L = FINISH FLOOR LEVEL (MUKA ATAS LANTAI)
PEMBANGUNAN GEDUNG
C.F.L = CEILING FINISH LEVEL (MUKA ATAS PLAFON)
T.O.R = TOP OF ROOF (MUKA ATAS ATAP) PUSKESMAS TOPORE
DIMENSI PADA GAMBAR MENGGUNAKAN SATUAN MILIMETER
PEMERINTAH KABUPATEN MAMUJU
CV. WAHYU ARSIPILAH Dwg No : Size. Lokasi :
A.3 DINAS KESEHATAN
DESA TOPORE, KEC. PAPALANG
Planning, Design, Management, & Supervisi Consultant DWG - DINKES - PKM - WYA -
HERIANTO JAFAR, S.T.
KAB. MAMUJU
Alamat : Jl. P. Diponegoro, BTN Griya Cahaya Masannang 1 ARS - 014 Rev.
Mamuju, 91512, Sulawesi Barat, Indonesia Direktur - PROV. SULAWESI BARAT Alamat : Jln. Pemuda No.02, Kel. Binanga, Kec. Mamuju, Kab. Mamuju
700
056
1200
056
2010
006
3000
636
006
1075 1075
2150
0002
008
0021
1 2 3 4 5 6 7 8 9 10 11 12
A A
ELEV. +2.850 ELEV. +2.850
ELEV. +3.600
B B
ELEV. +2.200 ELEV. +3.000
KUSEN TYPE V-1 (2 UNIT) KUSEN TYPE V-2 (3 UNIT) KUSEN TYPE V-3 (3 UNIT)
KUSEN Kusen Aluminium 4" Kusen Aluminium 4" Kusen Aluminium 4"
C DAUN Daun Ventilasi Aluminium Daun Ventilasi Aluminium Daun Ventilasi Aluminium C
KACA Kaca Rayban 5 mm (Warna Biru) Kaca Rayban 5 mm (Warna Biru) Kaca Rayban 5 mm (Warna Biru)
JENIS BUKAAN Swing 90° Swing 90° Swing 90°
D D
ELEV. +3.600
E E
ELEV. +3.600
F ELEV. +3.000 F
ELEV. +1.600
G G
KUSEN TYPE J-4 (1 UNIT) KUSEN TYPE V-4 (1 UNIT)
KUSEN Kusen Aluminium 4" Kusen Aluminium 4"
H DAUN Daun Jendela Aluminium Daun Ventilasi Aluminium H
KACA Kaca Rayban 5 mm (Warna Biru) Kaca Rayban 5 mm (Warna Biru)
JENIS BUKAAN Swing 90° Swing 90°
1 2 3 4 5 6 7 8 9 10 11 12
Catatan : Revisi : Dibuat : Nama Gambar : Skala :
Plan & Design Consultant AS PLAN DRAWING
LEGENDA : Deskripsi Tgl Check Plan & Design Consultant
(FOR CONSTRUCTION)
T.O.C = TOP OF CONCRETE (MUKA ATAS BETON) CV. WAHYU ARSIPILAH
B.O.C = BOTTOM OF CONCRETE (MUKA BAWAH BETON)
DETAIL KUSEN 1 : 25 Pekerjaan :
F.F.L = FINISH FLOOR LEVEL (MUKA ATAS LANTAI)
PEMBANGUNAN GEDUNG
C.F.L = CEILING FINISH LEVEL (MUKA ATAS PLAFON)
T.O.R = TOP OF ROOF (MUKA ATAS ATAP) PUSKESMAS TOPORE
DIMENSI PADA GAMBAR MENGGUNAKAN SATUAN MILIMETER
PEMERINTAH KABUPATEN MAMUJU
CV. WAHYU ARSIPILAH Dwg No : Size. Lokasi :
A.3 DINAS KESEHATAN
DESA TOPORE, KEC. PAPALANG
Planning, Design, Management, & Supervisi Consultant DWG - DINKES - PKM - WYA -
HERIANTO JAFAR, S.T.
KAB. MAMUJU
Alamat : Jl. P. Diponegoro, BTN Griya Cahaya Masannang 1 ARS - 015 Rev.
Mamuju, 91512, Sulawesi Barat, Indonesia Direktur - PROV. SULAWESI BARAT Alamat : Jln. Pemuda No.02, Kel. Binanga, Kec. Mamuju, Kab. Mamuju
4750
829 784 784 784 784 784
0052
055
006
0531
0001
1800
1000 800
098
011
700
005
051
1 2 3 4 5 6 7 8 9 10 11 12
A A
ELEV. +1.400
B B
VOID
ELEV. +0.900
ELEV. +3.600
C C
KUSEN TYPE LK (1 UNIT)
KUSEN Kusen Aluminium 4"
DAUN Daun Jendela Aluminium
KACA Kaca Bening 5 mm
D JENIS BUKAAN - D
E E
ENGSEL
ELEV. +0.900
ENGSEL
F F
HOLLOW STAINLESS STEEL
G G
KUSEN TYPE J-5 (1 UNIT) RAILING TYPE R-1 (1 UNIT)
KUSEN Kusen Aluminium 4" Railing Besi Hollow Stainless Steel 40/60 DAN 40/40
H DAUN Daun Jendela Aluminium - H
KACA Kaca Rayban 5 mm (Warna Biru) -
JENIS BUKAAN Jendela Atas = Swing 90°, Jendela Bawah = Sliding (Geser) Swing 90°
1 2 3 4 5 6 7 8 9 10 11 12
Catatan : Revisi : Dibuat : Nama Gambar : Skala :
Plan & Design Consultant AS PLAN DRAWING
LEGENDA : Deskripsi Tgl Check Plan & Design Consultant
(FOR CONSTRUCTION)
T.O.C = TOP OF CONCRETE (MUKA ATAS BETON) CV. WAHYU ARSIPILAH
B.O.C = BOTTOM OF CONCRETE (MUKA BAWAH BETON)
DETAIL KUSEN 1 : 25 Pekerjaan :
F.F.L = FINISH FLOOR LEVEL (MUKA ATAS LANTAI)
PEMBANGUNAN GEDUNG
C.F.L = CEILING FINISH LEVEL (MUKA ATAS PLAFON)
T.O.R = TOP OF ROOF (MUKA ATAS ATAP) PUSKESMAS TOPORE
DIMENSI PADA GAMBAR MENGGUNAKAN SATUAN MILIMETER
PEMERINTAH KABUPATEN MAMUJU
CV. WAHYU ARSIPILAH Dwg No : Size. Lokasi :
A.3 DINAS KESEHATAN
DESA TOPORE, KEC. PAPALANG
Planning, Design, Management, & Supervisi Consultant DWG - DINKES - PKM - WYA -
HERIANTO JAFAR, S.T.
KAB. MAMUJU
Alamat : Jl. P. Diponegoro, BTN Griya Cahaya Masannang 1 ARS - 016 Rev.
Mamuju, 91512, Sulawesi Barat, Indonesia Direktur - PROV. SULAWESI BARAT Alamat : Jln. Pemuda No.02, Kel. Binanga, Kec. Mamuju, Kab. Mamuju
0001
098
0001
098
737
001
461
4150
4800
0001
098
461
737
001
461
737
001
1 2 3 4 5 6 7 8 9 10 11 12
1000
A RAILING STAINLESS STEEL RAILING STAINLESS STEEL RAILING STAINLESS STEEL A
B B
RAILING STAINLESS STEEL RAILING STAINLESS STEEL
RAILING TYPE R-2 (1 UNIT)
KUSEN : RAILING HOLLOW STAINLESS STEEL 40/60 & 40/40
C C
JENIS BUKAAN : SWING 90°
1000
RAILING STAINLESS STEEL RAILING STAINLESS STEEL RAILING STAINLESS STEEL
D D
RAILING STAINLESS STEEL RAILING STAINLESS STEEL
E E
RAILING TYPE R-3 (1 UNIT)
KUSEN : RAILING HOLLOW STAINLESS STEEL 40/60 & 40/40
JENIS BUKAAN : SWING 90°
4150
F RAILING STAINLESS STEEL RAILING STAINLESS STEEL RAILING STAINLESS STEEL F
G G
RAILING STAINLESS STEEL RAILING STAINLESS STEEL RAILING STAINLESS STEEL RAILING STAINLESS STEEL
RAILING TYPE R-4 (1 UNIT)
H H
MATERIAL : RAILING HOLLOW STAINLESS STEEL 40/60 & 40/40
JENIS BUKAAN : -
1 2 3 4 5 6 7 8 9 10 11 12
Catatan : Revisi : Dibuat : Nama Gambar : Skala :
Plan & Design Consultant AS PLAN DRAWING
LEGENDA : Deskripsi Tgl Check Plan & Design Consultant
(FOR CONSTRUCTION)
T.O.C = TOP OF CONCRETE (MUKA ATAS BETON) CV. WAHYU ARSIPILAH
B.O.C = BOTTOM OF CONCRETE (MUKA BAWAH BETON)
DETAIL KUSEN 1 : 25 Pekerjaan :
F.F.L = FINISH FLOOR LEVEL (MUKA ATAS LANTAI)
PEMBANGUNAN GEDUNG
C.F.L = CEILING FINISH LEVEL (MUKA ATAS PLAFON)
T.O.R = TOP OF ROOF (MUKA ATAS ATAP) PUSKESMAS TOPORE
DIMENSI PADA GAMBAR MENGGUNAKAN SATUAN MILIMETER
PEMERINTAH KABUPATEN MAMUJU
CV. WAHYU ARSIPILAH Dwg No : Size. Lokasi :
A.3 DINAS KESEHATAN
DESA TOPORE, KEC. PAPALANG
Planning, Design, Management, & Supervisi Consultant DWG - DINKES - PKM - WYA -
HERIANTO JAFAR, S.T.
KAB. MAMUJU
Alamat : Jl. P. Diponegoro, BTN Griya Cahaya Masannang 1 ARS - 017 Rev.
Mamuju, 91512, Sulawesi Barat, Indonesia Direktur - PROV. SULAWESI BARAT Alamat : Jln. Pemuda No.02, Kel. Binanga, Kec. Mamuju, Kab. Mamuju
EL.
EL.
EL.
EL.
EL.
EL.
EL.
1500 1700 1500
0051
0021
0081
4700
0054
1500 1700 1500
009
057
056
023
0091
033
1 2 3 4 5 6 7 8 9 10 11 12
A A
B B
B
+4.50
T.O.C.
HOMOGENOUS TILE
C TIPE UNPOLISHED / SLIP STOP KRAN AIR 1 " C HOMOGENOUS TILE 2
(60 x 60)
TIPE UNPOLISHED / SLIP STOP
(60 x 60) FLOOR DRAIN +3.60
±0.000 C.F.L.
HOMOGENOUS TILE -0.020
TIPE UNPOLISHED / SLIP STOP
(60 x 60)
+2.85
±0.000
HOMOGENOUS TILE
D D
TIPE UNPOLISHED / SLIP STOP
(60 x 60) WASHTAFEL KERAMIK
±0.000 +2.20
+1.88
WASHTAFEL KERAMIK
PLINT HOMOGENOUS TILE
1 TIPE POLISHED (10 x 60)
E E
HOMOGENOUS TILE HOMOGENOUS TILE HOMOGENOUS TILE
TIPE UNPOLISHED / SLIP STOP TIPE UNPOLISHED / SLIP STOP TIPE UNPOLISHED / SLIP STOP WC HOMOGENOUS TILE
(60 x 60) (60 x 60) (60 x 60) KRAN AIR 1 " TIPE POLISHED (30 x 60)
2 HANDRAIL TOILET
-0.020 -0.020 -0.020
PAS. 1 BATA
2
CLOSET DUDUK FLUSH
F F
A
-0.02
FLOOR DRAIN HANDRAIL KRAN AIR 1 2 " FLOOR DRAIN HANDRAIL F.F.L.
-0.35
CLOSET DUDUK FLUSH
CLOSET DUDUK KRAN AIR 1/2" JET WASHER CLOSET DUDUK
G G
8 9 8 9
DENAH TOILET / WC POTONGAN WC 1
SKALA 1 : 40 SKALA 1 : 40 WC
H H
1 2 3 4 5 6 7 8 9 10 11 12
Catatan : Revisi : Dibuat : Nama Gambar : Skala :
Plan & Design Consultant AS PLAN DRAWING
LEGENDA : Deskripsi Tgl Check Plan & Design Consultant
(FOR CONSTRUCTION)
T.O.C = TOP OF CONCRETE (MUKA ATAS BETON) CV. WAHYU ARSIPILAH
DENAH TOILET / WC
B.O.C = BOTTOM OF CONCRETE (MUKA BAWAH BETON)
1 : 40 Pekerjaan :
F.F.L = FINISH FLOOR LEVEL (MUKA ATAS LANTAI) POTONGAN WC
PEMBANGUNAN GEDUNG
C.F.L = CEILING FINISH LEVEL (MUKA ATAS PLAFON)
T.O.R = TOP OF ROOF (MUKA ATAS ATAP) PUSKESMAS TOPORE
DIMENSI PADA GAMBAR MENGGUNAKAN SATUAN MILIMETER
PEMERINTAH KABUPATEN MAMUJU
CV. WAHYU ARSIPILAH Dwg No : Size. Lokasi :
A.3 DINAS KESEHATAN
DESA TOPORE, KEC. PAPALANG
Planning, Design, Management, & Supervisi Consultant DWG - DINKES - PKM - WYA -
HERIANTO JAFAR, S.T.
KAB. MAMUJU
Alamat : Jl. P. Diponegoro, BTN Griya Cahaya Masannang 1 ARS - 018 Rev.
Mamuju, 91512, Sulawesi Barat, Indonesia Direktur - PROV. SULAWESI BARAT Alamat : Jln. Pemuda No.02, Kel. Binanga, Kec. Mamuju, Kab. Mamuju
3200 2500 3200 3200 3200 3000 3800 4700
1 2 3 4 5 6 7 8 9
0054
0042
0005
0042
0054
F
E
D
C
B
A
0054
0051
0052
0043
0051
0052
0054
0042
0005
0042
0054
00881
32600
4000 2400 1800 4300 4300 2000 4650 2000 4650
1300
0001
009
1200 1600
1500 1700 1500
3000 2800
10 11
0081
2500
0051
0021
0002
7° 7° 7° 7° 7°
VOID
4° 4° 4° 4° 4°
1300
0031
1300
0031
1 2 3 4 5 6 7 8 9 10 11 12
A A
B B
C C
D D
E E
F F
G G
DENAH ATAP
H H
SKALA 1 : 125
1 2 3 4 5 6 7 8 9 10 11 12
Catatan : Revisi : Dibuat : Nama Gambar : Skala :
Plan & Design Consultant AS PLAN DRAWING
LEGENDA : Deskripsi Tgl Check Plan & Design Consultant
(FOR CONSTRUCTION)
T.O.C = TOP OF CONCRETE (MUKA ATAS BETON) CV. WAHYU ARSIPILAH
B.O.C = BOTTOM OF CONCRETE (MUKA BAWAH BETON)
DENAH ATAP 1 : 125 Pekerjaan :
F.F.L = FINISH FLOOR LEVEL (MUKA ATAS LANTAI)
PEMBANGUNAN GEDUNG
C.F.L = CEILING FINISH LEVEL (MUKA ATAS PLAFON)
T.O.R = TOP OF ROOF (MUKA ATAS ATAP) PUSKESMAS TOPORE
DIMENSI PADA GAMBAR MENGGUNAKAN SATUAN MILIMETER
PEMERINTAH KABUPATEN MAMUJU
CV. WAHYU ARSIPILAH Dwg No : Size. Lokasi :
A.3 DINAS KESEHATAN
DESA TOPORE, KEC. PAPALANG
Planning, Design, Management, & Supervisi Consultant DWG - DINKES - PKM - WYA -
HERIANTO JAFAR, S.T.
KAB. MAMUJU
Alamat : Jl. P. Diponegoro, BTN Griya Cahaya Masannang 1 STR - 019 Rev.
Mamuju, 91512, Sulawesi Barat, Indonesia Direktur - PROV. SULAWESI BARAT Alamat : Jln. Pemuda No.02, Kel. Binanga, Kec. Mamuju, Kab. Mamuju
3200 2500 3200 3200 3200 3000 3800 4700
1 2 3 4 5 6 7 8 9
0054
0042
0005
0042
0054
F
E
D
C
B
A
0054
0051
0052
0043
0051
0052
0054
0042
0005
0042
0054
00881
32600
4000 2400 1800 4300 4300 2000 4650 2000 4650
1300
0001
009
1200 1600
1500 1700 1500
3000 2800
10 11
0081
2500
0051
0021
0002
TALANG BETON
ROOFMASH ATAP SPANDEK ZINCALUME
ALUMINIUM FOIL BUBLE
(JARING ATAP) KR-5 AZ-150 Thk. 0,35 mm
7°
VOID
ROOFMASH ATAP SPANDEK ZINCALUME
ALUMINIUM FOIL BUBLE
(JARING ATAP) KR-5 AZ-150 Thk. 0,35 mm
4°
RENG BAJA RINGAN
R - 40.0,45
KUDA-KUDA BAJA RINGAN
PENUTUP ACP
TALANG BETON
1300
0031
1300
0031
1 2 3 4 5 6 7 8 9 10 11 12
3
KD-3
A A
B B
KANOPI BETON
C C
D D
E E
PENUTUP ACP
F F
G G
1 2 DENAH KAP ATAP
H H
KD-1 KD-2
SKALA 1 : 125
1 2 3 4 5 6 7 8 9 10 11 12
Catatan : Revisi : Dibuat : Nama Gambar : Skala :
Plan & Design Consultant AS PLAN DRAWING
LEGENDA : Deskripsi Tgl Check Plan & Design Consultant
(FOR CONSTRUCTION)
T.O.C = TOP OF CONCRETE (MUKA ATAS BETON) CV. WAHYU ARSIPILAH
B.O.C = BOTTOM OF CONCRETE (MUKA BAWAH BETON)
DENAH KAP ATAP 1 : 125 Pekerjaan :
F.F.L = FINISH FLOOR LEVEL (MUKA ATAS LANTAI)
PEMBANGUNAN GEDUNG
C.F.L = CEILING FINISH LEVEL (MUKA ATAS PLAFON)
T.O.R = TOP OF ROOF (MUKA ATAS ATAP) PUSKESMAS TOPORE
DIMENSI PADA GAMBAR MENGGUNAKAN SATUAN MILIMETER
PEMERINTAH KABUPATEN MAMUJU
CV. WAHYU ARSIPILAH Dwg No : Size. Lokasi :
A.3 DINAS KESEHATAN
DESA TOPORE, KEC. PAPALANG
Planning, Design, Management, & Supervisi Consultant DWG - DINKES - PKM - WYA -
HERIANTO JAFAR, S.T.
KAB. MAMUJU
Alamat : Jl. P. Diponegoro, BTN Griya Cahaya Masannang 1 STR - 020 Rev.
Mamuju, 91512, Sulawesi Barat, Indonesia Direktur - PROV. SULAWESI BARAT Alamat : Jln. Pemuda No.02, Kel. Binanga, Kec. Mamuju, Kab. Mamuju
21400
ATAP SENG SPANDEK
ZINCALUME, KR-5 AZ-150 Thk. 0,35 mm
700 350 421 700 700
R
R
E
-
N
4
G
0 .
B
0
A
,4
J
5
A RINGAN 8245
700
700 700 700 700 700
700 700
13256
700
700 700 700 700 700
700 700
700 700 700
700
700 700
700 700
700 700
KAKI KUDA-KUDA BATANG TARIK BATANG SKOR KAKI KUDA-KUDA
1200 CANAL C-75.75.0,75 CANAL C-75.75.0,75 CANAL C-75.75.0,75 CANAL C-75.75.0,75 1200
1300 5800 2400 5000 2400 4500 1300
F E D C B
A
8192
343 RENG BAJA RINGAN ATAP SENG SPANDEK
700
700 R - 40.0,45 ZINCALUME, KR-5 AZ-150 Thk. 0,35 mm
700
700
700
700
700
700
700
700
700
KAKI KUDA-KUDA BATANG TARIK BATANG SKOR 1200
CANAL C-75.75.0,75 CANAL C-75.75.0,75 CANAL C-75.75.0,75
2400 4500 1300
C B
A
985
052
1 2 3 4 5 6 7 8 9 10 11 12
A A
B B
C C
DETAIL KUDA-KUDA 1
SKALA 1 : 60 KD-1
D D
E E
F F
G G
DETAIL KUDA-KUDA 2
H H
SKALA 1 : 30 KD-2
1 2 3 4 5 6 7 8 9 10 11 12
Catatan : Revisi : Dibuat : Nama Gambar : Skala :
Plan & Design Consultant AS PLAN DRAWING
LEGENDA : Deskripsi Tgl Check Plan & Design Consultant
(FOR CONSTRUCTION)
T.O.C = TOP OF CONCRETE (MUKA ATAS BETON) CV. WAHYU ARSIPILAH
1 : 60
B.O.C = BOTTOM OF CONCRETE (MUKA BAWAH BETON)
DETAIL KUDA-KUDA Pekerjaan :
F.F.L = FINISH FLOOR LEVEL (MUKA ATAS LANTAI) 1 : 30
PEMBANGUNAN GEDUNG
C.F.L = CEILING FINISH LEVEL (MUKA ATAS PLAFON)
T.O.R = TOP OF ROOF (MUKA ATAS ATAP) PUSKESMAS TOPORE
DIMENSI PADA GAMBAR MENGGUNAKAN SATUAN MILIMETER
PEMERINTAH KABUPATEN MAMUJU
CV. WAHYU ARSIPILAH Dwg No : Size. Lokasi :
A.3 DINAS KESEHATAN
DESA TOPORE, KEC. PAPALANG
Planning, Design, Management, & Supervisi Consultant DWG - DINKES - PKM - WYA -
HERIANTO JAFAR, S.T.
KAB. MAMUJU
Alamat : Jl. P. Diponegoro, BTN Griya Cahaya Masannang 1 STR - 021 Rev.
Mamuju, 91512, Sulawesi Barat, Indonesia Direktur - PROV. SULAWESI BARAT Alamat : Jln. Pemuda No.02, Kel. Binanga, Kec. Mamuju, Kab. Mamuju
350
700
8200
700
700
700
700
700
700
700
700
700
700
1200
1300 4500 2400
F E D
0001
1 2 3 4 5 6 7 8 9 10 11 12
A A
B B
C C
ATAP SENG SPANDEK RENG BAJA RINGAN
ZINCALUME, KR-5 AZ-150 Thk. 0,35 mm R - 40.0,45
D D
E E
BATANG TARIK BATANG SKOR KAKI KUDA-KUDA
CANAL C-75.75.0,75 CANAL C-75.75.0,75 CANAL C-75.75.0,75
F F
G G
DETAIL KUDA-KUDA 3
SKALA 1 : 30 KD-3
H H
1 2 3 4 5 6 7 8 9 10 11 12
Catatan : Revisi : Dibuat : Nama Gambar : Skala :
Plan & Design Consultant AS PLAN DRAWING
LEGENDA : Deskripsi Tgl Check Plan & Design Consultant
(FOR CONSTRUCTION)
T.O.C = TOP OF CONCRETE (MUKA ATAS BETON) CV. WAHYU ARSIPILAH
B.O.C = BOTTOM OF CONCRETE (MUKA BAWAH BETON)
DETAIL KUDA-KUDA 1 : 30 Pekerjaan :
F.F.L = FINISH FLOOR LEVEL (MUKA ATAS LANTAI)
PEMBANGUNAN GEDUNG
C.F.L = CEILING FINISH LEVEL (MUKA ATAS PLAFON)
T.O.R = TOP OF ROOF (MUKA ATAS ATAP) PUSKESMAS TOPORE
DIMENSI PADA GAMBAR MENGGUNAKAN SATUAN MILIMETER
PEMERINTAH KABUPATEN MAMUJU
CV. WAHYU ARSIPILAH Dwg No : Size. Lokasi :
A.3 DINAS KESEHATAN
DESA TOPORE, KEC. PAPALANG
Planning, Design, Management, & Supervisi Consultant DWG - DINKES - PKM - WYA -
HERIANTO JAFAR, S.T.
KAB. MAMUJU
Alamat : Jl. P. Diponegoro, BTN Griya Cahaya Masannang 1 STR - 022 Rev.
Mamuju, 91512, Sulawesi Barat, Indonesia Direktur - PROV. SULAWESI BARAT Alamat : Jln. Pemuda No.02, Kel. Binanga, Kec. Mamuju, Kab. Mamuju
3200 2500 3200 3200 3200 3000 3800 4700
1 2 3 4 5 6 7 8 9
0054
0042
0005
0042
0054
F
E
D
C
B
A
0054
0051
0052
0043
0051
0052
0054
0042
0005
0042
0054
00881
32600
4000 2400 1800 4300 4300 2000 4650 2000 4650
1300
0001
009
1200 1600
1500 1700 1500
3000 2800
10 11
0081
2500
0051
0021
0002
1 2 3 4 5 6 7 8 9 10 11 12
A A
B B
C C
D D
E E
F F
G G
URAIAN JUMLAH
FOOTPLAT 61 Titik
DENAH PONDASI FOOTPLAT
H H
SKALA 1 : 125
1 2 3 4 5 6 7 8 9 10 11 12
Catatan : Revisi : Dibuat : Nama Gambar : Skala :
Plan & Design Consultant AS PLAN DRAWING
LEGENDA : Deskripsi Tgl Check Plan & Design Consultant
(FOR CONSTRUCTION)
T.O.C = TOP OF CONCRETE (MUKA ATAS BETON) CV. WAHYU ARSIPILAH
B.O.C = BOTTOM OF CONCRETE (MUKA BAWAH BETON)
DENAH PONDASI FOOTPLAT 1 : 125 Pekerjaan :
F.F.L = FINISH FLOOR LEVEL (MUKA ATAS LANTAI)
PEMBANGUNAN GEDUNG
C.F.L = CEILING FINISH LEVEL (MUKA ATAS PLAFON)
T.O.R = TOP OF ROOF (MUKA ATAS ATAP) PUSKESMAS TOPORE
DIMENSI PADA GAMBAR MENGGUNAKAN SATUAN MILIMETER
PEMERINTAH KABUPATEN MAMUJU
CV. WAHYU ARSIPILAH Dwg No : Size. Lokasi :
A.3 DINAS KESEHATAN
DESA TOPORE, KEC. PAPALANG
Planning, Design, Management, & Supervisi Consultant DWG - DINKES - PKM - WYA -
HERIANTO JAFAR, S.T.
KAB. MAMUJU
Alamat : Jl. P. Diponegoro, BTN Griya Cahaya Masannang 1 STR - 024 Rev.
Mamuju, 91512, Sulawesi Barat, Indonesia Direktur - PROV. SULAWESI BARAT Alamat : Jln. Pemuda No.02, Kel. Binanga, Kec. Mamuju, Kab. Mamuju
5402
054
0002
500
0021
2800
0002
1900
3700
2000
2000 3700 3200 2100 2000 4350 4350
3200 2500 3200 3200 3200 3000 3800 4700
1 2 3 4 5 6 7 8 9
0054
0042
0005
0042
0054
F
E
D
C
B
A
0054
0051
0052
0043
0051
0052
0054
0042
0005
0042
0054
00881
32600
4000 2400 1800 4300 4300 2000 4650 2000 4650
1300
0001
009
1200 1600
1500 1700 1500
3000 2800
10 11
0081
2500
0051
0021
0002
1 2 3 4 5 6 7 8 9 10 11 12
A A
B B
A
024
C C
D D
D
E
024
024
E E
C
F B F
024
024
G G
KETERANGAN :
15
SLOOF
20
20
SLOOF
30
PONDASI BATU ROLLAG 1 PC : 2 PP
DENAH PONDASI MENERUS
H H
SKALA 1 : 125
1 2 3 4 5 6 7 8 9 10 11 12
Catatan : Revisi : Dibuat : Nama Gambar : Skala :
Plan & Design Consultant AS PLAN DRAWING
LEGENDA : Deskripsi Tgl Check Plan & Design Consultant
(FOR CONSTRUCTION)
T.O.C = TOP OF CONCRETE (MUKA ATAS BETON) CV. WAHYU ARSIPILAH
B.O.C = BOTTOM OF CONCRETE (MUKA BAWAH BETON)
DENAH PONDASI MENERUS 1 : 125 Pekerjaan :
F.F.L = FINISH FLOOR LEVEL (MUKA ATAS LANTAI)
PEMBANGUNAN GEDUNG
C.F.L = CEILING FINISH LEVEL (MUKA ATAS PLAFON)
T.O.R = TOP OF ROOF (MUKA ATAS ATAP) PUSKESMAS TOPORE
DIMENSI PADA GAMBAR MENGGUNAKAN SATUAN MILIMETER
PEMERINTAH KABUPATEN MAMUJU
CV. WAHYU ARSIPILAH Dwg No : Size. Lokasi :
A.3 DINAS KESEHATAN
DESA TOPORE, KEC. PAPALANG
Planning, Design, Management, & Supervisi Consultant DWG - DINKES - PKM - WYA -
HERIANTO JAFAR, S.T.
KAB. MAMUJU
Alamat : Jl. P. Diponegoro, BTN Griya Cahaya Masannang 1 STR - 023 Rev.
Mamuju, 91512, Sulawesi Barat, Indonesia Direktur - PROV. SULAWESI BARAT Alamat : Jln. Pemuda No.02, Kel. Binanga, Kec. Mamuju, Kab. Mamuju
5 S 16
61
S
5
1000
100 800 100
0001
001
008
001
EL. ±0.000 (F.F.L.) EL. ±0.000 (F.F.L.)
EL.±0.00
EL. -0.35
EL. -1.00
G.L.
EL. -1.20
EL. -1.40
EL. -1.70
EL. -1.85
053
056
002
002
003
200
100 800 100
1000
051
S10 - 100
8 S 16
PONDASI FOOT PLATE
5 S 16
LANTAI KERJA
URUGAN PASIR 001
05
200
002
1 2 3 4 5 6 7 8 9 10 11 12
A A
B B
C C
D D
E E
F F
G G
DETAIL PONDASI FOOTPLAT
H H
SKALA 1 : 20
1 2 3 4 5 6 7 8 9 10 11 12
Catatan : Revisi : Dibuat : Nama Gambar : Skala :
Plan & Design Consultant AS PLAN DRAWING
LEGENDA : Deskripsi Tgl Check Plan & Design Consultant
(FOR CONSTRUCTION)
T.O.C = TOP OF CONCRETE (MUKA ATAS BETON) CV. WAHYU ARSIPILAH
B.O.C = BOTTOM OF CONCRETE (MUKA BAWAH BETON)
DETAIL PONDASI FOOTPLAT 1 : 20 Pekerjaan :
F.F.L = FINISH FLOOR LEVEL (MUKA ATAS LANTAI)
PEMBANGUNAN GEDUNG
C.F.L = CEILING FINISH LEVEL (MUKA ATAS PLAFON)
T.O.R = TOP OF ROOF (MUKA ATAS ATAP) PUSKESMAS TOPORE
DIMENSI PADA GAMBAR MENGGUNAKAN SATUAN MILIMETER
PEMERINTAH KABUPATEN MAMUJU
CV. WAHYU ARSIPILAH Dwg No : Size. Lokasi :
A.3 DINAS KESEHATAN
DESA TOPORE, KEC. PAPALANG
Planning, Design, Management, & Supervisi Consultant DWG - DINKES - PKM - WYA -
HERIANTO JAFAR, S.T.
KAB. MAMUJU
Alamat : Jl. P. Diponegoro, BTN Griya Cahaya Masannang 1 STR - 025 Rev.
Mamuju, 91512, Sulawesi Barat, Indonesia Direktur - PROV. SULAWESI BARAT Alamat : Jln. Pemuda No.02, Kel. Binanga, Kec. Mamuju, Kab. Mamuju
EL.±0.00
EL. -0.35
EL. -1.00
G.L.
EL. -1.20
EL. -1.40
25 200 75
300
700
EL.
EL.
EL.
EL.
EL.
EL.
053
056
002
002
EL. ±0.000 (F.F.L.)
EL. -0.100 (F.F.L.)
ANGKUR S10
PAS. BATU KALI/
GUNUNG
PAS. BATU KOSONG
URUGAN PASIR
005
SPESI PAS. 1/2 BATA
RABAT BAWAH LANTAI HOMOGENOUS TILE
60 x 60
URUGAN PASIR
BAWAH LANTAI
EL.±0.00
SLOOF 20
30
EL. -0.35
URUGAN TANAH
INTERVAL 1 m
EL. -1.00
G.L.
EL. -1.20
EL. -1.40
200 50
300
700
053
056
002
002
EL. ±0.000 (F.F.L.)
EL. -0.100 (F.F.L.)
ANGKUR S10
PAS. BATU KALI/
GUNUNG
PAS. BATU KOSONG
URUGAN PASIR
005
SPESI PAS. 1/2 BATA
RABAT BAWAH LANTAI HOMOGENOUS TILE
60 x 60
URUGAN PASIR
BAWAH LANTAI
EL.±0.00
SLOOF 20
30
EL. -0.35
URUGAN TANAH
INTERVAL 1 m
EL. -1.00
G.L.
EL. -1.20
EL. -1.40
50 200 50
300
700
053
056
002
002
EL. ±0.000 (F.F.L.)
ANGKUR S10
PAS. BATU KALI/
GUNUNG
PAS. BATU KOSONG
URUGAN PASIR
005
SPESI PAS. 1/2 BATA
RABAT BAWAH LANTAI HOMOGENOUS TILE
60 x 60
URUGAN PASIR
BAWAH LANTAI
EL. ±0.000 (F.F.L.)
F.F.L. F.F.L. F.F.L.
SLOOF 20
30
URUGAN TANAH
INTERVAL 1 m
50
RAILING STAINLESS STEEL
HOMOGENOUS TILE
60 x 60
370 1000
+0.00
F.F.L.
-0.35
-0.75
-1.00
G.L.
-1.20
-1.40
50 200 50
300
715 700
007
005
PAS. BATA ROLLAG 1/2
EL. ±0.000 (F.F.L.)
EL. -0.050 (F.F.L.)
RABAT SALURAN PAS. BATU KOSONG
T = 5 cm
URUGAN PASIR
T = 5 cm URUGAN PASIR
053
004
052
002
002
SLOOF 20 30
ANGKUR S10
INTERVAL 1 m
EL.±0.00
EL. -0.35
RABAT BETON
T = 10 cm
URUGAN PASIR
T = 5 cm
EL. -1.00
G.L.
PAS. BATU KALI/GUNUNG
EL. -1.20
EL. -1.40
200 50
300
700
053
056
002
002
EL. ±0.000 (F.F.L.)
ANGKUR S10
PAS. BATU KALI/
GUNUNG
PAS. BATU KOSONG
URUGAN PASIR
005
1 2 3 4 5 6 7 8 9 10 11 12
A A
B B
C C
D D
DETAIL A DETAIL B DETAIL C
SKALA 1 : 20 024 SKALA 1 : 20 024 SKALA 1 : 20 024
SPESI PAS. 1/2 BATA
RABAT BAWAH LANTAI HOMOGENOUS TILE
E 60 x 60 E
URUGAN PASIR
BAWAH LANTAI
EL. ±0.000 (F.F.L.)
F.F.L.
SLOOF 15
20
F F
URUGAN TANAH
INTERVAL 1 m
G G
DETAIL D 50 DETAIL E
H H
SKALA 1 : 20 024 SKALA 1 : 20 024
1 2 3 4 5 6 7 8 9 10 11 12
Catatan : Revisi : Dibuat : Nama Gambar : Skala :
Plan & Design Consultant AS PLAN DRAWING
LEGENDA : Deskripsi Tgl Check Plan & Design Consultant
(FOR CONSTRUCTION)
T.O.C = TOP OF CONCRETE (MUKA ATAS BETON) CV. WAHYU ARSIPILAH
B.O.C = BOTTOM OF CONCRETE (MUKA BAWAH BETON)
DETAL PONDASI MENERUS 1 : 20 Pekerjaan :
F.F.L = FINISH FLOOR LEVEL (MUKA ATAS LANTAI)
PEMBANGUNAN GEDUNG
C.F.L = CEILING FINISH LEVEL (MUKA ATAS PLAFON)
T.O.R = TOP OF ROOF (MUKA ATAS ATAP) PUSKESMAS TOPORE
DIMENSI PADA GAMBAR MENGGUNAKAN SATUAN MILIMETER
PEMERINTAH KABUPATEN MAMUJU
CV. WAHYU ARSIPILAH Dwg No : Size. Lokasi :
A.3 DINAS KESEHATAN
DESA TOPORE, KEC. PAPALANG
Planning, Design, Management, & Supervisi Consultant DWG - DINKES - PKM - WYA -
HERIANTO JAFAR, S.T.
KAB. MAMUJU
Alamat : Jl. P. Diponegoro, BTN Griya Cahaya Masannang 1 STR - 026 Rev.
Mamuju, 91512, Sulawesi Barat, Indonesia Direktur - PROV. SULAWESI BARAT Alamat : Jln. Pemuda No.02, Kel. Binanga, Kec. Mamuju, Kab. Mamuju
TUMPUAN LAPANGAN
SLOOF TIPE S-1
30 90 30
TUMPUAN LAPANGAN
SLOOF TIPE S-2
03
041
03
150
002
30 90 30
2 S 16
S10 - 100
2 S 16
03
041
03
150
002
TUMPUAN LAPANGAN
KOLOM TIPE K-1
2 S 16
5 0 5 0
S10 - 150
2 S 16
130
20 90 20
TUMPUAN LAPANGAN
BALOK LATEI TIPE B-L
031
02
09
02
130
20 90 20
2 S 10
0
5
S 6 - 100
2 S 10
031
02
09
02
130
20 90 20
TUMPUAN LAPANGAN
KOLOM TIPE K-P
2 S 10
S 6 - 150
5
0
2 S 10
031
02
09
02
130
20 90 20
2 S 10
0
5
S 6 - 100
2 S 10
031
02
09
02
200
40 120 40
2 S 10
S 6 - 150
5
0
2 S 10
003
04
022
04
200
40 120 40
2 S 16
S10 - 100
2 S 16
3 S 16
003
04
022
04
3 S 16
200
30 140 30
2 S 16
S10 - 150
2 S 16
002
03
041
03
200
30 140 30
3 S 16
S10 - 100
2 S 16
3 S 16
002
03
041
03
8
0
R15 R15
3 S 16
0 0
8 8
S10 - 150
2 S 16
8
0
3 S 16
R R
15 15
KET :
SUDUT KOLOM DIBENTUK CHAMFER, TIDAK LANCIP/RUNCING
30 90 30
TUMPUAN LAPANGAN
RINGBALK TIPE RB-2
03
041
03
150
002
30 90 30
2 S 13
S10 - 100
2 S 13
03
041
03
150
002
1 2 3 4 5 6 7 8 9 10 11 12
A A
B B
C C
D D
E E
F F
2 S 13
5 0 5 0
S10 - 150 G G
2 S 13
DETAIL PEMBESIAN
H H
SKALA 1 : 5
1 2 3 4 5 6 7 8 9 10 11 12
Catatan : Revisi : Dibuat : Nama Gambar : Skala :
Plan & Design Consultant AS PLAN DRAWING
LEGENDA : Deskripsi Tgl Check Plan & Design Consultant
(FOR CONSTRUCTION)
T.O.C = TOP OF CONCRETE (MUKA ATAS BETON) CV. WAHYU ARSIPILAH
B.O.C = BOTTOM OF CONCRETE (MUKA BAWAH BETON)
DETAIL PEMBESIAN 1 : 5 Pekerjaan :
F.F.L = FINISH FLOOR LEVEL (MUKA ATAS LANTAI)
PEMBANGUNAN GEDUNG
C.F.L = CEILING FINISH LEVEL (MUKA ATAS PLAFON)
T.O.R = TOP OF ROOF (MUKA ATAS ATAP) PUSKESMAS TOPORE
DIMENSI PADA GAMBAR MENGGUNAKAN SATUAN MILIMETER
PEMERINTAH KABUPATEN MAMUJU
CV. WAHYU ARSIPILAH Dwg No : Size. Lokasi :
A.3 DINAS KESEHATAN
DESA TOPORE, KEC. PAPALANG
Planning, Design, Management, & Supervisi Consultant DWG - DINKES - PKM - WYA -
HERIANTO JAFAR, S.T.
KAB. MAMUJU
Alamat : Jl. P. Diponegoro, BTN Griya Cahaya Masannang 1 STR - 027 Rev.
Mamuju, 91512, Sulawesi Barat, Indonesia Direktur - PROV. SULAWESI BARAT Alamat : Jln. Pemuda No.02, Kel. Binanga, Kec. Mamuju, Kab. Mamuju
200
40 120 40
004
04
023
04
40 120
3 S 16
S10 - 100
2 S 16
2 S 16
04
200
40
004
04
023
2 S 16
0 0 8
8
S10 - 150
2 S 16
3 S 16
TUMPUAN LAPANGAN
RINGBALK TIPE RB-1
200
40 120 40
TUMPUAN LAPANGAN
RINGBALK TIPE RB-3
052
04
071
04
200
40 120 40
3 S 13 2 S 13
S10 - 150
2 S 13
2 S 13
S10 - 100
2 S 13 3 S 13
052
04
071
04
1 2 3 4 5 6 7 8 9 10 11 12
A A
B B
C C
D D
E E
0
8
F F
8
0
G G
DETAIL PEMBESIAN
H H
SKALA 1 : 5
1 2 3 4 5 6 7 8 9 10 11 12
Catatan : Revisi : Dibuat : Nama Gambar : Skala :
Plan & Design Consultant AS PLAN DRAWING
LEGENDA : Deskripsi Tgl Check Plan & Design Consultant
(FOR CONSTRUCTION)
T.O.C = TOP OF CONCRETE (MUKA ATAS BETON) CV. WAHYU ARSIPILAH
B.O.C = BOTTOM OF CONCRETE (MUKA BAWAH BETON)
DETAIL PEMBESIAN 1 : 5 Pekerjaan :
F.F.L = FINISH FLOOR LEVEL (MUKA ATAS LANTAI)
PEMBANGUNAN GEDUNG
C.F.L = CEILING FINISH LEVEL (MUKA ATAS PLAFON)
T.O.R = TOP OF ROOF (MUKA ATAS ATAP) PUSKESMAS TOPORE
DIMENSI PADA GAMBAR MENGGUNAKAN SATUAN MILIMETER
PEMERINTAH KABUPATEN MAMUJU
CV. WAHYU ARSIPILAH Dwg No : Size. Lokasi :
A.3 DINAS KESEHATAN
DESA TOPORE, KEC. PAPALANG
Planning, Design, Management, & Supervisi Consultant DWG - DINKES - PKM - WYA -
HERIANTO JAFAR, S.T.
KAB. MAMUJU
Alamat : Jl. P. Diponegoro, BTN Griya Cahaya Masannang 1 STR - 028 Rev.
Mamuju, 91512, Sulawesi Barat, Indonesia Direktur - PROV. SULAWESI BARAT Alamat : Jln. Pemuda No.02, Kel. Binanga, Kec. Mamuju, Kab. Mamuju
40d
40d 40d
1000 1000
003
003
003
40d
KOLOM UTAMA / KOLOM PRAKTIS
ANGKUR S10 - 300
DIPASANG TIAP 6 SUSUN BATA
OVERLAPP COLUMN
SLOOF
ANGKUR S10 PAS. BATU GUNUNG/KALI URUGAN PASIR BAWAH PONDASI
INTERVAL 1m T = 5 cm
PAS. BATU KOSONG
COR BETON T = 15 cm
d04
1 2 3 4 5 6 7 8 9 10 11 12
A A
BALOK/RINGBALK
B B
C C
KOLOM
D D
DETAIL SAMBUNGAN SUDUT (KOLOM & RINGBALK)
E E
SKALA 1 : 15
BALOK 40d
F F
BALOK/RINGBALK
40d
G G
KOLOM
H DETAIL SAMBUNGAN PONDASI, SLOOF DAN KOLOM H
DETAIL SAMBUNGAN TENGAH (KOLOM & RINGBALK)
SKALA 1 : 15
SKALA 1 : 15
1 2 3 4 5 6 7 8 9 10 11 12
Catatan : Revisi : Dibuat : Nama Gambar : Skala :
Plan & Design Consultant AS PLAN DRAWING
LEGENDA : Deskripsi Tgl Check Plan & Design Consultant
(FOR CONSTRUCTION)
T.O.C = TOP OF CONCRETE (MUKA ATAS BETON) CV. WAHYU ARSIPILAH
B.O.C = BOTTOM OF CONCRETE (MUKA BAWAH BETON)
SYARAT PENYAMBUNGAN TULANGAN 1 : 15 Pekerjaan :
F.F.L = FINISH FLOOR LEVEL (MUKA ATAS LANTAI)
PEMBANGUNAN GEDUNG
C.F.L = CEILING FINISH LEVEL (MUKA ATAS PLAFON)
T.O.R = TOP OF ROOF (MUKA ATAS ATAP) PUSKESMAS TOPORE
DIMENSI PADA GAMBAR MENGGUNAKAN SATUAN MILIMETER
PEMERINTAH KABUPATEN MAMUJU
CV. WAHYU ARSIPILAH Dwg No : Size. Lokasi :
A.3 DINAS KESEHATAN
DESA TOPORE, KEC. PAPALANG
Planning, Design, Management, & Supervisi Consultant DWG - DINKES - PKM - WYA -
HERIANTO JAFAR, S.T.
KAB. MAMUJU
Alamat : Jl. P. Diponegoro, BTN Griya Cahaya Masannang 1 STR - 029 Rev.
Mamuju, 91512, Sulawesi Barat, Indonesia Direktur - PROV. SULAWESI BARAT Alamat : Jln. Pemuda No.02, Kel. Binanga, Kec. Mamuju, Kab. Mamuju
100 1050 200
S10 - 150
052
004
056
1350
RINGBALK TIPE RB-4
PLAT TALANG BETON S10 - 150
T = 10 cm
RINGBALK TIPE RB-1
051
RINGBALK TIPE RB-1
001
051
RINGBALK TIPE RB-1
KOLOM
056
052
1 2 3 4 5 6 7 8 9 10 11 12
A A
B B
S 10
S 10 - 100
C S 10 C
S 10 - 150
S 10
S 10
D D
S 10
E E
F F
G G
DETAIL TALANG BETON
H H
SKALA 1 : 10
1 2 3 4 5 6 7 8 9 10 11 12
Catatan : Revisi : Dibuat : Nama Gambar : Skala :
Plan & Design Consultant AS PLAN DRAWING
LEGENDA : Deskripsi Tgl Check Plan & Design Consultant
(FOR CONSTRUCTION)
T.O.C = TOP OF CONCRETE (MUKA ATAS BETON) CV. WAHYU ARSIPILAH
B.O.C = BOTTOM OF CONCRETE (MUKA BAWAH BETON)
DETAIL TALANG BETON 1 : 10 Pekerjaan :
F.F.L = FINISH FLOOR LEVEL (MUKA ATAS LANTAI)
PEMBANGUNAN GEDUNG
C.F.L = CEILING FINISH LEVEL (MUKA ATAS PLAFON)
T.O.R = TOP OF ROOF (MUKA ATAS ATAP) PUSKESMAS TOPORE
DIMENSI PADA GAMBAR MENGGUNAKAN SATUAN MILIMETER
PEMERINTAH KABUPATEN MAMUJU
CV. WAHYU ARSIPILAH Dwg No : Size. Lokasi :
A.3 DINAS KESEHATAN
DESA TOPORE, KEC. PAPALANG
Planning, Design, Management, & Supervisi Consultant DWG - DINKES - PKM - WYA -
HERIANTO JAFAR, S.T.
KAB. MAMUJU
Alamat : Jl. P. Diponegoro, BTN Griya Cahaya Masannang 1 STR - 030 Rev.
Mamuju, 91512, Sulawesi Barat, Indonesia Direktur - PROV. SULAWESI BARAT Alamat : Jln. Pemuda No.02, Kel. Binanga, Kec. Mamuju, Kab. Mamuju
3200 2500 3200 3200 3200 3000 3800 4700
1 2 3 4 5 6 7 8 9
0054
0042
0005
0042
0054
F
E
D
C
B
A
0054
0051
0052
0043
0051
0052
0054
0042
0005
0042
0054
00881
32600
4000 2400 1800 4300 4300 2000 4650 2000 4650
1300
0001
009
1200 1600
1500 1700 1500
3000 2800
10 11
0081
2500
0051
0021
0002
1 2 3 4 5 6 7 8 9 10 11 12
A A
K-1 K-1 K-1 K-1 K-1 K-1 K-1 K-1 K-1 K-1
B B
C K-1 K-1 K-1 K-1 K-1 K-1 K-1 K-1 K-1 K-1 C
K-1
K-1 K-1 K-1 K-1 K-1 K-1 K-1 K-1 K-1 K-1 K-1
D D
K-1 K-1 K-1 K-1 K-1 K-1 K-1 K-1 K-1 K-1
E E
K-1 K-1 K-1 K-1 K-1 K-1 K-1 K-1 K-1 K-1 K-1
F F
K-1 K-1 K-1 K-1 K-1 K-1 K-1 K-1 K-1 K-1 K-1
G G
URAIAN JUMLAH
KOLOM TIPE K-1 64 Titik
DENAH PERLETAKAN KOLOM UTAMA
H H
SKALA 1 : 125
1 2 3 4 5 6 7 8 9 10 11 12
Catatan : Revisi : Dibuat : Nama Gambar : Skala :
Plan & Design Consultant AS PLAN DRAWING
LEGENDA : Deskripsi Tgl Check Plan & Design Consultant
(FOR CONSTRUCTION)
T.O.C = TOP OF CONCRETE (MUKA ATAS BETON) CV. WAHYU ARSIPILAH
B.O.C = BOTTOM OF CONCRETE (MUKA BAWAH BETON)
DENAH PERLETAKAN KOLOM UTAMA 1 : 125 Pekerjaan :
F.F.L = FINISH FLOOR LEVEL (MUKA ATAS LANTAI)
PEMBANGUNAN GEDUNG
C.F.L = CEILING FINISH LEVEL (MUKA ATAS PLAFON)
T.O.R = TOP OF ROOF (MUKA ATAS ATAP) PUSKESMAS TOPORE
DIMENSI PADA GAMBAR MENGGUNAKAN SATUAN MILIMETER
PEMERINTAH KABUPATEN MAMUJU
CV. WAHYU ARSIPILAH Dwg No : Size. Lokasi :
A.3 DINAS KESEHATAN
DESA TOPORE, KEC. PAPALANG
Planning, Design, Management, & Supervisi Consultant DWG - DINKES - PKM - WYA -
HERIANTO JAFAR, S.T.
KAB. MAMUJU
Alamat : Jl. P. Diponegoro, BTN Griya Cahaya Masannang 1 STR - 031 Rev.
Mamuju, 91512, Sulawesi Barat, Indonesia Direktur - PROV. SULAWESI BARAT Alamat : Jln. Pemuda No.02, Kel. Binanga, Kec. Mamuju, Kab. Mamuju
3200 2500 3200 3200 3200 3000 3800 4700
1 2 3 4 5 6 7 8 9
0054
0042
0005
0042
0054
F
E
D
C
B
A
0054
0051
0052
0043
0051
0052
0054
0042
0005
0042
0054
00881
32600
4000 2400 1800 4300 4300 2000 4650 2000 4650
1300
0001
009
1200 1600
1500 1700 1500
3000 2800
10 11
0081
2500
0051
0021
0002
1 2 3 4 5 6 7 8 9 10 11 12
A A
K-P
K-L K-L K-L K-L
K-L
B B
K-P K-P
K-L K-P K-P K-P K-P
K-P K-P
K-P K-P K-P
K-L
K-L
500 K-L K-L
K-P K-P K-P K-P K-P K-P K-P
C C
K-P
K-P K-P
K-P K-P K-P K-P
K-P K-P
D D
K-P
K-P K-P
K-P K-P K-P
K-P
K-P K-P
E E
K-P K-P
K-P K-P K-P K-P K-P K-P K-P K-P K-P K-P
K-P
K-P K-P K-P
F K-P K-P F
K-P K-P K-P K-P K-P K-P K-P K-P K-P
K-P K-P
K-P K-P K-P K-P
K-L
K-P
K-P K-P K-P K-P K-P
K-P
URAIAN JUMLAH K-P
G G
KOLOM TIPE K-P 78 Titik
KOLOM TIPE K-L 11 Titik
DENAH PERLETAKAN KOLOM PRAKTIS & LATEI
H H
SKALA 1 : 125
1 2 3 4 5 6 7 8 9 10 11 12
Catatan : Revisi : Dibuat : Nama Gambar : Skala :
Plan & Design Consultant AS PLAN DRAWING
LEGENDA : Deskripsi Tgl Check Plan & Design Consultant
(FOR CONSTRUCTION)
T.O.C = TOP OF CONCRETE (MUKA ATAS BETON) CV. WAHYU ARSIPILAH
DENAH PERLETAKAN KOLOM
B.O.C = BOTTOM OF CONCRETE (MUKA BAWAH BETON)
1 : 125 Pekerjaan :
F.F.L = FINISH FLOOR LEVEL (MUKA ATAS LANTAI) PRAKTIS & LATEI
PEMBANGUNAN GEDUNG
C.F.L = CEILING FINISH LEVEL (MUKA ATAS PLAFON)
T.O.R = TOP OF ROOF (MUKA ATAS ATAP) PUSKESMAS TOPORE
DIMENSI PADA GAMBAR MENGGUNAKAN SATUAN MILIMETER
PEMERINTAH KABUPATEN MAMUJU
CV. WAHYU ARSIPILAH Dwg No : Size. Lokasi :
A.3 DINAS KESEHATAN
DESA TOPORE, KEC. PAPALANG
Planning, Design, Management, & Supervisi Consultant DWG - DINKES - PKM - WYA -
HERIANTO JAFAR, S.T.
KAB. MAMUJU
Alamat : Jl. P. Diponegoro, BTN Griya Cahaya Masannang 1 STR - 032 Rev.
Mamuju, 91512, Sulawesi Barat, Indonesia Direktur - PROV. SULAWESI BARAT Alamat : Jln. Pemuda No.02, Kel. Binanga, Kec. Mamuju, Kab. Mamuju
3200 2500 3200 3200 3200 3000 3800 4700
1 2 3 4 5 6 7 8 9
0054
0042
0005
0042
0054
F
E
D
C
B
A
0054
0051
0052
0043
0051
0052
0054
0042
0005
0042
0054
00881
32600
4000 2400 1800 4300 4300 2000 4650 2000 4650
1300
0001
009
1200 1600
1500 1700 1500
3000 2800
10 11
0081
2500
0051
0021
0002
1 2 3 4 5 6 7 8 9 10 11 12
A A
B B
C C
D D
E E
F F
KETERANGAN :
G 13 G BALOK TIPE B-L (B.O.C +3.400)
13
13
BALOK TIPE B-L (B.O.C +3.600) 13
13
BALOK TIPE B-L (B.O.C +3.400) 20
DENAH BALOK LATEI
H H
SKALA 1 : 125
1 2 3 4 5 6 7 8 9 10 11 12
Catatan : Revisi : Dibuat : Nama Gambar : Skala :
Plan & Design Consultant AS PLAN DRAWING
LEGENDA : Deskripsi Tgl Check Plan & Design Consultant
(FOR CONSTRUCTION)
T.O.C = TOP OF CONCRETE (MUKA ATAS BETON) CV. WAHYU ARSIPILAH
B.O.C = BOTTOM OF CONCRETE (MUKA BAWAH BETON)
DENAH BALOK LATEI 1 : 125 Pekerjaan :
F.F.L = FINISH FLOOR LEVEL (MUKA ATAS LANTAI)
PEMBANGUNAN GEDUNG
C.F.L = CEILING FINISH LEVEL (MUKA ATAS PLAFON)
T.O.R = TOP OF ROOF (MUKA ATAS ATAP) PUSKESMAS TOPORE
DIMENSI PADA GAMBAR MENGGUNAKAN SATUAN MILIMETER
PEMERINTAH KABUPATEN MAMUJU
CV. WAHYU ARSIPILAH Dwg No : Size. Lokasi :
A.3 DINAS KESEHATAN
DESA TOPORE, KEC. PAPALANG
Planning, Design, Management, & Supervisi Consultant DWG - DINKES - PKM - WYA -
HERIANTO JAFAR, S.T.
KAB. MAMUJU
Alamat : Jl. P. Diponegoro, BTN Griya Cahaya Masannang 1 STR - 033 Rev.
Mamuju, 91512, Sulawesi Barat, Indonesia Direktur - PROV. SULAWESI BARAT Alamat : Jln. Pemuda No.02, Kel. Binanga, Kec. Mamuju, Kab. Mamuju
5000
RB-1
RB-1 RB-1
RB-1 RB-1 RB-1
RB-1 RB-1
0002
0004
5000 1500
051
-
01S
1525
5733
1
1625
D C
051
-
01S
1625
S10 - 150
S10 - 150
007
1 2 3 4 5 6 7 8 9 10 11 12
A A
B B
C C
D D
RB-3
RB-3 RB-3
E E
2
036
A
036
F F
G G
1 B DENAH PLAT KANOPI TERAS
H H
036 036
SKALA 1 : 40
1 2 3 4 5 6 7 8 9 10 11 12
Catatan : Revisi : Dibuat : Nama Gambar : Skala :
Plan & Design Consultant AS PLAN DRAWING
LEGENDA : Deskripsi Tgl Check Plan & Design Consultant
(FOR CONSTRUCTION)
T.O.C = TOP OF CONCRETE (MUKA ATAS BETON) CV. WAHYU ARSIPILAH
B.O.C = BOTTOM OF CONCRETE (MUKA BAWAH BETON)
DENAH PLAT KANOPI TERAS 1 : 40 Pekerjaan :
F.F.L = FINISH FLOOR LEVEL (MUKA ATAS LANTAI)
PEMBANGUNAN GEDUNG
C.F.L = CEILING FINISH LEVEL (MUKA ATAS PLAFON)
T.O.R = TOP OF ROOF (MUKA ATAS ATAP) PUSKESMAS TOPORE
DIMENSI PADA GAMBAR MENGGUNAKAN SATUAN MILIMETER
PEMERINTAH KABUPATEN MAMUJU
CV. WAHYU ARSIPILAH Dwg No : Size. Lokasi :
A.3 DINAS KESEHATAN
DESA TOPORE, KEC. PAPALANG
Planning, Design, Management, & Supervisi Consultant DWG - DINKES - PKM - WYA -
HERIANTO JAFAR, S.T.
KAB. MAMUJU
Alamat : Jl. P. Diponegoro, BTN Griya Cahaya Masannang 1 STR - 035 Rev.
Mamuju, 91512, Sulawesi Barat, Indonesia Direktur - PROV. SULAWESI BARAT Alamat : Jln. Pemuda No.02, Kel. Binanga, Kec. Mamuju, Kab. Mamuju
001
8000
055
0754
001
053
600 4150 600
0204
475
004
0263
3350
300 1025 1025 300
055
0754
001
053
001
0204
1 2 3 4 5 6 7 8 9 10 11 12
A A
B B
C C
D D
E E
F F
300 2575
G G
TAMPAK 1 TAMPAK 2
SKALA 1 : 40 036 SKALA 1 : 40 036
H H
1 2 3 4 5 6 7 8 9 10 11 12
Catatan : Revisi : Dibuat : Nama Gambar : Skala :
Plan & Design Consultant AS PLAN DRAWING
LEGENDA : Deskripsi Tgl Check Plan & Design Consultant
(FOR CONSTRUCTION)
T.O.C = TOP OF CONCRETE (MUKA ATAS BETON) CV. WAHYU ARSIPILAH
B.O.C = BOTTOM OF CONCRETE (MUKA BAWAH BETON)
TAMPAK KANOPI 1 : 40 Pekerjaan :
F.F.L = FINISH FLOOR LEVEL (MUKA ATAS LANTAI)
PEMBANGUNAN GEDUNG
C.F.L = CEILING FINISH LEVEL (MUKA ATAS PLAFON)
T.O.R = TOP OF ROOF (MUKA ATAS ATAP) PUSKESMAS TOPORE
DIMENSI PADA GAMBAR MENGGUNAKAN SATUAN MILIMETER
PEMERINTAH KABUPATEN MAMUJU
CV. WAHYU ARSIPILAH Dwg No : Size. Lokasi :
A.3 DINAS KESEHATAN
DESA TOPORE, KEC. PAPALANG
Planning, Design, Management, & Supervisi Consultant DWG - DINKES - PKM - WYA -
HERIANTO JAFAR, S.T.
KAB. MAMUJU
Alamat : Jl. P. Diponegoro, BTN Griya Cahaya Masannang 1 STR - 036 Rev.
Mamuju, 91512, Sulawesi Barat, Indonesia Direktur - PROV. SULAWESI BARAT Alamat : Jln. Pemuda No.02, Kel. Binanga, Kec. Mamuju, Kab. Mamuju
3200 2500 3200 3200 3200 3000 3800 4700
1 2 3 4 5 6 7 8 9
0054
0042
0005
0042
0054
F
E
D
C
B
A
0054
0051
0052
0043
0051
0052
0054
0042
0005
0042
0054
00881
32600
4000 2400 1800 4300 4300 2000 4650 2000 4650
1300
0001
009
1200 1600
1500 1700 1500
3000 2800
10 11
0081
2500
0051
0021
0002
1 2 3 4 5 6 7 8 9 10 11 12
A A
B B
C C
D D
E E
F F
G G
KETERANGAN :
20 RINGBALK TIPE RB-1 (T.O.C +4.500)
40
RINGBALK 13 TIPE RB-2 (T.O.C +4.500)
20
20
RINGBALK TIPE RB-3 (T.O.C +4.500)
25
15 RINGBALK TIPE RB-4 (T.O.C +4.750)
65
DENAH RINGBALK
H H
SKALA 1 : 125
1 2 3 4 5 6 7 8 9 10 11 12
Catatan : Revisi : Dibuat : Nama Gambar : Skala :
Plan & Design Consultant AS PLAN DRAWING
LEGENDA : Deskripsi Tgl Check Plan & Design Consultant
(FOR CONSTRUCTION)
T.O.C = TOP OF CONCRETE (MUKA ATAS BETON) CV. WAHYU ARSIPILAH
B.O.C = BOTTOM OF CONCRETE (MUKA BAWAH BETON)
DENAH RINGBALK 1 : 125 Pekerjaan :
F.F.L = FINISH FLOOR LEVEL (MUKA ATAS LANTAI)
PEMBANGUNAN GEDUNG
C.F.L = CEILING FINISH LEVEL (MUKA ATAS PLAFON)
T.O.R = TOP OF ROOF (MUKA ATAS ATAP) PUSKESMAS TOPORE
DIMENSI PADA GAMBAR MENGGUNAKAN SATUAN MILIMETER
PEMERINTAH KABUPATEN MAMUJU
CV. WAHYU ARSIPILAH Dwg No : Size. Lokasi :
A.3 DINAS KESEHATAN
DESA TOPORE, KEC. PAPALANG
Planning, Design, Management, & Supervisi Consultant DWG - DINKES - PKM - WYA -
HERIANTO JAFAR, S.T.
KAB. MAMUJU
Alamat : Jl. P. Diponegoro, BTN Griya Cahaya Masannang 1 STR - 034 Rev.
Mamuju, 91512, Sulawesi Barat, Indonesia Direktur - PROV. SULAWESI BARAT Alamat : Jln. Pemuda No.02, Kel. Binanga, Kec. Mamuju, Kab. Mamuju
FIN. COATING PVDF (EXTERIOR)
S10 - 150 PLAT BETON
T= 130 mm
EL. + 4.350 (T.O.C)
S10 - 150
PIPA DRAIN
PCV - AW 3"
K-1
300 300 4150 300 300
5000
D C
001
055
RB-1 ALUMINIUM COMPOSITE PANEL (ACP)
001
053
1625
200 200
001
053
1625
PIPA DRAIN 1025 300
001
600
055
RB-1
300 1025
PCV - AW 3"
K-1
600
700
PLAT BETON
T= 130 mm
S10 - 150
EL. + 4.350 (T.O.C)
PIPA DRAIN
100
150 150
300
4000
1
055
001
053
001
1200
RB-1 RB-1
300 175
KOLOM K-1 KOLOM K-1
PVC - AW 3"
0011
ALUMINIUM COMPOSITE PANEL (ACP) RB-3
FIN. COATING PVDF (EXTERIOR)
RB-3 RB-3 RB-3
ALUMINIUM COMPOSITE PANEL (ACP)
FIN. COATING PVDF (EXTERIOR)
051
031
021
004
ALUMINIUM COMPOSITE PANEL (ACP)
FIN. COATING PVDF (EXTERIOR)
100
S10 - 150
03
07
03
031
1 2 3 4 5 6 7 8 9 10 11 12
A
A A
B B
POTONGAN A
C SKALA 1 : 25 036 C
D D
E E
F F
POTONGAN B
SKALA 1 : 25 036
G G
S10 - 150 PLAT ATAP
T = 130mm
DETAIL - A
H H
SKALA 1 : 10
1 2 3 4 5 6 7 8 9 10 11 12
Catatan : Revisi : Dibuat : Nama Gambar : Skala :
Plan & Design Consultant AS PLAN DRAWING
LEGENDA : Deskripsi Tgl Check Plan & Design Consultant
(FOR CONSTRUCTION)
T.O.C = TOP OF CONCRETE (MUKA ATAS BETON) CV. WAHYU ARSIPILAH
1 : 25
B.O.C = BOTTOM OF CONCRETE (MUKA BAWAH BETON)
POTONGAN KANOPI Pekerjaan :
F.F.L = FINISH FLOOR LEVEL (MUKA ATAS LANTAI) 1 : 10
PEMBANGUNAN GEDUNG
C.F.L = CEILING FINISH LEVEL (MUKA ATAS PLAFON)
T.O.R = TOP OF ROOF (MUKA ATAS ATAP) PUSKESMAS TOPORE
DIMENSI PADA GAMBAR MENGGUNAKAN SATUAN MILIMETER
PEMERINTAH KABUPATEN MAMUJU
CV. WAHYU ARSIPILAH Dwg No : Size. Lokasi :
A.3 DINAS KESEHATAN
DESA TOPORE, KEC. PAPALANG
Planning, Design, Management, & Supervisi Consultant DWG - DINKES - PKM - WYA -
HERIANTO JAFAR, S.T.
KAB. MAMUJU
Alamat : Jl. P. Diponegoro, BTN Griya Cahaya Masannang 1 STR - 037 Rev.
Mamuju, 91512, Sulawesi Barat, Indonesia Direktur - PROV. SULAWESI BARAT Alamat : Jln. Pemuda No.02, Kel. Binanga, Kec. Mamuju, Kab. Mamuju
1 2 3 4 5 6 7 8 9 10 11 12
A A
B B
C C
D D
E E
F F
G G
JUMLAH JUMLAH JUMLAH
SYMBOL KETERANGAN SYMBOL KETERANGAN SYMBOL KETERANGAN
(BH) (BH) (BH)
PANEL BOX + AKSESORIS 1 STOP KONTAK (Elev. +1.50) 28 SAKLAR TUNGGAL (Elev. +1.50) 23
STOP KONTAK (Elev. +0.30) 30 DOWNLIGHT LED PANEL 18 WATT 98
DOWNLIGHT LED PANEL 5 WATT 7
DOWNLIGHT LED PANEL 12 WATT 13
EXHAUST FAN 6 DENAH INSTALASI LISTRIK
H H
SAKLAR GANDA (Elev. +1.50) 15
SKALA 1 : 125
1 2 3 4 5 6 7 8 9 10 11 12
Catatan : Revisi : Dibuat : Nama Gambar : Skala :
Plan & Design Consultant AS PLAN DRAWING
LEGENDA : Deskripsi Tgl Check Plan & Design Consultant
(FOR CONSTRUCTION)
T.O.C = TOP OF CONCRETE (MUKA ATAS BETON) CV. WAHYU ARSIPILAH
B.O.C = BOTTOM OF CONCRETE (MUKA BAWAH BETON)
DENAH INSTALASI LISTRIK 1 : 125 Pekerjaan :
F.F.L = FINISH FLOOR LEVEL (MUKA ATAS LANTAI)
PEMBANGUNAN GEDUNG
C.F.L = CEILING FINISH LEVEL (MUKA ATAS PLAFON)
T.O.R = TOP OF ROOF (MUKA ATAS ATAP) PUSKESMAS TOPORE
DIMENSI PADA GAMBAR MENGGUNAKAN SATUAN MILIMETER
PEMERINTAH KABUPATEN MAMUJU
CV. WAHYU ARSIPILAH Dwg No : Size. Lokasi :
A.3 DINAS KESEHATAN
DESA TOPORE, KEC. PAPALANG
Planning, Design, Management, & Supervisi Consultant DWG - DINKES - PKM - WYA -
HERIANTO JAFAR, S.T.
KAB. MAMUJU
Alamat : Jl. P. Diponegoro, BTN Griya Cahaya Masannang 1 MEP - 038 Rev.
Mamuju, 91512, Sulawesi Barat, Indonesia Direktur - PROV. SULAWESI BARAT Alamat : Jln. Pemuda No.02, Kel. Binanga, Kec. Mamuju, Kab. Mamuju
SPOEL-HOEK WC/KM WC/KM
±0.000 -0.020 -0.020
R. PERAWATAN (P) R. PERAWATAN (L) GUDANG
R. BERSALIN R. PASKA BERSALIN WC/KM
±0.000 ±0.000 ±0.000
R. STERIL R. ALAT
±0.000 ±0.000 R. LINEN -0.020
±0.000 ±0.000
±0.000
R. TINDAKAN
GAWAT DARURAT
±0.000
R. LAKTASI
R. KAPUS
±0.000
±0.000
DROP OFF KORIDOR
RUANG MAIN
ADMINISTRASI
-0.020 ANAK ±0.000
R. PERTEMUAN /
RUANG TUNGGU PASIEN ±0.000 PENYULUHAN ±0.000
±0.000 ±0.000
±0.000 R. RAPAT
R. FARMASI
±0.000
LOKET
R. VAKSIN LAVATORY JANITOR
DAFTAR
AMBIL SAMPEL ±0.000 ±0.000 -0.020 LAUNDRY
KLINIK ±0.000 DAPUR ±0.000
GUDANG OBAT REKAM MEDIK KLINIK GIGI MULUT KLINIK
±0.000
LABORATORIUM
±0.000 ±0.000 ±0.000 ±0.000 ±0.000
±0.000 WC/KM
WC/KM (P) DIFABEL WC/KM (L)
R. DOT
R. CUCI
-0.020 -0.020 -0.020
±0.000
-0.120
CCADRUR :I E3R8TVR022-703
CCADRUR :I E3R8TVR022-703
AC SPLIT
1 PK
AC SPLIT AC SPLIT AC SPLIT AC SPLIT AC SPLIT AC SPLIT
1 PK 1 PK 1 PK 1 PK 1 PK 1 PK
CCADRUR :I E3R8TVR022-703 307-220RVT8R3E I:R URDACC CCADRUR :I E3R8TVR022-703 CCADRUR :I E3R8TVR022-703 CCADRUR :I E3R8TVR022-703 307-220RVT8R3E I:R URDACC
JUMLAH
SYMBOL KETERANGAN
(BH)
AC SPLIT 1 PK 8
AC SPLIT 1 1/2 PK 8
CCADRUR :I E3R8TVR022-703
CCADRUR :I E3R8TVR022-703
1 2 3 4 5 6 7 8 9 10 11 12
A A
CCADRUR :I E3R8TVR022-703 CCADRUR :I E3R8TVR022-703 CCADRUR :I E3R8TVR022-703 CCADRUR :I E3R8TVR022-703 CCADRUR :I E3R8TVR022-703 CCADRUR :I E3R8TVR022-703 CCADRUR :I E3R8TVR022-703 CCADRUR :I E3R8TVR022-703
B B
AC SPLIT AC SPLIT AC SPLIT AC SPLIT AC SPLIT AC SPLIT AC SPLIT AC SPLIT
1,5 PK 1,5 PK 2 PK 2 PK 1,5 PK 1,5 PK 1,5 PK 1,5 PK
C C
AC SPLIT
1 PK
D AC SPLIT AC SPLIT D
1,5 PK 1,5 PK
E E
F F
G G
JUMLAH
SYMBOL KETERANGAN
(BH)
AC SPLIT 2 PK 2
DENAH INSTALASI TATA UDARA
H STOP KONTAK AC SPLIT 18 H
SKALA 1 : 125
1 2 3 4 5 6 7 8 9 10 11 12
Catatan : Revisi : Dibuat : Nama Gambar : Skala :
Plan & Design Consultant AS PLAN DRAWING
LEGENDA : Deskripsi Tgl Check Plan & Design Consultant
(FOR CONSTRUCTION)
T.O.C = TOP OF CONCRETE (MUKA ATAS BETON) CV. WAHYU ARSIPILAH
B.O.C = BOTTOM OF CONCRETE (MUKA BAWAH BETON)
DENAH INSTALASI TATA UDARA 1 : 125 Pekerjaan :
F.F.L = FINISH FLOOR LEVEL (MUKA ATAS LANTAI)
PEMBANGUNAN GEDUNG
C.F.L = CEILING FINISH LEVEL (MUKA ATAS PLAFON)
T.O.R = TOP OF ROOF (MUKA ATAS ATAP) PUSKESMAS TOPORE
DIMENSI PADA GAMBAR MENGGUNAKAN SATUAN MILIMETER
PEMERINTAH KABUPATEN MAMUJU
CV. WAHYU ARSIPILAH Dwg No : Size. Lokasi :
A.3 DINAS KESEHATAN
DESA TOPORE, KEC. PAPALANG
Planning, Design, Management, & Supervisi Consultant DWG - DINKES - PKM - WYA -
HERIANTO JAFAR, S.T.
KAB. MAMUJU
Alamat : Jl. P. Diponegoro, BTN Griya Cahaya Masannang 1 MEP - 039 Rev.
Mamuju, 91512, Sulawesi Barat, Indonesia Direktur - PROV. SULAWESI BARAT Alamat : Jln. Pemuda No.02, Kel. Binanga, Kec. Mamuju, Kab. Mamuju
1 2 3 4 5 6 7 8 9 10 11 12
A A
B SPOEL-HOEK WC/KM WC/KM B
±0.000 -0.020 -0.020
R. PERAWATAN (P) R. PERAWATAN (L) GUDANG
R. BERSALIN R. PASKA BERSALIN WC/KM
±0.000 ±0.000 ±0.000
R. STERIL R. ALAT
±0.000 ±0.000 R. LINEN -0.020
±0.000 ±0.000
±0.000
R. TINDAKAN
GAWAT DARURAT
C C
±0.000
R. LAKTASI
R. KAPUS
±0.000
D ±0.000 D
DROP OFF KORIDOR
RUANG MAIN
ADMINISTRASI
-0.020 ANAK ±0.000
R. PERTEMUAN /
RUANG TUNGGU PASIEN ±0.000 PENYULUHAN ±0.000
±0.000 ±0.000
±0.000 R. RAPAT
E E
R. FARMASI
±0.000
LOKET
R. VAKSIN LAVATORY JANITOR
DAFTAR
AMBIL SAMPEL ±0.000 ±0.000 -0.020 LAUNDRY
KLINIK ±0.000 DAPUR ±0.000
F GUDANG OBAT REKAM MEDIK KLINIK GIGI MULUT KLINIK F
±0.000
LABORATORIUM
±0.000 ±0.000 ±0.000 ±0.000 ±0.000
±0.000 WC/KM
WC/KM (P) DIFABEL WC/KM (L)
R. DOT
R. CUCI
-0.020 -0.020 -0.020
±0.000
-0.120
G G
JUMLAH
SYMBOL KETERANGAN
(BH)
SERVER PENGHUBUNG JARINGAN LAN SEMUA RUANGAN 1
DENAH ALUR JARINGAN LAN TELEPON DAN SERVER
PORT LAN CAT 6 DAN RJ 11 TELEPON SISTEM TANAM TEMBOK 15
KABEL TELEPON RJ 11 - SKALA 1 : 125
H H
1 2 3 4 5 6 7 8 9 10 11 12
Catatan : Revisi : Dibuat : Nama Gambar : Skala :
Plan & Design Consultant AS PLAN DRAWING
LEGENDA : Deskripsi Tgl Check Plan & Design Consultant
(FOR CONSTRUCTION)
T.O.C = TOP OF CONCRETE (MUKA ATAS BETON) CV. WAHYU ARSIPILAH
DENAH ALUR JARINGAN LAN
B.O.C = BOTTOM OF CONCRETE (MUKA BAWAH BETON)
1 : 125 Pekerjaan :
F.F.L = FINISH FLOOR LEVEL (MUKA ATAS LANTAI) TELEPON DAN SERVER
PEMBANGUNAN GEDUNG
C.F.L = CEILING FINISH LEVEL (MUKA ATAS PLAFON)
T.O.R = TOP OF ROOF (MUKA ATAS ATAP) PUSKESMAS TOPORE
DIMENSI PADA GAMBAR MENGGUNAKAN SATUAN MILIMETER
PEMERINTAH KABUPATEN MAMUJU
CV. WAHYU ARSIPILAH Dwg No : Size. Lokasi :
A.3 DINAS KESEHATAN
DESA TOPORE, KEC. PAPALANG
Planning, Design, Management, & Supervisi Consultant DWG - DINKES - PKM - WYA -
HERIANTO JAFAR, S.T.
KAB. MAMUJU
Alamat : Jl. P. Diponegoro, BTN Griya Cahaya Masannang 1 MEP - 040 Rev.
Mamuju, 91512, Sulawesi Barat, Indonesia Direktur - PROV. SULAWESI BARAT Alamat : Jln. Pemuda No.02, Kel. Binanga, Kec. Mamuju, Kab. Mamuju
KETERANGAN :
PIPA DISTRIBUSI = PVC - AW 1/2"
PIPA INDUK = PVC - AW 3/4"
NODNAT/MADP
IRAD
1 2 3 4 5 6 7 8 9 10 11 12
A A
SPOEL-HOEK WC/KM WC/KM
B ±0.000 -0.020 -0.020 B
R. PERAWATAN (P) R. PERAWATAN (L) GUDANG
R. BERSALIN R. PASKA BERSALIN WC/KM
±0.000 ±0.000 ±0.000
R. STERIL R. ALAT
±0.000 ±0.000 R. LINEN -0.020
±0.000 ±0.000
±0.000
R. TINDAKAN
GAWAT DARURAT
±0.000
C C
R. LAKTASI
R. KAPUS
±0.000
±0.000
D DROP OFF KORIDOR D
RUANG MAIN
ADMINISTRASI
-0.020 ANAK ±0.000
R. PERTEMUAN /
RUANG TUNGGU PASIEN ±0.000 PENYULUHAN ±0.000
±0.000 ±0.000
±0.000 R. RAPAT
E R. FARMASI E
±0.000
LOKET
R. VAKSIN LAVATORY JANITOR
DAFTAR
AMBIL SAMPEL ±0.000 ±0.000 -0.020 LAUNDRY
KLINIK ±0.000 DAPUR ±0.000
GUDANG OBAT REKAM MEDIK KLINIK GIGI MULUT KLINIK
±0.000
LABORATORIUM
F ±0.000 ±0.000 ±0.000 ±0.000 ±0.000 F
±0.000 WC/KM
WC/KM (P) DIFABEL WC/KM (L)
R. DOT
R. CUCI
-0.020 -0.020 -0.020
±0.000
-0.120
G G
DENAH AIR BERSIH
H H
SKALA 1 : 125
1 2 3 4 5 6 7 8 9 10 11 12
Catatan : Revisi : Dibuat : Nama Gambar : Skala :
Plan & Design Consultant AS PLAN DRAWING
LEGENDA : Deskripsi Tgl Check Plan & Design Consultant
(FOR CONSTRUCTION)
T.O.C = TOP OF CONCRETE (MUKA ATAS BETON) CV. WAHYU ARSIPILAH
B.O.C = BOTTOM OF CONCRETE (MUKA BAWAH BETON)
DENAH AIR BERSIH 1 : 125 Pekerjaan :
F.F.L = FINISH FLOOR LEVEL (MUKA ATAS LANTAI)
PEMBANGUNAN GEDUNG
C.F.L = CEILING FINISH LEVEL (MUKA ATAS PLAFON)
T.O.R = TOP OF ROOF (MUKA ATAS ATAP) PUSKESMAS TOPORE
DIMENSI PADA GAMBAR MENGGUNAKAN SATUAN MILIMETER
PEMERINTAH KABUPATEN MAMUJU
CV. WAHYU ARSIPILAH Dwg No : Size. Lokasi :
A.3 DINAS KESEHATAN
DESA TOPORE, KEC. PAPALANG
Planning, Design, Management, & Supervisi Consultant DWG - DINKES - PKM - WYA -
HERIANTO JAFAR, S.T.
KAB. MAMUJU
Alamat : Jl. P. Diponegoro, BTN Griya Cahaya Masannang 1 MEP - 041 Rev.
Mamuju, 91512, Sulawesi Barat, Indonesia Direktur - PROV. SULAWESI BARAT Alamat : Jln. Pemuda No.02, Kel. Binanga, Kec. Mamuju, Kab. Mamuju
1 2 3 4 5 6 7 8 9 10 11 12
BAK RESAPAN
A MENUJU PARIT / SALURAN INDUK Slope 2% A
Slope 2%
Slope 2%
B SPOEL-HOEK WC/KM WC/KM B
±0.000 -0.020 -0.020
R. PERAWATAN (P) R. PERAWATAN (L) GUDANG
R. BERSALIN R. PASKA BERSALIN WC/KM
±0.000 ±0.000 ±0.000
R. STERIL R. ALAT
±0.000 ±0.000 R. LINEN -0.020
±0.000 ±0.000
±0.000
R. TINDAKAN
GAWAT DARURAT
C C
±0.000
R. LAKTASI
Slope 2%
R. KAPUS
±0.000
D ±0.000 D
DROP OFF KORIDOR
RUANG MAIN
ADMINISTRASI
-0.020 ANAK ±0.000
R. PERTEMUAN /
RUANG TUNGGU PASIEN ±0.000 PENYULUHAN Slope 2% ±0.000
±0.000 ±0.000
±0.000 R. RAPAT
E E
R. FARMASI
±0.000
LOKET
R. VAKSIN LAVATORY JANITOR
DAFTAR
AMBIL SAMPEL ±0.000 ±0.000 -0.020 LAUNDRY
KLINIK ±0.000 DAPUR ±0.000
F GUDANG OBAT REKAM MEDIK KLINIK GIGI MULUT KLINIK F
±0.000
LABORATORIUM
±0.000 ±0.000 ±0.000 ±0.000 ±0.000
±0.000 WC/KM
WC/KM (P) DIFABEL WC/KM (L)
R. DOT
R. CUCI
-0.020 -0.020 -0.020
±0.000
-0.120
Slope 2% Slope 2%
G G
MENUJU PARIT / SALURAN INDUK
KETERANGAN :
Slope 2% Slope 2% PIPA PVC - AW 2" (Washtafel)
BAK RESAPAN
PIPA PVC - AW 3" (Floor Drain & Induk)
DENAH INSTALASI LIMBAH CAIR
H H
SKALA 1 : 125
1 2 3 4 5 6 7 8 9 10 11 12
Catatan : Revisi : Dibuat : Nama Gambar : Skala :
Plan & Design Consultant AS PLAN DRAWING
LEGENDA : Deskripsi Tgl Check Plan & Design Consultant
(FOR CONSTRUCTION)
T.O.C = TOP OF CONCRETE (MUKA ATAS BETON) CV. WAHYU ARSIPILAH
B.O.C = BOTTOM OF CONCRETE (MUKA BAWAH BETON)
DENAH INSTALASI LIMBAH CAIR 1 : 125 Pekerjaan :
F.F.L = FINISH FLOOR LEVEL (MUKA ATAS LANTAI)
PEMBANGUNAN GEDUNG
C.F.L = CEILING FINISH LEVEL (MUKA ATAS PLAFON)
T.O.R = TOP OF ROOF (MUKA ATAS ATAP) PUSKESMAS TOPORE
DIMENSI PADA GAMBAR MENGGUNAKAN SATUAN MILIMETER
PEMERINTAH KABUPATEN MAMUJU
CV. WAHYU ARSIPILAH Dwg No : Size. Lokasi :
A.3 DINAS KESEHATAN
DESA TOPORE, KEC. PAPALANG
Planning, Design, Management, & Supervisi Consultant DWG - DINKES - PKM - WYA -
HERIANTO JAFAR, S.T.
KAB. MAMUJU
Alamat : Jl. P. Diponegoro, BTN Griya Cahaya Masannang 1 MEP - 042 Rev.
Mamuju, 91512, Sulawesi Barat, Indonesia Direktur - PROV. SULAWESI BARAT Alamat : Jln. Pemuda No.02, Kel. Binanga, Kec. Mamuju, Kab. Mamuju
1 2 3 4 5 6 7 8 9 10 11 12
BAK RESAPAN BIOFIL
A A
BF-08
MENUJU PARIT / SALURAN INDUK PVC-AW 3" PVC - AW 4"
PVC - AW 4"
SLOPE 2% SLOPE 2% SLOPE 2%
B B
SPOEL-HOEK WC/KM WC/KM
±0.000 -0.020 -0.020
R. PERAWATAN (P) R. PERAWATAN (L) GUDANG
R. BERSALIN R. PASKA BERSALIN WC/KM
±0.000 ±0.000 ±0.000
R. STERIL R. ALAT
±0.000 ±0.000 R. LINEN -0.020
±0.000 ±0.000
±0.000
R. TINDAKAN
C C
GAWAT DARURAT
±0.000
R. LAKTASI
R. KAPUS
±0.000
D D
±0.000
DROP OFF KORIDOR
RUANG MAIN
ADMINISTRASI
-0.020 ANAK ±0.000
R. PERTEMUAN /
RUANG TUNGGU PASIEN ±0.000 PENYULUHAN ±0.000
±0.000 ±0.000
±0.000 R. RAPAT
E E
R. FARMASI
±0.000
LOKET
R. VAKSIN LAVATORY JANITOR
DAFTAR
AMBIL SAMPEL ±0.000 ±0.000 -0.020 LAUNDRY
F KLINIK ±0.000 DAPUR ±0.000 F
GUDANG OBAT REKAM MEDIK KLINIK GIGI MULUT KLINIK
±0.000
LABORATORIUM
±0.000 ±0.000 ±0.000 ±0.000 ±0.000
±0.000 WC/KM
WC/KM (P) DIFABEL WC/KM (L)
R. DOT
R. CUCI
-0.020 -0.020 -0.020
±0.000
-0.120
G G
SLOPE 2% SLOPE 2% SLOPE 2%
MENUJU PARIT / SALURAN INDUK PVC-AW 3" PVC - AW 4" PVC - AW 4"
BIOFIL
BAK RESAPAN
BF-08
DENAH INSTALASI LIMBAH PADAT
H H
SKALA 1 : 125
1 2 3 4 5 6 7 8 9 10 11 12
Catatan : Revisi : Dibuat : Nama Gambar : Skala :
Plan & Design Consultant AS PLAN DRAWING
LEGENDA : Deskripsi Tgl Check Plan & Design Consultant
(FOR CONSTRUCTION)
T.O.C = TOP OF CONCRETE (MUKA ATAS BETON) CV. WAHYU ARSIPILAH
B.O.C = BOTTOM OF CONCRETE (MUKA BAWAH BETON)
DENAH INSTALASI LIMBAH PADAT 1 : 125 Pekerjaan :
F.F.L = FINISH FLOOR LEVEL (MUKA ATAS LANTAI)
PEMBANGUNAN GEDUNG
C.F.L = CEILING FINISH LEVEL (MUKA ATAS PLAFON)
T.O.R = TOP OF ROOF (MUKA ATAS ATAP) PUSKESMAS TOPORE
DIMENSI PADA GAMBAR MENGGUNAKAN SATUAN MILIMETER
PEMERINTAH KABUPATEN MAMUJU
CV. WAHYU ARSIPILAH Dwg No : Size. Lokasi :
A.3 DINAS KESEHATAN
DESA TOPORE, KEC. PAPALANG
Planning, Design, Management, & Supervisi Consultant DWG - DINKES - PKM - WYA -
HERIANTO JAFAR, S.T.
KAB. MAMUJU
Alamat : Jl. P. Diponegoro, BTN Griya Cahaya Masannang 1 MEP - 043 Rev.
Mamuju, 91512, Sulawesi Barat, Indonesia Direktur - PROV. SULAWESI BARAT Alamat : Jln. Pemuda No.02, Kel. Binanga, Kec. Mamuju, Kab. Mamuju
0002
1200
2200
1000
2000
1200
1000
PENUTUP MANHOLE
URUGAN TANAH
BATU KORAL URUGAN PASIR
LAPISAN IJUK BATU KORAL
BATU KORAL BATU KALI/GUNUNG
0001 0021
SEPTICTANK BIOFIL LANTAI KERJA K-225
BF - 08 Thk. 15 cm
PVC - AW 4" PVC - AW 4"
PIPA INLET PVC - AW 4"
PIPA OUTLET PVC - AW 4"
0571
051
0091
1 2 3 4 5 6 7 8 9 10 11 12
A A
B B
SLOPE 2% SLOPE 2%
MENUJU PARIT
BAK RESAPAN
1
PVC - AW 3" PVC - AW 4"
B-SPT
C C
PIPA OUTLET VENTILASI CLEAN OUT PIPE PIPA INLET
DETAIL BIO SEPTICTANK
D D
SKALA 1 : 25
URUGAN TANAH PILIHAN
TANPA BUTIRAN
E E
SLOPE 2%
PIPA OUTLET PVC - AW 4"
PIPA OUTLET PVC - AW 3"
SLOPE 2%
MENUJU PARIT SLOPE 2%
F F
G G
LANTAI KERJA
K-225, Thk. 15 cm
2000
2200
POTONGAN 1
H H
SKALA 1 : 25 B-SPT
1 2 3 4 5 6 7 8 9 10 11 12
Catatan : Revisi : Dibuat : Nama Gambar : Skala :
Plan & Design Consultant AS PLAN DRAWING
LEGENDA : Deskripsi Tgl Check Plan & Design Consultant
(FOR CONSTRUCTION)
T.O.C = TOP OF CONCRETE (MUKA ATAS BETON) CV. WAHYU ARSIPILAH
DETAIL BIO SEPTICTANK
B.O.C = BOTTOM OF CONCRETE (MUKA BAWAH BETON)
1 : 25 Pekerjaan :
F.F.L = FINISH FLOOR LEVEL (MUKA ATAS LANTAI) POTONGAN
PEMBANGUNAN GEDUNG
C.F.L = CEILING FINISH LEVEL (MUKA ATAS PLAFON)
T.O.R = TOP OF ROOF (MUKA ATAS ATAP) PUSKESMAS TOPORE
DIMENSI PADA GAMBAR MENGGUNAKAN SATUAN MILIMETER
PEMERINTAH KABUPATEN MAMUJU
CV. WAHYU ARSIPILAH Dwg No : Size. Lokasi :
A.3 DINAS KESEHATAN
DESA TOPORE, KEC. PAPALANG
Planning, Design, Management, & Supervisi Consultant DWG - DINKES - PKM - WYA -
HERIANTO JAFAR, S.T.
KAB. MAMUJU
Alamat : Jl. P. Diponegoro, BTN Griya Cahaya Masannang 1 MEP - 044 Rev.
Mamuju, 91512, Sulawesi Barat, Indonesia Direktur - PROV. SULAWESI BARAT Alamat : Jln. Pemuda No.02, Kel. Binanga, Kec. Mamuju, Kab. Mamuju
1 2 3 4 5 6 7 8 9 10 11 12
4331
A A
3327
0
0
3000
4
5 3000
3000
0
0
0 3000
3
0
3000
0
3
0
0 3000
3000
51327
B
3
0 0 3000 B
0
3000
0
3
0 3000
0
0
3000
3
0 3000
0
0
3000
3
0 3000
0
0 3000
3 0 3000
C
3
0
0
0 21602200
A
C
3000
5
0
0 3000
PGR
6
6
5
8 5
9
8
5 9
B 3000
3000
6 8 PGR 3000
3000 52360
3000
0
0
0 3000
D
3 3000
D
0
0 3000
0
3 3000
0
0 3000
3 0 3000
0
0
C
3000
3
0 3000
0
0 PGR
3000
0
3
0
0
E 3 0 0 0 0 E
3
0 0 0 0
0 0
3 3
0
0 0
0 0 3 0
3
0
0
0
3
0
0 0
5 0
4 3 0
0
0
0
3
F 4128 3408
3000 3
0 0 0 F
3000
0
0
0
3000 3
3000
0
0
0
3000 3
3000 3000 3 0 0 0
5
4 0 0 0
42408 3000
3000 3
0
0 0
3000
0
0 0
3000 3
G 3000
0
0 0 G
3000 3
3000
0
0 0
3000 3
3000
0
0 0
3000
3000
3000
0
3
0
0 0
3
28960 3000
3000
2500
2460 3
0
0 0
3
0 0
DENAH PAGAR KELILING KOMPLEKS
H H
SKALA 1 : 450
1 2 3 4 5 6 7 8 9 10 11 12
Catatan : Revisi : Dibuat : Nama Gambar : Skala :
Plan & Design Consultant AS PLAN DRAWING
LEGENDA : Deskripsi Tgl Check Plan & Design Consultant
(FOR CONSTRUCTION)
T.O.C = TOP OF CONCRETE (MUKA ATAS BETON) CV. WAHYU ARSIPILAH
B.O.C = BOTTOM OF CONCRETE (MUKA BAWAH BETON)
DENAH PAGAR KELILING KOMPLEKS 1 : 450 Pekerjaan :
F.F.L = FINISH FLOOR LEVEL (MUKA ATAS LANTAI)
PEMBANGUNAN GEDUNG
C.F.L = CEILING FINISH LEVEL (MUKA ATAS PLAFON)
T.O.R = TOP OF ROOF (MUKA ATAS ATAP) PUSKESMAS TOPORE
DIMENSI PADA GAMBAR MENGGUNAKAN SATUAN MILIMETER
PEMERINTAH KABUPATEN MAMUJU
CV. WAHYU ARSIPILAH Dwg No : Size. Lokasi :
A.3 DINAS KESEHATAN
DESA TOPORE, KEC. PAPALANG
Planning, Design, Management, & Supervisi Consultant DWG - DINKES - PKM - WYA -
HERIANTO JAFAR, S.T.
KAB. MAMUJU
Alamat : Jl. P. Diponegoro, BTN Griya Cahaya Masannang 1 LDS - 045 Rev.
Mamuju, 91512, Sulawesi Barat, Indonesia Direktur - PROV. SULAWESI BARAT Alamat : Jln. Pemuda No.02, Kel. Binanga, Kec. Mamuju, Kab. Mamuju
1 2 3 4 5 6 7 8 9 10 11 12
A A
EL.+2.35
T.O.C.
B B
C C
EL. -0.15
T.O.C.
EL. -0.40
F.F.L.
D EL. -1.00 D
G.L.
3000 3000
TAMPAK PAGAR SAMPING & BELAKANG
SKALA 1 : 40
E E
PEMERINTAH KABUPATEN MAMUJU
F F
DINAS KESEHATAN
PUSKESMAS TOPORE
Alamat : Jln. Poros Mamuju - Tarailu, Km. 65 Kecamatan Papalang (91565)
G G
3000 8859 3000
H TAMPAK PAGAR DEPAN H
SKALA 1 : 50
1 2 3 4 5 6 7 8 9 10 11 12
Catatan : Revisi : Dibuat : Nama Gambar : Skala :
Plan & Design Consultant AS PLAN DRAWING
LEGENDA : Deskripsi Tgl Check Plan & Design Consultant
(FOR CONSTRUCTION)
T.O.C = TOP OF CONCRETE (MUKA ATAS BETON) CV. WAHYU ARSIPILAH
B.O.C = BOTTOM OF CONCRETE (MUKA BAWAH BETON)
TAMPAK PAGAR DEPAN 1 : 50 Pekerjaan :
F.F.L = FINISH FLOOR LEVEL (MUKA ATAS LANTAI)
PEMBANGUNAN GEDUNG
C.F.L = CEILING FINISH LEVEL (MUKA ATAS PLAFON)
T.O.R = TOP OF ROOF (MUKA ATAS ATAP) PUSKESMAS TOPORE
DIMENSI PADA GAMBAR MENGGUNAKAN SATUAN MILIMETER
PEMERINTAH KABUPATEN MAMUJU
CV. WAHYU ARSIPILAH Dwg No : Size. Lokasi :
A.3 DINAS KESEHATAN
DESA TOPORE, KEC. PAPALANG
Planning, Design, Management, & Supervisi Consultant DWG - DINKES - PKM - WYA -
HERIANTO JAFAR, S.T.
KAB. MAMUJU
Alamat : Jl. P. Diponegoro, BTN Griya Cahaya Masannang 1 LDS - 046 Rev.
Mamuju, 91512, Sulawesi Barat, Indonesia Direktur - PROV. SULAWESI BARAT Alamat : Jln. Pemuda No.02, Kel. Binanga, Kec. Mamuju, Kab. Mamuju
0081
1 2 3 4 5 6 7 8 9 10 11 12
A A
B B
INTERVAL BESI HOLLOW HOLLOW 40.60.2 mm HOLLOW 20.40.1,2 mm
4040404040404040404040404040404040404040404040404040 FINISH CAT FINISH CAT
C C
D D
BESI HOLLOW 40.60.2 mm
E E
BESI HOLLOW 40.60.2 mm
F F
BESI PLAT 3 mm
FINISH CAT
4800
G G
TAMPAK PINTU PAGAR
SKALA 1 : 15
H H
1 2 3 4 5 6 7 8 9 10 11 12
Catatan : Revisi : Dibuat : Nama Gambar : Skala :
Plan & Design Consultant AS PLAN DRAWING
LEGENDA : Deskripsi Tgl Check Plan & Design Consultant
(FOR CONSTRUCTION)
T.O.C = TOP OF CONCRETE (MUKA ATAS BETON) CV. WAHYU ARSIPILAH
B.O.C = BOTTOM OF CONCRETE (MUKA BAWAH BETON)
TAMPAK PINTU PAGAR 1 : 15 Pekerjaan :
F.F.L = FINISH FLOOR LEVEL (MUKA ATAS LANTAI)
PEMBANGUNAN GEDUNG
C.F.L = CEILING FINISH LEVEL (MUKA ATAS PLAFON)
T.O.R = TOP OF ROOF (MUKA ATAS ATAP) PUSKESMAS TOPORE
DIMENSI PADA GAMBAR MENGGUNAKAN SATUAN MILIMETER
PEMERINTAH KABUPATEN MAMUJU
CV. WAHYU ARSIPILAH Dwg No : Size. Lokasi :
A.3 DINAS KESEHATAN
DESA TOPORE, KEC. PAPALANG
Planning, Design, Management, & Supervisi Consultant DWG - DINKES - PKM - WYA -
HERIANTO JAFAR, S.T.
KAB. MAMUJU
Alamat : Jl. P. Diponegoro, BTN Griya Cahaya Masannang 1 LDS - 047 Rev.
Mamuju, 91512, Sulawesi Barat, Indonesia Direktur - PROV. SULAWESI BARAT Alamat : Jln. Pemuda No.02, Kel. Binanga, Kec. Mamuju, Kab. Mamuju
EL. +2.35
T.O.C.
EL. +2.15
B.O.C.
EL. -0.15
T.O.C.
EL. -0.40
F.F.L.
EL. -1.00
G.L.
EL. -1.40
175 250 175
600
002
0032
052
006
002
051
05
0052
0501
002
RINGBALK BETON 13
20
FINISHING CAT
KOLOM BETON 20
20
FINISHING CAT
PAS. DINDING 1 BATA 1 : 4 2
FINISHING PLASTERAN + ACIAN + CAT
SLOOF BETON 20
25
PAS. DINDING SALURAN 1 BATA 1 : 2
2
FINISHING PLASTERAN + ACIAN
URUGAN PASIR
THK. 50 mm
PAVING BLOCK SEGI ENAM
Thk. 80 mm
400
ANGKUR S 10 - 1000
005
URUGAN TANAH
Thk. 470 mm
006
08
05
074
001
4 S 16
FINISHING CAT
PIPA DRAIN 3"
INTERVAL 3 m
61
S
4
700
600
007 006
200
002
EL. -0.15
EL. -0.40
EL. -1.00
EL. -1.40
EL. -1.70
EL. -1.80
200 200 200
700
052
006
004
003
001
1 2 3 4 5 6 7 8 9 10 11 12
A A
B B
C C
D D
E E
KOLOM PEDESTAL 20 20
F F
6 S 13
S10 - 100
PONDASI FOOTPLAT
4 S16
PAS. BATU KALI/GUNUNG
G PAS. BATU KOSONG G
LANTAI KERJA, 5 cm
URUGAN PASIR
PASIR URUG, 5 cm
50 50
DETAIL PONDASI FOOTPLAT POTONGAN A
H H
SKALA 1 : 20 SKALA 1 : 20 PGR
1 2 3 4 5 6 7 8 9 10 11 12
Catatan : Revisi : Dibuat : Nama Gambar : Skala :
Plan & Design Consultant AS PLAN DRAWING
LEGENDA : Deskripsi Tgl Check Plan & Design Consultant
(FOR CONSTRUCTION)
T.O.C = TOP OF CONCRETE (MUKA ATAS BETON) CV. WAHYU ARSIPILAH
POTONGAN
B.O.C = BOTTOM OF CONCRETE (MUKA BAWAH BETON)
1 : 20 Pekerjaan :
F.F.L = FINISH FLOOR LEVEL (MUKA ATAS LANTAI) DETAIL PONDASI FOOTPLAT
PEMBANGUNAN GEDUNG
C.F.L = CEILING FINISH LEVEL (MUKA ATAS PLAFON)
T.O.R = TOP OF ROOF (MUKA ATAS ATAP) PUSKESMAS TOPORE
DIMENSI PADA GAMBAR MENGGUNAKAN SATUAN MILIMETER
PEMERINTAH KABUPATEN MAMUJU
CV. WAHYU ARSIPILAH Dwg No : Size. Lokasi :
A.3 DINAS KESEHATAN
DESA TOPORE, KEC. PAPALANG
Planning, Design, Management, & Supervisi Consultant DWG - DINKES - PKM - WYA -
HERIANTO JAFAR, S.T.
KAB. MAMUJU
Alamat : Jl. P. Diponegoro, BTN Griya Cahaya Masannang 1 LDS - 048 Rev.
Mamuju, 91512, Sulawesi Barat, Indonesia Direktur - PROV. SULAWESI BARAT Alamat : Jln. Pemuda No.02, Kel. Binanga, Kec. Mamuju, Kab. Mamuju
EL.
T.O.C.
EL.
T.O.C.
RINGBALK BETON 13
20
FINISHING CAT
PAS. DINDING 1 BATA 1 : 4 2
KOLOM BETON 20
30
FINISHING CAT
SLOOF BETON 20 25
PAS. DINDING SALURAN 1 BATA 1 : 2 2
FINISHING PLASTERAN + ACIAN
URUGAN PASIR
THK. 50 mm
PAVING BLOCK SEGI ENAM
Thk. 80 mm
400
-0.15
T.O.C.
-0.40
F.F.L.
EL. -1.00
G.L.
-1.40
175 250 175
005
URUGAN TANAH
Thk. 470 mm
006
08
05
074
001
+2.05 EL.
PENEBALAN PLASTERAN
T.O.C.
FINISHING ACIAN + CAT
+1.85 EL.
T.O.C.
FINISHING CAT
EL. -0.15
T.O.C.
EL. -0.40
F.F.L.
EL. -1.00
G.L.
PAS. BATU KALI/GUNUNG
PAS. BATU KOSONG
URUGAN PASIR
EL. -1.40
175 250 175
600
002
0002
052
006
002
001
05
0022
0501
002
BESI HOLLOW 40.80.2
INTERVAL 65 mm, FINISHING CAT DUCO
KOLOM BETON 20
30
FINISHING CAT
SLOOF BETON 20
25
PAS. DINDING SALURAN 1 BATA 1 : 2
2
FINISHING PLASTERAN + ACIAN
URUGAN PASIR
THK. 50 mm
PAVING BLOCK SEGI ENAM 400
Thk. 80 mm
ANGKUR S 10 - 1000
005
URUGAN TANAH
Thk. 470 mm
006
08
05
074
001
+2.05
PENEBALAN PLASTERAN
FINISHING ACIAN + CAT
+1.85
PENEBALAN PLASTERAN
FINISHING ACIAN + CAT
RINGBALK BETON 13 20
FINISHING CAT
PAS. DINDING 1 BATA 1 : 4
2
FINISHING PLASTERAN + ACIAN + CAT
FINISHING CAT
PIPA DRAIN 3"
INTERVAL 3 m
PAS. BATU KALI/GUNUNG
PAS. BATU KOSONG
URUGAN PASIR
002
05
05
URUGAN PASIR
Thk. 50 mm
LANTAI KERJA
BETON K-100, Thk. 50 mm
RABAT BETON
BETON K-250, Thk. 50 mm
002
05
05
001
EL.
EL.
EL.
EL.
ANGKUR S 10 - 1000
PIPA DRAIN 3"
INTERVAL 3 m
EL.
EL.
002
05
05
002
0002
052
006
002
001
05
0022
0501
002
URUGAN PASIR
Thk. 50 mm
LANTAI KERJA
BETON K-100, Thk. 50 mm
RABAT BETON
BETON K-250, Thk. 50 mm
002
05
05
001
1 2 3 4 5 6 7 8 9 10 11 12
A A
B B
C C
D D
E E
F F
G G
300
300
POTONGAN B POTONGAN C
H H
SKALA 1 : 20 PGR SKALA 1 : 20 PGR
1 2 3 4 5 6 7 8 9 10 11 12
Catatan : Revisi : Dibuat : Nama Gambar : Skala :
Plan & Design Consultant AS PLAN DRAWING
LEGENDA : Deskripsi Tgl Check Plan & Design Consultant
(FOR CONSTRUCTION)
T.O.C = TOP OF CONCRETE (MUKA ATAS BETON) CV. WAHYU ARSIPILAH
B.O.C = BOTTOM OF CONCRETE (MUKA BAWAH BETON)
POTONGAN 1 : 20 Pekerjaan :
F.F.L = FINISH FLOOR LEVEL (MUKA ATAS LANTAI)
PEMBANGUNAN GEDUNG
C.F.L = CEILING FINISH LEVEL (MUKA ATAS PLAFON)
T.O.R = TOP OF ROOF (MUKA ATAS ATAP) PUSKESMAS TOPORE
DIMENSI PADA GAMBAR MENGGUNAKAN SATUAN MILIMETER
PEMERINTAH KABUPATEN MAMUJU
CV. WAHYU ARSIPILAH Dwg No : Size. Lokasi :
A.3 DINAS KESEHATAN
DESA TOPORE, KEC. PAPALANG
Planning, Design, Management, & Supervisi Consultant DWG - DINKES - PKM - WYA -
HERIANTO JAFAR, S.T.
KAB. MAMUJU
Alamat : Jl. P. Diponegoro, BTN Griya Cahaya Masannang 1 LDS - 049 Rev.
Mamuju, 91512, Sulawesi Barat, Indonesia Direktur - PROV. SULAWESI BARAT Alamat : Jln. Pemuda No.02, Kel. Binanga, Kec. Mamuju, Kab. Mamuju
HOLLOW GALVANIS 40.80.2 mm
50 65 65 65 65 65 65 65 65 65 65 65 65 65 65 65 65 65 65 65 65 65 65 65 65 65 65 65 65 65 65 65 65 65 65 65 65 65 65 65 65 50
PEMERINTAH KABUPATEN MAMUJU
DINAS KESEHATAN
PUSKESMAS TOPORE
Alamat : Jln. Poros Mamuju - Tarailu, Km. 65 Kecamatan Papalang (91565)
051
051
053
001
005
1 2 3 4 5 6 7 8 9 10 11 12
A A
B B
C C
DETAIL PAGAR BESI HOLLOW
SKALA 1 : 10
D D
LOGO STAINLESS STEEL
E E
HURUF STAINLESS STEEL
FONT : ARRIAL NARROW
HURUF STAINLESS STEEL
F FONT : ARRIAL NARROW (BOLD) F
HURUF STAINLESS STEEL
FONT : ARRIAL NARROW (BOLD)
G G
HURUF STAINLESS STEEL
FONT : ARRIAL NARROW
DETAIL HURUF & LOGO
H H
SKALA 1 : 15
1 2 3 4 5 6 7 8 9 10 11 12
Catatan : Revisi : Dibuat : Nama Gambar : Skala :
Plan & Design Consultant AS PLAN DRAWING
LEGENDA : Deskripsi Tgl Check Plan & Design Consultant
(FOR CONSTRUCTION)
T.O.C = TOP OF CONCRETE (MUKA ATAS BETON) CV. WAHYU ARSIPILAH
DETAIL PAGAR BESI HOLLOW 1 : 10
B.O.C = BOTTOM OF CONCRETE (MUKA BAWAH BETON)
Pekerjaan :
F.F.L = FINISH FLOOR LEVEL (MUKA ATAS LANTAI) DETAIL HURUF & LOGO 1 : 15
PEMBANGUNAN GEDUNG
C.F.L = CEILING FINISH LEVEL (MUKA ATAS PLAFON)
T.O.R = TOP OF ROOF (MUKA ATAS ATAP) PUSKESMAS TOPORE
DIMENSI PADA GAMBAR MENGGUNAKAN SATUAN MILIMETER
PEMERINTAH KABUPATEN MAMUJU
CV. WAHYU ARSIPILAH Dwg No : Size. Lokasi :
A.3 DINAS KESEHATAN
DESA TOPORE, KEC. PAPALANG
Planning, Design, Management, & Supervisi Consultant DWG - DINKES - PKM - WYA -
HERIANTO JAFAR, S.T.
KAB. MAMUJU
Alamat : Jl. P. Diponegoro, BTN Griya Cahaya Masannang 1 LDS - 050 Rev.
Mamuju, 91512, Sulawesi Barat, Indonesia Direktur - PROV. SULAWESI BARAT Alamat : Jln. Pemuda No.02, Kel. Binanga, Kec. Mamuju, Kab. Mamuju
1 2 3 4 5 6 7 8 9 10 11 12
A A
7
6
7
5847 3
B
44745
B
C C
3
9
9
6
5
51764
RUMAH DINAS
D 0 D
0
6
2
1
12200
E E
5
5400 0 2
2
2
8
3
3
5
F F
6
1
0
3
5
36448
38815
G G
KETERANGAN PAVING BLOCK :
TIPE = HEXAGONAL (SEGI ENAM), WARNA
TEBAL = 80 mm
MUTU = K-300
28586
DENAH PAVING BLOCK KOMPLEKS
H H
SKALA 1 : 450
1 2 3 4 5 6 7 8 9 10 11 12
Catatan : Revisi : Dibuat : Nama Gambar : Skala :
Plan & Design Consultant AS PLAN DRAWING
LEGENDA : Deskripsi Tgl Check Plan & Design Consultant
(FOR CONSTRUCTION)
T.O.C = TOP OF CONCRETE (MUKA ATAS BETON) CV. WAHYU ARSIPILAH
B.O.C = BOTTOM OF CONCRETE (MUKA BAWAH BETON)
DENAH PAVING BLOCK KOMPLEKS 1 : 450 Pekerjaan :
F.F.L = FINISH FLOOR LEVEL (MUKA ATAS LANTAI)
PEMBANGUNAN GEDUNG
C.F.L = CEILING FINISH LEVEL (MUKA ATAS PLAFON)
T.O.R = TOP OF ROOF (MUKA ATAS ATAP) PUSKESMAS TOPORE
DIMENSI PADA GAMBAR MENGGUNAKAN SATUAN MILIMETER
PEMERINTAH KABUPATEN MAMUJU
CV. WAHYU ARSIPILAH Dwg No : Size. Lokasi :
A.3 DINAS KESEHATAN
DESA TOPORE, KEC. PAPALANG
Planning, Design, Management, & Supervisi Consultant DWG - DINKES - PKM - WYA -
HERIANTO JAFAR, S.T.
KAB. MAMUJU
Alamat : Jl. P. Diponegoro, BTN Griya Cahaya Masannang 1 LDS - 051 Rev.
Mamuju, 91512, Sulawesi Barat, Indonesia Direktur - PROV. SULAWESI BARAT Alamat : Jln. Pemuda No.02, Kel. Binanga, Kec. Mamuju, Kab. Mamuju| Authority | |||
|---|---|---|---|
| 17 May 2022 | Pematangan Lahan Pintu Gerbang (Bts. Mamuju - Mamuju Tengah, Kota Kec. Kalukku, Bts. Kota Bagian Utara, Bts. Mamuju - Majene) | Kab. Mamuju | Rp 2,077,951,700 |
| 15 June 2023 | Pembangunan Mess Kejaksaan (Forkopimda) | Kab. Polewali Mandar | Rp 1,000,000,000 |
| 19 June 2023 | Pembangunan Pagar Polres Polman | Kab. Polewali Mandar | Rp 1,000,000,000 |
| 2 July 2024 | Lanjutan Pembangunan Kantor Perpustakaan Daerah | Kab. Mamuju | Rp 971,850,000 |
| 24 June 2024 | Rehabilitasi Bangunan Gedung Farmasi (Dak) | Kab. Mamuju | Rp 950,000,000 |
| 2 July 2024 | Pembangunan Dan Rehabilitasi Rkb (Dak) Sdi Dungkait Kec. Tapalang Barat Tahun 2024 | Kab. Mamuju | Rp 704,787,600 |