| 0729908806831000 | Rp 8,583,074,111 | |
CV Bangun Persada Indonesia | 02*2**3****31**0 | - |
| 0704647213807000 | - | |
| 0941951741831000 | - | |
| 0026592519833000 | - | |
Anita Mitra Setia | 09*6**9****03**0 | - |
| 0612133017822000 | - | |
| 0637489774805000 | - | |
| 0763420916831000 | - | |
PT Jaya Konstruksi Indonesia | 06*9**9****08**0 | - |
CV Fonuasingko Mandiri | 04*7**2****33**0 | - |
CV Al Hafiz Alfarizky | 10*1**1****26**6 | - |
| 0749083572807000 | - | |
| 0654257518807000 | - | |
| 0637415134833000 | - | |
| 0316868363811000 | - | |
| 0017321720811000 | - | |
| 0943997205833000 | - | |
| 0427478557802000 | - | |
| 0019875269811000 | - | |
| 0028213627805000 | - | |
| 0944382555833000 | - | |
| 0750912388831000 | - | |
| 0956323653831000 | - | |
| 0535900864822000 | - | |
| 0711230243831000 | - | |
| 0809792476831000 | - | |
| 0739194264219000 | - |
URAIAN SINGKAT PEKERJAAN NO. URAIAN PEKERJAAN A. PEKERJAAN PENDAHULUAN I. Pekerjaan Persiapan dan Lain-lain 1 Mobilisasi dan Demobilisasi 2 Papan Nama Pekerjaan 3 Pekerjaan Pembongkaran • Pembongkaran Dinding • Pembongkaran Plafond • Pembongkaran Struktur • Pembongkaran Kusen • Pembongkaran Penutup Atap • Pembersihan DAK Beton 4 Pembuangan Sisa Bongkaran 1 Direksi Keet 2 Gudang Bahan 3 Listrik Kerja 4 Air Kerja II. Pekerjaan Sistem Manajemen Keselamatan dan Kesehatan Kerja (SMK3) 1 Penyiapan RKK, RKPPL, dan RMLLP • Pembuatan Dokumen SMKK (RKK, RMLLP, atauRMPK) 2 Sosialisasi, Promosi, dan Pelatihan: • Spanduk (Banner) • Poster/Leaflet • Papan Informasi Keselamatan Konstruksi 3 Alat Pelindung Kerja dan Alat Pelindung Diri a. APK, Antara Lain: • Pembatas Area (Restricted Area) b. APD, antara lain: • Topi Pelindung (Safety Helmet) • Pelindung Telinga (Ear Plug, Ear Muff) • Sarung Tangan (Safety Gloves) • Sepatu Keselamatan (Safety Shoes, Rubber Safety Shoes and Toe Cap) • Rompi keselamatan (Safety Vest) 4 Personel Keselamatan Konstruksi : • Petugas Keselamatan Konstruksi, Petugas K3 Konstruksi 5 Fasilitas, Sarana ,Prasarana dan Alat Kesehatan: • Kotak P3K 6 Rambu dan Perlengkapan Lalu Lintas : • Rambu Petunjuk • Rambu Larangan • Rambu Informasi 7 Kegiatan dan Peralatan Terkait Pengendalian Risiko Keselamatan Konstruksi : • Fire Extinguisher 3 Kg dan Aksesoris • Bendera K3 B. PEKERJAAN INTERIOR MASJID I. Pekeraan Dinding 1 Pengukuran dan Pemasangan Bouplank 2 Pas. Dinding 1/2 Bata 1 Pc : 5 Ps 3 Plesteran Dinding 1 Pc : 5 Ps 4 Acian Dinding 5 Pas. Rangka Dinding Hollow Galvalum 6 Pas. Dinding ACP PVDF dan Rangka Besi Hollow 40.40.1,2 mm 7 Pas. Dinding GRC 8 Pas. Dinding Kerawangan GRC Motif Islami 9 Pas. Kaligrafi Islami GRC 10 Pas. List Profil Beton 402 mm 11 Pas. List Profil Beton 50 mm 12 Pas. Tali Air List U Aluminium 10 mm 13 Cat Dinding Dalam / Interior II. Pekerjaan Kusen Pintu dan Jendela 1 Kusen Kayu + Daun Pintu Plat Kuningan Cutting Motif - Tipe P (9 Bh) • Kusen Pintu Kayu • Daun Pintu Kayu NO. URAIAN PEKERJAAN • Kaca 5 mm Bening • Plat Kuningan Cutting Motif • Engsel Pintu • Door Closer • Kunci Pintu Silinder • Rumah Kunci 2 Daun (Mortise Lock Dekkson MTS RL DL8585 SSS) • Perisai Kunci (Escutcheon) • Grendel Tanam Atas • Grendel Tanam Bawah • Lubang Grendel Tanam • Handle Stainlees Steel 120 Cm • Pengecatan Kayu 2 Kusen Kayu + Jendela Plat Kuningan Cutting Motif - Tipe J1 (4 Bh) • Kusen Jendela Kayu • Kaca 5 mm Bening • Plat Kuningan Cutting Motif • Pengecatan Kayu 3 Kusen Kayu + Jendela Plat Kuningan Cutting Motif - Tipe J2 (20 Bh) • Kusen Jendela Kayu • Kaca 5 mm Bening • Plat Kuningan Cutting Motif • Pengecatan Kayu III. Pekerjaan Plafond 1 Rangka Plafond Baja Ringan (Hollow 4/4 + 2/4) 2 Pemasangan Langit-langit (Plafon) Serat Semen Tebal 6mm 3 Pas. Ornamen Kerawangan GRC 4 Pas. Kulit Batu 5 List Plafond Shadow Line 10.10.0,35 mm (Area Plafond Gipsum) 5 Cat Plafond Gipsum 6 Coating Kulit Batu IV. Pekerjaan Lantai 1 Pas. Underlayer (Pelapis Bawah Karpet) 2 Pas. Karpet Motif 3 Pas. List Karpet V. Pekerjaan Elektrikal a. Pengadaan dan pemasangan armature dan instalasi 1 Lampu gantung hias dia. 6 m 2 Downlight Slim LED 18 Watt 3 Lampu LED Strip 9 watt 3000K kuning - 50 m 4 Lampu Dinding 2 Arah 5 Saklar Tunggal 6 Saklar Ganda 7 Stop Kontak 10 A 8 Titik Penerangan 9 Titik Stop Kontak b. Sistem IP CCTV & Monitoring CCTV 1 Rak Server 6 U Wall Mounted 2 Patch Panel UTP Cat 6 4 Port 3 PoE Smart Switch 24 Port 4 UPS 1200 VA Rackmount 5 NVR 32 Chanel 2 TB 2 TB 6 LCD Monitor 42 Inch 7 HDMI 100 cm 8 Dome IP Camera 4 MP 9 Bullet IP Camera 4 MP 10 Instalasi Camera CCTV Kabel STP CAT 6e c. Sistem Tata Suara i. Pelataran dan Halaman Masjid 1 Speaker Aktive 12" Wall Mounted 2 Horn Speaker Outdoor 25 Watt 3 Instalasi Speaker Aktif NYMHY 2 x 1.5 mm2 4 Instalasi Horn Speaker Outdoor 25 Watt NYMHY 2 x 1.5 mm2 ii. Ruang Mushollah 1 Audio Mixer Analog 16 Chanel 2 Rak Sound Sistem 8 U NO. URAIAN PEKERJAAN 3 Power Sequencer 4 Handheld Mic Receiver Include Handheld Mic Wireless 2 Unit 5 UPS 650 VA 6 Speaker Aktive 12" Wall Mounted 7 Clip On Mic Wireless 8 Penarikan Canare Cable L2T2S (Dari Audio Mixer ke Speaker Aktive) 9 Jack XLR Female 1 Chanel d. Sistem WIFI, LAN & IP Phone 1 WIFI 6 Access Point 2 Instalasi WIFI 6 Access Point Kabel STP CAT 6e e. Sistem Tata Udara i. Pengadaan Unit 1 Round Cassette ARNU48GTYA4 48100 BTU/h 2 Wall Mounted ARNU12GSJN4 12300 BTU/h 3 Outdoor Multi-V 5 Pro II ARUV341LLS5 324800 BTU/h - Accessories - Multi V 1 Y-Branch ARBLN07121 2 Outdoor Pipe Connection ARCNN21 3 Wireless Remocon PWLSSB21C 4 Standard II Wired Remocon White PREMTB001 5 AC SMART 5 PACS5A000 ii. Instalasi Unit - Instalasi Unit VRF 1 Instalasi Multi V Outdoor • Pekerjaan Instalasi module outdoor Module Multi V 5 Pro Cap. >14 PK • Pekerjaan dudukan outdoor Tipe 1 (concrete uk. 120 x 250 x 2000 - K175 besi 3Ø6mm) • Pekerjaan tray kabel & pipa (slot angle, nut & bolt) 2 Instalasi Multi V Indoor • Instalasi Unit Multi V Wall Mounted termasuk bracket & support • Instalasi Unit Multi V Ceiling Cassette termasuk hanger & support 3 Instalasi Centralized Controller • Pekerjaan Instalasi Centralized Controller LG - Instalasi Pipa Refrigerant 1 Pekerjaan Supply & Instalasi Pipa Refrigerant ASTM B280 • Pekerjaan Supply & Instalasi Pipa Refrigerant ASTM B280 uk. 1/4" • Pekerjaan Supply & Instalasi Pipa Refrigerant ASTM B280 uk. 3/8" • Pekerjaan Supply & Instalasi Pipa Refrigerant ASTM B280 uk. 1/2" • Pekerjaan Supply & Instalasi Pipa Refrigerant ASTM B280 uk. 5/8" • Pekerjaan Supply & Instalasi Pipa Refrigerant ASTM B280 uk. 3/4" • Pekerjaan Supply & Instalasi Pipa Refrigerant ASTM B280 uk. 7/8" • Pekerjaan Supply & Instalasi Pipa Refrigerant ASTM B280 uk. 1-1/8" • Pekerjaan Supply & Instalasi Pipa Refrigerant ASTM B280 uk. 1-3/8" • Pekerjaan Supply & Instalasi Pipa Refrigerant ASTM B280 uk. 1-5/8" 2 Instalasi Branch 3 Biaya Pengelasan Pipa AC Refrigerant - Instalasi Pipa Drain PVC 1 Pipa drain (PVC tipe AW) ex. Rucika/Setara, termasuk insulasi closed cell EPDM tebal 3/8" • Pekerjaan Supply & Instalasi pipa pvc uk. 1/2" • Pekerjaan Supply & Instalasi pipa pvc uk. 1" (drain indoor unit ceiling mounted) • Pekerjaan Supply & Instalasi pipa pvc uk. 2" (Main Drain line) - Instalasi Hanger & Support Pipa 1 Pekerjaan Supply & Instalasi Hanger & Support Pipa Refrigerant • Pekerjaan Supply & Instalasi Hanger & Support Pipa Refrigerant Tipe I (long drat 6 mm, dynaset, besi siku, u 2 Pekerjaan Supply & Instalasi Hanger & Support Pipa Drain • Pekerjaan Supply & Instalasi Hanger & Support Pipa Drain Tipe I (long drat 6 mm, dynaset, besi siku, u bolt, p - Instalasi Listrik 1 Pekerjaan Supply & Instalasi Kabel Power dan Grounding Outdoor • Pekerjaan Supply & Instalasi Kabel Outdoor 3 Phase termasuk pipa conduit 2 Pekerjaan Supply & Instalasi Kabel Power Indoor (termasuk pipa conduit) • Pekerjaan Supply & Instalasi Kabel NYM 3 x 2.5 mm2 1 Phase termasuk pipa conduit 3 Pekerjaan Supply & Instalasi Kabel Komunikasi Indoor (termasuk pipa conduit) • Pekerjaan Supply & Instalasi Kabel Kontrol AWG 18 pair termasuk pipa conduit • Pekerjaan Supply & Instalasi Kabel Remote AWG 18 pair termasuk pipa conduit 4 Pekerjaan Supply & Instalasi Panel listrik (MCCB, MCB, Busbar, Digital • Pekerjaan Supply & Instalasi Panel SDP Indoor • Pekerjaan Supply & Instalasi Panel SDP Outdoor NO. URAIAN PEKERJAAN - Testing & Commissioning 1 Added Refrigerant Liquid (Freon R410A) 2 Testing (tes kebocoran dan tekanan koneksi pipa refrigerant, tes vakum, tes megger, tes tegangan listrik, tes p 3 Commissioning 4 Testing Pipa drain (tes kebocoran dan tekanan koneksi pipa drain) f. Sistem Kebakaran 1 Fire Extinguisher 3 Kg g. Pekerjaan Lain-Lain 1 Coating Waterproofing Plat Beton (Semen Base Sika Top 107) 2 Coating Waterproofing Membrane 3 Screed 4 Beton Site Mixed f'c 17 Mpa Manual 5 Perbaikan Marmer 7 Penggantian Penutup Atap Menggunakan Alderon C. PEKERJAAN AKHIR 1 Dokumentasi, Pelaporan dan Asbuildrawing • Pek. Pembuatan Laporan Progres dan Dokumentasi Proyek • Pek. Pembuatan Gambar Asbuild Drawing 2 Pembersihan Akhir
| Authority | |||
|---|---|---|---|
| 27 May 2025 | Pembangunan Gelanggang Renang | Kab. Morowali | Rp 7,597,548,000 |
| 27 February 2024 | Penyelesaian Mess Dosen Kampus II Untad | Kab. Morowali | Rp 5,000,000,000 |
| 17 June 2025 | Pembangunan Gedung Farmasi Dan Ruang Pertemuan ( 2 Lantai) | Kab. Morowali Utara | Rp 4,745,488,000 |
| 22 May 2024 | Pembangunan Kanopi Stadion Fonuasingko | Kab. Morowali | Rp 4,169,375,154 |
| 23 May 2025 | Bangunan Gedung Kantor Lainnya (Pembangunan Gedung Instalasi Kebidanan Dan Kandungan Rumah Sakit Pepakulia) | Kab. Morowali | Rp 4,141,800,000 |
| 20 June 2025 | Pembangunan Gor Futsal | Kab. Morowali | Rp 4,006,926,000 |
| 25 June 2019 | Pembangunan Gedung Instalasi Gizi (Dak) | Pemerintah Daerah Kabupaten Morowali | Rp 2,857,140,000 |
| 5 February 2025 | Pekerjaan Rehab Aula Rujab Bupati | Kab. Morowali | Rp 1,904,520,000 |
| 13 June 2017 | Pengadaan Pembangunan Gedung Icu Iccu Nicu (Dak) | Kab. Parigi Moutong | Rp 1,627,350,000 |
| 21 March 2018 | Pembangunan Rtjk Type 36 Non Panggung | Kab. Parigi Moutong | Rp 1,625,000,000 |