| 0702020215831000 | Rp 1,687,496,816 | |
| 0410870430831000 | - | |
| 0753127034831000 | - | |
CV Ali Konstruksi | 06*6**1****33**0 | - |
| 0414679050834000 | - | |
CV Nirwana Rahma Makmur | 09*9**6****01**0 | - |
| 0020146999814000 | - | |
| 0763420916831000 | - | |
| 0024552820833000 | - | |
| 0743588550822000 | - | |
| 0756379061833000 | - | |
| 0623917309833000 | - | |
| 0951918549833000 | - | |
| 0808378756407000 | - | |
| 0412441800833000 | - | |
| 0631650470801000 | - | |
| 0947032967833000 | - | |
| 0028472660803000 | - | |
| 0413243254833000 | - | |
| 0415848985833000 | - | |
| 0817066707831000 | - | |
| 0963299763804000 | - | |
CV Solusi Inti Pembangunan | 08*2**3****06**0 | - |
| 0900868290831000 | - | |
Invensi Bina Udaya | 06*2**9****14**0 | - |
| 0943997205833000 | - | |
| 0718927130805000 | - | |
| 0725342570833000 | - | |
| 0025732371831000 | - | |
| 0730300662833000 | - | |
| 0812227726831000 | - |
URAIAN SINGKAT PEKERJAAN
I PEKERJAAN AWAL
1 Pemasangan Papan Nama Proyek
2 Pek. Pembongkaran Atap
3 Pek. Pembongkaran Dinding Bata
4 Pek. Pembersihan Lokasi
5 Pemasangan Bowplank
II PEKERJAAN TANAH DAN PONDASI
1 Pondasi Batu Gunung
a. Galian Tanah
b. Urugan Tanah Kembali Bekas Galian
c. Urugan Pasir
2 Pekerjaan Peninggian Lantai
a. Urugan Pasir Perata
3 Anstamping Batu Gunung
4 Pondasi Batu Gunung 1 : 4
III PEKERJAAN BETON
1 Balok Sloof Teras (SL) 15x15 cm
a. Sloof 15x15
2 Kolom (KL) 30x30 cm
a. Kolom 30x30
3 Ring Balk (RB1)Teras 15x20 cm Elv. + 3,55
a. Ringbalk 15/20
4 Ring Balk (RB2)Teras 15x30 cm Elv. + 3,55
a. Ringbalk 15/30
5 Balok Latei (LB) 15x15 cm Elv. + 2,55
a. Balok Latei 15/15
6 Ring Balk (RB1) 15x20 cm Elv. + 6,00
a. Ringbalk 15/20
7 Ring Balk (RB1) 15x20 cm Elv. + 7,00
a. Ringbalk 15/20
8 Ring Balk (RB1) 15x20 cm Elv. + 8,10
a. Ringbalk 15/20
9 Dak Kanopi Jendela
a. Kanopi 10/50
10 Kolom Praktis (KP) 15x15 cm
a. Kolom 15x15
IV PEKERJAAN STRUKTUR ATAP
1 Rangka Atap Baja Ringan
2 Atap Spandek Zincalume
3 Lisplank GRC 0,8 x 30 cm
4 Talang PVC
5 Pipa Pembuangan Atap 2"
V PEKERJAAN KUSEN, DAUN PINTU DAN JENDELA
1 Kusen dan Pintu Aluminium (P1)
2 Kusen dan Pintu Jendela Aluminium (PJ1)
3 Kusen dan Pintu Jendela Aluminium (PJ2)
4 Kusen dan Pintu Jendela Aluminium (PJ3)
5 Kusen dan Jendela Aluminium (J1)
6 Kusen dan Jendela Aluminium (J2)
7 Pintu Panil Kayu (P2)
8 Pintu KM/WC Aluminium (P3)
9 Jendela Kayu (J3)
VI PEKERJAAN PASANGAN DINDING, PLESTERAN DAN ACIAN
1 Pasangan Dinding Bata 1/2 batu 1 Pc : 4 Psr
2 Plesteran Dinding, Kolom dan Pondasi 1 Pc : 4 Psr
3 Acian Dinding, Kolom dan Pondasi
4 Pek. Rangka Kayu Dinding Partisi
5 Pasangan Penutup Dinding Partisi Kalsiboard 6mm
VII PEKERJAAN PENUTUP LANTAI DAN DINDING
1 Keramik 60 x 60 (Polos) Dalam Ruangan TPT
2 Keramik 60 x 60 (Anti Slip) Teras Samping
VIII PEKERJAAN PLAFOND DAN ALUCOPAN
1 Pek. Rangka Plafond Baja Ringan Type FLAT
2 Pek. Plafond Gypsum Board 9 mm Type FLAT
3 Pek. List Profil Plafond Gypsum
4 Pek. Rangka Besi Holow Dinding Alucopan
5 Pek. Penutup Alucopan
IX PEKERJAAN PENGECATAN
1 Pengecatan Dinding Kualitas Sedang
2 Pengecatan Plafond
3 Pengecatan Lisplank GRC (Menggunakan Cat Kayu 2 Lapis)
X PEKERJAAN ELEKTRIKAL
1 Indirect Led 5 Watt
2 RMI Ceilling Recessed 2x18 Watt TL-LED
3 Down Light Led 18 Watt
4 Saklar Tungal
5 Saklar Ganda
6 Titik Penerangan
7 Titik Stop Kontak
8 Box MCB (Include MCB)
10 Panel
Komponen Utama :
1 x MCCB 45 A, 3 P,50 kA
3 x MCCB 4 A, 3 P, 25 kA
7 x MCCB 6 A, 3 P, 25 kA
3 x CT 1000/5A
3 x A-meter 0 - 250 A
1 x V-meter 0 - 500 V + VSS 7 position
1 x kW-meter 0 - 300 kW
3 x F-meter 45 - 55 Hz
3 x fuse 2 A + fuse holder
3 x pilot lamp
1 lot busbar 50 A full neutral, 5 bus
1 lot control wiring + aksesori
1 lot cubicle 60 x 40 x 25 cm
1 lot grounding
11 Instalasi Penangkal Petir
Komponen Penangkal Petir :
- Flash Vectron Terminal Radius Proteksi 150 Meter Termasuk
Dudukan, Pipa Penyangga Dari GIP Tinggi ± 3 Meter, Base Plat dan
Perlengkapan Bantu Lainnya.
- Obstruction Light 100 W
2
- N2XSY Cable 1 x 70 mm + Conduit PVC Diameter 32 mm
Termasuk Clamp, Support dan Perlengkapan Bantu Lainnya Sesuai
- Kabel NYM 3 x 2,5 mm2 in PVC Hl Diameter 20 mm, Instalasi
Obstruction Light
- Bak Kontrol Ukuran 200 x 200 x 200 mm dari pasangan bata, tutup
beton, lubang rembesan, kolom, BC diameter 70mm termasuk pipa
GIP medium diameter 50 mm, copper rod tembaga, tahanan max. 1
ohm dan perlengkapan lain sehingga sistem berfungsi termasuk
XI PEKERJAAN LAIN-LAIN
1 Pembuatan Logo t=120cm dan Huruf "djp t=65cm
2 Pembuatan Logo t=50cm dan Huruf "djp" t=40cm
3 Pembuatan Huruf (Kantor Pajak )
BUNGKU| Authority | |||
|---|---|---|---|
| 18 May 2022 | Pembangunan Ruang Terbuka Hijau (Rth) Desa Kalukubula | Kab. Sigi | Rp 12,500,000,000 |
| 17 May 2023 | Pembangunan Ruang Terbuka Hijau Desa Kalukubula (Tahap II) | Kab. Sigi | Rp 9,750,000,000 |
| 9 May 2019 | Paket 65 Jasa Konstruksi Rehab Mako Polres Sigi Polda Sulteng Ta. 2019 | Kepolisian Negara Republik Indonesia | Rp 5,495,790,000 |
| 18 May 2022 | Pembangunan Taman Taipa | Kota Palu | Rp 2,250,000,000 |
| 25 August 2014 | Pembangunan Pelataran Kantor Bupati Morowali Utara | Rp 2,000,000,000 | |
| 3 May 2017 | Pembuatan Landscape Area Terminal | Kementerian Perhubungan | Rp 1,886,000,000 |
| 20 May 2016 | Pembangunan Air Tanah Dangkal/Dalam | Kab. Buol | Rp 1,400,000,000 |
| 15 June 2016 | Penimbunan Pasar Kolonodale | Kabupaten Morowali Utara | Rp 1,400,000,000 |
| 18 January 2020 | Rehabilitas Anjungan Leok I Tahap Akhir (Dau) | Kab. Buol | Rp 1,300,000,119 |
| 2 March 2018 | Biaya Pembuatan Lanscape Dan Lahan Parkir | Provinsi Sulawesi Tengah | Rp 1,260,993,434 |