| Reason | |||
|---|---|---|---|
| 0018929521314000 | Rp 879,700,335 | - | |
| 0016868408314000 | Rp 825,850,249 | Dokumen penawaran teknis tidak memenuhi syarat | |
| 0742352099314000 | - | - | |
| 0018930925314000 | - | - | |
| 0016868077314000 | - | - | |
| 0968748616314000 | - | - | |
| 0314722836314000 | - | - | |
| 0658018361314000 | - | - | |
| 0316184704314000 | - | - | |
| 0016868093314000 | - | - | |
| 0737711663314000 | - | - | |
CV Bintang Samudra | 00*9**7****06**0 | - | - |
| 0954383972314000 | - | - | |
| 0747380236314000 | - | - | |
| 0837856061307000 | - | - | |
| 0026714824301000 | - | - | |
CV Sufi Mataram | 04*3**3****06**0 | - | - |
| 0318162922314000 | - | - | |
| 0617197512314000 | - | - | |
| 0032762098301000 | - | - | |
| 0016868556314000 | - | - |
URAIAN SINGKAT PEKERJAAN
1. Nama Paket Pekerjaan : Pembangunan MCK di Yayasan Majelis AT Turodt Al Islami
Cabang 23 Musi Banyuasin Sekayu
2. Nilai Total HPS : Rp. 897.693.000,00
(Delapan Ratus Sembilan Puluh Tujuh Juta Enam Ratus Sembilan
Puluh Tiga Ribu Rupiah ) termasuk PPn.
3. Sumber Dana : Anggaran Pendapatan dan Belanja Daerah (APBD) Kabupaten
Musi Banyuasin Tahun Anggaran 2023.
4. Lingkup Pekerjaan : Bangunan direncanakan dengan rincian sebagai berikut :
- Panjang : 10,00 m
- Lebar : 4,50 m
- Luas : 45,00 m 2
- Jumlah : 2,00 unit
Rincian lingkup pelaksanaan konstruksi tersebut adalah :
a. KPA/PPK dibantu oleh Tim Teknis (Pengawas Lapangan)
dalam proses pelaksanaan pembangunan fisik.
b. Lingkup pekerjaan Kontraktor Pelaksana dalam kegiatan ini
adalah:
1) Memeriksa dan mempelajari dokumen untuk
pelaksanaan konstruksi yang akan dijadikan dasar
dalam pekerjaan di lapangan;
2) Menyusun program kerja yang meliputi jadwal waktu
pelaksanaan, jadwal pengadaan bahan, jadwal
penggunaan tenaga kerja, dan jadwal penggunaan
peralatan berat;
3) Melaksanakan persiapan di lapangan sesuai dengan
pedoman pelaksanaan;
4) Melaksanakan pekerjaan konstruksi fisik di lapangan
sesuai dengan dokumen pelaksanaan;
5) Mengoptimalkan pemakaian bahan, peralatan dan
metode pelaksanaan, serta ketepatan waktu dan biaya
pekerjaan konstruksi;
6) Mengoptimalkan pelaksanaan pekerjaan konstruksi dari
segi kualitas, kuantitas, dan laju pencapaian
volume/realisasi fisik;
7) Mengumpulkan data dan informasi di lapangan untuk
memecahkan persoalan yang terjadi selama
pelaksanaan konstruksi;
8) Melaksanakan pelaporan pelaksanaan konstruksi fisik,
melalui rapat-rapat lapangan, laporan harian, laporan
mingguan, laporan bulanan, laporan kemajuan
pekerjaan, laporan persoalan yang timbul atau
dihadapi, dan surat-menyurat;
9) Menyusun gambar pelaksanaan (shop drawing) untuk
pekerjaan-pekerjaan yang memerlukannya. Shop
drawing diajukan kepada Tim Teknis (Pengawas
Lapangan) dan Pejabat Pembuat Komitmen (PPK);
10) Membuat gambar yang . . .
Halaman 1
10) Membuat gambar yang sesuai dengan pelaksanaan di
lapangan (as built drawings) yang selesai sebelum
serah terima pertama, setelah disetujui oleh penyedia
jasa manajemen konstruksi atau penyedia jasa
pengawasan konstruksi dan diketahui oleh penyedia
jasa perencanaan konstruksi;
11) Melakukan perbaikan terhadap cacat/kerusakan pada
masa pemeliharaan, dan menyusun laporan akhir
pekerjaan konstruksi;
12) Menyusun berita acara persetujuan kemajuan
pekerjaan, berita acara pemeliharaan pekerjaan, dan
serah terima pertama dan kedua pelaksanaan
konstruksi sebagai kelengkapan untuk pembayaran
angsuran pekerjaan konstruksi; dan
13) Uraian pekerjaan :
I. PEKERJAAN PERSIAPAN
1 Pekerjaan Pembersihan Lokasi dan
Pemasangan bouwplank
2 Biaya Pengukuran
3 Transportasi Peralatan Pengeboran
4 Pekerjaan pembuatan Papan Nama Proyek
5 Biaya K3
II. PEKERJAAN PEMBUATAN SUMUR BOR
A. PERSIAPAN PENGEBORAN
1 Pek. Geolistrik dan Pembuatan Laporan
2 Pek. Persiapan Peralatan Pengeboran
B. PEKERJAAN PENGEBORAN
1 Pek. Pengeboran Hole dia. 6"
2 Pek. Pembesaran Lubang Bor/Reaming dia.
10"
3 Pek. Pengurasan Kandungan Lumpur
C. PEKERJAAN KONSTRUKSI SUMUR
1 Pek. Pas. Pipa PVC dia. 6" Terpasang
Untuk Casing Sumur Bor
2 Pek. Filter Gravel Pack
3 Pek. Cement Grouting (ad 1 PC : 2 Pasir)
4 Pek. Pemasangan Pipa Naik dia. 1"
5 Pek. Pemasangan Tali Seling Pengaman
Pompa
6 Pumping Test
III. PEKERJAAN PEMBANGUNAN RESERVOIR
A. PEKERJAAN TANAH / PASIR
1 Galian tanah u/ pondasi
2 Pek. Urugan Pasir Bawah Pondasi
3 Pek. Urugan Kembali Ex. Galian
4 Pek. Urugan pasir alas lantai reservoir +
ris bata
B. PEKERJAAN BATU . . .
Halaman 2
B. PEKERJAAN BATU DAN BETON
1 Pek. Cor beton K. 100 u/ lantai kerja
2 Pek. Beton bertulang u/ pondasi setempat
- Pek. Bekisting Pondasi Beton Bertulang
- Pek. Pembesian Pondasi Beton Bertulang
- Pek. Beton K.225 (f’ = 19,3 MPa, slump
(120 ± 20) mm, w/c = 0,58)
3 Pek. Beton bertulang u/ kolom Uk. 30/30
cm
- Pek. Bekisting Kolom Beton Bertulang
- Pek. Pembesian Kolom Beton Bertulang
- Pek. Beton K.225 (f’ = 19,3 MPa, slump
(120 ± 20) mm, w/c = 0,58)
4 Pek. Beton bertulang u/ sloof Uk. 20/30 cm
- Pek. bekisting Sloof beton Bertulang
- Pek. Pembesian Sloof Beton Bertulang
- Pek. Beton K.225 (f’ = 19,3 MPa, slump
(120 ± 20) mm, w/c = 0,58)
5 Pek. Beton bertulang u/ balok Uk. 20/25
cm level + 3,00
- Pek. bekisting Balok beton Bertulang
- Pek. Pembesian Balok Beton Bertulang
- Pek. Beton K.225 (f’ = 19,3 MPa, slump
(120 ± 20) mm, w/c = 0,58)
6 Pek. Beton bertulang u/ plat lantai t. 12 +
3,00
- Pek. bekisting Plat Lantai beton Bertulang
- Pek. Pembesian Plat Lantai Beton
Bertulang
- Pek. Beton K.225 (f’ = 19,3 MPa, slump
(120 ± 20) mm, w/c = 0,58)
7 Pek. Beton bertulang u/ balok Uk. 20/25
cm level + 6,00
- Pek. bekisting Balok beton Bertulang
- Pek. Pembesian Balok Beton Bertulang
- Pek. Beton K.225 (f’ = 19,3 MPa, slump
(120 ± 20) mm, w/c = 0,58)
8 Pek. Beton bertulang u/ plat lantai t. 12
+6,00
- Pek. bekisting Plat Lantai beton Bertulang
- Pek. Pembesian Plat Lantai Beton
Bertulang
- Pek. Beton K.225 (f’ = 19,3 MPa, slump
(120 ± 20) mm, w/c = 0,58)
9 Pek. Beton bertulang u/ kolom 15/15
- Pek. Bekisting Kolom Beton Bertulang
- Pek. Pembesian Kolom Beton Bertulang
- Pek. Beton K.225 (f’ = 19,3 MPa, slump
(120 ± 20) mm, w/c = 0,58)
10. Pek. Beton bertulang . . .
Halaman 3
10 Pek. Beton bertulang u/ dinding bak
resevoir t.12
- Pek. Bekisting Dinding beton Bertulang
- Pek. Pembesian Dinding beton Bertulang
- Pek. Beton K.225 (f’ = 19,3 MPa, slump
(120 ± 20) mm, w/c = 0,58)
11 Pek. Beton bertulang u/ ring balok Uk.
15/15
- Pek. Bekisting Balok beton Bertulang
- Pek. Pembesian Balok Beton Bertulang
- Pek. Beton K.225 (f’ = 19,3 MPa, slump
(120 ± 20) mm, w/c = 0,58)
12 Pek. Beton bertulang u/ penutup bak
resevoir t.12
- Pek. bekisting Plat beton Bertulang
- Pek. Pembesian Plat Beton Bertulang
- Pek. Beton K.225 (f’ = 19,3 MPa, slump
(120 ± 20) mm, w/c = 0,58)
13 Pek. Pas. Bata 1 batu u/ ris ad. 1:4
14 Pek. Pas. Dinding batu bata ad. 1:4
15 Pek. Plesteran dinding ad. 1:4
16 Pek. Cor beton alas keramik lantai + rabat
(K-175)
17 Pek. Pas. Keramik uk. 40/40 cm
18 Pek. Plesteran acian bak reservoir ad. 1:3
C. PEKERJAAN PIPA DAN BESI
1 Pek. Pas. Tutup Mainhole + aksesoris
2 Pek. Pas. Pipa inlet (masuk) dia. 1"
3 Pek. Pas. Pipa out (air luber) dia. 1"
4 Pek. Pas. Pipa washout (pembilas) dia. 1"
5 Pek. Pas. Pipa outlet (penyaluran) dia. 2"
6 Pek. Pas. Tangga Kontrol
D. PEKERJAAN KAYU
1 Pek. Kusen Pintu Kayu Kelas II
2 Pek. Daun Pintu Panel Kayu Kelas II
3 Pek. Pas. Engsel Kuningan 4"
4 Pek. Pas. Kunci Tanam Biasa
E. PEKERJAAN PENGECATAN
1 Pek. Pengecatan dengan cat tembok
2 Pek. Pengecatan dengan cat minyak
IV. PEKERJAAN ELEKTRIKAL DAN LAINYA
1 Pengadaan dan Pemasangan Mesin Pompa
Submersible 1 Hp
2 Pengadaan Mesin Pompa Jetpump 250 watt
3 Kabel Submersible 3 x 2,5 mm CRI PVC Plat
Kabel
4 Pengadaan dan Pemasangan Mesin Genset
3000 watt
5. Pek. Pembuatan Teralis . . .
Halaman 4
5 Pek. Pembuatan Teralis Pengaman Lubang
Sumur dan Pompa
6 Pemasangan Stop Kontak + Instalasi
7 Pemasangan Saklar Ganda
8 Pemasangan Titik Lampu + Instalasi
9 Pemasangan Lampu Pijar 10 Watt
10 Pemasangan Kabel Biasa 2, 5 mm
V. PEKERJAAN PEMBANGUNAN 2 UNIT MCK
A. PONDASI SETEMPAT
1 Pekerjaan Galian Tanah
2 Pekerjaan Pasir Urug
3 Pekerjaan Beton Bertulang untuk pondasi
Setempat
- Pek. Pondasi beton bertulang (150 kg
besi + bekisting)
4 Pekerjaan Beton Bertulang untuk kaki
kolom pondasi setempat uk.20/20
- Pek. Bekisting Kolom pondasi beton
bertulang
- Pek. Pembesian kolom untuk pondasi
beton bertulang
- Pek. Pondasi beton bertulang (150 kg
besi + bekisting)
5 Pek. Urugan tanah kembali
B. PEKERJAAN RABAT & TANGGA
I PEK. RABAT
1 Pekerjaan Galian Tanah
2 Pekerjaan Urugan Pasir
3 Pek. Beton Bertulang untuk pondasi
Setempat
4 Pas. Pondasi Batu bata untuk Rabat
ad. 1:4
5 Pek. Beton Bertulang untuk Sloof
15/20
6 Pek. Beton Bertulang untuk Kolom
Praktis
7 Pek. Beton Bertulang untuk Ring
Balok 10/15
8 Pek. Beton Bertulang untuk Plat
lantai t.12
9 Pek.pasangan dinding 1/2 batu bata
1 : 4 dibawah rabat
10 Pek. Plesteran dinding
II PEK. TANGGA
1 Pekerjaan Galian Tanah
2 Pekerjaan Urugan Pasir
3 Pas. Pondasi Batu bata untuk Rabat
ad. 1:4
4. Pek. Pas. dinding . . .
Halaman 5
4 Pek. Pas. dinding 1/2 batu bata 1 : 4
u/ tangga
5 Pek. Tanah Timbunan
6 Pek. Beton K100 u/ lantai tangga
7 Pek. Plesteran dinding
C. PEKERJAAN BETON DAN PASANGAN BATU
1 Pek. Beton bertulang untuk sloof Uk. 25/30
- Pek. sloof beton bertulang (110 kg besi
+ bekisting)
2 Pek. Beton bertulang untuk Plat Lantai t.12
cm
3 Pek. Beton bertulang untuk kolom Uk.
25/25
- Pek. kolom beton bertulang (175 kg besi
+ bekisting)
4 Pek. Beton bertulang untuk Kolom praktis
5 Pek. Beton bertulang untuk Balok Utama
(BK1) Uk. 20/35
- Pek. balok beton bertulang (110 kg besi
+ bekisting)
6 Pek. Beton bertulang untuk Balok (BK2)
Uk. 15/20
- Pek. balok beton bertulang (110 kg besi
+ bekisting)
7 Pek. Beton bertulang untuk Ring Balok
UK.10/15
8 Pek.pasangan dinding batu bata 1 : 4
9 Pek. Plesteran ad. 1:4
D. PEKERJAAN ATAP DAN PLAFOND
1 Pek. Pasangan Rangka atap Baja Ringan
2 Pek. Pas. Atap Genteng Metal Zincalume
3 Pek. Pasangan Lisplank GRC
4 Pek. Bubungan Atap
5 Pek. Pasangan Plafon PVC + Rangka
hollow+ list plafon
6 Pek. Pasangan Font Nama Steinless Steel
uk. 30cm 'MCK'
E. PEKERJAAN PENUTUP LANTAI + DINDING
1 Pek.Keramik kasar UK. 20/20 untuk lantai
wc
2 Pek.Keramik UK. 20/40 untuk dinding WC
+ Tmpt. Cuci
3 Pek.Keramik Uk. 40/40 untuk luar wc +
teras wc
F. PEKERJAAN PINTU & VENTILASI
1 Pek. Pas. Pintu Wc (Pintu Fiber)
2 Pek. Pas. Bv.1 uk. 40 x 60 cm Alumunium
3 Pek. Pas. Roster Keramik uk. 20x40 cm
G. PEKERJAAN . . .
Halaman 6
G. PEKERJAAN PENGECATAN
1 Pek. Pengecatan Dinding dgn Cat Tembok
H. PEKERJAAN SANITAIR
1 Pek. Pas. Bak Fiber
2 Pek. Pas. Closet Jongkok (Bahan Porselen)
3 Pemasangan Kran air
4 Pemasangan Floor Drain
5 Pek. Pas. Instalasi Pipa Air Bersih dan Air
Kotor + Acc
6 Septictank Komunal Fabrikasi Kap. 50 KK
I. PEKERJAAN ELEKTRIKAL
1 Pek. Pas. Instalasi Titik Lampu
2 Pek. Pemasangan Daya Listrik 2200W
3 Pek. Pasangan Kabel Biasa 2, 5 mm
4 Pek. Pas. Lampu TL 10 W
5 Pek. Pas. Lampu TL 20 W
6 Pek. Pas. Saklar Single
7 Pek. Pas. Saklar Dobel
8 Pek. Pas. Stop Kontak + Instalasi
9 Pek. MCB 2 - 10 A
VI. BIAYA UMUM
1 Administrasi dan Dokumentasi
2 Biaya Pembersihan Akhir
Halaman 7