Normalisasi Saluran Desa Tenggulang Jaya (Sp 3) Dan Desa Sumber Jaya (Sp 4), Kec. Babat Supat

Basic Information
Type: Public Tender
Tender Code: 17480168
Date: 7 October 2023
Year: 2023
KLPD: Kab. Musi Banyuasin
Work Unit: Dinas Pekerjaan Umum Dan Penataan Ruang
Procurement Type: Pekerjaan Konstruksi
Method: Tender - Pascakualifikasi Satu File - Harga Terendah Sistem Gugur
Contract Type: Harga Satuan
Financial Information
Value (Nilai Pagu): Rp 2,144,940,000
Estimated Value (Nilai HPS): Rp 2,140,962,104
Winner (Pemenang): CV Lipas Rimbe
NPWP: 660661976314000
RUP Code: 44514814
Work Location: Kecamatan Babat Supat - Musi Banyu Asin (Kab.)
Participants: 8
Applicants
Reason
0660661976314000Rp 2,108,276,116-
0401199385301000Rp 2,052,725,253peralatan tidak memenuhi syarat
CV Alittifaqiah Press
09*7**3****12**0--
0949804561301000--
Tiga Putra Muara Ogan
05*9**9****12**0--
0742352099314000--
0434567392314000--
0031786148307000--
Attachment
BILL QUANTITY                                      
                                                                              
                                                                              
 SKPD   : DINAS PEKERJAAN UMUM DAN PENATAAN RUANG APBD-P TA. 2023             
 Kegiatan : Normalisasi/Restorasi Sungai                                      
 Pekerjaan : NORMALISASI SALURAN DESA TENGGULANG JAYA (SP 3) DAN DESA SUMBER JAYA (SP 4), KEC. BABAT SUPAT
 Kecamatan : BABAT SUPAT                                                      
 Kabupaten : MUSI BANYUASIN                                                   
  No. Mata                                   Perkiraan Harga Satuan Jumlah Harga
                      Uraian             Satuan                               
 Pembayaran                                  Kuantitas (Rupiah) (Rupiah)      
   a                   b                  c    d       e      f = (d x e)     
       PEKERJAAN TANAH                                                        
       Uitzet Trase Saluran               Ls     1.00 20,000,000.00 2 0,000,000.00
       Tebas tebang berupa memotong dan membersihkan lokasi dari              
  T.01.b                                 M2      -     8 ,556.75   -          
       tanaman/tumbuhan Ø < 15 cm                                             
 TM.01.1.a.4 Pekerjaan Galian Saluran dengan alat Excavator Long Arm M3 37,921.50 30,496.20 1,156,461,648.30
 TM.01.1.a.3 Pekerjaan Galian Saluran dengan alat Excavator Standar Arm M3 32,725.00 20,690.40 677,093,340.00
       Pengadaan Batang Kelapa untuk Feting Batang 10.00 1 ,000,000.00 1 0,000,000.00
                    Jumlah Harga PEKERJAAN TANAH (Masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 1,863,554,988.30
       PEKERJAAN LAIN - LAIN                                                  
       Papan Nama Kegiatan                Bh     1.00 3 50,000.00 350,000.00  
                                                                              
       Administrasi dan Dokumentasi       Ls     1 .00 3,942,200.00 3,942,200.00
       Rencana Keselamatan dan Kesehatan Kerja Konstruksi (RK3K) Ls 1.00 4,297,500.00 4,297,500.00
                                                                              
       Asbuilt Drawing                    Ls     1.00 15,000,000.00 1 5,000,000.00
   1.2 Mobilisasi dan Demobilisasi        Ls     1.00 41,650,000.00 4 1,650,000.00
                                                                              
                   Jumlah Harga PEKERJAAN LAIN - LAIN (Masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 6 5,239,700.00
     RENCANA  KESELAMATAN  DAN KESEHATAN  KERJA KONSTRUKSI  (RK3K)            
                                                                              
                                                                              
                                                                              
                                                                              
No                Uraian               Satuan Volume Harga Satuan Total Harga 
 1 Penyiapan RK3K terdiri atas:                                               
                                                                              
   a Pembuatan Manual, Prosedur, Instruksi Kerja, Ijin Kerja Set 1 .00 5 50,000.00 5 50,000.00
 2 Sosialisasi dan Promosi K3 terdiri atas:                                   
   a Spanduk (Banner);                   Lb     1 .00 1 40,000.00 1 40,000.00 
 3 Alat Pelindung Kerja terdiri atas:                                         
                                                                              
   a Pembatas Area (Restricted Area).    Ls     1 .00 1 40,000.00 1 40,000.00 
 4 Alat Pelindung Diri terdiri atas:                                          
   a Topi Pelindung (Safety Helmet);     Bh     5 .00  8 5,000.00 4 25,000.00 
                                                                              
   b Sarung Tangan (Safety Gloves);     Psg     5 .00   6 ,500.00 3 2,500.00  
   c Sepatu Keselamatan (Safety Shoes); Psg     5 .00 1 50,000.00 7 50,000.00 
   d Jaket Pelampung (Life Vest);        Bh     5 .00 2 95,000.00 1 ,475,000.00
 5 Fasilitas Sarana Kesehatan:                                                
                                                                              
   a Peralatan P3K (Kotak P3K, Obat Luka, Perban, dll) Ls 1 .00 2 00,000.00 2 00,000.00
 6 Lain-Lain Terkait Pengendalian Risiko K3                                   
   a Alat Pemadam Api Ringan (APAR);     Bh     1 .00 1 85,000.00 1 85,000.00 
                                                                              
 7 Penanganan Covid-19                   Ls     1 .00 4 00,000.00 4 00,000.00 
              JUMLAH TOTAL                                     #########      
    ITEM PEMBAYARAN NO. : 1.2                                                 
    JENIS PEKERJAAN : MOBILISASI                                              
                                                                              
    % TERHADAP TOTAL BIAYA PROYEK =   %                                       
                                                              Lembar 1.2-1    
                                                     HARGA     JUMLAH         
    No.             U R A I A N        SATUAN VOL.   SATUAN    HARGA          
                                                      (Rp.)     (Rp.)         
    A.  Sewa Tanah                                                            
                                         M2                                   
                                                 -         -         -        
    B.  PERALATAN                                                             
        Periksa lembar 1.2-2             Ls                   18,500,000.00   
                                                                              
     C. MOBILISASI FASILITAS KONTRAKTOR                                       
     1  Barak Pekerja,Gudang Dan Lain-lain                                    
                                         M2                                   
                                               2 4.00 4 00,000.00 9,600,000.00
    D.  LAINNYA                                                               
     1  Biaya jaga malam                 -     1 .00 8 ,000,000.00 8 ,000,000.00
     E. DEMOBILISASI                     LS    1 .00 5,550,000.00 5 ,550,000.00
                                                                              
                                                                              
        Total Biaya Mobilisasi                               4 1,650,000.00   
    Catatan :Jumlah yang tercantum pada masing-masing item mobilisasi di atas sudah termasuk over-head
        dan laba serta seluruh pajak dan bea (kecuali PPn), dan pengeluaran lainnya.
                                                                              
    ITEM PEMBAYARAN NO. : 1.2                                                 
    JENIS PEKERJAAN : M O B I L ISASI                                         
                                                              Lembar 1.2-2    
                                 KODE                HARGA     JUMLAH         
    No.          JENIS ALAT      ALAT  SATUAN VOL.   SATUAN    HARGA          
                                                      (Rp.)     (Rp.)         
    B.  PERALATAN                                                             
     1  EXCAVATOR LONG ARM 158 HP E10   Unit   3 .00 3,500,000.00 10,500,000.00
     2  EXCAVATOR STANDAR ARM 125 HP E10 Unit  2 .00 3,500,000.00 7 ,000,000.00
     3  WATERPASS                 E50   Unit   1 .00  250,000.00 250,000.00   
     4  THEODOLIT                E.43a  Unit   1 .00  250,000.00 250,000.00   
     5  MOBIL PICK UP              -    Unit   1 .00  500,000.00 500,000.00   
                                                                              
        Total untuk Item B pada Lembar 1                     1 8,500,000.00