Normalisasi Sungai Dua Pangkalan Jaya Kecamatan Babat Toman (Bankeu Prov.Sumsel Ta. 2023)

Basic Information
Type: Public Tender
Tender Code: 17501168
Date: 10 October 2023
Year: 2023
KLPD: Kab. Musi Banyuasin
Work Unit: Dinas Pekerjaan Umum Dan Penataan Ruang
Procurement Type: Pekerjaan Konstruksi
Method: Tender - Pascakualifikasi Satu File - Harga Terendah Sistem Gugur
Contract Type: Harga Satuan
Financial Information
Value (Nilai Pagu): Rp 2,000,000,000
Estimated Value (Nilai HPS): Rp 1,997,174,935
Winner (Pemenang): CV Alfa Jaya Perkasa
NPWP: 714747268314000
RUP Code: 44515111
Work Location: Kecamatan Babat Toman - Musi Banyu Asin (Kab.)
Participants: 6
Applicants
0714747268314000Rp 1,974,975,263
0665372124314000-
0620753574314000-
0031786148307000-
CV Alittifaqiah Press
09*7**3****12**0-
Tiga Putra Muara Ogan
05*9**9****12**0-
Attachment
BILL QUANTITY                                       
                                                                              
 SKPD   : DINAS PEKERJAAN UMUM DAN PENATAAN RUANG APBD-P TA. 2023             
 Kegiatan : Normalisasi/Restorasi Sungai                                      
 Pekerjaan : NORMALISASI SUNGAI DUA PANGKALAN JAYA KECAMATAN BABAT TOMAN (BANKEU PROV.SUMSEL TA.2023)
                                                                              
 Kecamatan : BABAT TOMAN                                                      
 Kabupaten : MUSI BANYUASIN                                                   
  No. Mata                                 Perkiraan Harga Satuan Jumlah Harga
                     Uraian           Satuan                                  
 Pembayaran                                Kuantitas (Rupiah) (Rupiah)        
    a                 b                c     d       e      f = (d x e)       
        PEKERJAAN TANAH                                                       
        Uitzet Trase Saluran           Ls     1 .00 1 7,000,000.00 1 7,000,000.00
                                                                              
        Tebas tebang berupa memotong dan membersihkan lokasi dari             
   T.01.b                              M2   3,441.00 8,556.75 2 9,443,776.75  
        tanaman/tumbuhan Ø < 15 cm                                            
  TM.01.1.a.3 Pekerjaan Galian Saluran dengan alat Excavator Standart Arm M3 80,519.40 2 0,730.50 1,669,207,421.70
        Pengadaan Batang Kelapa untuk Feting Batang 20.00 950,000.00 1 9,000,000.00
                                                                              
                    Jumlah Harga PEKERJAAN TANAH (Masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 1,734,651,198.45
                                                                              
        PEKERJAAN LAIN - LAIN                                                 
                                                                              
        Papan Nama Kegiatan            Bh     1.00  350,000.00 3 50,000.00    
                                                                              
        Administrasi dan Dokumentasi   Ls     1.00  3,500,000.00 3,500,000.00 
                                                                              
        Rencana Keselamatan dan Kesehatan Kerja Konstruksi (RK3K) Ls 1.00 5,555,500.00 5,555,500.00
                                                                              
        Asbuilt Drawing                Ls     1 .00 1 0,000,000.00 1 0,000,000.00
                                                                              
    1.2 Mobilisasi dan Demobilisasi    Ls     1 .00 45,200,000.00 4 5,200,000.00
                                                                              
                  Jumlah Harga PEKERJAAN LAIN - LAIN (Masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 6 4,605,500.00
     RENCANA  KESELAMATAN  DAN KESEHATAN KERJA KONSTRUKSI (RK3K)              
                                                                              
                                                                              
                                                                              
No               Uraian              Satuan Volume Harga Satuan Total Harga   
                                                                              
 1 Penyiapan RK3K terdiri atas:                                               
   a Pembuatan Manual, Prosedur, Instruksi Kerja, Ijin Kerja Set 1 .00 5 50,000.00 5 50,000.00
 2 Sosialisasi dan Promosi K3 terdiri atas:                                   
   a Spanduk (Banner);                Lb      1 .00 1 40,000.00 1 40,000.00   
                                                                              
 3 Alat Pelindung Kerja terdiri atas:                                         
   a Pembatas Area (Restricted Area). Ls      1 .00 1 40,000.00 1 40,000.00   
 4 Alat Pelindung Diri terdiri atas:                                          
   a Topi Pelindung (Safety Helmet);  Bh      7 .00 8 5,000.00 5 95,000.00    
                                                                              
   b Sarung Tangan (Safety Gloves);   Psg     7 .00  6 ,500.00  4 5,500.00    
   c Sepatu Keselamatan (Safety Shoes); Psg   7 .00 1 50,000.00 1 ,050,000.00 
   d Jaket Pelampung (Life Vest);     Bh      7 .00 2 95,000.00 2 ,065,000.00 
 5 Fasilitas Sarana Kesehatan:                                                
   a Peralatan P3K (Kotak P3K, Obat Luka, Perban, dll) Ls 1 .00 2 00,000.00 2 00,000.00
                                                                              
 6 Lain-Lain Terkait Pengendalian Risiko K3                                   
   a Alat Pemadam Api Ringan (APAR);  Bh      2 .00 1 85,000.00 3 70,000.00   
 7 Penanganan Covid-19                Ls      1 .00 4 00,000.00 4 00,000.00   
             JUMLAH TOTAL                                    5,555,500.00     
    ITEM PEMBAYARAN NO. : 1.2                                                 
    JENIS PEKERJAAN : MOBILISASI                                              
                                                                              
    % TERHADAP TOTAL BIAYA PROYEK =   %                                       
                                                              Lembar 1.2-1    
                                                     HARGA     JUMLAH         
    No.             U R A I A N        SATUAN VOL.   SATUAN    HARGA          
                                                      (Rp.)     (Rp.)         
    A.  Sewa Tanah                                                            
                                         M2                                   
                                                 -                            
    B.  PERALATAN                                                             
        Periksa lembar 1.2-2             Ls                                   
                                                                              
     C. MOBILISASI FASILITAS KONTRAKTOR                                       
     1  Barak Pekerja,Gudang Dan Lain-lain                                    
                                         M2                                   
                                               2 4.00                         
    D.  LAINNYA                                                               
     1  Biaya jaga malam                 -     1 .00                          
     E. DEMOBILISASI                     LS    1 .00                          
                                                                              
                                                                              
        Total Biaya Mobilisasi                                                
    Catatan :Jumlah yang tercantum pada masing-masing item mobilisasi di atas sudah termasuk over-head
        dan laba serta seluruh pajak dan bea (kecuali PPn), dan pengeluaran lainnya.
                                                                              
    ITEM PEMBAYARAN NO. : 1.2                                                 
    JENIS PEKERJAAN : M O B I L ISASI                                         
                                                              Lembar 1.2-2    
                                 KODE                HARGA     JUMLAH         
    No.          JENIS ALAT      ALAT  SATUAN VOL.   SATUAN    HARGA          
                                                      (Rp.)     (Rp.)         
    B.  PERALATAN                                                             
     1  EXCAVATOR STANDART ARM 125 HP E.15.h Unit 6 .00                       
     2  WATERPASS                 E50   Unit   1 .00                          
     3  THEODOLIT                E.43a  Unit   1 .00                          
     4  MOBIL PICK UP              -    Unit   1 .00                          
                                                                              
        Total untuk Item B pada Lembar 1
Tenders also won by CV Alfa Jaya Perkasa
Authority
21 March 2022Peningkatan Jalan Muara Ikan - Muara IkanKab. Penukal Abab Lematang IlirRp 8,716,200,000
21 March 2022Peningkatan Jalan Talang Ali - Bulu KuringKab. Penukal Abab Lematang IlirRp 6,720,000,000
14 March 2024Belanja Modal Bangunan Gedung Kantor (Rehab Gedung Komisi)Kab. Musi BanyuasinRp 6,337,108,130
13 January 2023Pembangunan Jembatan Air Deras Talang AkarPemerintah Daerah Kabupaten Penukal Abab Lematang IlirRp 5,050,000,000
27 September 2022Peningkatan Jalan Kerta Dewa - Jerambah BesiKab. Penukal Abab Lematang IlirRp 4,600,000,000
1 July 2025Penggantian Box Culvert Ruas Lubuk Tua - Dangku -Pasar Megang Sakti(k.076)Kab. Musi RawasRp 2,500,000,000
4 October 2023Lanjutan Pembangunan Jembatan Di Dusun IV Talang Sungai Putih Desa Bandar Jaya, Kec. SekayuKab. Musi BanyuasinRp 2,059,500,000
9 October 2023Pembangunan Pelataran Kantor Kejari PaliPemerintah Daerah Kabupaten Penukal Abab Lematang IlirRp 2,000,000,000
29 June 2018Peningkatan Jalan Mulyo Asih (A5) - Karya Maju (A1), Kec. KeluangKab. Musi BanyuasinRp 1,996,500,000
10 February 2023Lanjutan Peningkatan Jalan Karta Dewa - Jerambah BesiPemerintah Daerah Kabupaten Penukal Abab Lematang IlirRp 1,900,000,000