| Reason | |||
|---|---|---|---|
| 0860092022922000 | Rp 728,800,000 | - | |
| 0028130557952000 | Rp 728,870,871 | - | |
| 0922404579923000 | Rp 729,749,877 | - | |
| 0715942561924000 | Rp 728,915,370 | Tidak memenuhi ketentuan Bab V Lembar Data Kualifikasi poin 3 tentang Sertifikat Badan Usaha (SBU). Masa Berlaku sertifikat yang ditawarkan telah habis yaitu pada tanggal 27 Juni 2025. | |
| 0018205476923000 | - | - | |
CV Victoria Jaya Abadi | 00*6**4****23**0 | Rp 828,124,639 | - |
| 0415847334923000 | Rp 739,685,713 | - | |
| 0018786301923000 | Rp 766,465,967 | - | |
| 0903132579923000 | Rp 740,000,000 | - | |
| 0020438354923000 | Rp 834,964,816 | - | |
| 0713096436923000 | Rp 767,638,613 | - | |
| 0958860405923000 | Rp 738,746,625 | - | |
| 0942057589923000 | Rp 754,164,865 | - | |
| 0414261651922000 | Rp 811,951,936 | - | |
| 0765361175923000 | - | - | |
| 0014153142923000 | - | - | |
| 0932890320924000 | - | - | |
CV Djata Konstruksi | 06*3**9****23**0 | - | - |
| 0859812315923000 | - | - | |
| 0940461528923000 | - | - | |
| 0940175417923000 | - | - | |
CV Cakrawala Samudera Raya | 06*6**6****23**0 | - | - |
| 0017339953924000 | - | - | |
| 0714089166924000 | - | - | |
| 0869218289923000 | - | - | |
CV Panorama Karya | 10*0**0****89**8 | - | - |
CV De Sare Family | 01*5**5****23**0 | - | - |
| 0017682337921000 | - | - | |
CV Michael Putra Mandiri | 02*5**8****23**0 | - | - |
CV Adinda Harapan Jaya | 10*0**0****78**2 | - | - |
| 0948089347923000 | - | - | |
| 0943531244923000 | - | - | |
CV Paradiso Putra | 10*0**0****14**8 | - | - |
CV Nitu Oki | 06*0**8****23**0 | - | - |
| 0634521546923000 | - | - | |
| 0603246968923000 | - | - | |
| 0414017525923000 | - | - | |
| 0316071752922000 | - | - | |
| 0317197333923000 | - | - | |
CV Santana Pratama Consultant | 05*9**9****23**0 | - | - |
| 0029250180923000 | - | - | |
| 0407413012921000 | - | - | |
| 0819972563922000 | - | - | |
| 0029251808923000 | - | - | |
| 0705929479924000 | - | - |
BILL OFF QUANTITY
REKAPITULASI
Program : Pengelolaan Dan Pengembangan Sistem Penyediaan Air Minum
Kegiatan : Pengelolaan Dan Pengembangan Sistem Penyediaan Air Minum ( Spam ) Di Daerah Kabupaten/Kota
Pekerjaan : Perluasan SPAM Jaringan Perpipaan Dan Sambungan Rumah (SR) Di Desa Lodaolo
Lokasi : Kec. Mauponggo - Desa Lodaolo
T.A : 2025
NILAI TKDN JUMLAH HARGA
No U R A I A N P E K E R J A A N JUMLAH HARGA
(%) KDN
A. PEKERJAAN PERSIAPAN 11.350.351,00 100,00 11.350.351,00
B. PENGADAAN DAN PEMASANGAN PIPA HDPE + ACCESIORIS 390.148.268,73 56,19 219.205.314,39
C. PEKERJAAN PEMBANGUNAN BAK RESERVOAR 30 m³ (Sistem Over Flow) 171.425.308,41 81,60 139.885.097,61
D. PEKERJAAN BETON CROSING JALAN 9.045.536,16 65,08 5.886.644,27
E. PEKERJAAN SAMBUNGAN RUMAH (SR) IKK Lodaolo SR 121 unyt. 229.423.326,14 49,64 113.882.802,90
F. PEKERJAAN FINISHING 2.000.000,00 100,00 2.000.000,00
I. BIAYA PEKERJAAN 813.392.790,44 492.210.210,17
II. PAJAK (12%) 97.607.134,85 54.143.123,12
III. TOTAL BIAYA (I+II) 910.999.925,30 546.353.333,29
PEMBULATAN 910.999.925,00 59,97 546.353.000,00
TERBILANG : SEMBILAN RATUS SEPULUH JUTA SEMBILAN RATUS SEMBILAN PULUH SEMBILAN RIBU SEMBILAN RATUS DUA
PULUH LIMA RUPIAH
………………………………….
PT/CV…………………………
…………………………
………………………………..
…………………………………..
…………………………………..
BILL OFF QUANTITY
RENCANA ANGGARAN DAN BIAYA
Program : Pengelolaan Dan Pengembangan Sistem Penyediaan Air Minum
Kegiatan : Pengelolaan Dan Pengembangan Sistem Penyediaan Air Minum ( Spam ) Di Daerah Kabupaten/Kota
Pekerjaan : Perluasan SPAM Jaringan Perpipaan Dan Sambungan Rumah (SR) Di Desa Lodaolo
Lokasi : Kec. Mauponggo - Desa Lodaolo
T.A : 2025
NILAI
JUMLAH JUMLAH
NO URAIAN PEKERJAAN Kode Analisa SAT. VOL. HARGA SAT. TKDN
HARGA BIAYA KDN
(%)
1 2 3 4 5 6 7 = 5 x 6 8 9 = 8/100*7
A. PEKERJAAN PERSIAPAN
1 Pembersihan Awal - Ls 1 ,00 500.000,00 500.000,00 1 00,00 5 00.000,00
2 Mobilisasi / Demobilisasi - Ls 1 ,00 1.000.000,00 1.000.000,00 1 00,00 1 .000.000,00
3 Pengukuran dan Pematokan - Ls 1 ,00 1.000.000,00 1.000.000,00 1 00,00 1 .000.000,00
4 Pengujian Material JMF - Ls 1 ,00 5.500.000,00 5.500.000,00 1 00,00 5 .500.000,00
5 Sistem Menejemen Keselamatan dan Kesehatan Kerja (SMK3) - Ls 1 ,00 2.050.351,00 2.050.351,00 1 00,00 2 .050.351,00
6 Pengadaan Air Kerja - Ls 1 ,00 1.000.000,00 1.000.000,00 1 00,00 1 .000.000,00
7 Papan Nama Proyek - Ls 1 ,00 300.000,00 300.000,00 1 00,00 3 00.000,00
JUMLAH HARGA A. 11.350.351,00 100,00 11.350.351,00
B. PENGADAAN DAN PEMASANGAN PIPA HDPE + ACCESIORIS
B.1 PEK. PENGADAAN DAN PEMASANGAN PIPA HDPE + ACCESIORIS
1 Pengadaan dan Pemasangan Pipa HDPE Ø 2" (SDR - 11 ; PN 16) 100 m' A.8.4.1.17 m' 3 00,00 128.594,54 38.578.360,53 5 0,30 1 9.403.493,84
2 Pengadaan dan Pemasangan Pipa HDPE Ø 1.5" (SDR - 11 ; PN 16) 100 m' A.8.4.1.17 m' 2 .730,00 8 5.407,41 233.162.238,79 5 1,93 1 21.075.867,58
3 Pengadaan dan Pemasangan Pipa HDPE Ø 1" (SDR - 11 ; PN 16) 100 m' A.8.4.1.17 m' 1 .700,00 4 3.441,83 73.851.109,01 5 6,62 4 1.814.787,72
4 Pengadaan dan Pemasangan Pipa HDPE Ø 1/2" (SDR - 11 ; PN 16) 100 m' A.8.4.1.17 m' 3 00,00 2 4.718,14 7.415.442,97 6 3,85 4 .735.108,54
5 Copler HDPE ∅ 2" - bh 3 ,00 309.418,95 928.256,85 4 5,82 4 25.327,29
6 Copler HDPE ∅ 1.5" - bh 2 0,00 9 5.769,91 1.915.398,24 4 5,82 8 77.635,47
7 Copler HDPE ∅ 1" - bh 2 3,00 5 6.129,89 1.290.987,39 4 5,82 5 91.530,42
8 End Cap HDPE ∅ 1.5" - bh 4 ,00 6 3.073,64 252.294,55 4 5,82 1 15.601,36
9 End Cap HDPE ∅ 1" - bh 9 ,00 2 2.358,01 201.222,10 4 5,82 9 2.199,97
10 Tee HDPE Ø 1.5″ - bh 1 ,00 159.975,31 159.975,31 4 5,82 7 3.300,69
11 Tee HDPE ∅ 1" - bh 1 ,00 5 1.419,20 51.419,20 4 5,82 2 3.560,28
12 Reduser Tee hdpe Ø 1-1/2″ - Ø 1″ - bh 5 ,00 143.730,28 718.651,40 4 5,82 3 29.286,07
13 Reduser Copler hdpe Ø 1-1/2″ - Ø 1″ - bh 3 ,00 9 5.343,64 286.030,92 4 5,82 1 31.059,37
14 Reduser Copler hdpe Ø 2″ - Ø 1.5″ - bh 1 ,00 154.329,26 154.329,26 4 5,82 7 0.713,67
15 Famale Thread HDPE Ø 1.5″ bh 5 ,00 6 0.572,98 302.864,89 4 5,82 1 38.772,69
16 Male Thread HDPE Ø 1.5″ bh 3 ,00 5 5.029,14 165.087,41 4 5,82 7 5.643,05
- Accesioris Pipa BOX CONTROL (1 Unyt)
1 Reduser Tee hdpe Ø 2″ - Ø 1.5″ - bh 1 ,00 2 73.682,96 273.682,96 4 5,82 1 25.401,53
2 Stop Kran Ø 2″ - bh 1 ,00 5 74.731,86 574.731,86 9 5,15 5 46.857,36
3 Stop Kran Ø 1.5″ - bh 1 ,00 4 51.349,20 451.349,20 9 5,15 4 29.458,76
4 Double Niple GIP Ø 2" - bh 2 ,00 7 1.016,02 142.032,05 2 0,14 2 8.605,25
5 Double Niple GIP Ø 1.5" - bh 2 ,00 5 4.255,58 108.511,16 2 0,14 2 1.854,15
6 Famale Thread HDPE Ø 2″ - bh 2 ,00 9 8.864,15 197.728,30 4 5,82 9 0.599,11
7 Famale Thread HDPE Ø 1.5″ - bh 2 ,00 6 0.572,98 121.145,96 4 5,82 5 5.509,08
- Accesioris Eksisting Bak Reser 16 m3
1 Elbow hdpe Ø 1.5″ ( inlet ) - bh 3 ,00 1 87.087,75 561.263,25 4 5,82 2 57.170,82
2 Rehab Eks. Bak Reser + Pek. Pemasangan Accesioris Pipa INLET (2 unyt) - Ls 1 ,00 2 .500.000,00 2.500.000,00 1 00,00 2 .500.000,00
- Accesioris Eksisting Bak Reser 8 m3 Dusun 3
1 Elbow hdpe Ø 1.5″ ( inlet ) - bh 3 ,00 1 87.087,75 561.263,25 4 5,82 2 57.170,82
2 Rehab Eks. Bak Reser + Pek. Pemasangan Accesioris Pipa INLET (2 unyt) - Ls 1 ,00 2 .500.000,00 2.500.000,00 1 00,00 2 .500.000,00
- Accesioris Eksisting Bak Reser 8 m3 Dusun 2
1 Elbow hdpe Ø 1.5″ ( inlet ) - bh 3 ,00 1 87.087,75 561.263,25 4 5,82 2 57.170,82
2 Rehab Eks. Bak Reser + Pek. Pemasangan Accesioris Pipa INLET (2 unyt) - Ls 1 ,00 2 .500.000,00 2.500.000,00 1 00,00 2 .500.000,00
JUMLAH HARGA B.1 3 70.486.640,05 1 99.543.685,71
B.2 KONSTRUKSI PEMASANGAN PIPA HDPE
1 Galian Tanah Biasa Pada Pemasangan Pipa U.3.4.1.a.1 (c) m³ 1 68,16 100.229,40 16.855.062,38 1 00,00 1 6.855.062,38
2 Urugan Tanah Kembali U.3.5.1.a (c) m³ 4 2,04 6 6.757,50 2.806.566,30 1 00,00 2 .806.566,30
JUMLAH HARGA B.2 1 9.661.628,68 1 9.661.628,68
JUMLAH HARGA B. ( B.1 + B.2 ) 390.148.268,73 56,19 219.205.314,39
C. PEKERJAAN PEMBANGUNAN BAK RESERVOAR 30 m³ (Sistem Over Flow)
C.1 KONSTRUKSI PADA PEKERJAAN PEMBANGUNAN BAK RESERVOAR 30 m³ (Sistem Over Flow)
1 Galian Tanah Berbatu pada Persiapan Lahan U.3.4.3.a.1 (c) m3 5 6,00 2 00.272,50 11.215.260,00 1 00,00 1 1.215.260,00
2 Galian Tanah Pondasi U.3.4.1.a.1 (c) m3 7 ,43 1 00.229,40 744.503,98 1 00,00 7 44.503,98
3 Urugan Tanah Kembali U.3.5.1.a (c) m3 2 ,88 6 6.757,50 192.261,60 1 00,00 1 92.261,60
4 Urugan Pasir U.3.5.1.b (c) m3 1 ,31 2 06.115,63 270.835,93 1 00,00 2 70.835,93
5 Pas. Batu Kosong/Aanstamping A.3.2.1.9 m3 1 ,78 5 61.134,88 999.942,36 9 6,98 9 69.740,67
6 Pas. Pondasi Batu Kali/Gunung 2.1.1.b.(a) m3 7 ,53 1 .114.966,37 8.393.466,83 9 7,80 8 .208.863,77
7 Pekerjaan Beton Lantai Dalam Dan Luar f'c =9,8 Mpa ( k125 ) U.4.1.a (c) m3 1 ,95 1 .617.952,61 3.155.007,59 9 7,43 3 .074.039,23
8 Pek Beton Bertulang Lantai Bak Reservoir 30 m³
- Beton K-225 A.4.1.1.7 m3 2 ,88 1 .808.703,43 5.209.065,87 9 6,91 5 .048.320,64
- Pembesian U.4.6.a.1 (a) kg 3 83,62 2 0.349,81 7.806.512,77 6 1,17 4 .775.119,93
- Begisting A.4.1.1.23 m2 4 ,32 5 20.363,55 2.247.970,52 9 9,28 2 .231.712,52
9 Pek Beton Bertulang Dinding Bak Reservoir 30 m³
- Beton K-225 A.4.1.1.7 m3 1 0,68 1 .808.703,43 19.320.570,00 9 6,91 1 8.724.361,48
- Pembesian U.4.6.a.1 (a) kg 1 .314,57 2 0.349,81 26.751.160,40 6 1,17 1 6.363.260,12
- Begisting A.4.1.1.23 m2 8 1,92 5 20.363,55 42.628.181,63 9 9,28 4 2.319.881,81
10 Pek Beton Bertulang Plat Deck Bak Reservoir 30 m³
- Beton K-225 A.4.1.1.7 m3 1 ,80 1 .808.703,43 3.255.666,17 9 6,91 3 .155.200,40
- Pembesian U.4.6.a.1 (a) kg 1 99,15 2 0.349,81 4.052.640,27 6 1,17 2 .478.935,72
- Begisting A.4.1.1.23 m2 1 4,40 5 20.363,55 7.493.235,05 9 9,28 7 .439.041,72
11 Acian luar dalam 3.2.2.2.36.(c) m2 9 4,84 5 2.052,47 4.936.656,46 9 9,06 4 .890.285,45
12 Cat luar dalam A.4.7.1.10. m2 9 4,84 5 5.794,09 5.291.511,50 1 00,00 5 .291.511,50
13 Menhole uk 60x60 cm - unyt 2 ,00 3 50.000,00 700.000,00 1 00,00 7 00.000,00
14 Tanga Besi Hollo uk 4x4 cm (luar & dalam) - unyt 3 ,00 1 .000.000,00 3.000.000,00 1 00,00 3 .000.000,00
NILAI
JUMLAH JUMLAH
NO URAIAN PEKERJAAN Kode Analisa SAT. VOL. HARGA SAT. TKDN
HARGA BIAYA KDN
(%)
1 2 3 4 5 6 7 = 5 x 6 8 9 = 8/100*7
15 Pipa Hawa Ø 2" - unyt 2 ,00 3 50.000,00 700.000,00 1 00,00 7 00.000,00
16 Pemasangan Plat Baja Eser (tebal 3 mm) - m2 1 ,41 1 .024.698,65 1.444.825,10 1 00,00 1 .444.825,10
17 Pemasangan 1m Besi Siku 3 x 3 - m 6 ,70 3 20.648,65 2.148.345,96 1 00,00 2 .148.345,96
18 Gembok - Bh 2 ,00 3 5.000,00 70.000,00 1 00,00 7 0.000,00
19 Engsel - Psng 6 ,00 6 0.000,00 360.000,00 1 00,00 3 60.000,00
JUMLAH HARGA C.1 1 62.387.620,01 1 34.601.047,52
C.2 ACCESIORIES PADA PEKERJAAN PEMBANGUNAN BAK RESERVOAR 30 m³ (Sistem Over Flow)
1 Pengadaan dan Pemasangan INLET Pipa GIP Ø 2" (1 unyt) medium A A.8.4.1.34 m' 3 ,50 1 86.984,73 654.446,55 4 9,78 3 25.754,14
2 Pengadaan dan Pemasangan PENGURAS & PELUAP Pipa GIP Ø 2" (1 unyt) medium A A.8.4.1.34 m' 2 ,00 1 86.984,73 373.969,46 4 9,78 1 86.145,23
3 Pengadaan dan Pemasangan OUTLET Pipa GIP Ø 2" (2 unyt) medium A A.8.4.1.33 m' 8 ,00 1 86.984,73 1.495.877,84 4 9,78 7 44.580,90
4 Pengadaan dan Pemasangan OUTLET Pipa GIP Ø 1.5" (1 unyt) medium A A.8.4.1.33 m' 4 ,00 1 41.292,02 565.168,10 5 1,57 2 91.469,19
- Accesioris Pipa OUTLET 2 Unyt
1 Knee/Bock 90° GIP Ø 2" - bh 4 ,00 3 6.270,33 145.081,33 4 1,20 5 9.773,51
2 Knee/Bock 90° GIP Ø 1.5" - bh 2 ,00 2 2.771,73 45.543,46 4 1,20 1 8.763,90
3 Shocket GIP Ø 2" - bh 2 ,00 3 4.271,97 68.543,94 5 8,09 3 9.817,18
4 Shocket GIP Ø 1.5" - bh 1 ,00 2 5.633,90 25.633,90 5 8,09 1 4.890,73
5 Double Niple GIP Ø 2" - bh 1 0,00 7 1.016,02 710.160,24 2 0,14 1 43.026,27
6 Double Niple GIP Ø 1.5" - bh 5 ,00 5 4.255,58 271.277,90 2 0,14 5 4.635,37
7 Water mour GIP Ø 2" - bh 4 ,00 7 5.721,84 302.887,37 5 7,63 1 74.553,99
8 Water mour GIP Ø 1.5" - bh 2 ,00 5 2.850,28 105.700,56 5 7,63 6 0.915,23
9 Stop Kran GIP Ø 2" - bh 2 ,00 5 74.731,86 1.149.463,72 9 5,15 1 .093.714,73
10 Stop Kran GIP Ø 1.5" - bh 1 ,00 4 51.349,20 451.349,20 9 5,15 4 29.458,76
11 Tee GIP Ø 2" - bh 2 ,00 4 6.519,99 93.039,98 3 2,40 3 0.144,95
12 Tee GIP Ø 1.5" - bh 1 ,00 3 2.338,07 32.338,07 3 2,40 1 0.477,54
13 Female Threaded Adaptor Copler Ø 2" - bh 2 ,00 9 8.864,15 197.728,30 3 5,04 6 9.283,99
14 Female Threaded Adaptor Copler Ø 1.5" - bh 1 ,00 6 0.572,98 60.572,98 3 5,04 2 1.224,77
- Accesioris Pipa INLET 1 Unyt
1 Knee/Bock 90° GIP Ø 2" - bh 3 ,00 3 6.270,33 108.811,00 4 1,20 4 4.830,13
2 Female Threaded Adaptor Copler HDPE Ø 2" - bh 6 ,00 9 8.864,15 593.184,89 3 5,04 2 07.851,98
3 Reduser Copler HDPE Ø 2"-1.5" - bh 1 ,00 1 54.329,26 154.329,26 4 5,82 7 0.713,67
- Accesioris Pipa Penguras 2 Unyt
1 Knee/Bock 90° GIP Ø 2" - bh 2 ,00 3 6.270,33 72.540,66 4 1,20 2 9.886,75
2 Shocket GIP Ø 2" - bh 2 ,00 3 4.271,97 68.543,94 5 8,09 3 9.817,18
3 Double Niple GIP Ø 2" - bh 2 ,00 7 1.016,02 142.032,05 2 0,14 2 8.605,25
4 Stop Kran GIP Ø 2" - bh 2 ,00 5 74.731,86 1.149.463,72 9 5,15 1 .093.714,73
JUMLAH HARGA C.2 9 .037.688,40 5 .284.050,09
JUMLAH HARGA C. ( C.1 + C.2 ) 171.425.308,41 81,60 139.885.097,61
D. PEKERJAAN BETON CROSING JALAN
D.1 KONSTRUKSI PADA PEKERJAAN BETON CROSING JALAN pada Jaringan Distribusi SR
1 Galian Tanah Biasa U.3.4.1.a.1 (c) m³ 4 ,80 1 00.229,40 481.101,12 1 00,00 4 81.101,12
2 Urugan Tanah U.3.5.1.a (c) m³ 0 ,96 6 6.757,50 64.087,20 1 00,00 6 4.087,20
3 Pekerjaan Beton Lantai Dalam Dan Luar f'c =9,8 Mpa ( k125 ) U.4.1.a (c) m³ 1 ,44 1 .617.952,61 2.329.851,76 9 7,43 2 .270.059,74
JUMLAH HARGA D.1 2 .875.040,08 2 .815.248,06
D.2 ACCESIORIES PADA PEKERJAAN BETON CROSING JALAN
1 Pengadaan dan Pemasangan Pipa Sarung A GIP Ø 2" medium A A.8.4.1.34 m' 3 3,00 1 86.984,73 6.170.496,08 4 9,78 3 .071.396,22
JUMLAH HARGA D.2 6 .170.496,08 3 .071.396,22
JUMLAH HARGA D. ( D.1 + D.2 ) 9.045.536,16 65,08 5.886.644,27
E. PEKERJAAN SAMBUNGAN RUMAH (SR) IKK Lodaolo SR 121 unyt.
E. PEKERJAAN SAMBUNGAN RUMAH (SR) / I K K ( 121 ).
E.1 KONSTRUKSI PEKERJAAN SAMBUNGAN RUMAH (SR) / I K K ( 121 ).
1 Galian Tanah Biasa U.3.4.1.a.1 (c) m3 1 ,49 100.229,40 149.171,42 1 00,00 1 49.171,42
2 Pekerjaan Beton Lantai pada dudukan Meteran Air f'c =7,4 Mpa ( k100 ) A.4.1.1.1 m3 2 ,91 1.574.287,24 4.585.717,34 9 7,64 4 .477.476,30
JUMLAH HARGA E.1 4 .734.888,76 9 7,71 4 .626.647,72
E.2 ACCESIORIS PADA PEKERJAAN SAMBUNGAN RUMAH (SR) / I K K ( 121 )..
1 Pipa GIP Φ 1/2" Medium A A.8.4.1.33 M' 7 86,50 63.787,32 50.168.724,58 6 0,51 3 0.354.744,62
2 Long Boch GIP ∅ 1/2" - Bh 4 84,00 57.005,13 27.590.482,97 4 2,54 1 1.736.991,45
3 Over Sock GIP ∅ 1/2" - 3/4" - Bh 2 42,00 37.126,07 8.984.508,33 6 2,47 5 .612.622,35
4 Water Meter ( 1,6 m³/h ) - Bh 1 21,00 565.073,58 68.373.903,55 3 8,00 2 5.982.083,35
5 Double Nipple GIP ∅ 1/2" - Bh 8 47,00 16.866,89 14.286.259,30 2 0,14 2 .877.252,62
6 Water Mur GIP ∅ 1/2" - Bh 2 42,00 33.627,34 8.137.816,06 5 7,63 4 .689.823,40
7 Gate Valve / Stop Kran GIP ∅ 1/2" - Bh 1 21,00 90.612,85 10.964.155,10 9 5,15 1 0.432.393,58
8 Tee GIP ∅ 1/2" - Bh 1 21,00 17.511,53 2.118.894,72 3 2,40 6 86.521,89
9 Dop GIP ∅ 1/2" ( Drat Luar ) - Bh 1 21,00 22.668,59 2.742.898,98 3 5,69 9 78.940,65
10 Knee 90 ° / Bock GIP ∅ 1/2" - Bh 1 21,00 5.695,41 689.144,96 4 1,20 2 83.927,72
11 Kran Air GIP ∅ 1/2" - Bh 1 21,00 52.321,68 6.330.923,47 4 6,89 2 .968.570,02
12 Box Meter - Bh 1 21,00 99.591,45 12.050.565,34 4 2,22 5 .087.748,69
13 Shocket GIP ∅ 1/2" - Bh 2 42,00 18.091,70 4.378.190,39 5 8,09 2 .543.290,80
14 Famale Thread HDPE Ø 1/2″ - Bh 2 42,00 12.096,61 2.927.380,49 3 5,04 1 .025.754,12
15 Seltip - Bh 1 21,00 4.500,00 544.500,00 1 00,00 5 44.500,00
16 Clamp Sadle GIP Ø 1.5″ - Ø1/2″ - Bh 6 7,00 43.116,79 2.888.825,20 7 8,43 2 .265.705,61
17 Clamp Sadle GIP Ø 1″ - Ø1/2″ - Bh 5 4,00 27.986,37 1.511.263,93 7 8,43 1 .185.284,30
JUMLAH HARGA E.2 2 24.688.437,39 1 09.256.155,18
JUMLAH HARGA E. ( E.1 + E.2 ) 229.423.326,14 49,64 113.882.802,90
F. PEKERJAAN FINISHING
1 Pembersihan Akhir Lokasi - Ls 1 ,00 1.000.000,00 1.000.000,00 1 00,00 1 .000.000,00
2 Uji Coba Pengaliran - Ls 1 ,00 1.000.000,00 1.000.000,00 1 00,00 1 .000.000,00
JUMLAH HARGA F. 2.000.000,00 100,00 2.000.000,00