BILL OFF QUANTITY
REKAPITULASI
PROGRAM : PENGELOLAAN DAN PENGEMBANGAN SISTEM AIR SISTIM PENYEDIAAN AIR MINUM
KEGIATAN : PENGELOLAAN DAN PENGEMBANGAN SISTEM AIR MINUM (SPAM) DI DAERAH KABUPATEN/KOTA
PEKERJAAN : PENGEMBANGAN JARINGAN DISTRIBUSI DAN SAMBUNGAN RUMAH (SR) DI KELURAHAN LAPE
LOKASI : KELURAHAN LAPE - KECAMATAN AESESA
T.A : 2023
NILAI JUMLAH HARGA
No U R A I A N P E K E R J A A N JUMLAH HARGA
TKDN (%) KDN
A. PERSIAPAN 8.800.000,00 100,00 8.800.000,00
B. PEKERJAAN PIPA HDPE DAN ACCESIORIS 1.029.032.052,99 48,58 499.888.690,03
C. PEKERJAAN SAMBUNGAN RUMAH ( SR ) 231 Unit 436.748.596,98 38,86 169.717.328,29
D. PEKERJAAN FINISHING 2.500.000,00 100,00 2.500.000,00
I. BIAYA PEKERJAAN 1.477.080.649,97 680.906.018,32
II. PAJAK (11%) 162.478.871,50 74.899.662,02
III. TOTAL BIAYA (I+II) 1.639.559.521,47 755.805.680,33
PEMBULATAN 1.639.559.500,00 46,10 755.805.600,00
TERBILANG : SATU MILYARD ENAM RATUS TIGA PULUH ENAM JUTA LIMA RATUS LIMA PULUH SEMBILAN RIBU TUJUH
PULUH EMPAT RUPIAH
…….., ………………….
PENAWAR
CV/PT………………….
………………………….
……………………………………
……………………………………
#REF!
RENCANA ANGGARAN DAN BIAYA
Program : PENGELOLAAN DAN PENGEMBANGAN SISTEM AIR SISTIM PENYEDIAAN AIR MINUM
Kegiatan : PENGELOLAAN DAN PENGEMBANGAN SISTEM AIR MINUM (SPAM) DI DAERAH KABUPATEN/KOTA
Pekerjaan : PENGEMBANGAN JARINGAN DISTRIBUSI DAN SAMBUNGAN RUMAH (SR) DI KELURAHAN LAPE
Lokasi : KELURAHAN LAPE - KECAMATAN AESESA
Tahun Anggaran : 2023
RENCANA ANGGARAN DAN BIAYA
NILAI TKDN
NO URAIAN PEKERJAAN SAT. VOL. HARGA SAT. JUMLAH HARGA JUMLAH BIAYA KDN
(%)
1 2 3 4 5 6 = 4 x 5 7 8
A. PERSIAPAN
1 Pembersihan Awal Lokasi, mobilisasi dan administrasi Ls 1 ,00 3.500.000,00 3.500.000,00 1 00,00 3.500.000,00
2 Pengukuran dan Pematokan Ls 1 ,00 1.500.000,00 1.500.000,00 1 00,00 1.500.000,00
3 Pengadaan Air Kerja Ls 1 ,00 1.000.000,00 1.000.000,00 1 00,00 1.000.000,00
4 Sistem Manajemen Keselamatan dan Kesehatan Kerja (SMK3) Ls 1 ,00 2.500.000,00 2.500.000,00 1 00,00 2.500.000,00
5 Papan Nama Proyek Ls 1 ,00 300.000,00 300.000,00 1 00,00 300.000,00
JUMLAH HARGA A 8.800.000,00 8.800.000,00
B. PEKERJAAN PIPA HDPE DAN ACCESIORIS
B1. PENGADAAN PIPA HDPE DAN ACCESORIS
1 Pemasangan Pipa HDPE Ø 3" (SDR - 11 ; PN 16) 50 m' m' 2.040,00 236.841,61 4 83.156.887,04 4 7,04 2 27.253.011,80
2 Pemasangan Pipa HDPE Ø 1,5" (SDR - 11 ; PN 16) 100 m' m' 6.291,00 75.877,50 4 77.345.343,45 5 1,24 2 44.584.209,75
3 Pemasangan Pipa HDPE Ø 1,0" (SDR - 11 ; PN 16) 100 m' m' 420,00 40.910,16 17.182.267,37 5 6,52 9.711.302,36
4 Copler HDPE Ø 1,5" Bh 6 4,00 86.243,64 5.519.592,86 9 4,78 5.231.470,11
5 Copler HDPE Ø 1" Bh 5 ,00 28.466,59 142.332,94 9 4,78 134.903,16
6 And Cap HDPE Ø 3" Bh 3 ,00 201.681,59 605.044,77 4 5,82 277.231,51
7 And Cap HDPE Ø 1.5" Bh 2 4,00 50.434,09 1.210.418,12 4 5,82 554.613,58
8 And Cap HDPE Ø 1.0" Bh 4 ,00 17.861,59 71.446,35 4 5,82 32.736,72
9 Tee HDPE Ø 1,5 " Bh 1 ,00 264.533,89 264.533,89 4 9,54 131.050,09
10 Clam Sadle HDPE Ø 4" - 3" Bh 3 ,00 82.880,34 248.641,02 7 8,43 195.009,15
11 Clam Sadle HDPE Ø 3" - 1,5" Bh 2 4,00 59.877,59 1.437.062,12 7 8,43 1.127.087,82
12 Clam Sadle HDPE Ø 1,5" - 1" Bh 4 ,00 20.038,14 80.152,55 7 8,43 62.863,65
13 Gate Valve Ø 3" Bh 3 ,00 3.711.052,84 11.133.158,52 9 5,15 10.593.200,33
JUMLAH HARGA B1. 9 98.396.880,9922 4 99.888.690,0294
B2. KONSTRUKSI PEMASANGAN PIPA HDPE
1 Galian Tanah Pada Pemasangan Pipa m³ 410,44 63.250,00 25.960.330,00 1 00,00 25.960.330,00
2 Urugan Tanah Kembali m³ 101,63 46.000,00 4.674.842,00 1 00,00 4.674.842,00
JUMLAH HARGA B1. 3 0.635.172,00 3 0.635.172,00
JUMLAH HARGA B. ( B1. + B2. ) 1 .029.032.052,99 5 30.523.862,03
C. PEKERJAAN SAMBUNGAN RUMAH ( SR ) 231 Unit
C1. KONSTRUKSI SAMBUNGAN RUMAH ( SR )
1 Galian Tanah m³ 1 7,33 63.250,00 1.095.806,25 1 00,00 1.095.806,25
2 Urug Tanah Bekas Galian m³ 6 ,93 46.000,00 318.790,63 1 00,00 318.790,63
3 Pengecoran Beton Pengaman Meteran K -125 m³ 1 0,40 1.595.426,23 16.584.455,70 9 7,51 16.171.021,93
JUMLAH HARGA C1. 1 7.999.053 1 7.585.619
C2. ACCESORIS SAMBUNGAN RUMAH ( SR )
1 Pipa GIP Φ 1/2" Medium A M' 2.520,00 60.284,25 1 51.916.302,75 3 6,33 55.191.192,79
2 Clam Sadle GIP ∅ 1,5-1/2" Bh 210,00 18.295,89 3.842.136,57 3 6,33 1.395.848,22
3 Clam Sadle GIP ∅ 1,0-1/2" Bh 2 1,00 13.882,19 291.525,96 3 6,33 105.911,38
4 Long Boch GIP ∅ 1/2" Bh 924,00 51.320,41 47.420.060,13 3 6,33 17.227.707,84
5 Water Meter ( 1,6 m³/h ) Bh 231,00 475.568,34 1 09.856.286,17 3 6,33 39.910.788,77
6 Double Nipple GIP ∅ 1/2" Bh 924,00 15.159,84 14.007.690,70 3 6,33 5.088.994,03
7 Water Mur GIP ∅ 1/2" Bh 231,00 30.259,34 6.989.907,17 3 6,33 2.539.433,28
8 Gate Valve / Stop Kran GIP ∅ 1/2" Bh 231,00 81.597,64 18.849.054,47 3 6,33 6.847.861,49
9 Tee GIP ∅ 1/2" Bh 231,00 15.740,59 3.636.075,92 3 6,33 1.320.986,38
10 Dop GIP ∅ 1/2" ( Drat Luar ) Bh 231,00 20.386,59 4.709.301,92 3 6,33 1.710.889,39
11 Boock GIP ∅ 1/2" Bh 231,00 10.130,54 2.340.155,53 3 6,33 850.178,50
12 Kran Air GIP ∅ 1/2" Bh 231,00 47.101,09 10.880.351,42 3 6,33 3.952.831,67
13 Box Meter Bh 231,00 46.520,34 10.746.198,17 3 6,33 3.904.093,80
14 Shocket GIP ∅ 1/2" Bh 462,00 16.263,26 7.513.627,70 3 6,33 2.729.700,94
15 Over Sock GIP ∅ 1/2" - 3/4" Bh 231,00 24.451,84 5.648.374,67 3 6,33 2.052.054,52
16 Male threaded coupler/drat luar HDPE ∅ 3/4-1/2" Bh 231,00 12.023,79 2.777.495,12 3 6,33 1.009.063,98
17 Seltip Ls 231,00 75.000,00 17.325.000,00 3 6,33 6.294.172,50
JUMLAH HARGA C2. 4 18.749.544 1 52.131.709
JUMLAH HARGA C. ( C1. + C2. ) 4 36.748.596,98 1 69.717.328,29
JUMLAH HARGA G. -
D. PEKERJAAN FINISHING
1 Pembersihan Akhir Lokasi Ls 1 ,00 1.000.000,00 1.000.000,00 1 00,00 1.000.000,00
2 Uji Coba Pengaliran Ls 1 ,00 1.500.000,00 1.500.000,00 1 00,00 1.500.000,00
JUMLAH HARGA D. 2.500.000,00 2.500.000,00
ANALISA RENCANA ANGGARAN BIAYA ANGKUTAN
Program : Pengelolaan Dan Pengembangan Sistem Air Sistim Penyediaan Air Minum
Kegiatan : Pengelolaan Dan Pengembangan Sistem Air Minum (Spam) Di Daerah Kabupaten/Kota
Pekerjaan : Pengembangan Jaringan Distribusi Dan Sambungan Rumah (Sr) Di Kelurahan Lape
Lokasi : Kelurahan Lape - Kecamatan Aesesa
Tahun Anggaran : 2023
Volume Panjang Pipa Panjang Total Biaya Kirim Biaya Kirim Biaya Kirim Biaya Kirim Total Biaya kirim
Container/Truck (Roll / Btg) / Container/Truck dr Pelbh Sby dr Pelbh Sby dr Pel. di NTT dr Pelbh. di NTT ke lokasi
No. Diameter
(Roll / Btg) (M') (M') ke Pelbh NTT ke Pelbh NTT ke Lokasi ke Lokasi Sementara
(Rp./ Container) (Rp./ M') (Rp./ Truck') (Rp./ M') (Rp.M')
1 2 3 4 5 = (4 x 3) 6 7 = (6/5) 8 9 = (8/5) 10 = (7+9)
1 Pipa PE. Ǿ 0,5" (20 mm) 3 5,00 Roll 1 00,00 3 .500,00 18.000.000,00 5.142,86 500.000,00 1 42,86 5.285,71
2 Pipa PE. Ǿ 3/4" (25 mm) 3 0,00 Roll 1 00,00 3 .000,00 18.000.000,00 6.000,00 500.000,00 1 66,67 6.166,67
3 Pipa PE. Ǿ 1" (32 mm) 2 8,00 Roll 1 00,00 2 .800,00 18.000.000,00 6.428,57 500.000,00 1 78,57 6.607,14
4 Pipa PE. Ǿ 1,1/4" (40 mm) 2 7,00 Roll 1 00,00 2 .700,00 18.000.000,00 6.666,67 500.000,00 1 85,19 6.851,85
5 Pipa PE. Ǿ 1,5" (50 mm) 2 5,00 Roll 1 00,00 2 .500,00 18.000.000,00 7.200,00 500.000,00 2 00,00 7.400,00
6 Pipa PE. Ǿ 2" (63 mm) 2 2,00 Roll 1 00,00 2 .200,00 18.000.000,00 8.181,82 500.000,00 2 27,27 8.409,09
7 Pipa PE. Ǿ 2,5" (75 mm) 1 9,00 Roll 50,00 9 50,00 18.000.000,00 18.947,37 500.000,00 5 26,32 19.473,68
8 Pipa PE. Ǿ 3" (90 mm) 1 7,00 Roll 50,00 8 50,00 18.000.000,00 21.176,47 500.000,00 5 88,24 21.764,71
9 Pipa PE. Ǿ 4" (110 mm) 450,00 Btg 6,00 2 .700,00 18.000.000,00 6.666,67 500.000,00 1 85,19 6.851,85
10 Pipa PE. Ǿ 5" (125 mm) 350,00 Btg 6,00 2 .100,00 18.000.000,00 8.571,43 500.000,00 2 38,10 8.809,52
11 Pipa PE. Ǿ 6" (160 mm) 300,00 Btg 6,00 1 .800,00 18.000.000,00 10.000,00 500.000,00 2 77,78 10.277,78
12 Pipa PE. Ǿ8" (200 mm) 250,00 Btg 6,00 1 .500,00 18.000.000,00 12.000,00 500.000,00 3 33,33 12.333,33
13 Pipa GIP. Ǿ 1/2" 1.000,00 Btg 6,00 6 .000,00 18.000.000,00 3.000,00 500.000,00 83,33 3.083,33
14 Pipa GIP. Ǿ 3/4" 975,00 Btg 6,00 5 .850,00 18.000.000,00 3.076,92 500.000,00 85,47 3.162,39
15 Pipa GIP. Ǿ 1" 920,00 Btg 6,00 5 .520,00 18.000.000,00 3.260,87 500.000,00 90,58 3.351,45
16 Pipa GIP. Ǿ 1,1/4" 755,00 Btg 6,00 4 .530,00 18.000.000,00 3.973,51 500.000,00 1 10,38 4.083,89
16 Pipa GIP. Ǿ 1,5" 820,00 Btg 6,00 4 .920,00 18.000.000,00 3.658,54 500.000,00 1 01,63 3.760,16
17 Pipa GIP. Ǿ 2" 700,00 Btg 6,00 4 .200,00 18.000.000,00 4.285,71 500.000,00 1 19,05 4.404,76
18 Pipa GIP. Ǿ 2,5" 655,00 Btg 6,00 3 .930,00 18.000.000,00 4.580,15 500.000,00 1 27,23 4.707,38
19 Pipa GIP. Ǿ 3" 394,00 Btg 6,00 2 .364,00 18.000.000,00 7.614,21 500.000,00 2 11,51 7.825,72
20 Pipa GIP. Ǿ 4" 276,00 Btg 6,00 1 .656,00 18.000.000,00 10.869,57 500.000,00 3 01,93 11.171,50
21 Pipa GIP. Ǿ 5" 214,00 Btg 6,00 1 .284,00 18.000.000,00 14.018,69 500.000,00 3 89,41 14.408,10
22 Pipa GIP. Ǿ 6" 174,00 Btg 6,00 1 .044,00 18.000.000,00 17.241,38 500.000,00 4 78,93 17.720,31
23 Pipa GIP. Ǿ 8" 130,00 Btg 6,00 7 80,00 18.000.000,00 23.076,92 500.000,00 6 41,03 23.717,95
24 Mesin Jet Tenaga Surya 1 ,00 Unit 1,00 12.000.000,00 1 2.000.000,00 1 .000.000,00 1.000.000,00 13.000.000,00
ANALISA HARGA PIPA DILOKASI SEMENTARA
Program : Pengelolaan Dan Pengembangan Sistem Air Sistim Penyediaan Air Minum
Kegiatan : Pengelolaan Dan Pengembangan Sistem Air Minum (Spam) Di Daerah Kabupaten/Kota
Pekerjaan : Pengembangan Jaringan Distribusi Dan Sambungan Rumah (Sr) Di Kelurahan Lape
Lokasi : Kelurahan Lape - Kecamatan Aesesa
Tahun Anggaran : 2023
STANDARD SNI 06 - 4829 - 2005 / ISO 4427-1996, S-5 SDR 11 (PN 16)
STANDARD SNI 07 - 0039 - 87 ; BS 1387 – 67 (Pipa GIP Medium A)
Price Pengiriman Harga Pipa
List Dor To Door dr Pabrik Asuransi Keuntungan di
No. Jenis dan Ukuran
ke Lokasi di NTT 0,30% 10% Lokasi
(Rp./M') (Rp./M') (Rp./M') (Rp./M') (Rp./M')
a b c d e = (0,3/100) x c f = 10% x c g = c + d + e + f
1 Pipa PE. Ǿ 0,5" (20 mm) 9.009,00 5.285,71 27,03 9 00,90 15.222,64
2 Pipa PE. Ǿ 3/4" (25 mm) 11.550,00 6.166,67 34,65 1 .155,00 18.906,32
3 Pipa PE. Ǿ 1" (32 mm) 18.942,00 6.607,14 56,83 1 .894,20 27.500,17
4 Pipa PE. Ǿ 1,1/4" (40 mm) 29.106,00 6.851,85 87,32 2 .910,60 38.955,77
5 Pipa PE. Ǿ 1,5" (50 mm) 45.160,50 7.400,00 135,48 4 .516,05 57.212,03
6 Pipa PE. Ǿ 2" (63 mm) 71.379,00 8.409,09 214,14 7 .137,90 87.140,13
7 Pipa PE. Ǿ 2,5" (75 mm) 99.676,50 19.473,68 299,03 9 .967,65 129.416,86
8 Pipa PE. Ǿ 3" (90 mm) 144.490,50 21.764,71 433,47 1 4.449,05 181.137,73
9 Pipa PE. Ǿ 4" (110 mm) 214.137,00 6.851,85 642,41 2 1.413,70 243.044,96
10 Pipa PE. Ǿ 5" (125 mm) 277.777,50 8.809,52 833,33 2 7.777,75 315.198,11
11 Pipa PE. Ǿ 6" (160 mm) 454.377,00 10.277,78 1.363,13 4 5.437,70 511.455,61
12 Pipa PE. Ǿ8" (200 mm) 708.246,00 12.333,33 2.124,74 7 0.824,60 793.528,67
13 Pipa GIP. Ǿ 1/2" 50.435,00 3.083,33 151,31 5 .043,50 58.713,14
14 Pipa GIP. Ǿ 3/4" 64.872,50 3.162,39 194,62 6 .487,25 74.716,76
15 Pipa GIP. Ǿ 1" 97.212,50 3.351,45 291,64 9 .721,25 110.576,84
16 Pipa GIP. Ǿ 1,1/4" 128.205,00 4.083,89 384,62 1 2.820,50 145.494,00
17 Pipa GIP. Ǿ 1,5" 147.455,00 3.760,16 442,37 1 4.745,50 166.403,03
18 Pipa GIP. Ǿ 2" 201.162,50 4.404,76 603,49 2 0.116,25 226.287,00
19 Pipa GIP. Ǿ 2,5" 256.602,50 4.707,38 769,81 2 5.660,25 287.739,94
20 Pipa GIP. Ǿ 3" 331.292,50 7.825,72 993,88 3 3.129,25 373.241,35
21 Pipa GIP. Ǿ 4" 479.710,00 11.171,50 1.439,13 4 7.971,00 540.291,63
22 Pipa GIP. Ǿ 5" 645.645,00 14.408,10 1.936,94 6 4.564,50 726.554,53
23 Pipa GIP. Ǿ 6" 768.652,50 17.720,31 2.305,96 7 6.865,25 865.544,01
24 Pipa GIP. Ǿ 8" 1.125.836,25 23.717,95 3.377,51 1 12.583,63 1.265.515,33
25 Pengadaan Mesin Jet Tenaga Surya
Kebutuhan Satuan Price Pengiriman Harga Mesin
List Dor To Door dr Pabrik Keuntungan di
No. Jenis dan Ukuran
2022 ke Lokasi di NTT 5% Lokasi
(Rp./unit') (Rp./M') (Rp./M') (Rp./Unit)
Mesin PS2-4000 C-SJ3-32,Rp 1 1/4 '' - UL ' ' - D , P S 2 - 4 0 10,00 0Con t r o l le r -644..08 0K0v.a000,00 2.166.666,67 3 .240.000,00 70.206.666,67
Well Probe Sensor 1,00 1.575.000,00 7 8.750,00 1.653.750,00
Cable splice Kit 2,5-6 sqmm 1,00 360.000,00 1 8.000,00 378.000,00
DC Disconnect Six 1,00 4.560.000,00 2 28.000,00 4.788.000,00
Surge Protector 1,00 525.000,00 2 6.250,00 551.250,00
Float Switch 1,00 495.000,00 2 4.750,00 519.750,00
Solar Panel 330 Wp 32 lbr 32,00 4.620.000,00 2.166.666,67 7 .392.000,00 157.398.666,67
PV Cable NYAF 1x6 mm 2 Roll 2,00 2.050.000,00 2 05.000,00 4.305.000,00
Bracket Penyangga galvanise 1,00 55.440.000,00 2 .772.000,00 58.212.000,00
Box Panel Outdoor 1,00 2.500.000,00 1 25.000,00 2.625.000,00
Pump Cable NYYHY 4x4 mm 2 Roll 2,00 5.995.000,00 5 99.500,00 12.589.500,00
Sensor Cable NYYHY 2x0,75mm 2 Roll 2,00 1.450.000,00 1 45.000,00 3.045.000,00
Grounding Kit 1,00 4.000.000,00 2 00.000,00 4.200.000,00
Accesories Instalasi 1,00 4.915.000,00 2 45.750,00 5.160.750,00
kabel Seling -
Sun Sensor Matahari -
Material Packing 1 ,00 1.000.000,00 5 0.000,00 1.050.000,00
Instalation Fee 1 ,00 18.000.000,00 9 00.000,00 18.900.000,00
ANALISA HARGA SATUAN
Pemasangan 1m Pipa HDPE Ø 4"
Nilai
Uraian Satuan Koefisien Harga Satuan Jumlah Harga Ket. Total Biaya KDN
TKDN (%)
- Pekerja Oh 0,0620 70.000,00 4.340,00 100,00 WNI 4.340,00
- Tukang Oh 0,0310 80.000,00 2.480,00 100,00 WNI 2.480,00
- Mandor Oh 0,0060 100.000,00 600,00 100,00 WNI 600,00
Jumlah a 7.420,00 7.420,00
b. Bahan
Pipa PE. Ǿ 4" (110 mm) m' 1,0000 246.185,07 246.185,07 45,06 TKDN Kemenperin 110.930,99
Jumlah b 246.185,07 110.930,99
c. Alat
- Mesin Las Hari 0,0190 787.570,74 14.963,84 45,00 Alat Kerja 6.733,73
Jumlah c 14.963,84 6.733,73
Jumlah a+b+c 268.568,91 125.084,72
Biaya Umum dan Keuntungan (15%) 40.285,34 18.762,71
Harga Satuan Pekerjaan 308.854,25 46,57 143.847,43
ANALISA HARGA SATUAN
Pemasangan 1m Pipa HDPE Ø 3"
Uraian Satuan Koefisien Harga Satuan Jumlah Harga Nilai TKDN (%) Ket. Total Biaya KDN
- Pekerja Oh 0,0620 70.000,00 4.340,00 100,00 WNI 4.340,00
- Tukang Oh 0,0310 80.000,00 2.480,00 100,00 WNI 2.480,00
- Mandor Oh 0,0060 100.000,00 600,00 100,00 WNI 600,00
Jumlah a 7.420,00 7.420,00
b. Bahan
Pipa PE. Ǿ 3" (90 mm) m' 1,0000 183.565,38 183.565,38 45,06 TKDN Kemenperin 82.714,56
Jumlah b 183.565,38 82.714,56
c. Alat
- Mesin Las Hari 0,0190 787.570,74 14.963,84 45,00 Alat Kerja 6.733,73
Jumlah c 14.963,84 6.733,73
Jumlah a+b+c 205.949,23 96.868,29
Biaya Umum dan Keuntungan (15%) 30.892,38 14.530,24
Harga Satuan Pekerjaan 236.841,61 47,04 111.398,54
ANALISA HARGA SATUAN
Pemasangan 1m Pipa HDPE Ø 2"
Nilai
Uraian Satuan Koefisien Harga Satuan Jumlah Harga Ket. Total Biaya KDN
TKDN (%)
- Pekerja Oh 0,0620 70.000,00 4.340,00 100,00 WNI 4.340,00
- Tukang Oh 0,0310 80.000,00 2.480,00 100,00 WNI 2.480,00
- Mandor Oh 0,0060 100.000,00 600,00 100,00 WNI 600,00
Jumlah a 7.420,00 7.420,00
b. Bahan
Pipa PE. Ǿ 2" (63 mm) m' 1,0000 88.970,13 88.970,13 45,06 TKDN Kemenperin 40.089,94
Jumlah b 88.970,13 40.089,94
c. Alat
- Mesin Las Hari 0,0190 - 45,00 Alat Kerja -
Jumlah c - -
Jumlah a+b+c 96.390,13 47.509,94
Biaya Umum dan Keuntungan (15%) 14.458,52 7.126,49
Harga Satuan Pekerjaan 110.848,65 49,29 54.636,43
ANALISA HARGA SATUAN
Pemasangan 1m Pipa HDPE Ø 1.1/2"
Nilai
Uraian Satuan Koefisien Harga Satuan Jumlah Harga Ket. Total Biaya KDN
TKDN (%)
- Pekerja Oh 0,0620 70.000,00 4.340,00 100,00 WNI 4.340,00
- Tukang Oh 0,0310 80.000,00 2.480,00 100,00 WNI 2.480,00
- Mandor Oh 0,0060 100.000,00 600,00 100,00 WNI 600,00
Jumlah a 7.420,00 7.420,00
b. Bahan
Pipa PE. Ǿ 1,5" (50 mm) m' 1,0000 58.560,43 58.560,43 45,06 TKDN Kemenperin 26.387,33
Jumlah b 58.560,43 26.387,33
c. Alat
- Mesin Las Hari 0,0190 - 45,00 Alat Kerja -
Jumlah c - -
Jumlah a+b+c 65.980,43 33.807,33
Biaya Umum dan Keuntungan (15%) 9.897,07 5.071,10
Harga Satuan Pekerjaan 75.877,50 51,24 38.878,43
ANALISA HARGA SATUAN
Pemasangan 1m Pipa HDPE Ø 1"
Nilai
Uraian Satuan Koefisien Harga Satuan Jumlah Harga Ket. Total Biaya KDN
TKDN (%)
- Pekerja Oh 0,0620 70.000,00 4.340,00 100,00 WNI 4.340,00
- Tukang Oh 0,0310 80.000,00 2.480,00 100,00 WNI 2.480,00
- Mandor Oh 0,0060 100.000,00 600,00 100,00 WNI 600,00
Jumlah a 7.420,00 7.420,00
b. Bahan
Pipa PE. Ǿ 1" (32 mm) m' 1,0000 28.154,05 28.154,05 45,06 TKDN Kemenperin 12.686,22
Jumlah b 28.154,05 12.686,22
c. Alat
- Mesin Las Hari 0,0190 - 45,00 Alat Kerja -
Jumlah c - -
Jumlah a+b+c 35.574,05 20.106,22
Biaya Umum dan Keuntungan (15%) 5.336,11 3.015,93
Harga Satuan Pekerjaan 40.910,16 56,52 23.122,15
ANALISA HARGA SATUAN
3
1 m Pasangan Batu Kosong
Nilai
Uraian Satuan Koefisien Harga Satuan Jumlah Harga Ket. Total Biaya KDN
TKDN (%)
a. Tenaga
- Pekerja Oh 0,7800 70.000,00 5 4.600,00 100,00 54.600,00
WNI
- Tukang Oh 0,3900 80.000,00 3 1.200,00 100,00 31.200,00
WNI
- Kepala Tukang Oh 0,0390 90.000,00 3 .510,00 100,00 3.510,00
WNI
- Mandor Oh 0,0390 100.000,00 3 .900,00 100,00 3.900,00
WNI
Jumlah a 9 3.210,00 93.210,00
b. Bahan
- Batu Kali m3 1,2000 333.274,09 3 99.928,90 100,00 399.928,90
WNI
Jumlah b 3 99.928,90 399.928,90
c. Alat
Jumlah c - -
Jumlah a+b+c 4 93.138,90 493.138,90
Biaya Umum dan Keuntungan (15%) 7 3.970,84 73.970,84
Harga Satuan Pekerjaan 5 67.109,74 100,00 567.109,74
pemasangan 1m3 Pondasi Batu Belah Campuran 1 SP : 4 PP
Nilai
Uraian Satuan Koefisien Harga Satuan Jumlah Harga Ket. Total Biaya KDN
TKDN (%)
a. Tenaga
- Pekerja Oh 1,5000 70.000,00 1 05.000,00 100,00 105.000,00
WNI
- Tukang Oh 0,7500 80.000,00 6 0.000,00 100,00 60.000,00
WNI
- Kepala Tukang Oh 0,0750 90.000,00 6 .750,00 100,00 6.750,00
WNI
- Mandor Oh 0,0750 100.000,00 7 .500,00 100,00 7.500,00
WNI
Jumlah a 1 79.250,00 179.250,00
b. Bahan
- Batu Kali m3 1,2000 333.274,09 3 99.928,90 100,00 399.928,90
- Semen Kg 163,0000 1.598,30 2 60.523,00 92,16 240.098,00
TKDN Kemenperin
- Pasir m3 0,5200 267.551,71 1 39.126,89 100,00 139.126,89
Jumlah b 7 99.578,79 779.153,79
c. Alat
Jumlah c - -
Jumlah a+b+c 9 78.828,79 958.403,79
Biaya Umum dan Keuntungan (15%) 1 46.824,32 143.760,57
Harga Satuan Pekerjaan 1 .125.653,11 97,91 1.102.164,36
2
1 m Pasangan Bata (1pc : 4 pp )
Nilai
Uraian Satuan Koefisien Harga Satuan Jumlah Harga Ket. Total Biaya KDN
TKDN (%)
a. Tenaga
- Pekerja Oh 0,3200 70.000,00 2 2.400,00 100,00 22.400,00
WNI
- Tukang Oh 0,1000 80.000,00 8 .000,00 100,00 8.000,00
WNI
- Mandor Oh 0,0150 100.000,00 1 .500,00 100,00 1.500,00
WNI
Jumlah a 3 1.900,00 31.900,00
b. Bahan
- Batu Bata Merah Bh 70,0000 1.100,00 7 7.000,00 100,00 77.000,00
WNI
- Semen Kg 11,5000 1.598,30 1 8.380,46 92,16 16.939,43
TKDN Kemenperin
- Pasir m3 0,0430 267.551,71 1 1.504,72 100,00 11.504,72
WNI
Jumlah b 1 06.885,18 105.444,15
c. Alat
Jumlah c - -
Jumlah a+b+c 1 38.785,18 137.344,15
Biaya Umum dan Keuntungan (15%) 2 0.817,78 20.601,62
Harga Satuan Pekerjaan 1 59.602,96 98,96 157.945,78
2
1 m Plesteran (1pc : 4pp)
Nilai
Uraian Satuan Koefisien Harga Satuan Jumlah Harga Ket. Total Biaya KDN
TKDN (%)
a. Tenaga
- Pekerja Oh 0,3000 70.000,00 2 1.000,00 100,00 21.000,00
WNI
- Tukang Oh 0,1500 80.000,00 1 2.000,00 100,00 12.000,00
WNI
- Kepala Tukang Oh 0,0150 90.000,00 1 .350,00 100,00 1.350,00
WNI
- Mandor Oh 0,0300 100.000,00 3 .000,00 100,00 3.000,00
WNI
Jumlah a 3 7.350,00 37.350,00
b. Bahan
- Semen Kg 4,4500 1.598,30 7 .112,44 92,16 6.554,82
TKDN Kemenperin
- Pasir m3 0,0180 267.551,71 4 .815,93 100,00 4.815,93
WNI
Jumlah b 1 1.928,37 11.370,75
c. Alat
Jumlah c - -
Jumlah a+b+c 4 9.278,37 48.720,75
Biaya Umum dan Keuntungan (15%) 7 .391,76 7.308,11
Harga Satuan Pekerjaan 5 6.670,12 98,87 56.028,87
2
1 m Acian
Nilai
Uraian Satuan Koefisien Harga Satuan Jumlah Harga Ket. Total Biaya KDN
TKDN (%)
a. Tenaga
- Pekerja Oh 0,2000 70.000,00 1 4.000,00 100,00 14.000,00
WNI
- Tukang Oh 0,1000 80.000,00 8 .000,00 100,00 8.000,00
WNI
- Kepala Tukang Oh 0,0100 90.000,00 9 00,00 100,00 900,00
WNI
- Mandor Oh 0,0200 100.000,00 2 .000,00 100,00 2.000,00
WNI
Jumlah a 2 4.900,00 24.900,00
b. Bahan
- Semen Kg 3,2500 1.598,30 5 .194,48 92,16 4.787,23
TKDN Kemenperin
Jumlah b 5 .194,48 4.787,23
c. Alat
Jumlah c - -
Jumlah a+b+c 3 0.094,48 29.687,23
Biaya Umum dan Keuntungan (15%) 4 .514,17 4.453,08
Harga Satuan Pekerjaan 3 4.608,65 98,65 34.140,31
2
1 m Cat Tembok ( 1 lapis Plamir, 1 lapis Cat Dasar, 2 lapis Cat Penutup)
Nilai
Uraian Satuan Koefisien Harga Satuan Jumlah Harga Ket. Total Biaya KDN
TKDN (%)
a. Tenaga
- Pekerja Oh 0,0250 70.000,00 1 .750,00 100,00 1.750,00
WNI
- Tukang Oh 0,0630 80.000,00 5 .040,00 100,00 5.040,00
WNI
- Kepala Tukang Oh 0,0063 90.000,00 5 67,00 100,00 567,00
WNI
- Mandor Oh 0,0063 100.000,00 6 30,00 100,00 630,00
WNI
Jumlah a 7 .987,00 7.987,00
b. Bahan
- Plamur Tembok Kg 0,100 25.000,00 2 .500,00 100,00 TKDN Kem e n p e r i n 2.500,00
- Cat Dasar Kg 0,120 75.000,00 9 .000,00 100,00 TKDN Kem e n p e r i n 9.000,00
- Cat Penutup 2x Kg 0,260 75.000,00 1 9.500,00 100,00 TKDN Kem e n p e r i n 19.500,00
-
Jumlah b 3 1.000,00 31.000,00
c. Alat
Jumlah c - -
Jumlah a+b+c 3 8.987,00 38.987,00
Biaya Umum dan Keuntungan (15%) 5 .848,05 5.848,05
Harga Satuan Pekerjaan 4 4.835,05 100,00 44.835,05
ANALISA HARGA SATUAN
3
1 m Galian Tanah Biasa Sedalam ≤ 1 m
Nilai TKDN
Uraian Satuan Koefisien Harga Satuan Jumlah Harga Ket. Total Biaya KDN
(%)
a. Tenaga
- Pekerja Oh 0,7500 70.000,00 52.500,00 100,00 WNI 52.500,00
- Mandor Oh 0,0250 100.000,00 2.500,00 100,00 WNI 2.500,00
Jumlah a 55.000,00 55.000,00
b. Bahan
- -
Jumlah b -
c. Alat
- Alat Bantu -
Jumlah c - -
Jumlah a+b+c 55.000,00 55.000,00
Biaya Umum dan Keuntungan (15%) 8.250,00 8.250,00
Harga Satuan Pekerjaan 63.250,00 100,00 63.250,00
1 m3 Galian Tanah Cadas / Tanah Keras Sedalam ≤ 1 m
Nilai TKDN
Uraian Satuan Koefisien Harga Satuan Jumlah Harga Ket. Total Biaya KDN
(%)
a. Tenaga
- Pekerja Oh 1,5000 70.000,00 105.000,00 100,00 WNI 105.000,00
- Mandor Oh 0,0600 100.000,00 6.000,00 100,00 WNI 6.000,00
Jumlah a 111.000,00 111.000,00
b. Bahan
- -
Jumlah b -
c. Alat
- Alat Bantu -
Jumlah c - -
Jumlah a+b+c 111.000,00 111.000,00
Biaya Umum dan Keuntungan (15%) 16.650,00 16.650,00
Harga Satuan Pekerjaan 127.650,00 100,00 127.650,00
3
1 m Timbunan Tanah Atau Urugan Kembali Galian Tanah
Nilai TKDN
Uraian Satuan Koefisien Harga Satuan Jumlah Harga Ket. Total Biaya KDN
(%)
a. Tenaga
- Pekerja Oh 0,5000 70.000,00 35.000,00 100,00 WNI 35.000,00
- Mandor Oh 0,0500 100.000,00 5.000,00 100,00 WNI 5.000,00
Jumlah a 40.000,00 40.000,00
b. Bahan
- -
Jumlah b -
c. Alat
- Alat Bantu -
Jumlah c - -
Jumlah a+b+c 40.000,00 40.000,00
Biaya Umum dan Keuntungan (15%) 6.000,00 6.000,00
Harga Satuan Pekerjaan 46.000,00 100,00 46.000,00
3
1 m Timbunan Pasir Sebagai Bahan Pengisi
Nilai TKDN
Uraian Satuan Koefisien Harga Satuan Jumlah Harga Ket. Total Biaya KDN
(%)
a. Tenaga
- Pekerja Oh 0,3000 70.000,00 21.000,00 100,00 WNI 21.000,00
- Mandor Oh 0,0100 100.000,00 1.000,00 100,00 WNI 1.000,00
Jumlah a 22.000,00 22.000,00
b. Bahan
- Pasir m3 1,2000 267.551,71 321.062,05
Jumlah b 321.062,05
c. Alat
- Alat Bantu -
Jumlah c - -
Jumlah a+b+c 343.062,05 22.000,00
Biaya Umum dan Keuntungan (15%) 51.459,31 3.300,00
Harga Satuan Pekerjaan 394.521,35 6 ,41 25.300,00