REKAPITULASI
: PENGELOLAAN DAN PENGEMBANGAN SISTEM AIR SISTIM
PROGRAM
PENYEDIAAN AIR MINUM
KEGIATAN : PENGELOLAAN DAN PENGEMBANGAN SISTEM AIR MINUM ( SPAM )DI DAERAH KABUPATEN/KOTA
PEKERJAAN : PENGEMBANGAN JARINGAN DISTRIBUSI DASNA MBUNGAN RUMAH (SR) DI DESA WAJO
LOKASI : DESA WAJO - KECAMATAN KEO TENGAH
T.A : 2023
NILAI TKDN JUMLAH HARGA
No U R A I A N P E K E R J A A N JUMLAH HARGA
(%) KDN
A. PERSIAPAN 8.800.000,00 100,00 8.800.000,00
B. PEKERJAAN PIPA HDPE DAN ACCESIORIS 795.570.672,40 53,65 426.807.452,69
C. PEKERJAAN CROSING JALAN 8.821.572,69 66,19 5.838.822,32
D. PEKERJAAN BAK RESERVOIR 10 M³ 67.337.253,18 82,88 55.809.965,68
E. PEKERJAAN SAMBUNGAN RUMAH ( SR ) 203 Unit 393.076.119,49 37,80 148.592.287,91
F. PEKERJAAN FINISHING 2.500.000,00 100,00 2.500.000,00
I. BIAYA PEKERJAAN 1.276.105.617,76 902.644.040,70
II. PAJAK (11%) 140.371.617,95 99.290.844,48
III. TOTAL BIAYA (I+II) 1.416.477.235,71 1.001.934.885,18
PEMBULATAN 1.416.477.000,00 70,73 1.001.934.000,00
TERBILANG : SATU MILIYARD EMPAT RATUS DELAPAN BELAS JUTA SEMBILAN RATUS ENAM PULUH DELAPAN
RIBU RUPIAH
…………………………….
PENAWAR
CV/PT………………..
………………………..
…………………..
#VALUE!
RENCANA ANGGARAN DAN BIAYA
Program : PENGELOLAAN DAN PENGEMBANGAN SISTEM AIR SISTIM PENYEDIAAN AIR MINUM
Kegiatan : PENGELOLAAN DAN PENGEMBANGAN SISTEM AIR MINUM ( SPAM )DI DAERAH KABUPATEN/KOTA
Pekerjaan : PENGEMBANGAN JARINGAN DISTRIBUSI DASNA MBUNGAN RUMAH (SR) DI DESA WAJO
Lokasi : DESA WAJO - KECAMATAN KEO TENGAH
Tahun Anggaran : 2023
RENCANA ANGGARAN DAN BIAYA
NILAI JUMLAH BIAYA
NO URAIAN PEKERJAAN SAT. VOL. HARGA SAT. JUMLAH HARGA
TKDN (%) KDN
1 2 3 4 5 6 = 4 x 5 7 8
A. PERSIAPAN
1 Pembersihan Awal Lokasi, mobilisasi dan administrasi Ls 1 ,00 3 .500.000,00 3 .500.000,00 1 00,00 3.500.000,00
2 Pengukuran dan Pematokan Ls 1 ,00 1 .500.000,00 1 .500.000,00 1 00,00 1.500.000,00
3 Pengadaan Air Kerja Ls 1 ,00 1 .000.000,00 1 .000.000,00 1 00,00 1.000.000,00
4 Sistem Manajemen Keselamatan dan Kesehatan Kerja (SMK3) Ls 1 ,00 2 .500.000,00 2 .500.000,00 1 00,00 2.500.000,00
5 Papan Nama Proyek Ls 1 ,00 3 00.000,00 3 00.000,00 1 00,00 300.000,00
JUMLAH HARGA A 8 .800.000,00 8.800.000,00
B. PEKERJAAN PIPA HDPE DAN ACCESIORIS
B1. PENGADAAN PIPA HDPE DAN ACCESORIS
1 Pemasangan Pipa HDPE Ø 2" (SDR - 11 ; PN 16) 50 m' m' 2 .200,00 1 12.307,38 247.076.243,55 4 9,23 121.646.221,78
2 Pemasangan Pipa HDPE Ø 1,5" (SDR - 11 ; PN 16) 100 m' m' 4 .400,00 77.245,06 339.878.257,74 5 1,13 173.776.475,82
3 Pemasangan Pipa HDPE Ø 1,0" (SDR - 11 ; PN 16) 100 m' m' 4 .091,00 41.199,95 168.549.007,21 5 6,44 95.126.914,20
3 Copler HDPE Ø 2" Bh 2 2,00 2 47.606,80 5 .447.349,53 9 4,78 5.162.997,88
3 Copler HDPE Ø 1,5" Bh 4 4,00 86.340,10 3 .798.964,26 9 4,78 3.600.658,33
4 Copler HDPE Ø 1 " Bh 4 1,00 76.916,80 3 .153.588,67 9 4,78 2.988.971,34
6 And Cap HDPE Ø 1.5" Bh 1,00 50.530,55 5 0.530,55 4 5,82 23.153,10
7 And Cap HDPE Ø 1.0" Bh 5,00 17.958,05 8 9.790,23 4 5,82 41.141,89
9 Gate Valve ∅ 1" Bh 3,00 1 30.825,55 3 92.476,64 9 5,15 373.441,52
12 Single Air Valve Flanges Ø 2" Bh 4,00 7 66.746,80 3 .066.987,19 9 5,15
JUMLAH HARGA B1. 7 71.503.195,5570 4 02.739.975,8488
B2. KONSTRUKSI PEMASANGAN PIPA HDPE
1 Galian Tanah Pada Pemasangan Pipa m³ 3 20,85 63.250,00 20.293.604,38 1 00,00 20.293.604,38
2 Urugan Tanah Kembali m³ 8 2,04 46.000,00 3 .773.872,46 1 00,00 3.773.872,46
JUMLAH HARGA B2. 2 4.067.476,84 2 4.067.476,84
JUMLAH HARGA B. ( B1. + B2. ) 795.570.672,40 426.807.452,69
C. PEKERJAAN CROSING JALAN
1 Galian Biasa m³ 2,71 63.250,00 1 71.458,10 1 00,00 171.458,10
2 Urugan Pasir di Bawah Pipa m³ 1,08 3 94.521,35 4 26.083,06 1 00,00 426.083,06
3 Pipa Pembungkus GIP Ø 2" m' 1 8,00 2 97.163,18 5 .348.937,18 4 5,86 2.453.022,59
4 Pekerjaan rabat Beton Crosing Jalan f'c =19,3 Mpa ( K-200 ) m³ 1,62 1 .774.749,60 2 .875.094,35 9 6,98 2.788.258,57
JUMLAH HARGA C. 8 .821.572,69 5 .838.822,32
D. PEKERJAAN BAK RESERVOIR 10 M³
D1. KONSTRUKSI PEKERJAAN BAK RESERVOIR 10 M³.
1 Galian Tanah m³ 4,23 63.250,00 2 67.547,50 1 00,00 267.547,50
2 Urugan Pasir Bak Reservoir m³ 0,56 3 94.521,35 2 20.931,96 1 00,00 220.931,96
3 Pas. Anstamping m³ 2,25 5 67.109,74 1 .275.996,91 1 00,00 1.275.996,91
4 Pek. Pondasi Batu Kali/Gunung m³ 1 1,72 1 .136.351,62 13.318.041,00 9 7,86 13.032.922,50
5 Urugan Tanah Peninggi Lantai m³ 1,61 1 27.650,00 2 05.516,50 1 00,00 205.516,50
6 Pekerjaan Beton Lantai Dalam Dan Luar f'c =9,8 Mpa ( K-125 ) m³ 0,50 1 .613.541,50 8 06.770,75 9 6,98 782.404,05
7 Pek Beton Bertulang Lantai Bak Reservoir
- Beton K 225 m³ 1,00 1 .774.749,60 1 .774.749,60 9 6,88 1.719.378,38
- Pembesian kg 1 49,39 27.830,52 4 .157.601,15 5 8,17 2.418.631,73
- Bekisting m2 1,80 2 08.078,19 3 74.540,74 9 8,49 368.895,61
8 Pek Beton Bertulang Dinding Bak Reservoir
- Beton K 225 m³ 3,60 1 .774.749,60 6 .389.098,56 9 6,88 6.189.762,17
- Pembesian kg 5 43,68 27.830,52 15.130.896,27 5 8,17 8.802.206,98
- Bekisting m2 3 6,00 2 08.078,19 7 .490.814,89 9 8,49 7.377.912,12
9 Pek Beton Bertulang Plat Penutup Bak Reservoir
- Beton K 225 m³ 0,71 1 .774.749,60 1 .260.072,22 9 6,88 1.220.758,65
- Pembesian kg 1 35,30 27.830,52 3 .765.469,15 5 8,17 2.190.513,91
- Bekisting m2 5,00 2 08.078,19 1 .040.390,96 9 8,49 1.024.710,02
10 Acian Bak Reservoir Luar dan Dalam m² 6 1,44 34.821,96 2 .139.461,37 9 8,61 2.109.659,42
11 Pengecatan Waterprofing Bak Reservoir Luar dan Dalam m² 6 1,44 44.835,05 2 .754.665,47 1 00,00 2.754.665,47
12 Pek. Manhole Bak Reservor Unit 1,00 2 00.000,00 2 00.000,00 4 1,03 82.060,00
13 Pek.Anak Tangga Pada Bak Reservoir Unit 1,00 2 .000.000,00 2 .000.000,00 1 00,00 2.000.000,00
14 Pipa Hawa Unit 1,00 2 00.000,00 2 00.000,00 1 00,00 200.000,00
JUMLAH HARGA D1. 6 4.772.565 5 4.244.474
NILAI JUMLAH BIAYA
NO URAIAN PEKERJAAN SAT. VOL. HARGA SAT. JUMLAH HARGA
TKDN (%) KDN
1 2 3 4 5 6 = 4 x 5 7 8
D2. ACCESORIS BAK RESERVOIR PEMBAGI 10 M3
1 Pipa GIP ∅ 1,5" Medium A (In let) m' 3,50 2 25.267,60 7 88.436,58 4 5,86 361.577,02
2 Pipa GIP ∅ 1" Medium A (Out let) m' 3,00 1 61.382,29 4 84.146,88 4 5,86 222.029,76
3 Pipa GIP ∅ 1,5" Medium A (Penguras) m' 1,00 2 25.267,60 2 25.267,60 4 5,86 103.307,72
4 Tee All Flange Gip ∅ 1,5" Bh 7,00 29.194,30 2 04.360,08 9 5,15 194.448,61
5 Doble Niple ∅ 2" Bh 3,00 64.039,30 1 92.117,89 9 5,15 182.800,17
6 Gate Valve ∅ 1" Bh 2,00 1 30.825,55 2 61.651,09 9 5,15 248.961,02
7 Knee GIP ∅ 1,5" Bh 2,00 46.036,05 9 2.072,09 9 5,15 87.606,60
8 Knee GIP ∅ 1,0" Bh 4,00 20.297,21 8 1.188,83 9 4,78 76.950,77
9 Dop Gip 1,5" Bh 1,00 49.252,90 4 9.252,90 4 5,82 22.567,68
10 Female Adaptor HDPE Ø 1.1/2" Bh 1,00 1 07.595,55 1 07.595,55 3 5,04 37.701,48
11 Female Adaptor HDPE Ø 1" Bh 2,00 39.299,35 7 8.598,69 3 5,04 27.540,98
JUMLAH HARGA D2. 2 .564.688 1 .565.492
JUMLAH HARGA D. ( D1. + D2. ) 67.337.253,18 55.809.965,68
E. PEKERJAAN SAMBUNGAN RUMAH ( SR ) 203 Unit
E1. KONSTRUKSI SAMBUNGAN RUMAH ( SR )
1 Galian Tanah Pondasi m³ 1,81 63.250,00 1 14.640,63 1 00,00 114.640,63
2 Urug Tanah Bekas Galian m³ 0,45 46.000,00 2 0.843,75 1 00,00 20.843,75
3 Pengecoran Beton Pengaman Meteran K -125 m³ 5,83 1 .613.541,50 9 .400.654,15 9 6,98 9.116.728,44
JUMLAH HARGA E1. 9 .536.139 9 .252.213
E2. ACCESORIS SAMBUNGAN RUMAH ( SR )
1 Pipa GIP Φ 1/2" Medium A M' 2 .436,00 61.246,92 149.197.494,12 3 6,33 54.203.449,62
2 Clam Sadle GIP ∅ 1,5-1/2" Bh 5 8,00 18.392,35 1 .066.756,11 3 6,33 387.552,50
3 Clam Sadle GIP ∅ 1,0-1/2" Bh 1 45,00 13.978,65 2 .026.903,79 3 6,33 736.374,15
4 Long Boch GIP ∅ 1/2" Bh 8 12,00 51.416,87 41.750.498,26 3 6,33 15.167.956,02
5 Water Meter ( 1,6 m³/h ) Bh 2 03,00 4 75.664,80 96.559.953,75 3 6,33 35.080.231,20
6 Double Nipple GIP ∅ 1/2" Bh 8 12,00 15.256,30 12.388.113,00 3 6,33 4.500.601,45
7 Water Mur GIP ∅ 1/2" Bh 2 03,00 30.355,80 6 .162.226,75 3 6,33 2.238.736,98
8 Gate Valve / Stop Kran GIP ∅ 1/2" Bh 2 03,00 81.694,10 16.583.901,65 3 6,33 6.024.931,47
9 Tee GIP ∅ 1/2" Bh 2 03,00 15.837,05 3 .214.920,50 3 6,33 1.167.980,62
10 Dop GIP ∅ 1/2" ( Drat Luar ) Bh 2 03,00 20.483,05 4 .158.058,50 3 6,33 1.510.622,65
11 Boock GIP ∅ 1/2" Bh 2 03,00 10.227,00 2 .076.081,37 3 6,33 754.240,36
12 Kran Air GIP ∅ 1/2" Bh 2 03,00 47.197,55 9 .581.102,00 3 6,33 3.480.814,36
13 Box Meter Bh 2 03,00 46.616,80 9 .463.209,75 3 6,33 3.437.984,10
14 Shocket GIP ∅ 1/2" Bh 4 06,00 16.359,72 6 .642.047,05 3 6,33 2.413.055,69
15 Over Sock GIP ∅ 1/2" - 3/4" Bh 2 03,00 24.548,30 4 .983.304,25 3 6,33 1.810.434,43
16 Male threaded coupler/drat luar HDPE ∅ 3/4-1/2" Bh 2 03,00 12.120,25 2 .460.410,10 3 6,33 893.866,99
17 Seltip Ls 2 03,00 75.000,00 15.225.000,00 3 6,33 5.531.242,50
JUMLAH HARGA E2. 3 83.539.981 1 39.340.075
JUMLAH HARGA D. ( E1. + E2. ) 393.076.119,49 148.592.287,91
F. PEKERJAAN FINISHING
1 Pembersihan Akhir Lokasi Ls 1,00 1 .000.000,00 1 .000.000,00 1 00,00 1.000.000,00
2 Uji Coba Pengaliran Ls 1,00 1 .500.000,00 1 .500.000,00 1 00,00 1.500.000,00
JUMLAH HARGA F. 2 .500.000,00 2.500.000,00
ANALISA RENCANA ANGGARAN BIAYA ANGKUTAN
Program : Pengelolaan Dan Pengembangan Sistem Air Sistim Penyediaan Air Minum
Kegiatan : Pengelolaan Dan Pengembangan Sistem Air Minum ( Spam )Di Daerah Kabupaten/Kota
Pekerjaan : Pengembangan Jaringan Distribusi DaSna mbungan Rumah (Sr) Di Desa Wajo
Lokasi : Desa Wajo - Kecamatan Keo Tengah
Tahun Anggaran : 2023
Volume Panjang Pipa Panjang Total Biaya Kirim Biaya Kirim Biaya Kirim Biaya Kirim Total Biaya kirim
Container/Truck (Roll / Btg) / Container/Truck dr Pelbh Sby dr Pelbh Sby dr Pel. di NTT dr Pelbh. di NTT ke lokasi
No. Diameter
(Roll / Btg) (M') (M') ke Pelbh NTT ke Pelbh NTT ke Lokasi ke Lokasi Sementara
(Rp./ Container) (Rp./ M') (Rp./ Truck') (Rp./ M') (Rp.M')
1 2 3 4 5 = (4 x 3) 6 7 = (6/5) 8 9 = (8/5) 10 = (7+9)
1 Pipa PE. Ǿ 0,5" (20 mm) 3 5,00 Roll 1 00,00 3 .500,00 18.000.000,00 5.142,86 500.000,00 1 42,86 5.285,71
2 Pipa PE. Ǿ 3/4" (25 mm) 3 0,00 Roll 1 00,00 3 .000,00 18.000.000,00 6.000,00 500.000,00 1 66,67 6.166,67
3 Pipa PE. Ǿ 1" (32 mm) 2 8,00 Roll 1 00,00 2 .800,00 18.000.000,00 6.428,57 500.000,00 1 78,57 6.607,14
4 Pipa PE. Ǿ 1,1/4" (40 mm) 2 7,00 Roll 1 00,00 2 .700,00 18.000.000,00 6.666,67 500.000,00 1 85,19 6.851,85
5 Pipa PE. Ǿ 1,5" (50 mm) 2 5,00 Roll 1 00,00 2 .500,00 18.000.000,00 7.200,00 500.000,00 2 00,00 7.400,00
6 Pipa PE. Ǿ 2" (63 mm) 2 2,00 Roll 1 00,00 2 .200,00 18.000.000,00 8.181,82 500.000,00 2 27,27 8.409,09
7 Pipa PE. Ǿ 2,5" (75 mm) 1 9,00 Roll 50,00 9 50,00 18.000.000,00 18.947,37 500.000,00 5 26,32 19.473,68
8 Pipa PE. Ǿ 3" (90 mm) 1 7,00 Roll 50,00 8 50,00 18.000.000,00 21.176,47 500.000,00 5 88,24 21.764,71
9 Pipa PE. Ǿ 4" (110 mm) 450,00 Btg 6,00 2 .700,00 18.000.000,00 6.666,67 500.000,00 1 85,19 6.851,85
10 Pipa PE. Ǿ 5" (125 mm) 350,00 Btg 6,00 2 .100,00 18.000.000,00 8.571,43 500.000,00 2 38,10 8.809,52
11 Pipa PE. Ǿ 6" (160 mm) 300,00 Btg 6,00 1 .800,00 18.000.000,00 10.000,00 500.000,00 2 77,78 10.277,78
12 Pipa PE. Ǿ8" (200 mm) 250,00 Btg 6,00 1 .500,00 18.000.000,00 12.000,00 500.000,00 3 33,33 12.333,33
13 Pipa GIP. Ǿ 1/2" 1.000,00 Btg 6,00 6 .000,00 18.000.000,00 3.000,00 500.000,00 83,33 3.083,33
14 Pipa GIP. Ǿ 3/4" 975,00 Btg 6,00 5 .850,00 18.000.000,00 3.076,92 500.000,00 85,47 3.162,39
15 Pipa GIP. Ǿ 1" 920,00 Btg 6,00 5 .520,00 18.000.000,00 3.260,87 500.000,00 90,58 3.351,45
16 Pipa GIP. Ǿ 1,1/4" 755,00 Btg 6,00 4 .530,00 18.000.000,00 3.973,51 500.000,00 1 10,38 4.083,89
16 Pipa GIP. Ǿ 1,5" 820,00 Btg 6,00 4 .920,00 18.000.000,00 3.658,54 500.000,00 1 01,63 3.760,16
17 Pipa GIP. Ǿ 2" 700,00 Btg 6,00 4 .200,00 18.000.000,00 4.285,71 500.000,00 1 19,05 4.404,76
18 Pipa GIP. Ǿ 2,5" 655,00 Btg 6,00 3 .930,00 18.000.000,00 4.580,15 500.000,00 1 27,23 4.707,38
19 Pipa GIP. Ǿ 3" 394,00 Btg 6,00 2 .364,00 18.000.000,00 7.614,21 500.000,00 2 11,51 7.825,72
20 Pipa GIP. Ǿ 4" 276,00 Btg 6,00 1 .656,00 18.000.000,00 10.869,57 500.000,00 3 01,93 11.171,50
21 Pipa GIP. Ǿ 5" 214,00 Btg 6,00 1 .284,00 18.000.000,00 14.018,69 500.000,00 3 89,41 14.408,10
22 Pipa GIP. Ǿ 6" 174,00 Btg 6,00 1 .044,00 18.000.000,00 17.241,38 500.000,00 4 78,93 17.720,31
23 Pipa GIP. Ǿ 8" 130,00 Btg 6,00 7 80,00 18.000.000,00 23.076,92 500.000,00 6 41,03 23.717,95
24 Mesin Jet Tenaga Surya 1 ,00 Unit 1,00 12.000.000,00 1 2.000.000,00 1 .000.000,00 1.000.000,00 13.000.000,00
ANALISA HARGA PIPA DILOKASI SEMENTARA
Program : Pengelolaan Dan Pengembangan Sistem Air Sistim Penyediaan Air Minum
Kegiatan : Pengelolaan Dan Pengembangan Sistem Air Minum ( Spam )Di Daerah Kabupaten/Kota
Pekerjaan : Pengembangan Jaringan Distribusi DaSna mbungan Rumah (Sr) Di Desa Wajo
Lokasi : Desa Wajo - Kecamatan Keo Tengah
Tahun Anggaran : 2023
STANDARD SNI 06 - 4829 - 2005 / ISO 4427-1996, S-5 SDR 11 (PN 16)
STANDARD SNI 07 - 0039 - 87 ; BS 1387 – 67 (Pipa GIP Medium A)
Price Pengiriman Harga Pipa
List Dor To Door dr Pabrik Asuransi Keuntungan di
No. Jenis dan Ukuran
2020 ke Lokasi di NTT 0,30% 10% Lokasi
(Rp./M') (Rp./M') (Rp./M') (Rp./M') (Rp./M')
a b c d e = (0,3/100) x c f = 10% x c g = c + d + e + f
1 Pipa PE. Ǿ 0,5" (20 mm) 9.009,00 5.285,71 27,03 9 00,90 15.222,64
2 Pipa PE. Ǿ 3/4" (25 mm) 11.550,00 6.166,67 34,65 1 .155,00 18.906,32
3 Pipa PE. Ǿ 1" (32 mm) 18.942,00 6.607,14 56,83 1 .894,20 27.500,17
4 Pipa PE. Ǿ 1,1/4" (40 mm) 29.106,00 6.851,85 87,32 2 .910,60 38.955,77
5 Pipa PE. Ǿ 1,5" (50 mm) 45.160,50 7.400,00 135,48 4 .516,05 57.212,03
6 Pipa PE. Ǿ 2" (63 mm) 71.379,00 8.409,09 214,14 7 .137,90 87.140,13
7 Pipa PE. Ǿ 2,5" (75 mm) 99.676,50 19.473,68 299,03 9 .967,65 129.416,86
8 Pipa PE. Ǿ 3" (90 mm) 144.490,50 21.764,71 433,47 1 4.449,05 181.137,73
9 Pipa PE. Ǿ 4" (110 mm) 214.137,00 6.851,85 642,41 2 1.413,70 243.044,96
10 Pipa PE. Ǿ 5" (125 mm) 277.777,50 8.809,52 833,33 2 7.777,75 315.198,11
11 Pipa PE. Ǿ 6" (160 mm) 454.377,00 10.277,78 1.363,13 4 5.437,70 511.455,61
12 Pipa PE. Ǿ8" (200 mm) 708.246,00 12.333,33 2.124,74 7 0.824,60 793.528,67
13 Pipa GIP. Ǿ 1/2" 50.435,00 3.083,33 151,31 5 .043,50 58.713,14
14 Pipa GIP. Ǿ 3/4" 64.872,50 3.162,39 194,62 6 .487,25 74.716,76
15 Pipa GIP. Ǿ 1" 97.212,50 3.351,45 291,64 9 .721,25 110.576,84
16 Pipa GIP. Ǿ 1,1/4" 128.205,00 4.083,89 384,62 1 2.820,50 145.494,00
17 Pipa GIP. Ǿ 1,5" 147.455,00 3.760,16 442,37 1 4.745,50 166.403,03
18 Pipa GIP. Ǿ 2" 201.162,50 4.404,76 603,49 2 0.116,25 226.287,00
19 Pipa GIP. Ǿ 2,5" 256.602,50 4.707,38 769,81 2 5.660,25 287.739,94
20 Pipa GIP. Ǿ 3" 331.292,50 7.825,72 993,88 3 3.129,25 373.241,35
21 Pipa GIP. Ǿ 4" 2.741.200,00 11.171,50 8.223,60 2 74.120,00 3.034.715,10
22 Pipa GIP. Ǿ 5" 645.645,00 14.408,10 1.936,94 6 4.564,50 726.554,53
23 Pipa GIP. Ǿ 6" 768.652,50 17.720,31 2.305,96 7 6.865,25 865.544,01
24 Pipa GIP. Ǿ 8" 1.125.836,25 23.717,95 3.377,51 1 12.583,63 1.265.515,33
25 Pengadaan Mesin Jet Tenaga Surya
Kebutuhan Satuan Price Pengiriman Harga Mesin
List Dor To Door dr Pabrik Keuntungan di
No. Jenis dan Ukuran
2022 ke Lokasi di NTT 5% Lokasi
(Rp./unit') (Rp./M') (Rp./M') (Rp./Unit)
Mesin PS2-4000 C-SJ3-32,Rp 1 1/4 '' - UL'' -
1,00 64.800.000,00 2.166.666,67 3 .240.000,00 70.206.666,67
D,PS2-4000 Controller-4.0 Kva
Well Probe Sensor 1,00 1.575.000,00 7 8.750,00 1.653.750,00
Cable splice Kit 2,5-6 sqmm 1,00 360.000,00 1 8.000,00 378.000,00
DC Disconnect Six 1,00 4.560.000,00 2 28.000,00 4.788.000,00
Surge Protector 1,00 525.000,00 2 6.250,00 551.250,00
Float Switch 1,00 495.000,00 2 4.750,00 519.750,00
Solar Panel 330 Wp 32 lbr 32,00 4.620.000,00 2.166.666,67 7 .392.000,00 157.398.666,67
PV Cable NYAF 1x6 mm 2 Roll 2,00 2.050.000,00 2 05.000,00 4.305.000,00
Bracket Penyangga galvanise 1,00 55.440.000,00 2 .772.000,00 58.212.000,00
Box Panel Outdoor 1,00 2.500.000,00 1 25.000,00 2.625.000,00
Pump Cable NYYHY 4x4 mm 2 Roll 2,00 5.995.000,00 5 99.500,00 12.589.500,00
Sensor Cable NYYHY 2x0,75mm 2 Roll 2,00 1.450.000,00 1 45.000,00 3.045.000,00
Grounding Kit 1,00 4.000.000,00 2 00.000,00 4.200.000,00
Accesories Instalasi 1,00 4.915.000,00 2 45.750,00 5.160.750,00
kabel Seling -
Sun Sensor Matahari -
Material Packing 1,00 1.000.000,00 5 0.000,00 1.050.000,00
Instalation Fee 1,00 18.000.000,00 9 00.000,00 18.900.000,00
ANALISA HARGA SATUAN
3
1 m Pasangan Batu Kosong
Nilai
Uraian Satuan Koefisien Harga Satuan Jumlah Harga Ket. Total Biaya KDN
TKDN (%)
a. Tenaga
- Pekerja Oh 0,7800 70.000,00 54.600,00 100,00 WNI 5 4.600,00
- Tukang Oh 0,3900 80.000,00 31.200,00 100,00 WNI 3 1.200,00
- Kepala Tukang Oh 0,0390 90.000,00 3.510,00 100,00 WNI 3.510,00
- Mandor Oh 0,0390 100.000,00 3.900,00 100,00 WNI 3.900,00
Jumlah a 93.210,00 9 3.210,00
b. Bahan
- Batu Kali m3 1,2000 333.274,09 399.928,90 100,00 WNI 3 99.928,90
Jumlah b 399.928,90 3 99.928,90
c. Alat
Jumlah c - -
Jumlah a+b+c 493.138,90 4 93.138,90
Biaya Umum dan Keuntungan (15%) 73.970,84 7 3.970,84
Harga Satuan Pekerjaan 567.109,74 100,00 5 67.109,74
pemasangan 1m3 Pondasi Batu Belah Campuran 1 SP : 4 PP
Nilai
Uraian Satuan Koefisien Harga Satuan Jumlah Harga Ket. Total Biaya KDN
TKDN (%)
a. Tenaga
- Pekerja Oh 1,5000 70.000,00 105.000,00 100,00 WNI 1 05.000,00
- Tukang Oh 0,7500 80.000,00 60.000,00 100,00 WNI 6 0.000,00
- Kepala Tukang Oh 0,0750 90.000,00 6.750,00 100,00 WNI 6.750,00
- Mandor Oh 0,0750 100.000,00 7.500,00 100,00 WNI 7.500,00
Jumlah a 179.250,00 1 79.250,00
b. Bahan
- Batu Kali m3 1,2000 333.274,09 399.928,90 100,00 3 99.928,90
- Semen Kg 163,0000 1.655,37 269.826,05 92,16 TKDN Kemenperin 2 48.671,69
- Pasir m3 0,5200 267.551,71 139.126,89 100,00 1 39.126,89
Jumlah b 808.881,84 7 87.727,48
c. Alat
Jumlah c - -
Jumlah a+b+c 988.131,84 9 66.977,48
Biaya Umum dan Keuntungan (15%) 148.219,78 1 45.046,62
Harga Satuan Pekerjaan 1.136.351,62 97,86 1.112.024,10
2
1 m Pasangan Bata (1pc : 4 pp )
Nilai
Uraian Satuan Koefisien Harga Satuan Jumlah Harga Ket. Total Biaya KDN
TKDN (%)
a. Tenaga
- Pekerja Oh 0,3200 70.000,00 22.400,00 100,00 WNI 2 2.400,00
- Tukang Oh 0,1000 80.000,00 8.000,00 100,00 WNI 8.000,00
- Mandor Oh 0,0150 100.000,00 1.500,00 100,00 WNI 1.500,00
Jumlah a 31.900,00 3 1.900,00
b. Bahan
- Batu Bata Merah Bh 70,0000 1.100,00 77.000,00 100,00 WNI 7 7.000,00
- Semen Kg 11,5000 1.655,37 19.036,81 92,16 TKDN Kemenperin 1 7.544,32
- Pasir m3 0,0430 267.551,71 11.504,72 100,00 WNI 1 1.504,72
Jumlah b 107.541,53 1 06.049,05
c. Alat
Jumlah c - -
Jumlah a+b+c 139.441,53 1 37.949,05
Biaya Umum dan Keuntungan (15%) 20.916,23 2 0.692,36
Harga Satuan Pekerjaan 160.357,76 98,93 1 58.641,40
2
1 m Plesteran (1pc : 4pp)
Nilai
Uraian Satuan Koefisien Harga Satuan Jumlah Harga Ket. Total Biaya KDN
TKDN (%)
a. Tenaga
- Pekerja Oh 0,3000 70.000,00 21.000,00 100,00 WNI 2 1.000,00
- Tukang Oh 0,1500 80.000,00 12.000,00 100,00 WNI 1 2.000,00
- Kepala Tukang Oh 0,0150 90.000,00 1.350,00 100,00 WNI 1.350,00
- Mandor Oh 0,0300 100.000,00 3.000,00 100,00 WNI 3.000,00
Jumlah a 37.350,00 3 7.350,00
b. Bahan
- Semen Kg 4,4500 1.655,37 7.366,42 92,16 TKDN Kemenperin 6.788,89
- Pasir m3 0,0180 267.551,71 4.815,93 100,00 WNI 4.815,93
Jumlah b 12.182,35 1 1.604,82
c. Alat
Jumlah c - -
Jumlah a+b+c 49.532,35 4 8.954,82
Biaya Umum dan Keuntungan (15%) 7.429,85 7.343,22
Harga Satuan Pekerjaan 56.962,20 98,83 5 6.298,04
2
1 m Acian
Nilai
Uraian Satuan Koefisien Harga Satuan Jumlah Harga Ket. Total Biaya KDN
TKDN (%)
a. Tenaga
- Pekerja Oh 0,2000 70.000,00 14.000,00 100,00 WNI 1 4.000,00
- Tukang Oh 0,1000 80.000,00 8.000,00 100,00 WNI 8.000,00
- Kepala Tukang Oh 0,0100 90.000,00 900,00 100,00 WNI 900,00
- Mandor Oh 0,0200 100.000,00 2.000,00 100,00 WNI 2.000,00
Jumlah a 24.900,00 2 4.900,00
b. Bahan
- Semen Kg 3,2500 1.655,37 5.379,97 92,16 TKDN Kemenperin 4.958,18
Jumlah b 5.379,97 4.958,18
c. Alat
Jumlah c - -
Jumlah a+b+c 30.279,97 2 9.858,18
Biaya Umum dan Keuntungan (15%) 4.542,00 4.478,73
Harga Satuan Pekerjaan 34.821,96 98,61 3 4.336,90
2
1 m Cat Tembok ( 1 lapis Plamir, 1 lapis Cat Dasar, 2 lapis Cat Penutup)
Nilai
Uraian Satuan Koefisien Harga Satuan Jumlah Harga Ket. Total Biaya KDN
TKDN (%)
a. Tenaga
- Pekerja Oh 0,0250 70.000,00 1.750,00 100,00 WNI 1.750,00
- Tukang Oh 0,0630 80.000,00 5.040,00 100,00 WNI 5.040,00
- Kepala Tukang Oh 0,0063 90.000,00 567,00 100,00 WNI 567,00
- Mandor Oh 0,0063 100.000,00 630,00 100,00 WNI 630,00
Jumlah a 7.987,00 7.987,00
b. Bahan
- Plamur Tembok Kg 0,100 25.000,00 2.500,00 100,00 TKDN Kemenperin 2.500,00
- Cat Dasar Kg 0,120 75.000,00 9.000,00 100,00 TKDN Kemenperin 9.000,00
- Cat Penutup 2x Kg 0,260 75.000,00 19.500,00 100,00 TKDN Kemenperin 1 9.500,00
-
Jumlah b 31.000,00 3 1.000,00
c. Alat
Jumlah c - -
Jumlah a+b+c 38.987,00 3 8.987,00
Biaya Umum dan Keuntungan (15%) 5.848,05 5.848,05
Harga Satuan Pekerjaan 44.835,05 100,00 4 4.835,05
ANALISA HARGA SATUAN
1 m3 Galian Tanah Biasa Sedalam ≤ 1 m
Nilai TKDN
Uraian Satuan Koefisien Harga Satuan Jumlah Harga Ket. Total Biaya KDN
(%)
a. Tenaga
- Pekerja Oh 0,7500 70.000,00 52.500,00 1 00,00 WNI 52.500,00
- Mandor Oh 0,0250 100.000,00 2.500,00 1 00,00 WNI 2.500,00
Jumlah a 55.000,00 55.000,00
b. Bahan
- -
Jumlah b -
c. Alat
- Alat Bantu -
Jumlah c - -
Jumlah a+b+c 55.000,00 55.000,00
Biaya Umum dan Keuntungan (15%) 8.250,00 8.250,00
Harga Satuan Pekerjaan 63.250,00 1 00,00 63.250,00
1 m3 Galian Tanah Cadas / Tanah Keras Sedalam ≤ 1 m
Nilai TKDN
Uraian Satuan Koefisien Harga Satuan Jumlah Harga Ket. Total Biaya KDN
(%)
a. Tenaga
- Pekerja Oh 1,5000 70.000,00 105.000,00 1 00,00 WNI 105.000,00
- Mandor Oh 0,0600 100.000,00 6.000,00 1 00,00 WNI 6.000,00
Jumlah a 111.000,00 111.000,00
b. Bahan
- -
Jumlah b -
c. Alat
- Alat Bantu -
Jumlah c - -
Jumlah a+b+c 111.000,00 111.000,00
Biaya Umum dan Keuntungan (15%) 16.650,00 16.650,00
Harga Satuan Pekerjaan 127.650,00 1 00,00 127.650,00
1 m3 Timbunan Tanah Atau Urugan Kembali Galian Tanah
Nilai TKDN
Uraian Satuan Koefisien Harga Satuan Jumlah Harga Ket. Total Biaya KDN
(%)
a. Tenaga
- Pekerja Oh 0,5000 70.000,00 35.000,00 1 00,00 WNI 35.000,00
- Mandor Oh 0,0500 100.000,00 5.000,00 1 00,00 WNI 5.000,00
Jumlah a 40.000,00 40.000,00
b. Bahan
- -
Jumlah b -
c. Alat
- Alat Bantu -
Jumlah c - -
Jumlah a+b+c 40.000,00 40.000,00
Biaya Umum dan Keuntungan (15%) 6.000,00 6.000,00
Harga Satuan Pekerjaan 46.000,00 1 00,00 46.000,00
1 m3 Timbunan Pasir Sebagai Bahan Pengisi
Nilai TKDN
Uraian Satuan Koefisien Harga Satuan Jumlah Harga Ket. Total Biaya KDN
(%)
a. Tenaga
- Pekerja Oh 0,3000 70.000,00 21.000,00 1 00,00 WNI 21.000,00
- Mandor Oh 0,0100 100.000,00 1.000,00 1 00,00 WNI 1.000,00
Jumlah a 22.000,00 22.000,00
b. Bahan
- Pasir m3 1,2000 267.551,71 321.062,05 1 00,00 321.062,05
Jumlah b 321.062,05 321.062,05
c. Alat
- Alat Bantu -
Jumlah c - -
Jumlah a+b+c 343.062,05 343.062,05
Biaya Umum dan Keuntungan (15%) 51.459,31 51.459,31
Harga Satuan Pekerjaan 394.521,35 1 00,00 394.521,35
ANALISA HARGA SATUAN
pembesian 10 kg dengan besi polos/besi ulir
Nilai TKDN
Uraian Satuan Koefisien Harga Satuan Jumlah Harga Ket. Total Biaya KDN
(%)
a. Tenaga
- Pekerja Oh 0,0700 70.000,00 4.900,00 100,00 4.900,00
WNI
- Tukang Besi Oh 0,0700 80.000,00 5.600,00 100,00 5.600,00
WNI
- Kepala Tukang Oh 0,0070 90.000,00 630,00 100,00 630,00
WNI
- Mandor Oh 0,0040 100.000,00 400,00 100,00 400,00
WNI
Jumlah a 11.530,00 1 1.530,00
b. Bahan
- Besi Beton Polos Kg 10,5000 21.519,69 225.956,75 55,77 1 26.016,08
TKDN Kemenperin
- Kawat Ikat Kg 0,1500 30.118,38 4.517,76 71,65 3.236,97
TKDN Kemenperin
Jumlah b 230.474,51 1 29.253,05
Jumlah a+b 242.004,51 1 40.783,05
Biaya Umum dan Keuntungan (15%) 36.300,68 2 1.117,46
Harga Satuan Pekerjaan 278.305,18 58,17 1 61.900,51
1 m2 Pasang Begisting Beton
Nilai TKDN
Uraian Satuan Koefisien Harga Satuan Jumlah Harga Ket. Total Biaya KDN
(%)
a. Tenaga
- Pekerja Oh 0,5200 70.000,00 36.400,00 100,00 3 6.400,00
WNI
- Tukang Kayu Oh 0,2600 80.000,00 20.800,00 100,00 2 0.800,00
WNI
- Kepala Tukang Oh 0,0260 90.000,00 2.340,00 100,00 2.340,00
WNI
- Mandor Oh 0,0260 100.000,00 2.600,00 100,00 2.600,00
WNI
Jumlah a 62.140,00 6 2.140,00
b. Bahan
- Tripleks Tebal 9 mm lbr 0,3500 154.634,14 54.121,95 100,00 5 4.121,95
TKDN Kemenperin
- Kaso 5/7 m3 0,0150 3.431.707,17 51.475,61 100,00 5 1.475,61
TKDN Kemenperin
- Minyak Begisting ltr 0,2000 33.000,00 6.600,00 100,00 6.600,00
TKDN Kemenperin
- Paku Kg 0,3000 22.000,00 6.600,00 58,68 3.872,88
TKDN Kemenperin
Jumlah b 118.797,56 1 16.070,44
c. Alat
Jumlah c - -
Jumlah a+b+c 180.937,56 1 78.210,44
Biaya Umum dan Keuntungan (15%) 27.140,63 2 6.731,57
Harga Satuan Pekerjaan 208.078,19 98,49 2 04.942,00
Membuat 1m3 beton mutu f'c =16,9 Mpa ( k200 ) slump (12± 2)cm,w/c=0,61 adukan 1pc : 2psr : 3krkl
Nilai TKDN
Uraian Satuan Koefisien Harga Satuan Jumlah Harga Ket. Total Biaya KDN
(%)
a. Tenaga
- Pekerja Oh 1,6500 70.000,00 115.500,00 100,00 1 15.500,00
WNI
- Tukang Oh 0,2750 80.000,00 22.000,00 100,00 2 2.000,00
WNI
- Kepala Tukang Oh 0,0280 90.000,00 2.520,00 100,00 2.520,00
WNI
- Mandor Oh 0,0830 100.000,00 8.300,00 100,00 8.300,00
WNI
Jumlah a 148.320,00 1 48.320,00
b. Bahan
- Semen PC ( 40 Kg ) Zak 8,8000 66.214,98 582.691,85 92,16 5 37.008,81
TKDN Kemenperin
- Pasir Beton m3 0,7310 267.551,71 195.580,30 100,00 1 95.580,30
TKDN Kemenperin
- Batu Kerikil 2/3 m3 1,0310 505.774,09 521.453,08 100,00 5 21.453,08
TKDN Kemenperin
- Air ltr 215,0000 3 00,00 64.500,00 100,00 6 4.500,00
TKDN Kemenperin
Jumlah b 1 .364.225,23 1.318.542,19
c. Alat
Jumlah c - -
Jumlah a+b+c 1 .512.545,23 1.466.862,19
Biaya Umum dan Keuntungan (15%) 226.881,78 2 20.029,33
Harga Satuan Pekerjaan 1 .739.427,01 96,98 1.686.891,51
Membuat 1m3 beton mutu f'c =9,8 Mpa ( k125 ) slump (12± 2)cm, adukan 1pc : 3psr : 5krkl
Nilai TKDN
Uraian Satuan Koefisien Harga Satuan Jumlah Harga Ket. Total Biaya KDN
(%)
a. Tenaga
- Pekerja Oh 1,6500 70.000,00 115.500,00 100,00 1 15.500,00
WNI
- Tukang Oh 0,2750 80.000,00 22.000,00 100,00 2 2.000,00
WNI
- Kepala Tukang Oh 0,0280 90.000,00 2.520,00 100,00 2.520,00
WNI
- Mandor Oh 0,0830 100.000,00 8.300,00 100,00 8.300,00
WNI
Jumlah a 148.320,00 1 48.320,00
b. Bahan
- Semen PC ( 40 Kg ) Zak 6,9000 66.214,98 456.883,38 92,16 4 21.063,72
TKDN Kemenperin
- Pasir Beton m3 0,8280 267.551,71 221.532,81 100,00 2 21.532,81
TKDN Kemenperin
- Batu Kerikil 2/3 m3 1,0120 505.774,09 511.843,38 100,00 5 11.843,38
TKDN Kemenperin
- Air ltr 215,0000 3 00,00 64.500,00 100,00 6 4.500,00
TKDN Kemenperin
Jumlah b 1 .254.759,57 1.218.939,91
c. Alat
Jumlah c - -
Jumlah a+b+c 1 .403.079,57 1.367.259,91
Biaya Umum dan Keuntungan (15%) 210.461,94 2 05.088,99
Harga Satuan Pekerjaan 1 .613.541,50 97,45 1.572.348,90
Membuat 1m3 beton mutu f'c =19,3 Mpa ( k225 ) slump (12± 2)cm, adukan 1pc : 2psr : 3krkl
Nilai TKDN
Uraian Satuan Koefisien Harga Satuan Jumlah Harga Ket. Total Biaya KDN
(%)
a. Tenaga
- Pekerja Oh 1,6500 70.000,00 115.500,00 100,00 1 15.500,00
WNI
- Tukang Oh 0,2750 80.000,00 22.000,00 100,00 2 2.000,00
WNI
- Kepala Tukang Oh 0,0280 90.000,00 2.520,00 100,00 2.520,00
WNI
- Mandor Oh 0,0830 100.000,00 8.300,00 100,00 8.300,00
WNI
Jumlah a 148.320,00 1 48.320,00
b. Bahan
- Semen PC ( 40 Kg ) Zak 9,2750 66.214,98 614.143,96 92,16 5 65.995,08
TKDN Kemenperin
- Pasir Beton m3 0,6980 267.551,71 186.751,09 100,00 1 86.751,09
TKDN Kemenperin
- Batu Kerikil 2/3 m3 1,0470 505.774,09 529.545,47 100,00 5 29.545,47
TKDN Kemenperin
- Air ltr 215,0000 3 00,00 64.500,00 100,00 6 4.500,00
TKDN Kemenperin
Jumlah b 1 .394.940,52 1.346.791,64
c. Alat
Jumlah c - -
Jumlah a+b+c 1 .543.260,52 1.495.111,64
Biaya Umum dan Keuntungan (15%) 231.489,08 2 24.266,75
Harga Satuan Pekerjaan 1 .774.749,60 96,88 1.719.378,38
pembesian 10 kg besi Siku 5x5x0,5
Nilai TKDN
Uraian Satuan Koefisien Harga Satuan Jumlah Harga Ket. Total Biaya KDN
(%)
a. Tenaga
- Pekerja Oh 0,0700 70.000,00 4.900,00 100,00 4.900,00
WNI
- Tukang Besi Oh 0,0700 80.000,00 5.600,00 100,00 5.600,00
WNI
- Kepala Tukang Oh 0,0070 90.000,00 630,00 100,00 630,00
WNI
- Mandor Oh 0,0040 100.000,00 400,00 100,00 400,00
WNI
Jumlah a 11.530,00 1 1.530,00
b. Bahan
- Besi siku 5x5x0,5 Kg 10,5000 13.777,78 144.666,67 -
TKDN Kemenperin
-
Jumlah b 144.666,67
c. Alat
- Mesin Las Hari 0,0190 787.570,74 14.963,84 45,00 6.733,73
TKDN Kemenperin
Jumlah c 14.963,84 6.733,73
Jumlah a+b+c 171.160,51 1 8.263,73
Biaya Umum dan Keuntungan (15%) 25.674,08 2.739,56
Harga Satuan Pekerjaan 196.834,59 10,67 2 1.003,29