| 0311944797409000 | Rp 1,021,767,801 | |
| 0669320590922000 | Rp 932,541,629 | |
| 0315635102922000 | Rp 924,475,926 | |
PT Andalan Electrical Consultan | 09*7**0****22**0 | - |
| 0017682162921000 | - | |
Tierta Agung Komodo | 04*6**1****24**0 | - |
| 0027483502008000 | - | |
PT Dewa Cahaya Gorontalo | 07*0**8****22**0 | - |
PT Sekring Electrical Teknik | 04*6**0****23**0 | - |
| 0906984653005000 | - | |
PT Layanan Satu Pintu | 06*8**9****22**0 | - |
| 0934777665303000 | - | |
PT Sultan Maju Mandiri | 06*6**6****22**0 | - |
| 0017683244921000 | - | |
Pancamanunggal Kapti Engineering | 00*5**5****09**0 | - |
| 0935468157614000 | - | |
CV Adonara Power Engineering | 0421467820922000 | - |
CV Virsal Teknik | 09*5**4****21**0 | - |
| 0869218289923000 | - | |
| 0017338971921000 | - | |
| 0667084800922000 | - | |
| 0011134491921000 | - | |
| 0803825413921000 | - | |
| 0846468437024000 | - | |
PT Lingkar Bumi Perkasa | 04*7**0****24**0 | - |
PT Karya Anak Lewotana | 06*1**1****22**0 | - |
| 0942128992922000 | - |
URAIAN KERJA
PENERANGAN JALAN DAN PEKERJAAN ELEKTRIKAL PENGADAAN
LAMPU JALAN
1. RINCIAN PEKERJAAN
NO U R A I A N PEKERJAAN
A. PEKERJAAN UMUM & PERSIAPAN
1 Mobilisasi/Demobilisasi Alat dan Tenaga
2 Administrasi dan Dokumentasi
3 K3
4 Penyediaan Air Kerja
5 Pengukuran / Pematokan
6 Papan Nama Proyek
B. PEKERJAAN TANAH
1 Pekerjaan Galian Pondasi
C. PEKERJAAN STRUKTUR
1 Pekerjaan Pondasi Camp. 1 pc : 2 psr : 3 krl
- Pekerjaan Beton K-250
- Pekerjaan Besi Angker
PEKERJAAN PENGADAAN DAN PEMASANGAN TIANG DAN LED
D.
SOLAR CELL
I 1 LENGAN+ ACECORIS (ALL IN ONE)
1 Solar Panel 60 WP Mono Crystalline
2 Lampu LED 30 Watt
3 Battery Module 12.8V 24 AH Li Fe Po 4
4 Output Voltage 12V DC Protection Class IP66
Tiang bulat Hot Deep Galvanis diameter 4 Inchi, ketebalan 2,9 mm, H
5
= 7 m
Mbay, 20 Juni 2023
PEJABAT PEMBUAT KOMITMEN
ALOISIUS RAI, A.Md
NIP. 19680117 199703 1 006