| Reason | |||
|---|---|---|---|
| 0033034026307000 | Rp 2,044,204,277 | - | |
| 0937474187401000 | - | - | |
| 0824485072015000 | Rp 1,999,060,050 | Tidak memenuhi persyaratan kualifikasi | |
| 0601974165015000 | - | - | |
PT Nareswara Kreasi Indonesia | 09*4**4****06**0 | - | - |
CV Alittifaqiah Press | 09*7**3****12**0 | - | - |
CV Bintang Samudra | 00*9**7****06**0 | - | - |
| 0024483620002000 | - | - | |
CV Ridho Putra Irama | 09*8**0****02**0 | - | - |
| 0030149751407000 | - | - |
SPESIFIKASI TEKNIS
PROGRAM : PENYULUHAN PERTANIAN
KEGIATAN : PELAKSANAAN PENYULUHAN PERTANIAN
SUB KEGIATAN : PENGEMBANGAN KAPASITAS KELEMBAGAAN PETANI DI KECAMATAN
DAN DESA
PEKERJAAN : JASA PENYELENGARAAN ACARA (PELAKSANAAN PEKAN DAERAH
(PEDA) KONTAK TANI NELAYAN ANDALAN (KTNA) TINGKAT PROVINSI
SUMATERA SELATAN
OPD : DINAS PERTANIAN KABUPATEN OKU TIMUR
SUMBER DANA : APBD KABUPATEN OKU TIMUR
TAHUN ANGGARAN : 2023
BENTUK
NO ITEM VOLUME SPESIFIKASI
KEGIATAN
1 PEDA A PAREDE / DEFILE PESERTA
KTNA XV - TIANG BENDERA/PATAKA 20 pcs Kayu Kaso Bulat
Bahan Triplek Finishing
- PAPAN NAMA KONTINGEN 17 pcs
Stiker
B PUBLIKASI
- PUBLIKASI MEDIA 5 MEDIA Media Online
- CETAK BALIHO / BILLBOARD 1 PAKET Bahan Flexy China
C DEKORASI
Bahan Triplek, Finishing
UNIT
- DEKORASI PANGGUNG UTAMA 1 Flexy China
Bahan Triplek, Finishing
UNIT
- DEKORASI GERBANG UTAMA 2 Flexy China
- DEKORASI TAMAN PANGGUNG UNIT Bunga Pot, Bunga Potong
UTAMA 1 Kombinasi Sayur & Buah
Bahan Triplek, Finishing
UNIT
- DEKORASI LANDMARK AREA 1 Flexy China
D SEWA PERLENGKAPAN ACARA
UNIT Tenda Plafon Putih, Rumbai
- TENDA SEMI Tratak VIP ( PESERTA )30 tenda satu warna
Tenda Plafon Sentris,
UNIT
- TENDA Tratak VIP ( TAMU VIP ) 8 Rumai tenda dua warna
Tenda Kerucut Tutup
UNIT
- TENDA SARNAVILE 5 X 5 M 3 Keliling
M2
- TENDA RODERS 20 X 40 M 800 Tenda Roders Tutup Keliling
M2
- PANGGUNG RIGGING 20 X 10 200 Rigging Uk Balok 40 x 40 cm
Kursi Plastik Standar,
UNIT
- KURSI PLASTIK + SARUNG 1500 Sarung warna putih
Kursi Tumpuk Standar,
UNIT
- KURSI TUMPUK + SARUNG 200 Sarung Ketat
- KURSI JATI VIP 30 UNIT Kursi Single Seater
Meja Single Seater Uk 60 x
UNIT
- MEJA VIP 20 60 cm
Bahan Triplek, rangka kayu
M2
- FLOORING VIP 200 kelas 3
Bahan Triplek, rangka kayu
M2
- FLOORING RODERS 600 kelas 3
Bahan Triplek, rangka kayu
M2
- FLOORING BACKSTAGE 75 kelas 3
- KARPET 875 M2 Karpet Lantai Meteran
UNIT Mesin Perkin atau Setara,
- GENSET 100 KVA Panggung 3 bukan mesin China
UNIT Mesin Perkin atau Setara,
- GENSET 250 KVA Tenda Roder 1 bukan mesin China
UNIT Krisbow atau setara,
- BLOWER/WATER FAN 15 Mobile Humidifier 26", 60 L
Toshiba, panasonic atau
UNIT
- AC 5 PK Tenda Roder 20 setara
Toshiba, panasonic atau
UNIT
- AC 5 PK Tenda Tratak 6 setara
- LED VIDEOTRON 24 M2 LED Panel P 3.9 Outdoor
6 input HDMI & SDI, 5
UNIT
- MIXER VIDEO 1 output HDMI & SDI
Multicam full HD 1920 x
UNIT
- MULTI KAMERA FULL HD 3 1080, 12x zoom
- LAPTOP 2 UNIT Core i7
Parled 120, Moving,
SET
Freshnell, Minibrute,
- LIGHTING SYSTEM 1 Gunsmoke, Digital Console
- KEMBANG API STAGE / PYRO TEKNIK1 SET Kembang api dingin
- RIGGING GAWANGAN 1 SET Uk. Balok 40 x 40 cm
PA System 25.000 Watt,
SET
- SOUND SYSTEM 25.000 WATT 1 Digital Console
- ALAT BAND STANDAR ARTIS 1 SET Request by Rider Artis
- SOUND SYSTEM 10.000 WATT 1 SET PA System 10.000 Watt
2 Speaker Aktif, Mixer 4
SET
- SOUND SYSTEM 2.000 WATT 6 Channel, 2 Mic Wireless
MCB 2 A + Stop Kontak 2
UNIT
- INSTALASI LISTRIK STAN 50 Mata
UNIT
- LAMPU TENDA 20 Bola Lampu Cahaya Putih
- LAMPU PENERANGAN AREA 6 UNIT HPIT LED 300 Watt
Portable Toilet Bahan
UNIT
- TOILET VVIP 2 Fiberglass
Bahan Besi Hollo Tinggi 150
M
- BARIKADE 200 cm
E DOKUMENTASI
Foto Tanpa Edit & Video
PAKET
- DOKUMENTASI FOTO & VIDEO 1 Aftermovie
F SERAGAM
Celana Training dan Kaos T-
PCS
- PAKAIAN OLAHRAGA SET 300 Shirt
- BAJU BATIK 300 PCS Baju Batik Standar
PCS
- ROMPI 200 Rompi Standar, logo bordir
- BATIK KEPALA DAERAH &
PCS
OPD/PEJABAT LAINNYA 100 Hanya bahan tanpa jahit
G HIBURAN
Laki-laki & Perempuan,
ORANG Berpengalaman untuk
- MASTER OF CEREMONY OPENING 2 Acara Nasional
GROUP
- ARTIS NASIONAL 1 Persetujuan dengan panitia
Melibatkan Siswa Siswi di
ORANG
- TARIAN KOLOSAL 30 OKU Timur
H MAN POWER
- PROJECT MANAGER 1 ORANG
- HEAD PRODUCTION 1 ORANG
- PRODUCTION CREW 4 ORANG
- LOGISTIC KOORDINATOR 1 ORANG
- LOGISTIC CREW 2 ORANG
- HOSPITALITY TEAM 2 ORANG
- SHOW MANAGEMENT 1 TEAM
- INSTRUKTUR TARI KOLOSAL 1 TEAM
- INTERNAL SECURITY 4 PERSON
I KONSUMSI
PAX 3 Kue kombinasi manis dan
- SNACK VIP 500 asin, air mineral, box
1 Lauk, 1 Sayur, Sambal,
Porsi Buah, air mineral,
- MAKAN VIP 500 Prasmanan
PAX 3 Kue kombinasi manis dan
- SNACK 6000 asin, air mineral, box
1 Lauk, 1 Sayur, Sambal,
PAX
- MAKAN 6000 Buah, air mineral, box
Ditetapkan di : Martapura
Tanggal : April 2023
Pejabat Pembuat Komitmen,
JUNI, SP, M.E.P
NIP. 197312042006041001| Authority | |||
|---|---|---|---|
| 10 September 2019 | Penggerakan Masyarakat Di 3 (Tiga) Kabupaten | Provinsi Sumatera Selatan | Rp 1,500,000,000 |
| 13 November 2020 | Pengadaan Peralatan Dan Perlengkapan Kantor Keperluan Badan Pengawas Pemilu (Bawaslu) Prov. Sumsel | Provinsi Sumatera Selatan | Rp 1,370,000,000 |
| 28 October 2021 | Belanja Jasa Penyelenggaraan Acara ( Pelaksanaan Pekan Olahraga Tingkat Provinsi (Porprov Ke Xiii)) | Kab. Ogan Komering Ulu Timur | Rp 1,136,050,000 |
| 28 August 2019 | Rehabilitasi Gedung Biro Umum Dan Perlengkapan Prov. Sumsel | Pemerintah Daerah Provinsi Sumatera Selatan | Rp 600,000,000 |