CV Fauzan Zee Roks | 03*1**8****03**0 | - |
| 0960980837205000 | Rp 846,495,690 | |
| 0024954216201000 | Rp 931,200,000 | |
| 0752140301205000 | Rp 903,942,400 | |
| 0031953466202000 | Rp 940,823,853 | |
| 0020123238202000 | Rp 898,623,294 | |
| 0749601340202000 | - | |
| 0438742348201000 | - | |
| 0026688473203000 | - | |
PT Nadya Ratu Permata | 09*2**4****05**0 | - |
| 0024215386203000 | - | |
| 0030754535201000 | - | |
| 0022437610201000 | - | |
| 0929446540203000 | - | |
| 0018008854203000 | - | |
| 0011161627201000 | - | |
CV Moyang Mendaluh | 08*9**5****05**0 | - |
| 0719009722201000 | - | |
| 0605428929205000 | - | |
Permata Emas Berlian | 06*7**1****48**0 | - |
Azli Karya | 06*0**9****05**0 | - |
| 0941367161205000 | - | |
PT Multimedia Kreatif Sejahtera | 10*1**1****34**3 | - |
| 0032007346311000 | - | |
| 0716533872103000 | - | |
| 0012672770204000 | - | |
| 0316039114202000 | - | |
PT Indo Trans Konstruksi | 08*8**7****07**0 | - |
CV Nuansa Cipta Mandiri | 09*9**9****01**0 | - |
| 0313924029201000 | - | |
| 0939721262201000 | - | |
| 0717721930201000 | - | |
CV Rinzi Karya Mandiri | 00*9**4****05**0 | - |
| 0719897951201000 | - | |
| 0748661824205000 | - | |
| 0750262107205000 | - |
Analisa El - 119
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
ITEM PEMBAYARAN NO. : 1.19
JENIS PEKERJAAN : Keselamatan Dan Kesehatan Kerja (Keselamatan Konstruksi)
SATUAN PEMBAYARAN : Lump Sum
PERKIRAAN HARGA JUMLAH
No. U R A I A N SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)
A. DATA DAN ASUMSI PERMEN No.21/PRT/2019
1 Pekerjaan Jalan dan Jembatan
Nilai Pekerjaan Jalan Asumsi Rp
Nilai Pekerjaan Jembatan Asumsi Rp
2 Jangka Waktu Pekerjaan Jalan Merujuk Ke Masa Pelaksanaan Bulan
Jangka Waktu Pekerjaan Jembatan Merujuk Ke Masa Pelaksanaan Bulan
3 Penyuluhan Penanggulangan HIVAIDS Jika disebutkan dalam kontrak Org
3 Alat Pelindung Kerja (APK) dan Alat Pelindung Diri (APD)
Alat Pelindung Kerja (APK)antara lains:
a Jaring pengaman (Safety Net) Sesuai kebutuhan Ls
b Tali keselamatan (Life Line) Sesuai kebutuhan Ls 1
c Penahan Jatuh (Safety Deck) Sesuai kebutuhan Ls
d Pagar pengaman (Guard Railling) Sesuai kebutuhan Ls
e Pembatas Area (Restricted Area) Sesuai kebutuhan Ls 1
Alat Pelindung Diri (APD) terdiri atas:
a Topi pelindung (Safety helmet) Pekerja, Staf, dan Tamu Buah 5
b Pelindung mata (Goggles, Spectacles) Sesuai Kebutuhan Psg
c Tameng muka (Face shield) Sesuai Kebutuhan Buah 2
d Pelindung pernafasan dan mulut (Masker) Sesuai Kebutuhan Box
e Sarung tangan (Safety gloves) Sesuai Kebutuhan Psg 5
f Sepatu keselamatan (Safety shoes) Pekerja, Staf, dan Tamu Psg 5
g Penunjang seluruh tubuh (Full bodu harnessS)esuai Kebutuhan Buah 2
h Rompi keselamatan (Safety vest) Sesuai Kebutuhan Buah 5
i Celemek (A[ron/coveralls) Sesuai Kebutuhan Buah
k Pelindung jatuh (Fall arrester) Sesuai Kebutuhan Buah
C TOTAL BIAYA KESELAMATAN DAN KESEHATAN KERJA
D OVERHEAD & PROFIT 0.00 % x D PERMEN No.21/PRT/2019
E HARGA SATUAN PEKERJAAN ( C+D )
Catatan : 1. Perkiraan Kuantitas harus disesuaikan dengan kebutuhan di lapangan yang berpedoman pada PERMEN No.21/PRT/2019
2. Harga perlu disesuaikan dengan harga terbaru, termasuk biaya personil
3. Yang dimaksud dengan konsultansi dengan Ahli terkait keselamatan konstruksi termasuk pakar dan praktisi
Analisa EI-742
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK :
No. PAKET KONTRAK : Penyelenggaraan Jalan Kabupaten/Kota
NAMA PAKET : Perencanaan DED Rehab Jembatan Gantung Luhung
-
PROP / KAB / KODYA : Prov. Sumatera Barat/ Kab. Pesisir Selatan
ITEM PEMBAYARAN NO. : 7.4.(2) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Pek. Baja Struktur TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : Kg % THD. BIAYA PROYEK :
PERKIRAAN HARGA JUMLAH
NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)
A. TENAGA
1. Pekerja Biasa (L01) jam 0.0350 0.00
2. Tukang (L02) jam 0.0233 0.00
3. Mandor (L03) jam 0.0117 0.00
JUMLAH HARGA TENAGA 0.00
B. BAHAN
1. Baja Konstruksi (M63) Kg 1.0250 0.00
2. Kawat Las (M14) Kg 0.0700 0.00
3. Cat Galvanize M136 Kg 0.0816
JUMLAH HARGA BAHAN 0.00
C. PERALATAN
1. WELDING SET + GENSET Jam 0.0200 0.00
JUMLAH HARGA PERALATAN 0.00
D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 0.00
E. OVERHEAD & PROFIT 10.0 % x D 0.00
F. HARGA SATUAN PEKERJAAN ( D + E ) 0.00
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
ITEM PEMBAYARAN NO. : 7.4.(2) Analisa EI-742
JENIS PEKERJAAN : Pek. Baja Struktur
SATUAN PEMBAYARAN : Kg URAIAN ANALISA HARGA SATUAN
No. U R A I A N KODE KOEF. SATUAN KETERANGAN
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (besi dan kawat) diterima seluruhnya
di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Faktor Kehilangan Besi Tulangan Fh 1.025
II. URUTAN KERJA
1 Baja konstruksi dipotong dan disesuaikan dengan kebutuhan
dilapangan
2 Pengelasan dan Pemasangan disesuikan dengan
Gambar Pelaksanaan dan Spesifikasi
III. PEMAKAIAN BAHAN, ALAT DAN TENAGA
1. BAHAN
1.a. Baja Konstruksi ( M63) 1.025 Kg
1.b. Kawat Las Elektroda ( M51) 0.0700 Kg
2. ALAT
WELDING SET + GENSET
Peralatan Generator Set lengkap dengan Peralatan Las
Kapasitas Prod / Jam = Kap.Prod tenaga / jam Mesin Alat Q3 50.00 Kg
Koefisien Alat / Kg = 1 : Q3 ( E20) 0.0200
2. ALAT
2.a. ALAT BANTU Ls
Diperlukan :
´- Alat Potong Baja
´- Kap Las
´- Alat Lainnya
3. TENAGA
Produksi kerja satu hari Qt 600.00 Kg
dibutuhkan tenaga : - Mandor M 1.00 orang
- Tukang Tb 2.00 orang
- Pekerja P 3.00 orang
Koefisien Tenaga / Kg :
- Mandor = ( M x Tk ) : Qt (L03) 0.0117 jam
- Tukang = ( Tb x Tk ) : Qt (L02) 0.0233 jam
- Pekerja = ( P x Tk ) : Qt (L01) 0.0350 jam
4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT
Lihat lampiran.
5. ANALISA HARGA SATUAN PEKERJAAN
Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA
SATUAN.
Didapat Harga Satuan Pekerjaan :
Note: 1
Rp. 0.00 / Kg
6. MASA PELAKSANAAN YANG DIPERLUKAN
Masa Pelaksanaan : . . . . . . . . . . . . bulan
7. VOLUME PEKERJAAN YANG DIPERLUKAN
Volume pekerjaan : 0.00 Kg.
Analisa El-717a
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK :
No. PAKET KONTRAK : Penyelenggaraan Jalan Kabupaten/Kota
NAMA PAKET : Perencanaan DED Rehab Jembatan Gantung Luhung
-
PROP / KAB / KODYA : Prov. Sumatera Barat/ Kab. Pesisir Selatan
ITEM PEMBAYARAN NO. :7.1 (7a) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN :Beton struktur fc’ 20 Mpa (Site Mix) TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN :M3 % THD. BIAYA PROYEK:
PERKIRAAN HARGA JUMLAH
NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)
A. TENAGA
1. Pekerja (L01) jam 6.8847
2. Tukang (L02) jam 1.1474
3. Mandor (L03) jam 0.5737
JUMLAH HARGA TENAGA
B. BAHAN
1. Semen (M12) Kg 334.9500
2. Pasir Beton (M01a) M3 0.7916
3. Agregat Kasar (M03) M3 0.9846
4. Kayu Perancah (M19) M3 0.1000
5. Paku (M18) Kg 0.8000
6. Air (M170) Kg 198.59
JUMLAH HARGA BAHAN
C. PERALATAN
1. Concrete Mixer (E43) jam 0.5737
2 Concrete Vibrator (E20) jam 0.5737
JUMLAH HARGA PERALATAN
D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )
E. OVERHEAD & PROFIT 10.0 % x D
F. HARGA SATUAN PEKERJAAN ( D + E )
Note: 1 Satuan dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
ITEM PEMBAYARAN N:7O..1 (7a) Analisa El-717a
JENIS PEKERJAAN :Beton struktur fc’ 20 Mpa (Site Mix)
SATUAN PEMBAYARA:MN3 URAIAN ANALISA HARGA SATUAN
No. U R A I A N KODE KOEF. SATUAN KETERANGAN
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : Struktur Jembatan
3 Bahan dasar (Agregat Kasar, Agregat Halus, Semen dan Super Plasticizer) diterima
diterima seluruhnya di lokasi pekerjaan
4 Jarak rata-rata Batching Plan ke lokasi pekerjaan L 50.00 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
Faktor Kon:v Aegrsrei gBaath Kaasar Fk AK 0.867
Lepas Ke p: aAdgartegat Halus Fk AH 0.85
6 Kadar Semen Minimum Ks 340.00 Kg/M3
Ag 19.00 mm
Wcr 0.50
6 Perbandingan Camp. : Semen Sm 330.00 Kg/M3
: Agregat Halus Ps 818.00 Kg/M3
: Agregat Kasar Kr 992.00 Kg/M3
: Air W 194.70 Kg/M3 FAS 0,590
: Super Plasticizer Plt 4.95 Kg/M3 1,5% terhadap semen
7 Berat Isi :
- Beton D1 2.20 T/M3
- Semen D2 1.13 T/M3
- Agregat Halus D3 1.31 T/M3
- Agregat Kasar D4 1.25 T/M3
- Air D5 1.00 T/M3
8 Faktor kehilangan bahan : Semen Fh1 1.02
: Agregat/Agregat Halus Fh2 1.05
II. URUTAN KERJA
1 Semen, Agregat Halus, Agregat Kasar dan Super Plasticizer ditakar dan dimuat
kedalam Concrete Batching Plant menggunakan Wheel Loader
2 Dituang kedalam Truck Mixer dan dicampur dengan air dan diaduk, kemudian dibawa
ke lokasi pekerjaan
3 Beton di-cor ke dalam bekisting yang telah disiapkan dan dipadatkan dengan Concrete Vibrator
4 Penyelesaian dan perapihan setelah pengecoran oleh pekerja secara manual
III. PEMAKAIAN BAHAN, ALAT DAN TENAGA
1. BAHAN
1.a. Semen (PC=) S m x Fh ((1,01+1,02)/2) (M12) 334.9500 Kg 1,037
1.b. Agregat Ha=l u((sP Bse/1to0n0 0 : D 3 ) x ((1,05+1,1)/2)/ Fk AH (M01a) 0.7916 M3 1,231
1.c. Agregat K=a s(a(Ar K / 1 000 : D4) x ((1,05+1,1)/2)/ Fk AK (M03) 0.9846 M3
Sesuai dengan
Gambar/Peruntukann
1.d. Kayu Perancah dan/atau Bekisting (M19) 0.1000 M3 ya
1.e. Paku = M19 x 8 (M18) 0.8000 Kg
1.f. Air = Air x Fh1 (M170) 198.5940 Ltr
1.g. Super Plastizier = Plt x Fh1 (M182) Kg
2. ALAT
2.a. CONCRETE MIXER; 500 L; 15 HP (E43)
Kapasitas Alat V 350.00 liter
Faktor Efisiensi Alat Fa 0.83 -
Waktu sikl(uTs1 +: T2 + T3 + T4) Ts
- Memuat T1 4.00 menit
- Mengaduk T2 4.00 menit
- Menuang T3 1.00 menit
- Tunggu, dll. T4 1.00 menit
Ts 10.00 menit
Kap. Prod. / jaVm x F=a x 60 Q1 1.743 M3/jam
1000 x Ts
Koefisien A =la t 1 / M: 3Q1 (E43) 0.5737 jam
2.b. CONCRETE VIBRATOR; GX 160; 5,5 HP (E20)
Kebutuhan alat penggetar beton disesuaikan dengan
kapasitas produksi alat pencdaimbuptuurh (kcaonncrete mixing plant) n vib 1 buah lihat Spesifikasi
butuh 6 bh utk 20m3
Kap. Prod. / jam = Q1 / n vib Q3 1.743 M3
Koefisien A =la t 1 / M: 3Q3 (E20) 0.5737 jam
ITEM PEMBAYARAN N:O7..1 (7a) Analisa El-717a
JENIS PEKERJAAN :Beton struktur fc’ 20 Mpa (Site Mix)
SATUAN PEMBAYARA:NM3 URAIAN ANALISA HARGA SATUAN
Lanjutan
No. U R A I A N KODE KOEF. SATUAN KETERANGAN
2.c. WATER TANK TRUCK (E23)
Volume Tanki Air V 4.00 M3
Kebutuhan air / M3 beton Wc 0.19 M3
Faktor Efiesiensi Alat Fa 0.83 -
Kapasitas pompa air Pa 100.00 liter/menit
Kap. Prod. / jpaam x =Fa x 60 Q3 26.21 M3
1000 x Wc
Koefisien A =la t 1 / M: 3Q3 (E23) 0.0382 jam
2.d. ALAT BANTU
Alat bantu lumpsum
Palu
Alat pemotong, dlsb
3. TENAGA
Produksi Beton dalam 1 hari= Tk x Q1 Qt 12.20 M3
Kebutuhan- tMenaangdao r: M 1.00 orang
- Tukang : Tb 2.00 orang
Tk batu = 1
Tk Kayu = 1
- Pekerja P 12.00 orang
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.5737 jam
- Tukang = (Tk x Tb) : Qt (L02) 1.1474 jam
- Pekerja = (Tk x P) : Qt (L01) 6.8847 jam
4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT
Lihat lampiran.
5. ANALISA HARGA SATUAN PEKERJAAN
Rp.
6. MASA PELAKSANAAN YANG DIPERLUKAN
Masa Pela…ks…an…aa…n …: …… bulan
7. VOLUME PEKERJAAN YANG DIPERLUKAN
Volume pekerjaan : 0.00 M3
PEREKAMAN ANALISA MASING-MASING HARGA
SATUAN.
Didapat Harga Satuan Pekerjaan :
/ M3
Lihat perhitungan dalam FORMULIR STANDAR UNTUK
ITEM PEMBAYARAN NO. : 7.4 (2) Analisa EI-742
JENIS PEKERJAAN : Pemasangan Baja Struktur
SATUAN PEMBAYARAN : Kg URAIAN ANALISA HARGA SATUAN
No. U R A I A N KODE KOEF. SATUAN KETERANGAN
I. ASUMSI
1 Membeli Komponen Baja Struktur dari Pabrik
(telah di coating)
2 Lokasi pekerjaan : di setiap jembatan
3 Jarak rata-rata Base camp ke lokasi pekerjaan Lp 50.00 KM
4 Jam kerja efektif per-hari Tk 7.00 jam
5 Jarak pabrik ke Lokasi Jembatan Ld2 30.00 KM
6 Berat Rangka Baja per komponen Bg 1,200.00 Kg
II. URUTAN KERJA
1 Baja disiapkan oleh pabrik dan dimuat
ke Tronton dengan biaya atas tanggungan pabrik
2 Mengangkut ke lokasi Jembatan dengan biaya
atas tanggungan Kontraktor
3 Menurunkan dari tronton menggunakan Crane dengan
biaya atas tanggungan Kontraktor
III. PEMAKAIAN BAHAN, ALAT DAN TENAGA
1. BAHAN
Sudah ada
2. ALAT
2.b. CRANE ON TRACK (75-100) T; 190 HP (E31)
Kapasitas V2 1.00 buah
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus
- Waktu penggeseran T1 20.00 menit
- Waktu Erection T2 30.00 menit
- Waktu lain-lain ( perkuatan rangka ) T3 10.00 menit
Ts1 60.00 menit
Kap. Prod. / jam = V2 x Fa x Bg x 60 Q1 996.00 Kg/jam
Ts2
Koefisien Alat / Kg = 1 : Q1 (E31) 0.0010 Jam
2. ALAT
WELDING SET + GENSET
Peralatan Generator Set lengkap dengan Peralatan Las
Kapasitas Prod / Jam = Kap.Prod tenaga / jam Mesin Alat Q3 50.00 Kg
Koefisien Alat / Kg = 1 : Q3 ( E20) 0.0200
2.b. ALAT BANTU
Lumpsum
3.
Qt 6,972.0 kg
M 1.00 orang
T 5.00 orang
P 20.00 orang
(L03) 0.0010 jam
(L02) 0.0050 jam
(L01) 0.0201 jam
4.
5.
Rp.
6. MASA PELAKSANAAN YANG DIPERLUKAN
Masa Pelaksanaan : . . . . . . . . . . . .
7. VOLUME PEKERJAAN YANG DIPERLUKAN
Volume pekerjaan : 0.00 kg
- Pekerja
HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT
Lihat lampiran.
ANALISA HARGA SATUAN PEKERJAAN
Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA
SATUAN.
Didapat Harga Satuan Pekerjaan :
/ Kg
- Tukang
= ( P x Tk ) : Qt
- Mandor
= ( Tb x Tk ) : Qt
Koefisien Tenaga / Kg :
= ( M x Tk ) : Qt
Diperlukan alat bantu kecil
- Kunci dan perlengkapannya
- Takel, tambang, Sling dan lain-lainnya.
TENAGA
Produksi Rangka baja (Prod. Crane menentukan)
Kebutuhan tenaga tambahan di lokasi :
- Mandor
- Tukang
- Pekerja
Analisa EI-742
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK :
No. PAKET KONTRAK : Penyelenggaraan Jalan Kabupaten/Kota
NAMA PAKET : Perencanaan DED Rehab Jembatan Gantung Luhung
-
PROP / KAB / KODYA : Prov. Sumatera Barat/ Kab. Pesisir Selatan
ITEM PEMBAYARAN NO. : 7.4 (2) PERKIRAAN VOL. PEK.:
JENIS PEKERJAAN : Pemasangan Baja Struktur TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : Kg % THD. BIAYA PROYEK:
PERKIRAAN HARGA JUMLAH
NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)
A. TENAGA
1. Pekerja (L01) jam 0.0010
2. Tukang (L02) jam 0.0050
3. Mandor (L03) jam 0.0201
JUMLAH HARGA TENAGA
B. BAHAN
1. Sudah ada
JUMLAH HARGA BAHAN
C. PERALATAN
1 WELDING SET + GENSET Jam 0.0200
2 Crane On Track (75-100)T; 190 HP (E07) jam 0.0010
3 Alat Bantu Ls 1.0000
JUMLAH HARGA PERALATAN
D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )
E. OVERHEAD & PROFIT 10.0 % x D
F. HARGA SATUAN PEKERJAAN ( D + E )
Note: 1 Satuan dapat atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN ; Pemasangan Kabel Baja ukuran Ø 1,5 "
SATUAN PEMBAYARAN : M1 URAIAN ANALISA HARGA SATUAN
No. U R A I A N KODE KOEF. SATUAN KETERANGAN
I. ASUMSI
1 Menggunakan cara Manual
2 Lokasi pekerjaan : sepanjang Jembatan
3 Jarak rata-rata Base camp ke lokasi pekerjaan L 5.00 Km
4 Jam kerja efektif per-hari Tk 7.00 Jam
II METHODE PELAKSANAAN
Pekerjaan pemasangan kabel jembatan dengan cara manual
III. PEMAKAIAN BAHAN, ALAT DAN TENAGA
1 Bahan
1.a Kabel Baja Ukuran Ø 1.1/2 " M113 1.00 M
2. ALAT
Alat bantu Lump Sum
3 TENAGA
Produksi Pemaangan / Hari Qt 150.00 M
Kebutuhan tenaga : - Mandor M 1.00 orang
- Tukang Tb 1.00 orang
- Pekerja P 6.00 orang
Kebutuhan tenaga : - Mandor = (Tk x M) : Qt (L.03) 0.0467 Jam
- Tukang = (Tk x Tb) : Qt (L.01) 0.0467 Jam
- Pekerja = (Tk x P) : Qt (L.01) 0.2800 Jam
4.
5.
1.
6.
Masa Pelaksanaan :
7. VOLUME PEKERJAAN YANG DIPERLUKAN
. . . . . . . . . . . .
Rp.
MASA PELAKSANAAN YANG DIPERLUKAN
bulan
PEREKAMAN ANALISA MASING-MASING HARGA
SATUAN.
Didapat Harga Satuan Pekerjaan :
/ M1
Lihat perhitungan dalam FORMULIR STANDAR UNTUK
HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT
Lihat lampiran.
ANALISA HARGA SATUAN PEKERJAAN
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
KEGIATAN -
No. PAKET KONTRAK : Penyelenggaraan Jalan Kabupaten/Kota
NAMA PAKET : Perencanaan DED Rehab Jembatan Gantung Luhung
-
PROP / KAB / KODYA : Prov. Sumatera Barat/ Kab. Pesisir Selatan
ITEM PEMBAYARAN NO. - PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Pengadaan Kabel Baja 1,5" TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M1 % THD. BIAYA PROYEK :
PERKIRAAN HARGA JUMLAH
NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)
A. TENAGA
1. Pekerja (L01) jam
2. Tukang (L02) jam
3. Mandor (L03) jam
JUMLAH HARGA TENAGA
B. BAHAN
1. Kabel Baja Ukuran Ø 1,5 " M 1.00
JUMLAH HARGA BAHAN
C. PERALATAN
3. Alat Bantu Ls 1.0000 0.00
JUMLAH HARGA PERALATAN
D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )
E. OVERHEAD & PROFIT 10.0 % x D
F. HARGA SATUAN PEKERJAAN ( D + E )
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa EI-7155
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK
No. PAKET KONTRAK : Penyelenggaraan Jalan Kabupaten/Kota
NAMA PAKET : Perencanaan DED Rehab Jembatan Gantung Luhung
PROP / KAB / KODYA : Prov. Sumatera Barat/ Kab. Pesisir Selatan
ITEM PEMBAYARAN NO. : 7.15.(5) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Pembongkaran Rangka Baja TOTAL HARGA (Rp.)
SATUAN PEMBAYARAN : LS % THD. BIAYA PROYEK:
PERKIRAAN HARGA JUMLAH
NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)
A. TENAGA
1. Pekerja (L01) Jam 1,470.0000
2. Mandor (L03) Jam 147.0000
JUMLAH HARGA TENAGA
B. BAHAN
JUMLAH HARGA BAHAN
C. PERALATAN
1. Kunci Torsi (E74) Jam 0.0000
2. Crane On Track (10-15) T; 260 HP (E07b) Jam 0.0000
3. WELDING SET + GENSET Ls 1.0000
4. Dump Truck (E08) Ls 1.0000
5. Alat Bantu Ls 1.0000
JUMLAH HARGA PERALATAN
D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )
E. OVERHEAD & PROFIT 10.0 % x D
F. HARGA SATUAN PEKERJAAN ( D + E )
Note: 1 Satuan dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.