| Reason | |||
|---|---|---|---|
| 0316950237417000 | - | - | |
| 0024843062924000 | - | - | |
| 0704229277429000 | - | - | |
| 0016089989001000 | - | - | |
PT Romlah (Rombongan Ngolah) | 09*3**0****61**0 | - | - |
| 0014690788631000 | - | - | |
| 0022083729631000 | - | - | |
| 0915271423401000 | - | - | |
CV Sinar Ivana | 08*6**8****21**0 | - | - |
| 0013642996008000 | - | - | |
| 0022918908062000 | - | - | |
| 0723832895403000 | - | - | |
| 0925265597648000 | - | - | |
CV Adi Permana | 0811451442501000 | - | - |
PT Mahakarya Megah Persada | 00*9**1****24**0 | - | - |
| 0012017711407000 | - | - | |
| 0012668406202000 | - | - | |
| 0019473826222000 | - | - | |
| 0822695656101000 | - | - | |
PT Langlang Buana Sakti Tbk | 00*2**0****01**0 | - | - |
CV Surya Sari Eltwo Mandiri | 03*4**2****05**0 | - | - |
PT Karunia Abadi Konstruksi | 0021128731403001 | - | - |
| 0844555045452000 | - | - | |
| 0839589280027000 | - | - | |
| 0022298723641000 | - | - | |
CV Herda Ripta Loka | 0027481076002000 | - | - |
| 0011361284401000 | - | - | |
| 0012413076404000 | - | - | |
PT Mangisi Makmur Sentosa | 0013944564011000 | - | - |
CV Mega Artha Jaya | 03*5**4****23**0 | - | - |
| 0317945673002000 | - | - | |
| 0014848998804000 | - | - | |
PT Surya Cipta Mandiri Utama | 00*4**5****03**0 | - | - |
| 0210544011426000 | - | - | |
Tirta Agung | 00*5**2****17**0 | - | - |
PT Torishima Guna Engineering | 00*8**9****56**0 | - | - |
PT Geo Indogreen Karya | 07*0**9****52**0 | - | - |
Aman Damai Lancar | 08*7**4****47**0 | - | - |
| 0022878391451000 | - | - | |
| 0023712888005000 | - | - | |
| 0012073615418000 | - | - | |
| 0762857977517000 | - | - | |
CV Rozaq | 06*3**7****04**0 | - | - |
| 0028746378121000 | - | - | |
| 0013955752005000 | - | - | |
PT Wira Darma Sejahtera | 07*0**7****21**0 | - | - |
PT Indomitra Jaya Prakasa | 07*9**2****11**0 | - | - |
PT Riden Jaya Konstruksi | 0023116148433000 | Rp 35,630,152,000 | - |
| 0317681088429000 | Rp 36,075,793,961 | - | |
| 0020222477019000 | - | - | |
| 0013041801027000 | - | - | |
| 0016095440025000 | Rp 35,696,362,623 | Surat Perjanjian Sewa Tidak Terekripsi Melalui Apendo | |
| 0011175692301000 | Rp 34,448,518,712 | Pekerjaan yang disubkontrakkan tidak sesuai dengan daftar subkontrakkan pada dokumen tender. | |
| 0026579979401000 | - | - | |
| 0012165767441000 | Rp 34,962,954,286 | Tidak ada metode pelaksanaan item Pekerjaan Urugan Pasir, Pekerjaan Pengadaan dan Pemasangan Pintu Air b = 1,00 m ; h = 1,00 m, Pekerjaan Pengadaan dan Pemasangan per m2 Trash Rack dengan b = 1,00 m ; Pekerjaan Timbunan Tanah Pilihan (dari Borrow Area sejauh kurang lebih 1 km) dipadatkan dengan Vibrator Roller, Pengadaan Tiang Pancang Ø30 cm menggunakan Beton K-300 termasuk pembesian, Pemancangan Tiang Pancang Ø30 cm, Pekerjaan Pengadaan dan Pemasangan Pintu Air b = 1,00 m ; h = 2,00 m, Pekerjaan Pengadaan dan Pemasangan Besi L.50.50.5, Besi Plat Kembang t = 3 mm, Besi Plat t = 10 mm, Besi CNP 10, Pipa GIP 1,5", Tangga Monyet Besi 16mm, Pipa Dinding Cl dia. 600 mm, Stub End + Flange Butfusion 600 mm, Gate Valve - 600 mm, Bend 45 - 600 mm, Pipa GI dia. 250 mm, Pekerjaan Pasangan Batu Bata, Manometer 150 mm - 10 Bar termasuk Shut Valve. Untuk Pekerjaan RUMAH GENSET DAN PENGADAAN GENSET tidak ada penjelasan metode pelaksanaan seluruh item yang ada. | |
| 0011196243437000 | Rp 35,194,406,225 | SKA Tenaga Tetap tidak sesuai dengan Subklasifikasi SBU yang disyaratkan. | |
| 0023989718031000 | Rp 35,632,092,359 | SKA Tenaga Tetap Member KSO (PT. Bangun Artha Sejahtera) tidak sesuai dengan Subklasifikasi SBU yang disyaratkan. | |
| 0312501976016000 | Rp 32,073,615,253 | Tidak memasukkan Jaminan Penawaran sesuai dengan ketentuan dan persyaratan. | |
| 0025149212631000 | Rp 37,859,197,200 | Nilai KD Tidak mencapai persyaratan minimal (3xNPT). | |
| 0016228280201000 | Rp 36,437,732,066 | Tidak melampirkan isian kualifikasi tenaga tetap yang sesuai dengan SBU, Tidak melampirkan neraca keuangan atau laporan keuangan. | |
| 0668740251609000 | Rp 35,631,251,781 | Pekerjaan yang disubkontrakkan Tidak Sesuai Dengan Yang Disyaratkan, RKK Tidak sesuai dengan yang di syaratkan, | |
| 0825646664076000 | Rp 33,226,000,000 | SKA Tenaga Tetap tidak sesuai dengan Subklasifikasi SBU yang disyaratkan. | |
| 0013604368013000 | Rp 35,617,608,377 | Tidak menyerahkan jaminan penawaran sesuai ketentuan dan persyaratan. | |
| 0026705756606000 | Rp 35,632,707,000 | Personil Manager Teknik Geodesi yang diusulkan adalah milik PT. Kartika Ekayasa., Pekerjaan yang disubkontrakkan Tidak Sesuai Dengan Yang Disyaratkan, | |
| 0012140802631000 | Rp 40,180,981,130 | Tidak menyerahkan jaminan penawaran sesuai ketentuan dan persyaratan. | |
| 0024004178211000 | Rp 34,546,963,749 | Berdasarkan hasil klarifikasi penawaran terhadap kepemilikan Surat Referensi personil manajerial Project Manager, Site Manager, dan Manager Tehnik Perpipaan dan Pompa Mekanik tidak memenuhi jumlah tahun pengalaman minimum sesuai persyaratan. | |
| 0020315800216000 | Rp 34,480,047,827 | Pada RK3K, Identifikasi Bahaya dan Rencana Tindakan item Pekerjaan kistdam tidak ada.Tidak ada penjelasan metode pelaksanaan Pekerjaan Pengadaan dan Pemasangan Pipa Dinding Cl dia. 600 , Pekerjaan Pengadaan dan Pemasangan Stub End + Flange Butfusion 600 mm, Pekerjaan Pengadaan dan Pemasangan Saringan/Screen 600 mm, Pekerjaan Pengadaan dan Pemasangan Pipa Dinding CI dia. 250 mm, Pekerjaan Pengadaan dan Pemasangan Swing Type Check Valve DN 300 mm PN 16, Ductile Iron, Pekerjaan Pengadaan dan Pemasangan Membrane Air Valve DN 80 mm dan DN 150 PN 16, Ductile Iron, Pekerjaan Pengadaan dan Pemasangan Resililent Seated Gate Valve DN 300 mm dan 600 mm PN 16, Ductile Iron, Pengadaan dan Pemasangan Elbow Steel , Rantai, Tee Y HDPE - 600 mm, Bend HDPE 45 - 600 mm, Reducer 300 mm x 600 mm, dan Manometer 150 mm - 10 Bar termasuk Shut Valve. | |
| 0026433359805000 | Rp 40,798,540,044 | Tidak menyerahkan jaminan penawaran sesuai ketentuan dan persyaratan. | |
| 0016671729701000 | Rp 32,233,836,056 | Pada RK3K penawaran, Tidak ada Sasaran Umum dan Khusus, serta Program K3 untuk Item Pekerjaan kistdam pada Pembuatan Bangunan Intake; Pek.Persiapan, Pek.Tanah dan Pondasi, Pek.Beton Bertulang, Pek.Pancang, dan Saluran Keliling Bangunan pada Pembangunan Kolam Lumpur; Pek.Penyambungan pipa HDPE sistem Compression Joint pada Pemasangan Pipa Transmisi; Pengelasan 10% dr bahan pada Pembangunan Jembatan Pipa; Control Panel MDP 4 line, Kabel NYYHY, Pemasangan Pompa submersible pada Pengadaan dan Pemasangan Pompa. | |
| 0860372002805000 | Rp 35,487,608,744 | Tidak menyerahkan jaminan penawaran sesuai ketentuan dan persyaratan. | |
| 0826601569015000 | Rp 42,203,212,889 | Pada Metode Pelaksanaan tidak ada uraian seluruh kegiatan pada PEKERJAAN PEMBANGUNAN KOLAM LUMPUR, PEKERJAAN PEMBANGUNAN JEMBATAN PIPA, PEKERJAAN RUMAH GENSET DAN PENGADAAN GENSET, PEKERJAAN RUANG POMPA DAN PERLENGKAPANNYA, PEKERJAAN RUMAH PANEL DAN RUMAH JAGA. | |
| 0011439882423000 | Rp 36,667,477,577 | Pekerjaan yang di Subkontrakkan tidak sesuai addendum dokumen, jumlah pengalaman personil untuk Project Manager dan Site Manager tidak memenuhi persyaratan minimal. | |
| 0019060284805000 | Rp 38,247,641,998 | Tidak melampirkan neraca keuangan atau laporan keuangan. | |
| 0030803654077000 | Rp 34,739,485,726 | Personil Manajerial atas nama VIVI ANI telah terkontrak pada paket Rehabilitasi Jaringan Irigasi Primer Kiri D.I.Cibaliung Kab. Pandeglang (Paket I) Tahun Anggaran 2020. | |
| 0210498051113000 | Rp 38,108,720,546 | Tidak melampirkan neraca keuangan atau laporan keuangan. | |
| 0016805632077000 | Rp 33,613,785,279 | SKA Tenaga Tetap tidak sesuai dengan Subklasifikasi SBU yang disyaratkan | |
| 0021867569044000 | Rp 33,626,928,382 | Pada RK3K item Saluran Keliling Bangunan pada Pekerjaan Pembangunan Kolam Lumpur tidak ada Sasaran Umum/Khusus serta Program K3. Pada Metode Pelaksanaan item Pekerjaan Pengadaan dan Pemasangan IWF 250.125.6.9 tidak ada. | |
| 0029340650804000 | Rp 36,033,885,477 | Pada Metode Pelaksanaan tidak ada uraian pekerjaan item baut angkur 16mm, Pekerjaan Pengadaan dan Pemasangan Profil U NP 65.42.5, Pekerjaan Pengadaan dan Pemasangan Profil IWF 294.200.8.12. | |
| 0027025261017000 | Rp 34,977,542,809 | Personil Manager Teknik Geodesi yang diusulkan adalah milik PT. Kartika Ekayasa. | |
| 0312332372421000 | Rp 37,823,378,410 | Member KSO tidak memiliki tenaga tetap dengan kualifikasi sesuai SBU. | |
| 0026140459731000 | Rp 34,022,299,644 | Kapasitas Vibrator Roller pada Surat Perjanjian Sewa kurang dari yang dipersyaratkan. | |
| 0029323490101000 | Rp 35,632,305,905 | SKA Tenaga Tetap tidak sesuai dengan Subklasifikasi SBU yang disyaratkan | |
| 0732625199106000 | Rp 35,787,133,246 | Pekerjaan yang disubkontrakkan Tidak Sesuai Dengan Yang Disyaratkan dalam dokumen tender. | |
| 0857363394445000 | - | - | |
| 0012459129527000 | - | - | |
CV Hikmah Permata Jaya | 03*1**6****35**0 | - | - |
| 0030059471307000 | - | - | |
| 0015019821401000 | - | - | |
| 0032585366104000 | - | - | |
| 0015495179701000 | - | - | |
| 0015962103034000 | - | - | |
| 0821476645411000 | - | - | |
| 0016806226701000 | - | - | |
| 0017804857308000 | - | - | |
| 0030768303941000 | - | - | |
| 0761224286322000 | - | - | |
| 0011321643419000 | - | - | |
| 0022329791322000 | - | - | |
| 0026967810031000 | - | - | |
CV Inti Berlian Bersama | 0316802636416000 | - | - |
| 0020840070424000 | - | - | |
| 0014850291331000 | - | - | |
| 0015405418061000 | - | - | |
CV Mitra Sejati Kontrator | 0021123542523000 | - | - |
PT Drajat Samudra Pasifik | 08*3**3****01**0 | - | - |
| 0907285811624000 | - | - | |
| 0012199899419000 | - | - | |
| 0020467460429000 | - | - | |
| 0317374999411000 | - | - | |
CV Jb Utama | 08*9**4****01**0 | - | - |
PT Agrotech Mitra Utama | 07*2**6****63**0 | - | - |
| 0013486048007000 | - | - | |
Kelman Infra Perkasa | 08*9**4****02**0 | - | - |
| 0802793323421000 | - | - | |
PT Sumber Amarta Jaya | 09*4**5****17**0 | - | - |
| 0018942979218000 | - | - | |
PT Inovasi Global Solusindo | 07*6**9****34**0 | - | - |
PT Cipta Sutajaya Mulya | 03*7**1****02**0 | - | - |
| 0013042155015000 | - | - | |
| 0024135105641000 | - | - | |
| 0722459070326000 | - | - | |
PT Areabangun Putra Sejati | 00*7**4****41**0 | - | - |
| 0027337427442000 | - | - | |
Anjaya Karya Makmur | 08*4**3****09**0 | - | - |
| 0021959564722000 | - | - | |
Riyah Permata Anugrah | 00*3**4****15**0 | - | - |
| 0022492326419000 | - | - | |
PT Rindang Buana Sejahtera | 07*8**9****18**0 | - | - |
Mitra Karya Bangunindo | 07*2**0****21**0 | - | - |
| 0022830418515000 | - | - | |
CV Santiadji Langgeng | 0315980896609000 | - | - |
| 0722429966331000 | - | - | |
| 0013970025023000 | - | - | |
| 0032149494328000 | - | - | |
| 0012108072423000 | - | - | |
PT Tania Mandiri Sentosa | 0019480052308000 | - | - |
| 0021225446102000 | - | - | |
| 0833829112101000 | - | - | |
Tri Tunggal | 0031085020911000 | - | - |
| 0022583348529000 | - | - | |
CV Bagas Putra | 0313760456419000 | - | - |
| 0029393501942000 | - | - | |
| 0030103360952000 | - | - | |
| 0734449416101000 | - | - | |
PT Tor Dolok Surungan | 08*2**3****02**0 | - | - |
| 0027754712518000 | - | - | |
PT Anugrah Indah Cahaya Timur | 07*4**9****23**0 | - | - |
PT Aryatama Konsultan | 0021339858723001 | - | - |
| 0210533808432000 | - | - | |
| 0756600391001000 | - | - | |
| 0012168043532000 | - | - | |
| 0826360877629000 | - | - | |
| 0016116337805000 | - | - | |
| 0011218658618000 | - | - | |
| 0022057848542000 | - | - | |
| 0023989692072000 | - | - | |
PT Riangga Jaya Utama | 0026079460451000 | - | - |
CV Daniza Karya | 0312704364201000 | - | - |
| 0033512062101000 | - | - | |
| 0709702492419000 | - | - | |
| 0021664065425000 | - | - | |
| 0021105168005000 | - | - | |
| 0032285140952000 | - | - | |
| 0864225362311000 | - | - | |
| 0019514892218000 | - | - | |
| 0662765627411000 | - | - | |
| 0018035873211000 | - | - | |
PT Riyan Dasri | 00*4**4****06**0 | - | - |
PT Jayapro Surya Abadi | 0774878265306100 | - | - |
| 0016017691811000 | - | - | |
PT Surya Mandiri Global | 00*8**9****11**0 | - | - |
| 0023836463801000 | - | - | |
PT Kia Pratama Kontrakindo | 09*2**6****09**0 | - | - |
Cahaya Bestari | 0026293175451000 | - | - |
| 0021282934432000 | - | - | |
| 0312585342404000 | - | - | |
| 0011212115503000 | - | - | |
PT Gilang Citra Persada | 0015627334804000 | - | - |
| 0863314795401000 | - | - | |
| 0732424585403000 | - | - | |
| 0908421415101000 | - | - | |
| 0742816176442000 | - | - | |
| 0027649979701000 | - | - | |
| 0838477875402000 | - | - | |
PT Sidom Kompani Grup Berkah | 08*7**8****14**0 | - | - |
Tatakarsa Kreasindo | 03*6**2****45**0 | - | - |
| 0727343311412000 | - | - | |
| 0011011350101000 | - | - | |
| 0024292047412000 | - | - | |
PT Dahlia Mutiara Utama | 0321890560442000 | - | - |
CV Ramadani | 0746616119401000 | - | - |
| 0024754517735000 | - | - | |
CV Andalas Karya | 00*0**2****15**0 | - | - |
| 0015686785609000 | - | - | |
| 0025186438403000 | - | - | |
PT Mansari Hulae Sejahtera | 08*2**8****48**0 | - | - |
| 0705671709401000 | - | - | |
CV Wijoyo Kusumo | 0703964577524000 | - | - |
| 0743342305023000 | - | - | |
| 0020131389807000 | - | - | |
| 0843113440501000 | - | - | |
| 0727849325432000 | - | - | |
Putri Moorcy Suryadi | 08*6**0****31**0 | - | - |
| 0025766411322000 | - | - | |
CV Dalisha Mandiri | 0768468316401000 | - | - |
PT Gaffari Sumber Rejeki | 00*8**3****08**0 | - | - |
| 0015140320911000 | - | - | |
CV Aster Cibodas | 02*0**0****51**0 | - | - |
| 0011310729423000 | - | - | |
| 0904715042952000 | - | - | |
| 0750130213401000 | - | - | |
| 0028087724023000 | - | - | |
| 0015499957201000 | - | - | |
| 0033127887077000 | - | - | |
| 0029548450201000 | - | - | |
| 0031410764325000 | - | - | |
PT Faustine Brantas Berkarya | 08*1**9****27**0 | - | - |
| 0317083426043000 | - | - | |
| 0028953628323000 | - | - | |
PT Aura Jagat Mandiri | 03*6**8****09**0 | - | - |
| 0709962864821000 | - | - | |
PT Trico Wana | 03*5**3****15**0 | - | - |
| 0748732336323000 | - | - | |
| 0834569725008000 | - | - | |
| 0032007056311000 | - | - | |
| 0737482463419000 | - | - | |
| 0016243164016000 | - | - | |
PT Kesayangan Karya Kontruksi | 09*4**3****08**0 | - | - |
CV Griya Ayula | 00*3**5****22**0 | - | - |
PT Borneo Jaya | 0011218516401000 | - | - |
| 0026094276609000 | - | - | |
| 0812028025401000 | - | - | |
| 0029790193016000 | - | - | |
PT Aman Abadi | 00*6**7****24**0 | - | - |
Hasil Putra Nusantara | 08*2**3****54**0 | - | - |
| 0030665574952000 | - | - | |
| 0913118659401000 | - | - | |
CV Bahri Kurniati Asiah | 00*4**9****01**0 | - | - |
PT Angkasa Mitra Abadi | 00*0**1****22**0 | - | - |
| 0708725395805000 | - | - | |
| 0847563392411000 | - | - | |
CV Matano Graha Mandiri | 0739520021805000 | - | - |
| 0019293455631000 | - | - | |
| 0015104862609000 | - | - | |
| 0018443853005000 | - | - | |
CV Wisnu Jaya | 07*0**3****01**0 | - | - |
| 0752201145914000 | - | - | |
CV Dodo Property | 07*5**6****09**0 | - | - |
| 0031295371323000 | - | - | |
PT Royal Inti Mahiro | 07*6**9****09**0 | - | - |
| 0841174691307000 | - | - | |
Tri'VI, CV | 00*2**9****46**0 | - | - |
| 0025466822942000 | - | - | |
| 0026390138204000 | - | - | |
CV Cahaya Maulid | 0719894024401000 | - | - |
PT Wijoksono Jaya Sakti | 03*5**6****45**0 | - | - |
PT Rudi Tirta Jaya | 09*8**1****01**0 | - | - |
| 0837759554001000 | - | - | |
| 0834027518429000 | - | - | |
CV Badak Kulon | 0766756209401000 | - | - |
| Authority | |||
|---|---|---|---|
| 14 July 2017 | Pengadaan Dan Pemasangan Jaringan Pipa Distribusi Air Bersih Kecamatan Teras Terunjam Dan Kecamatan Kota Mukomuko (Did) | Pemerintah Daerah Kabupaten Muko-Muko | Rp 16,000,000,000 |
| 16 March 2020 | Optimalisasi Iplt Kota Bandar Lampung | Kementerian Pekerjaan Umum dan Perumahan Rakyat | Rp 15,091,210,000 |
| 28 February 2017 | Pembangunan Tpa Cigeulis Kabupaten Pandeglang | Kementerian Pekerjaan Umum dan Perumahan Rakyat | Rp 15,000,000,000 |
| 16 February 2016 | Pembangunan Ipl Tpa Ciangir Kota Tasikmalaya | Kementerian Pekerjaan Umum dan Perumahan Rakyat | Rp 15,000,000,000 |
| 22 July 2015 | Pembangunan Tanggul Pencegah Banjir Teluk Pucung | Rp 6,347,080,000 | |
| 18 September 2017 | Pembangunan Gerbang Kota Lama | Kota Bandung | Rp 6,128,273,096 |
| 13 April 2018 | Jembatan Penghubung Desa Harjamekar Dengan Desa Kalijaya | Pemerintah Daerah Kabupaten Bekasi | Rp 4,999,550,000 |
| 14 January 2016 | Optimalisasi Spam Ikk Compreng (Pam-Jabar-10/2016) Di Kabupaten Subang | Kementerian Pekerjaan Umum dan Perumahan Rakyat | Rp 4,000,000,000 |
| 18 April 2016 | Pembangunan Jembatan Cipagadungan Arah Stadion (Gor) Sisi Selatan | Pemerintah Daerah Kabupaten Bekasi | Rp 3,998,200,000 |
| 8 April 2015 | Rehabilitasi Gedung Dinas Kependudukan Dan Catatan Sipil Dan Bappeda Kota Bekasi | Rp 3,375,890,000 |