Pembangunan Sarana Dan Prasarana Penyediaan Air Baku Bendungan Kuningan Kabupaten Kuningan

Basic Information
Type: Public Tender
Tender Code: 80894064
Date: 2 August 2022
Year: 2022
KLPD: Kementerian Pekerjaan Umum dan Perumahan Rakyat
Work Unit: Snvt Pelaksanaan Jaringan Pemanfaatan Air Cimanuk-Cisanggarung
Procurement Type: Pekerjaan Konstruksi
Method: Tender - Pascakualifikasi Satu File - Harga Terendah Sistem Gugur
Contract Type: Harga Satuan
Financial Information
Value (Nilai Pagu): Rp 134,644,790,000
Estimated Value (Nilai HPS): Rp 134,644,790,000
Winner (Pemenang): PT Karya Prima Mandiri Pratama
NPWP: 015200371701000
RUP Code: 35691445
Work Location: Desa Randusari Kecamatan Cibeurem - Kuningan (Kab.)
Participants: 87
Applicants
Reason
0015200371701000Rp 113,794,975,163-
0014228175804000Rp 118,218,106,542-
Trisula Delapan Sembilan
04*2**2****21**0--
PT Rimba Hijau Lestari
00*4**0****77**0--
0020758538213000--
0010600039093000Rp 115,806,522,019• Jumlah Pile Driver + Hammer kurang dari Yang disyaratkan 3 unit, yang ditawarkan 2 unit.
0017436122641000Rp 107,715,831,999• Kapasitas Dump truck melebihi yang disyaratkan 3500 cc – 4500 cc, yang ditawarkan kapasitas 4570 cc (1 unit). • Kapasitas Tandem Roller melebihi yang disyaratkan 2 - 4 ton, yang ditawarkan 12 ton (1 unit). • Kapasitas Pile Driver + Hammer melebihi yang disyaratkan 2,5 - 3 ton, yang ditawarkan 46 ton (1 unit). • Kapasitas Pneumatic Tire Roller melebihi yang disyaratkan 2 - 4 ton, yang ditawarkan 10 ton (1 unit)
PT Indo Teknik Pembangunan
03*2**2****36**0Rp 107,042,108,033• Tidak menguraikan tahapan/urutan pekerjaan dari awal sampai akhir secara garis besar dan uraian/cara kerja dari pekerjaan utama (Pengadaan dan Pemasangan Pompa Vertikal Turbin 100 ltr/dtk dan Pemasangan Rangka Baja Jembatan); • Kapasitas Flat bed truck with crane kurang dari yang disyaratkan 3 Ton – 5 Ton, yang ditawarkan kapasitas 2,93 ton (3 unit).
0011456167426000Rp 103,875,886,397• Kapasitas alat Rough Terrain Crane melebihi yang disyaratkan 10 Ton – 15 Ton, yang ditawarkan kapasitas 25 Ton (3 buah) dan 13 ton (1 buah). • Kapasitas Tandem Roller melebihi yang disyaratkan 2 - 4 ton, yang ditawarkan 8 ton (2 buah). • Kapasitas Pneumatic Tired Roller melebihi yang disyaratkan 2 - 4 ton, yang ditawarkan 10 ton dan 15 ton.
0019482140308000Rp 107,642,924,048• Kapasitas Flat bed truck with crane melebihi yang disyaratkan 3 Ton – 5 Ton, yang ditawarkan kapasitas 8 ton (1 unit) dan 5 ton (2 unit). • Kapasitas alat Rough Terrain Crane melebihi yang disyaratkan 10 Ton – 15 Ton, yang ditawarkan 26 ton (1 unit). • Kapasitas Tandem Roller melebihi yang disyaratkan 2 - 4 ton, yang ditawarkan 7,68 ton (1 unit). • Kapasitas Pneumatic Tire Roller melebihi yang disyaratkan 2 - 4 ton, yang ditawarkan 10 ton (1 unit)
0010000198093000--
PT Golden Piping Indonesia
03*3**1****11**0--
0962843520501000--
0027896166429000--
0011342144812000--
CV Viera Persada
00*7**6****17**0--
0754261147706000--
0013626437054000--
0016228959201000--
0723743951922000--
PT Farrel Internusa Pratama
00*0**8****01**0--
Wirya Krenindo Perkasa
00*7**4****43**0--
0028210292805000--
Mudah Karya Bersama PT
09*2**0****01**0--
PT Varia Usaha Beton
00*4**2****41**0--
0010016129093000--
0010610525062000--
0762857977517000--
PT Pancatama Tirta Mukti
00*7**4****47**0--
0012413076404000--
0024211674439000--
Berky Karya Indonesia
08*0**3****47**0--
CV Repiktra Apari
00*7**2****21**0--
0013050828073000--
PT Patra Geoteksindo Jaya
09*6**1****35**0--
PT Cahaya Geosolusi Indonesia
09*9**1****34**0--
0010016103093000--
PT Royal Inti Mahiro
07*6**9****09**0--
0021867569044000--
CV Daniza Karya
0312704364201000--
PT Artama Anugrah Konstruksi
09*4**9****67**0--
0032646622815000--
0818512931427000--
0011432929038000--
PT Langgeng Marga Perkasa
07*8**8****09**0--
PT Geo Indogreen Karya
07*0**9****52**0--
0315441527002000--
0015448632009000--
PT Wijoksono Jaya Sakti
03*5**6****45**0--
0937903367616000--
Roy Abadi Sejahtera
05*8**1****25**0--
0010016152093000--
0029579075048000--
CV Rozaq
06*3**7****04**0--
0013654421071000--
0017847963429000--
0033127887077000--
0942270737807000--
0015588288609000--
CV Patriot Abadi
0029315405128000--
0018007179201000--
0901574897323000--
0032883415027000--
0016094666018000--
Bumi Prima Konstruksi
09*6**9****32**0--
0722429966331000--
0014815666615000--
0012168043532000--
CV Mug
04*6**2****52**0--
0013951769005000--
PT Panji Mulyo Asmoro
09*5**2****25**0--
0010016145093000--
0020564373009000--
PT Sehat Cemerlang Indonesia
09*0**7****12**0--
CV Dayma Totalindo
07*0**6****05**0--
0032243446008000--
0017861212426000--
0839101987124000--
0023770845609000--
0027754712518000--
0015711591027000--
CV Bangun Karsa Indah
09*4**0****32**0--
PT Ara Perdana Gemilang
07*0**2****11**0--
0752962001005000--
0027677970529000--
0312386436003000--
0013076336062000--
Tenders also won by PT Karya Prima Mandiri Pratama
Authority
4 November 2020Pembangunan Penyediaan Air Baku Sumber Sungai Urang Kabupaten Batang Paket 1; Kabupaten Batang; Jawa Tengah; 11,7 Km; 0,2835M3/Detik; F; K; SycKementerian Pekerjaan Umum dan Perumahan RakyatRp 332,000,000,000
26 October 2021Revitalisasi Danau Rawa Pening Tahap I (Paket I); 1 Danau; 0 Juta M3; F; K; SycKementerian Pekerjaan Umum dan Perumahan RakyatRp 99,287,853,000
27 December 2024Pembangunan Pengendalian Banjir Air Bengkulu Kota BengkuluKementerian Pekerjaan Umum dan Perumahan RakyatRp 97,150,000,000
16 May 2023Pengendalian Banjir Sungai Sanggai Kab. Penajam Paser Utara (Ikn)Kementerian Pekerjaan Umum dan Perumahan RakyatRp 95,300,000,000
23 February 2022Pembangunan Intake Dan Pipa Transmisi Air Baku Bendungan Tukul Di Kabupaten Pacitan ; 8 Km; 0 M3/Detik; F; K; MycKementerian Pekerjaan Umum dan Perumahan RakyatRp 95,000,000,000
11 January 2024Revitalisasi Danau Rawa Pening Tahap I (Paket 3); Jawa Tengah; Kab. Semarang; 1 Unit; 0 Juta M3; F; K; SycKementerian Pekerjaan Umum dan Perumahan RakyatRp 72,000,000,000
27 November 2020Peningkatan Kapasitas Sudetan Floodway (Pelangwot-Sedayu Lawas) Kab. LamonganKementerian Pekerjaan Umum dan Perumahan RakyatRp 57,179,040,000
12 June 2023Peningkatan Infrastruktur Pengendali Banjir Di Kota Surakarta Dan Kabupaten SukoharjoKementerian Pekerjaan Umum dan Perumahan RakyatRp 53,830,000,000
21 December 2022Jaringan Pipa Transmisi Penyediaan Air Baku Tuk Uleng Yang Direhabilitasi (Myc); 8.346 Km; 0 M3/Detik; F; K; MycKementerian Pekerjaan Umum dan Perumahan RakyatRp 52,375,000,000
13 December 2016Pembangunan Jaringan Air Baku Kabupaten PemalangKementerian Pekerjaan Umum dan Perumahan RakyatRp 52,050,724,000