| Reason | |||
|---|---|---|---|
| 0660566126544000 | Rp 5,400,000,000 | - | |
| 0811172618525000 | Rp 5,419,598,765 | - | |
| 0395253131542000 | Rp 6,093,784,855 | - | |
| 0023677099426000 | - | - | |
| 0210311023542000 | - | - | |
| 0901375881543000 | - | - | |
| 0019971720503000 | - | - | |
| 0760299099442000 | - | - | |
| 0015563455522000 | - | - | |
PT Putra Irian Cahaya | 0720451814955000 | - | - |
| 0533909651545000 | - | - | |
| 0958620817543000 | - | - | |
| 0764373916627000 | Rp 5,200,000,000 | Bab III IKP.28.14.b.2).b) dan IV LDP.F.2 Peralatan utama wheel loader tidak memenuhi persyaratan karena terdapat ketidaksesuaian tahun pembuatan di bukti kepemilikan (2016) berbeda dengan surat perjanjian sewa (2017) | |
| 0815013156543000 | - | - | |
| 0026734830523000 | Rp 5,836,701,034 | Bab III IKP.28.14.b.2).b) dan IV LDP.F.2 Kapasitas Peralatan Utama (tandem roller) kurang dari yang disyaratkan | |
| 0806811220531000 | - | - | |
| 0318013380542000 | - | - | |
| 0404900433542000 | - | - | |
| 0314664889516000 | - | - | |
| 0721444446542000 | Rp 5,500,210,405 | Bab. III.IKP.42.1 dan 2 dan Bab. V. LDK.14 Pengalaman paling kurang 1 (satu) pekerjaan konstruksi dalam kurun waktu 4 (empat) tahun terakhir tidak tercantum pada SIMPAN | |
| 0312738032525000 | Rp 5,864,973,041 | Bab. III.IKP.42.1 dan 2 dan Bab. V. LDK.14 Pengalaman paling kurang 1 (satu) pekerjaan konstruksi dalam kurun waktu 4 (empat) tahun terakhir tidak tercantum pada SIMPAN | |
CV Putra Mahesa | 04*1**2****33**0 | - | - |
| 0022059471544000 | Rp 5,200,071,685 | Bab. III.IKP.42.1 dan 2 dan Bab. V. LDK.14 Pengalaman paling kurang 1 (satu) pekerjaan konstruksi dalam kurun waktu 4 (empat) tahun terakhir tidak tercantum pada SIMPAN | |
| 0314101767544000 | Rp 5,935,593,472 | Bab. III.IKP.42.1 dan 2 dan Bab. V. LDK.14 Pengalaman paling kurang 1 (satu) pekerjaan konstruksi dalam kurun waktu 4 (empat) tahun terakhir tidak tercantum pada SIMPAN | |
| 0919168500544000 | Rp 5,200,000,000 | Bab. III.IKP.42.1 dan 2 dan Bab. V. LDK.14 Pengalaman paling kurang 1 (satu) pekerjaan konstruksi dalam kurun waktu 4 (empat) tahun terakhir tidak tercantum pada SIMPAN | |
| 0026826370542000 | Rp 5,523,977,649 | Bab. V. LDK.3b Tidak menyampaikan tangkapan layar laman OSS yang mencantumkan bahwa sertifikat standar sedang menunggu verifikasi | |
| 0019612142522000 | Rp 6,119,119,381 | - | |
| 0313519415544000 | Rp 5,351,400,641 | Bab. III.IKP.42.1 dan 2 dan Bab. V. LDK.14 Pengalaman paling kurang 1 (satu) pekerjaan konstruksi dalam kurun waktu 4 (empat) tahun terakhir tidak tercantum pada SIMPAN | |
| 0632355160529000 | Rp 5,463,127,549 | Bab III IKP.28.14.b.2).b) dan IV LDP.F.2 Kapasitas Peralatan Utama (tandem roller) kurang dari yang disyaratkan | |
| 0027781327544000 | Rp 6,078,982,935 | Bab. III.IKP.42.1 dan 2 dan Bab. V. LDK.14 Pengalaman paling kurang 1 (satu) pekerjaan konstruksi dalam kurun waktu 4 (empat) tahun terakhir tidak tercantum pada SIMPAN | |
| 0315093930544000 | Rp 6,051,573,552 | Bab. III.IKP.42.1 dan 2 dan Bab. V. LDK.14 Pengalaman paling kurang 1 (satu) pekerjaan konstruksi dalam kurun waktu 4 (empat) tahun terakhir tidak tercantum pada SIMPAN | |
| 0016064594533000 | Rp 5,399,835,000 | Bab. III.IKP.42.4 dan Bab. V. LDK.14 Pencantuman pengalaman paling kurang 1 (satu) pekerjaan konstruksi dalam kurun waktu 4 (empat) tahun terakhir pada SIMPAN melebihi batas akhir pemasukan dokumen penawaran | |
| 0814918942541000 | Rp 5,655,000,000 | Bab III IKP.28.14.b.2).b) dan IV LDP.F.2 Kapasitas Peralatan Utama (tandem roller) kurang dari yang disyaratkan | |
| 0028273274643000 | - | - | |
| 0317159986541000 | - | - | |
| 0211368972421000 | - | - | |
| 0022565584653000 | - | - | |
| 0940307606732000 | - | - | |
| 0015108459439000 | - | - | |
| 0836583385544000 | - | - | |
| 0862725025403000 | - | - | |
| 0853492999323000 | - | - | |
| 0829916477429000 | - | - | |
CV Torgabe Artha Nugraha | 0818185761432000 | - | - |
| 0033304148518000 | - | - | |
PT Royal Damboo Infrastruktur | 09*7**7****01**0 | - | - |
| 0841795511619000 | - | - | |
| 0012444253517000 | - | - | |
| 0962843520501000 | - | - | |
| 0620522128801000 | - | - | |
| 0660732983544000 | - | - | |
| 0024576647508000 | - | - | |
| 0022078018615000 | - | - | |
| 0393502406609000 | - | - | |
| 0018484816521000 | - | - | |
CV Dsn Kaya Rezeki | 05*1**4****29**0 | - | - |
| 0316658343435000 | - | - | |
| 0719331431412000 | - | - | |
| 0018521799543000 | - | - | |
| 0603382953831000 | - | - | |
| 0022057350544000 | - | - | |
| 0317290252542000 | - | - | |
| 0762879765412000 | - | - | |
| 0021968946722000 | - | - | |
| 0942446899711000 | - | - | |
| 0661191163545000 | - | - | |
| 0828248435124000 | - | - | |
| 0720274562542000 | - | - | |
Tridaya Bakti Nusa | 03*8**8****17**0 | - | - |
CV Dempo Agung | 06*2**7****08**0 | - | - |
| 0917478091542000 | - | - | |
| 0752205328822000 | - | - | |
| 0839536315101000 | - | - | |
| 0704020270545000 | - | - | |
| 0812494482544000 | - | - | |
| 0660474727544000 | - | - | |
| 0026732370523000 | - | - | |
| 0708437769544000 | - | - | |
| 0210683793542000 | - | - | |
| 0932245459442000 | - | - | |
| 0014549034533000 | - | - | |
| 0033020900533000 | - | - | |
CV Niscala Azza Konstruksi | 04*8**2****42**0 | - | - |
| 0033020397533000 | - | - | |
| 0012173084627000 | - | - | |
| 0021047675501000 | - | - | |
| 0211359930542000 | - | - | |
| 0837077981542000 | - | - | |
| 0022479471438000 | - | - | |
| 0850947748543000 | - | - | |
| 0012503462812000 | - | - | |
| 0317119253442000 | - | - | |
| 0723416947524000 | - | - | |
| 0841515505822000 | - | - | |
| 0630554160101000 | - | - | |
| 0019011717017000 | - | - | |
| 0813863214801000 | - | - | |
| 0025803818216000 | - | - | |
| 0650992928545000 | - | - | |
| 0810938126311000 | - | - | |
| 0013566013015000 | - | - | |
| 0929366524438000 | - | - | |
| 0632947826542000 | - | - | |
| 0315085076541000 | - | - | |
| 0631236437322000 | - | - | |
| 0834596835101000 | - | - | |
| 0031953466202000 | - | - | |
| 0758185326446000 | - | - | |
| 0818494122543000 | - | - | |
| 0661978577544000 | - | - | |
| 0652227364523000 | - | - | |
| 0033489469543000 | - | - | |
PT Sembilan Bintang Bestari | 09*8**4****35**0 | - | - |
| 0602895831522000 | - | - | |
| 0722268620412000 | - | - | |
| 0013220157009000 | - | - | |
| 0663542058543000 | - | - | |
| 0804512416532000 | - | - | |
| 0317116291543000 | - | - | |
| 0666623855544000 | - | - | |
| 0810016121543000 | - | - | |
| 0023786338009000 | - | - | |
| 0211395868513000 | - | - | |
| 0410724579443000 | - | - | |
| 0745731257523000 | - | - | |
| 0017361882525000 | - | - | |
Dubay Utama | 0030200737608000 | - | - |
| 0843777145543000 | - | - | |
| 0809676919439000 | - | - | |
| 0757464243544000 | - | - | |
PT Wahana Inti Natura | 08*9**8****12**0 | - | - |
| 0025396177524000 | - | - | |
| 0314195496527000 | - | - | |
| 0312990195507000 | - | - | |
| 0723391934503000 | - | - | |
Putra Brantas | 06*0**0****55**0 | - | - |
| 0963456355656000 | - | - | |
| 0025396722524000 | - | - | |
PT Cahaya Geosolusi Indonesia | 09*9**1****34**0 | - | - |
| 0769593328429000 | - | - | |
| 0210253480525000 | - | - | |
| 0637255712542000 | - | - | |
| 0024095622321000 | - | - | |
| 0759227580617000 | - | - | |
| 0667119010401000 | - | - | |
Rexadaya Multi Cipta | 09*9**9****45**0 | - | - |
PT Tiga Tujuh Sejahtera | 05*2**5****11**0 | - | - |
| 0311856868013000 | - | - | |
| 0860716646655000 | - | - | |
| 0312873110526000 | - | - | |
| 0903107605517000 | - | - | |
CV Sulung Multi Abadi | 04*7**5****04**0 | - | - |
| 0021700471609000 | - | - | |
Sesfranvio Putra Mandiri | 04*7**4****47**0 | - | - |
| 0022121396629000 | - | - | |
| 0837629625543000 | - | - | |
CV Soeluck Strong | 06*6**1****24**0 | - | - |
| 0626732408542000 | - | - | |
| 0019923705543000 | - | - | |
| 0835618117523000 | - | - | |
| 0760091561518000 | - | - | |
| 0831753538647000 | - | - | |
| 0662038504412000 | - | - | |
| 0016482333505000 | - | - | |
| 0018172452009000 | - | - | |
| 0663667285542000 | - | - | |
Dirga Perkasa | 0025254269602000 | - | - |
| 0661775163542000 | - | - | |
| 0908421415101000 | - | - | |
| 0621827088627000 | - | - | |
| 0811727254323000 | - | - | |
Perkasa Halomoan Pane | 03*5**9****22**0 | - | - |
KEMENTERIAN PEK ERJAAN UMUM DAN P ERUMAHAN RAKYAT
D I R E K T O R A T J E N D E R A L S U M B E R D A Y A A I R
B A L A I B E S A R W I L A Y A H S U N G A I S E R A Y U O P A K
SATUAN KERJA OPERASI DAN PEMELIHARAAN SDA SERAYU OPAK
Jl. Solo Km.6 Yogyakarta 55281 Telp. (0274) 489172, Fax. (0274) 489552
http://sda.pu.go.id/balai/bbwsserayuopak
URAIAN PEKERJAAN
1. Pekerjaan Persiapan
1. Mobilisasi dan Demobilisasi
2. Pekerjaan Jalan Akses Utama
I. Pekerjaan Lapis Perkerasan Jalan
1. Galian Perkerasan Berbulir
2. Lapis Resap Pengikat - Aspal Cair/Emulsi
3. Laston Lapis Aus (AC-WC)
4. Laston Lapis Antara (AC-BC)
5. Pekerjaan Marka Jalan
II. Pekerjaan Bahu Jalan
1. Penggalian 1 m3 tanah biasa sedalam s.d. 1 m untuk volume 200 m3 s.d 2000
m3 cara manual.
2. 1 m3 urugan kembali galian tanah ( > s.d. 200 m3) tanpa pemadatan, secara
manual;
3. 1 m3 Timbunan dan Pemadatan Sirtu
4. Beton Sikloop 70% Beton fc’ 15 MPa: 30% Batu Belah, secara semi-
Mekanis untuk Volume s.d 200 m3
5. 1 m2 Bekisting biasa kolom beton dengan multiflex 12 mm atau 18 mm
III. Pekerjaan Penerangan Jalan Umum (PJU)
1. Penggalian 1 m3 tanah biasa sedalam s.d. 1 m untuk volume s.d. 200 m3 cara
manual
2. 1 m3 urugan kembali galian tanah ( > s.d. 200 m3) tanpa pemadatan, secara
manual
3. Pembuatan s.d Pengecoran 1 m3 beton mutu rendah fc' 10 Mpa; W/C = 700
secara semi mekanis
4. Pembuatan s.d Pengecoran 1 m3 beton mutu rendah fc'15 Mpa; W/C= 0,666
secara semi-mekanis
5. Pekerjaan PJU
3. Pekerjaan Jalan Lingkar
1. Lapis Resap Pengikat - Aspal Cair/Emulsi
2. Laston Lapis Aus (AC-WC)
3. Laston Lapis Antara (AC-BC)
4. Lapis Fondasi Agregat Kelas A
5. Pekerjaan Marka Jalan
4. Pekerjaan Dinding Penahan Tanah (DPT)
1. Bongkar 1 m3 pasangan batu (manual) untuk bangunan gedung
2. 1 m3 Pas. Batu Belah dengan Mortar tipe M (17,2 MPa), Semi-Mekanis,
beda tinggi > 0 s.d. 1 m'
3. 1 m3 Pas. Batu Belah dengan Mortar tipe M (17,2 MPa), Semi-Mekanis,
beda tinggi > 1 s.d. 2 m'
4. 1 m3 Pas. Batu Belah dengan Mortar tipe M (17,2 MPa), Semi-Mekanis,
beda tinggi > 2 s.d. 3 m'
5. Pekerjaan Siaran dengan mortar jenis PC-PP tipe M (17,2 MPa) pada 1 m2
dinding pasangan
6. Pembuatan s.d Pengecoran 1 m3 beton mutu sedang fc'30 Mpa; secara semi-
mekanis
7. Pembuatan s.d Pengecoran 1 m3 beton mutu rendah fc' 10 Mpa; W/C = 700
secara semi mekanis
8. 1 m2 Bekisting biasa kolom beton dengan multiflex 12 mm atau 18 mm
9. 1 kg Penulangan kolom, balok, ring balk dan sloof untuk BjTP atau BJTS
diameter < 12 mm secara manual
5. Pekerjaan Jalan Depan Kantor
1. Laston Lapis Aus (AC-WC)
2. Lapis Resap Pengikat - Aspal Cair/Emulsi
3. 1 m3 Timbunan dengan Pasir Uruk ( > 0 s.d. 200 m3), tanpa pemadatan
secara manual
6. Pekerjaan Dinding Penahan Tanah (DMU)
1. Penggalian 1 m3 tanah biasa sedalam s.d. 1 m untuk volume 200 m3 s.d 2000
m3 cara manual
2. 1 m3 Timbunan dengan Pasir Uruk ( > 0 s.d. 200 m3), tanpa pemadatan
secara manual
3. 1 m3 Pas. Batu Belah dengan Mortar tipe M (17,2 MPa), Semi-Mekanis,
beda tinggi > 0 s.d. 1 m'
4. 1 m3 Pas. Batu Belah dengan Mortar tipe M (17,2 MPa), Semi-Mekanis,
beda tinggi > 1 s.d. 2 m'
5. 1 m3 Pas. Batu Belah dengan Mortar tipe M (17,2 MPa), Semi-Mekanis,
beda tinggi > 2 s.d. 3 m'
6. Pekerjaan Siaran dengan mortar jenis PC-PP tipe M (17,2 MPa) pada 1 m2
dinding pasangan
7. Pembuatan s.d Pengecoran 1 m3 beton mutu sedang fc'30 Mpa; secara semi-
mekanis
8. 1 m2 Bekisting biasa kolom beton dengan multiflex 12 mm atau 18 mm
9. 1 kg Penulangan kolom, balok, ring balk dan sloof untuk BjTP atau BJTS
diameter < 12 mm secara manual
7. Pekerjaan Kantong Parkir 1
1. 1 m2 Pembersihan dan Pengupasan Permukaan (Striping)
2. Penggalian 1 m3 tanah biasa sedalam s.d. 1 m untuk volume s.d. 200 m3 cara
manual
3. Lapis Fondasi Agregat Kelas A
4. Laston Lapis Aus (AC-WC)
5. Laston Lapis Antara (AC-BC)
8. Pekerjaan Area Manuver Kendaraan 1
1. 1 m2 Pembersihan dan Pengupasan Permukaan (Striping)
2. 1 m3 Pemadatan tanah setebal 10 cm menggunakan mesin Stamper Kuda
secara semi-Mekanis "1 m3 Pemadatan tanah setebal 10 cm menggunakan
mesin
3. Lapis Fondasi Agregat Kelas A
4. Laston Lapis Aus (AC-WC)
5. Laston Lapis Antara (AC-BC)
9. Pekerjaan Area Manuver Kendaraan 2
1. 1 m2 Pembersihan dan Pengupasan Permukaan (Striping)
2. 1 m3 Pemadatan tanah setebal 10 cm menggunakan mesin Stamper Kuda
secara semi-Mekanis"
3. Lapis Fondasi Agregat Kelas A
4. Laston Lapis Aus (AC-WC)
5. Laston Lapis Antara (AC-BC)
10. Pekerjaan Perbaikan Dan Pengadaan Alat Instrumentasi Bendungan
1. "C17-Pro Vertical Digital INCLINOMETER SYSTEM (100 metre Cable
length, SOIL Instrument UK)"
2. VW Recorder
11. Biaya Penyelenggaraan K3 Serta Keselamatan Konstruksi