Penyediaan Sarana Dan Prasarana Sanitasi Di Lembaga Pendidikan Keagamaan (Lpk) Lokasi 30

Ulang
Basic Information
Type: Public Tender
Tender Code: 81355064
Status: Ulang
Date: 15 June 2023
Year: 2023
KLPD: Kementerian Pekerjaan Umum dan Perumahan Rakyat
Work Unit: Pelaksanaan Prasarana Permukiman Provinsi Riau
Procurement Type: Pekerjaan Konstruksi
Method: Pengadaan Langsung
Contract Type: Harga Satuan
Financial Information
Value (Nilai Pagu): Rp 200,000,000
Estimated Value (Nilai HPS): Rp 200,000,000
Winner (Pemenang): CV Rahmi
NPWP: 021184395221000
RUP Code: 43751468
Work Location: Pondok Pesantren Daarul Qur'an Darussalam, Kec. Kunto Darussalam Kab. Rokan Hulu - Jakarta Selatan (Kota)
Participants: 1
Attachment
REKAPITULASI BILL OF QUANTITY                         
                                                                            
                                                                            
                                  Penyediaan Sarana & Prasarana Sanitasi di Lembaga
   PEKERJAAN                   :                                            
                                  Pendidikan Keagamaan (LPK) Lokasi 30      
   LOKASI                      :  Pondok Pesantren Daarul Qur'an Darussalam 
                                  Desa Bukit Intan Makmur, Kecamatan Kunto Darussalam
                                  Kabupaten Rokan Hulu                      
   TAHUN ANGGARAN              :  2023                                      
    No               URAIAN PEKERJAAN                TOTAL BIAYA            
                                                                            
                                                                            
     I  BIAYA PENYELENGGARAAN SM K3 KONSTRUKSI   Rp.             -          
                                                                            
     II PEKERJAAN PERSIAPAN                      Rp.             -          
    III PEKERJAAN STRUKTUR                       Rp.             -          
                                                                            
    III PEKERJAAN ARSITEKTUR                     Rp.             -          
    IV  PEKERJAAN ELEKTRIKAL DAN PLUMBING        Rp.             -          
                                                                            
     V  PEKERJAAN IPAL NON-PABRIKASI                                        
      A . PEKERJAAN PERSIAPAN                    Rp.             -          
                                                                            
      B . PEKERJAAN TANAH DAN LANDASAN           Rp.             -          
      C . PEKERJAAN BAK INLET                    Rp.             -          
                                                                            
      D . PEKERJAAN BAK SETLLER & AF             Rp.             -          
      E . PEKERJAAN BAK DESINFEKTAN              Rp.             -          
                                                                            
      F . PEKERJAAN LAIN LAIN                    Rp.             -          
                                                                            
      G. COMISSIONING TEST                       Rp.             -          
                                      Total      Rp.             -          
                                                                            
                                      PPN (11%)  Rp.             -          
                                      Grand Total Rp.            -          
                                                                            
                                      Pembulatan Rp.             -          
                                                                            
                                                 Penawar,                   
                                                                            
                                                                            
                                                                            
                                                                            
                                                PT/CV. ……………………             
                                                Jabatan                     
                              BIIL OF QUANTITY                              
                                                                            
                                             Penyediaan Sarana & Prasarana Sanitasi di Lembaga
PEKERJAAN                                :                                  
                                             Pendidikan Keagamaan (LPK) Lokasi 30
LOKASI                                   :   Pondok Pesantren Daarul Qur'an Darussalam
                                         :   Desa Bukit Intan Makmur, Kecamatan Kunto Darussalam
                                         :   Kabupaten Rokan Hulu           
TAHUN ANGGARAN                           :   2023                           
 No             Uraian Pekerjaan         Volume   Harga satuan  Total       
 I BIAYA PENYELENGGARAAN SM K3 KONSTRUKSI                                   
 1 Papan informasi K.3                    1,00 bh Rp.    -  Rp.       -     
 2 Helm proyek                            8,00 Bh Rp.    -  Rp.       -     
 3 Sarung tangan (Safety gloves)          12,00 Psg Rp.  -  Rp.       -     
 4 Sepatu keselamatan untuk pekerja (Rubber safety shoes) 6,00 Psg Rp. - Rp. -
 5 Rompi keselamatan (Safety vest)        8,00 Bh Rp.    -  Rp.       -     
 6 Peralatan P3K (Kotak P3K, Obat Luka, Perban, dll) 1,00 set Rp. - Rp. -   
 7 Rambu Petunjuk/police line             1,00 roll Rp.  -  Rp.       -     
                                             Sub Total SM K3 Konstruksi : Rp. -
 II PEKERJAAN PERSIAPAN                                                     
 1 Pekerjaan Pembersihan area             54,74 m2 Rp.   -  Rp.       -     
 2 Pembongkaran Rabat Beton               1,58 m3 Rp.    -  Rp.       -     
 3 Pekerjaan Bouwplank                    29,70 m Rp.    -  Rp.       -     
                                            Sub Total Pekerjaan Persiapan : Rp. -
 III PEKERJAAN STRUKTUR                                                     
 1 Pekerjaan Tanah                                                          
   - Pekerjaan Galian Pondasi             5,78 m3 Rp.    -  Rp.       -     
   - Pekerjaan Urugan Pasir               0,83 m3 Rp.    -  Rp.       -     
   - Pekerjaan Lantai Kerja K-100         0,83 m3 Rp.    -  Rp.       -     
 2 Pekerjaan Pondasi Setempat                                               
   - Bekisting                            1,20 m2 Rp.    -  Rp.       -     
   - Pembesian Ø 10 mm                    43,66 Kg Rp.   -  Rp.       -     
   - Pembesian Ø 8 mm                     5,69 Kg Rp.    -  Rp.       -     
   - Pengecoran Beton K-175               0,42 m3 Rp.    -  Rp.       -     
 3 Pekerjaan Pasangan Pondasi Lajur 1 Bata 3,43 m3 Rp.   -  Rp.       -     
 4 Pekerjaan Urugan Tanah Bawah Lantai    7,67 m3 Rp.    -  Rp.       -     
 5 Pekerjaan Urugan Kembali               4,67 m3 Rp.    -  Rp.       -     
 6 Pekerjaan Cor Lantai Beton                                               
   - Pengecoran Beton K-175               2,56 m3 Rp.    -  Rp.       -     
 7 Pekerjaan Sloof 15X20                                                    
   - Bekisting                            15,46 m2 Rp.   -  Rp.       -     
   - Pembesian Ø 10 mm                    95,34 Kg Rp.   -  Rp.       -     
   - Pembesian Ø 8 mm                     50,76 Kg Rp.   -  Rp.       -     
   - Pengecoran Beton K-175               1,16 m3 Rp.    -  Rp.       -     
 8 Pekerjaan Kolom beton 12 x 12                                            
   - Bekisting                            23,71 m2 Rp.   -  Rp.       -     
   - Pembesian Ø 10 mm                   121,85 Kg Rp.   -  Rp.       -     
   - Pembesian Ø 8 mm                     16,64 Kg Rp.   -  Rp.       -     
   - Pengecoran Beton K-175               0,71 m3 Rp.    -  Rp.       -     
 9 Pekerjaan Balok 12x15 Elv. + 1,85                                        
   - Bekisting                            3,35 m2 Rp.    -  Rp.       -     
   - Pembesian Ø 10 mm                    27,50 Kg Rp.   -  Rp.       -     
   - Pembesian Ø 8 mm                     9,94 Kg Rp.    -  Rp.       -     
   - Pengecoran Beton K-175               0,20 m3 Rp.    -  Rp.       -     
 10 Pekerjaan Balok 12x20 Elv. + 2,25                                       
   - Bekisting                            9,12 m2 Rp.    -  Rp.       -     
   - Pembesian Ø 10 mm                    56,24 Kg Rp.   -  Rp.       -     
   - Pembesian Ø 8 mm                     26,42 Kg Rp.   -  Rp.       -     
   - Pengecoran Beton K-175               0,55 m3 Rp.    -  Rp.       -     
 11 Pekerjaan Balok 12 x 20 Elv. + 2,75                                     
   - Bekisting                            7,10 m2 Rp.    -  Rp.       -     
   - Pembesian Ø 10 mm                    43,78 Kg Rp.   -  Rp.       -     
   - Pembesian Ø 8 mm                     20,51 Kg Rp.   -  Rp.       -     
   - Pengecoran Beton K-175               0,43 m3 Rp.    -  Rp.       -     
                                            Sub Total Pekerjaan Struktur : Rp. -
 No             Uraian Pekerjaan         Volume   Harga satuan  Total       
 III PEKERJAAN ARSITEKTUR                                                   
 1 Pekerjaan Dinding                                                        
   - Pekerjaan pasangan Dinding bata merah 44,54 m2 Rp.  -  Rp.       -     
   - Pekerjaan pasangan Batu Kerawang/Roster 12,19 m2 Rp. - Rp.       -     
   - Pekerjaan Plesteran                  62,66 m2 Rp.   -  Rp.       -     
   - Pekerjaan Acian                      62,66 m2 Rp.   -  Rp.       -     
 2 Pekerjaan Penutup Lantai dan dinding                                     
 2.1 Pekerjaan Penutup Lantai dan dinding Kamar Mandi 1                     
   - Pasangan Keramik lantai 25x25        1,32 m2 Rp.    -  Rp.       -     
   - Pasangan Keramik dinding 25x40       3,98 m2 Rp.    -  Rp.       -     
 2.2 Pekerjaan Penutup Lantai dan dinding Kamar Mandi 2                     
   - Pasangan Keramik lantai 25x25        1,32 m2 Rp.    -  Rp.       -     
   - Pasangan Keramik dinding 25x40       3,98 m2 Rp.    -  Rp.       -     
 2.3 Pekerjaan Penutup Lantai dan dinding Kakus 1                           
   - Pasangan Keramik lantai 25x25        1,32 m2 Rp.    -  Rp.       -     
   - Pasangan Keramik dinding 25x40       3,98 m2 Rp.    -  Rp.       -     
 2.4 Pekerjaan Penutup Lantai dan dinding Kakus + Mandi 1                   
   - Pasangan Keramik lantai 25x25        1,74 m2 Rp.    -  Rp.       -     
   - Pasangan Keramik dinding 25x40       4,82 m2 Rp.    -  Rp.       -     
 2.5 Pekerjaan Penutup Lantai dan dinding Kakus + Mandi 2                   
   - Pasangan Keramik lantai 25x25        1,74 m2 Rp.    -  Rp.       -     
   - Pasangan Keramik dinding 25x40       4,82 m2 Rp.    -  Rp.       -     
 2.6 Pekerjaan Penutup Lantai dan dinding Kakus + Mandi 3                   
   - Pasangan Keramik lantai 25x25        1,74 m2 Rp.    -  Rp.       -     
   - Pasangan Keramik dinding 25x40       4,82 m2 Rp.    -  Rp.       -     
   Pekerjaan Penutup Lantai selasar depan Kakus, lantai area bak cuci       
 2,7                                                                        
   tangan, Lantai Area Cuci bersama, dan lantai area tempat wudhu           
   - Pasangan Keramik lantai 25x25        27,34 m2 Rp.   -  Rp.       -     
 2,8 Pekerjaan Bak Cuci Tangan                                              
   - Pekerjaan Beton                                                        
    * Bekisting                           14,20 m2 Rp.   -  Rp.       -     
    * Pembesian Ø 10 mm                   37,20 kg Rp.   -  Rp.       -     
    * Pengecoran Beton K-175              0,22 m3 Rp.    -  Rp.       -     
   - Pasangan Keramik lantai 25x25        0,72 m2 Rp.    -  Rp.       -     
   - Pasangan Keramik dinding 25x40       0,88 m2 Rp.    -  Rp.       -     
   - Waterproofing                        1,60 m2 Rp.    -  Rp.       -     
 2,9 Pekerjaan Tempat Wudhu                                                 
   - Pasangan Keramik lantai 25x25        1,20 m2 Rp.    -  Rp.       -     
   - Pasangan Keramik dinding 25x40       8,04 m2 Rp.    -  Rp.       -     
   - Grill Besi                           1,22 m2 Rp.    -  Rp.       -     
2,10 Pekerjaan Tempat Cuci Bersama                                          
   - Pasangan Keramik dinding 25x40       2,16 m2 Rp.    -  Rp.       -     
 3 Pekerjaan Penutup Atap                                                   
   - Pekerjaan rangka atap baja Ringan    47,94 m2 Rp.   -  Rp.       -     
   - Penutup Atap                         47,94 m2 Rp.   -  Rp.       -     
   - Listplank GRC tebal 10 mm lebar 30 cm cat waethershield 27,70 m Rp. - Rp. -
 4 Pekerjaan Pintu dan Ventilasi                                            
   - Pintu Aluminium Komplit terpasang    6,00 bh Rp.    -  Rp.       -     
   - Bouvenlicht kisi-kisi Besi hollow 2 x2 cm finish cat 2,16 m2 Rp. - Rp. -
 5 Pekerjaan Pengecatan                                                     
   - Pengecatan Tembok                    62,66 m2 Rp.   -  Rp.       -     
 6 Pekerjaan Sanitary                                                       
   - Pemasangan Closet Jongkok            4,00 bh Rp.    -  Rp.       -     
   - Pemasangan Kran air stainless        11,00 bh Rp.   -  Rp.       -     
   - Pemasangan head shower tanam lengkap dengan stop Kran 5,00 unit Rp. - Rp. -
   - Pemasangan Floordrain stainless      9,00 bh Rp.    -  Rp.       -     
   - Tempat Sabun Cair                    1,00 bh Rp.    -  Rp.       -     
 7 Pekerjaan Logo dan tulisan                                               
   - Loggo PU Akrilik                     1,00 bh Rp.    -  Rp.       -     
   - Tulisan "Indonesia Maju" Akrilik     1,00 Set Rp.   -  Rp.       -     
                                           Sub Total Pekerjaan Arsitektur : Rp. -
 IV PEKERJAAN ELEKTRIKAL DAN PLUMBING                                       
 1 Pekerjaan Elektrikal dan Plambing                                        
   - Pek. MCB                             1,00 bh Rp.    -  Rp.       -     
   - Pek. Box MCB                         1,00 unit Rp.  -  Rp.       -     
   - Pek. Instalasi titik lampu dan listrik 12,00 titik Rp. - Rp.     -     
   - Pekerjaan Pemasangan lampu SL 18 Watt + Fitting 12,00 bh Rp. - Rp. -   
   - Pekerjaan Pemasangan Sakelar         10,00 bh Rp.   -  Rp.       -     
 2 Pekerjaan pipa air bersih                                                
   - Pipa PVC Type AW dia 3/4 inch        42,00 m Rp.    -  Rp.       -     
 No             Uraian Pekerjaan         Volume   Harga satuan  Total       
 3 Pekerjaan pipa air bekas                                                 
   - Pipa PVC Type AW dia 3 inch          18,00 m Rp.    -  Rp.       -     
   - Fitting dia 3 inch                   10,00 bh Rp.   -  Rp.       -     
 4 Pekerjaan pipa air Kotor/Tinja                                           
   - Pipa PVC Type AW dia 4 inch          9,80 m Rp.     -  Rp.       -     
   - Fitting dia 4 inch                   5,00 bh Rp.    -  Rp.       -     
 5 Pekerjaan Bak Kontrol/Grease Trap beton                                  
   - Bak Kontrol beton                    1,00 bh Rp.    -  Rp.       -     
   - Grease Trap beton                    1,00 bh Rp.    -  Rp.       -     
   - Elbow PVC 3"                         1,00 bh Rp.    -  Rp.       -     
   - Tee PVC 3"                           1,00 bh Rp.    -  Rp.       -     
                                     Sub Total Pekerjaan Elektrikal dan plumbing: Rp. -
 V PEKERJAAN IPAL NON-PABRIKASI                                             
 A . PEKERJAAN PERSIAPAN                                                    
  1 Pembersihan lokasi                    20,99 m2 Rp.   -  Rp.       -     
                                            Sub Total Pekerjaan Persiapan: Rp. -
 B . PEKERJAAN TANAH DAN LANDASAN                                           
  1 Galian tanah manual                   30,55 m3 Rp.   -  Rp.       -     
  2 Urugan tanah kembali                  11,74 m3 Rp.   -  Rp.       -     
  3 Buang tanah keluar proyek             23,83 m3 Rp.   -  Rp.       -     
  4 Pasir urug, tebal 10 cm               1,06 m3 Rp.    -  Rp.       -     
  5 Rabat beton K-100 tebal 5 cm          0,53 m3 Rp.    -  Rp.       -     
                                        Sub Total Pekerjaan tanah dan landasan: Rp. -
 C . PEKERJAAN BAK INLET                                                    
 1 Pelat Lantai dasar                                                       
   - Pek. Beton K-225                     0,16 m3 Rp.    -  Rp.       -     
   - Tulangan besi polos Ø 8 mm           10,31 kg Rp.   -  Rp.       -     
   - Pemasangan bekisting pelat lantai dasar 0,44 m2 Rp. -  Rp.       -     
 2 Dinding                                                                  
   - Pek. Beton K-225                     0,12 m3 Rp.    -  Rp.       -     
   - Tulangan besi polos Ø 8 mm           17,66 kg Rp.   -  Rp.       -     
   - Pemasangan bekisting dinding         2,90 m2 Rp.    -  Rp.       -     
 3 Lantai Atas                                                              
   - Pek. Beton K-225                     0,11 m3 Rp.    -  Rp.       -     
   - Tulangan besi polos Ø 10 mm          8,57 kg Rp.    -  Rp.       -     
   - Pemasangan bekisting lantai Atas     0,65 m2 Rp.    -  Rp.       -     
 4 Tutup Manhole                                                            
   - Pek. Beton K-225                     0,02 m3 Rp.    -  Rp.       -     
   - Tulangan besi polos Ø 8 mm           2,84 kg Rp.    -  Rp.       -     
   - Pemasangan bekisting Mainhole        0,14 m2 Rp.    -  Rp.       -     
                                             Sub Total Pekerjaan bak inlet: Rp. -
 D . PEKERJAAN BAK SETLLER & AF                                             
 1 Pelat Lantai dasar                                                       
   - Pek. Beton K-225                     1,26 m3 Rp.    -  Rp.       -     
   - Tulangan besi polos Ø 12 mm          81,46 kg Rp.   -  Rp.       -     
   - Tulangan besi polos Ø 10 mm          56,98 kg Rp.   -  Rp.       -     
   - Pemasangan bekisting lantai dasar    2,33 m2 Rp.    -  Rp.       -     
 2 Dinding                                                                  
   - Pek. Beton K-225                     6,18 m3 Rp.    -  Rp.       -     
   - Tulangan besi polos Ø 10 mm         323,87 kg Rp.   -  Rp.       -     
   - Tulangan besi polos Ø 8 mm          183,91 kg Rp.   -  Rp.       -     
   - Pemasangan bekisting dinding         82,34 m2 Rp.   -  Rp.       -     
 3 Balok konsol dudukan media sarang tawon                                  
   - Pek. Beton K-225                     0,15 m3 Rp.    -  Rp.       -     
   - Tulangan besi polos Ø 10 mm          24,05 kg Rp.   -  Rp.       -     
   - Tulangan besi polos Ø 8 mm           8,06 kg Rp.    -  Rp.       -     
   - Pemasangan bekisting balok           2,55 m2 Rp.    -  Rp.       -     
 4 Lantai Atas                                                              
   - Pek. Beton K-225                     1,03 m3 Rp.    -  Rp.       -     
   - Tulangan besi polos Ø 10 mm          88,92 kg Rp.   -  Rp.       -     
   - Pemasangan bekisting Lantai Atas     5,70 m2 Rp.    -  Rp.       -     
 5 Waterstop lebar 200 mm                 14,90 m1 Rp.   -  Rp.       -     
 6 Ring balok praktis 10/15               1,00 m1 Rp.    -  Rp.       -     
 7 Tutup Manhole                                                            
   - Pek. Beton K-225                     0,11 m3 Rp.    -  Rp.       -     
   - Tulangan besi polos Ø 8 mm           14,22 kg Rp.   -  Rp.       -     
   - Pemasangan bekisting lantai          0,72 m2 Rp.    -  Rp.       -     
 8 Pasangan batu bata (1/2 bata) 1Pc : 3 Ps 0,45 m2 Rp.  -  Rp.       -     
 9 Plesteran 1Pc : 3 Ps                   0,90 m2 Rp.    -  Rp.       -     
 10 Acian                                 0,90 m2 Rp.     - Rp.       -     
                                         Sub Total Pekerjaan bak setller & af: Rp. -
 No             Uraian Pekerjaan         Volume   Harga satuan  Total       
 E . PEKERJAAN BAK DESINFEKTAN                                              
 1 Pelat Lantai dasar                                                       
   - Pek. Beton K-225                     0,17 m3 Rp.    -  Rp.       -     
   - Tulangan besi polos Ø 8 mm           10,17 kg Rp.   -  Rp.       -     
   - Pemasangan bekisting lantai dasar    0,46 m2 Rp.    -  Rp.       -     
 2 Dinding                                                                  
   - Pek. Beton K-225                     0,31 m3 Rp.    -  Rp.       -     
   - Pasangan batu bata (1/2 bata) 1Pc : 5 Ps Dinding dalam 0,60 m2 Rp. - Rp. -
   - Tulangan besi polos Ø 8 mm           23,74 kg Rp.   -  Rp.       -     
   - Pemasangan bekisting dinding         4,58 m2 Rp.    -  Rp.       -     
 3 Lantai Atas                                                              
   - Pek. Beton K-225                     0,13 m3 Rp.    -  Rp.       -     
   - Tulangan besi polos Ø 10 mm          8,94 kg Rp.    -  Rp.       -     
   - Pemasangan bekisting pelat Lantai Atas 1,14 m2 Rp.  -  Rp.       -     
 4 Tutup Manhole                                                            
   - Pek. Beton K-225                     0,02 m3 Rp.    -  Rp.       -     
   - Tulangan besi polos Ø 8 mm           2,84 kg Rp.    -  Rp.       -     
   - Pemasangan bekisting pelat lantai    0,14 m2 Rp.    -  Rp.       -     
                                         Sub Total Pekerjaan bak desinfektan: Rp. -
 F . PEKERJAAN LAIN LAIN                                                    
 1 Pemasangan dudukan media sarang tawon (bahan pipa PVC AW dia. 1") 2,70 m2 Rp. - Rp. -
 2 Pemasangan media sarang tawon, bahan rigid PVC tebal 0,2 mm 2,43 m3 Rp. - Rp. -
 3 Pemasangan pipa buangan PVC tipe AW dia. 4" 2,00 m1 Rp. - Rp.      -     
 4 Pemasangan pipa penguras PVC tipe AW dia. 4" 6,00 m1 Rp. - Rp.     -     
 5 Pemasangan penghubung antar bak pipa PVC tipe AW dia.4" 6,00 m1 Rp. - Rp. -
 6 Pemasangan Tee PVC tipe AW dia.4"      7,00 bh Rp.    -  Rp.       -     
   Pemasangan penghubung antar bak inlet dengan bak settler pipa PVC tipe AW
 7                                        1,20 m1 Rp.    -  Rp.       -     
   dia.3"                                                                   
 8 Pemasangan sirkulasi antar bak pipa PVC tipe AW dia. 2" 1,50 m1 Rp. - Rp. -
 9 Pemasangan vent pipa Galvanish dia. 2" p = 2 m 1,00 bh Rp. - Rp.   -     
 10 Floating Clorin feeder (pengumpan klorin apung) 1,00 unit Rp. - Rp. -   
 11 Khlorin Tablet                        10,00 kg Rp.    - Rp.       -     
   Pemasangan Fine Screen Stainliststeel 304, diameter lubang 1,5 cm, Tebal Plat
 12                                       1,00 unit Rp.   - Rp.       -     
   2 mm                                                                     
                                             Sub Total Pekerjaan lain-lain: Rp. -
 G. COMISSIONING TEST                                                       
 1 Uji Aliran dan Kebcoran Bak IPL        1,00 ls Rp.    -  Rp.       -     
 2 Uji Analisa Laboratrium, Air Limbah Domestik 1,00 spl Rp. - Rp.    -     
                                         Sub Total Pekerjaan comissioning test: Rp. -
                      DAFTAR HARGA SATUAN PEKERJAAN                         
                                                                            
 PROYEK       :                                                             
               Penyediaan Sarana & Prasarana Sanitasi di Lembaga Pendidikan Keagamaan (LPK) Lokasi 30
 PEKERJAAN    : Pembangunan Bilik MCK Wanita                                
 TAHUN ANGGARAN : 2023                                                      
                                      HARGA SATUAN                          
                                                       JUMLAH HARGA SATU    
 NO            URAIAN                                                       
                                   Upah (Rp.) Bahan (Rp.)  (Rp)    AN       
 A ANALISA PEKERJAAN PERSIAPAN                                              
  1 Pembersihan Lapangan                 -          -           -  / M2     
  2 Pembongkaran Rabat Beton             -          -           -  / M3     
  3 Pemasangan Bowplank                  -          -           -  / M1     
 B ANALISA PEKERJAAN STRUKTUR                                               
  1 Galian Tanah Biasa Sedalam 1 m       -          -           -  / M3     
  2 Galian Tanah Biasa Sedalam 2 s/d 3 m -          -           -  / M3     
  3 Buang Tanah Ke luar Lokasi / M3      -          -           -  / M3     
  4 Pengurugan Tanah Kembali             -          -           -  / M3     
  5 Pengurugan Tanah Bawah Lantai        -          -           -  / M3     
  6 Urugan Pasir                         -          -           -  / M3     
  7 Pekerjaan Pasangan Pondasi Rolag 30x30 -        -           -  / M3     
  8 Pek. Rabat Beton Fc 7.4 Mpa / Lantai Kerja -    -           -  / M3     
                                                                            
  9 Pekerjaan Beton Fc. 14.5 Mpa atau K. 175 Kg/Cm2 - -         -  / M3     
   Pekerjaan Beton Fc. 18,86 Mpa atau K. 225 Kg/Cm2 /                       
 10                                      -          -           -  / M3     
   M3                                                                       
 11 Pemasangan Waterstop Lebar 200 mm per m' -      -           -  /M       
 12 Penulangan 1 kg dengan Besi Polos Ø 12 mm -     -           -  / Kg     
 13 Penulangan 1 kg dengan Besi Polos Ø 10 mm -     -           -  / Kg     
 14 Penulangan 1 kg dengan Besi Polos Ø 8 mm -      -           -  / Kg     
 15 Penulangan 1 kg dengan Besi Polos Ø 6 mm -      -           -  / Kg     
 16 Bekisting Sloof                      -          -           -  / M2     
 17 Bekisting Kolom                      -          -           -  / M2     
 18 Bekisting Balok                      -          -           -  / M2     
 19 Bekisting Dinding                    -          -           -  / M2     
 20 Bekisting lantai Beton / M2          -          -           -  / M2     
 21 1 m' ring balk beton bertulang (10x15) cm -     -           -  / M      
 22 Pemasangan 1 m2 rangka atap baja ringan -       -           -  / M2     
 C ANALISA PEKERJAAN ARSITEKTUR                                             
  1 Pasangan 1/2 Bata Spesi 1 : 5        -          -           -  / M2     
  2 Pas. Roster ul. 20x20 cm             -          -           -  / M2     
  3 Plesteran Tebal 2 cm Spesi 1 : 4     -          -           -  / M2     
  4 Acian Dinding                        -          -           -  / M2     
  5 Memasang Pintu Kamar Mandi Aluminium -          -           -  / BH     
  6 Mencat Tembok dan plafond            -          -           -  / M2     
  7 Pasang Kloset Jongkok                -          -           -  / Unit   
  8 Pasangan Floor Drain                 -          -           -  / BH     
                                                                            
  9 Pasangan Kran Air 3/4"               -          -           -  / BH     
 10 Pekerjaan Pasang Keramik lantai 25 x 25 cm -    -           -  / M2     
 11 Pekerjaan Pasang Keramik dinding 25 x 40 cm -   -           -  / M2     
 12 Penutup Atap                         -          -           -  / M2     
 13 Listplank GRC tebal 10 mm lebar 30 cm cat waethershield - - -  / M      
 14 Bouvenlicht kisi-kisi Besi hollo 2 x2 cm finish cat - -     -  / M2     
 15 Waterproofing                        -          -           -  / M2     
                                      HARGA SATUAN                          
                                                       JUMLAH HARGA SATU    
 NO            URAIAN                                                       
                                   Upah (Rp.) Bahan (Rp.)  (Rp)    AN       
 16 Grill Besi                           -          -           -  / M2     
 17 Pemasangan head shower tanam lengkap dengan stop Kran - -   -  / Unit   
 18 Tempat Sabun                         -          -           -  / BH     
 19 Loggo PU Akrilik                                            -  / BH     
 20 Tulisan "Indonesia Maju" Akrilik                            -  /Set     
 D ANALISA PEKERJAAN ELEKTRIKAL                                             
  1 Pek. Instalasi Titik Lampu & Listrik -          -           - / Titik   
  2 Pek. MCB                             -          -           -  / BH     
  3 Pek. Box MCB                         -          -           -  / Unit   
                                                                            
  4 Pekerjaan Pemasangan lampu SL 18 Watt + Fitting - -         -  / BH     
  5 Pekerjaan Pemasangan Sakelar         -          -           -  / BH     
 E ANALISA PEKERJAAN PLAMBING                                               
 1 Pasangan Pipa PVC AW diameter 4" / M1  -          -           - / M'     
 2 Pemasangan Pipa PVC Dia 3/4"           -          -           - / M'     
                                                                            
 3 Pemasangan 1 bh Tee pipa PVC diameter 4” -        -           - / BH     
   Pemasangan 1 bh Fitting pipa PVC diameter 4” -    -           - / BH     
   Pemasangan 1 bh Fitting pipa PVC diameter 3” -    -           - / BH     
 4 Pemasangan 1 m’ Pipa PVC Tipe AW Diameter 3” -    -           - / M'     
 5 Pemasangan 1 m’ Pipa PVC Tipe AW Diameter 2” -    -           - / M'     
 6 Pemasangan 1 m’ Pipa PVC Tipe AW Diameter 1” -    -           - / M'     
   Pasangan Pipa PVC AW 1/2 Inch dari instalasi utama ke                    
 7                                        -          -           - / M'     
   fixture                                                                  
 8 Pemasangan Bak Kontrol Beton Ø40 cm t=45 cm                   - / BH     
 9 Pemasangan Grease Trap Beton Ø40 cm t=45 cm                   - / BH     
 F ANALISA PEKERJAAN IPAL                                                   
   Pemasangan 1 m2 dudukan media sarang tawon dengan                        
  1                                      -          -           -           
   bahan pipa PVC AW dia.1”                                        / M2     
   Pemasangan media sarang tawon, bahan rigid PVC tebal                     
  2                                                             -  /M3      
   0,2 mm                                                                   
  3 Pemasangan vent pipa Galvanish dia. 2"                      -  / BH     
  4 Floating Clorin feeder (pengumpan klorin apung)             -  /Unit    
  5 Khlorin Tablet                                              -  /Kg      
   Pemasangan Fine Screen Stainliststeel 304, diameter                      
  6                                                             -  /Unit    
   lubang 1,5 cm, Tebal Plat 2 mm                                           
 G COMISSIONING TEST                                                        
  1 Uji Aliran dan Kebocoran Bak IPL                            -  / ls     
  2 Uji Analisa Laboratorium, Air Limbah Domestik               -  /spl     
                       DAFTAR ANALISA HARGA SATUAN                          
                           Penyediaan Sarana & Prasarana Sanitasi di Lembaga Pendidikan Keagamaan
  PROYEK                  :                                                 
                           (LPK) Lokasi 30                                  
  PEKERJAAN               : Pembangunan Bilik MCK Wanita                    
  TAHUN ANGGARAN          : 2023                                            
                                                                            
  A ANALISA PEKERJAAN PERSIAPAN                                             
  1 Pembersihan Lapangan / M2                                               
      0,060 OH Pekerja     @       -  =       -                             
      0,005 OH Mandor      @       -  =       -                             
                                      =       -                             
                         Profit & Overhead (10%) = -    -                   
                                   Total =    -         -  =       -        
  2 Pembongkaran Rabat Beton / M3                                           
      6,667 OH Pekerja     @       -  =       -                             
      0,333 OH Mandor      @       -  =       -                             
                                      =       -                             
                         Profit & Overhead (10%) = -    -                   
                                   Total =    -         -  =       -        
  3 Pemasangan Bowplank / M1                                                
      0,100 OH Pekerja     @       -  =       -                             
      0,005 OH Mandor      @       -  =       -                             
      0,100 OH Tukang Kayu @       -  =       -                             
      0,010 OH Kepala Tukang @     -  =       -                             
      0,007 M3 Kayu Klas III/papan @ -          =       -                   
      0,250 Btg Kayu balok 5/7 @   -            =       -                   
      0,020 KG Paku        @       -            =       -                   
                                      =       - =       -                   
                         Profit & Overhead (10%) = -    -                   
                                   Total =    -         -  =       -        
  B ANALISA PEKERJAAN STRUKTUR                                              
  1 Galian Tanah Biasa sedalam 1 m / M3                                     
      0,450 OH Pekerja     @       -  =       -                             
      0,025 OH Mandor      @       -  =       -                             
                                      =       -         -                   
                         Profit & Overhead (10%) = -    -                   
                                   Total =    -         -  =       -        
  2 Galian Tanah Biasa sedalam 2 m / M3                                     
      0,450 OH Pekerja     @       -  =       -                             
      0,025 OH Mandor      @       -  =       -                             
                                      =       -         -                   
                         Profit & Overhead (10%) = -    -                   
                                   Total =    -         -  =       -        
  3 Buang Tanah Ke luar Lokasi / M3                                         
      0,300 OH Pekerja     @       -  =       -                             
      0,011 OH Mandor      @       -  =       -                             
                                      =       -         -                   
                         Profit & Overhead (10%) = -    -                   
                                   Total =    -         -  =       -        
                                                                            
  4 Pengurugan Tanah Kembali / M3                                           
      0,450 OH Pekerja     @       -  =       -                             
      0,045 OH Mandor      @       -  =       -                             
                                      =       -         -                   
                         Profit & Overhead (10%) = -    -                   
                                   Total =    -         -  =       -        
  5 Urugan Tanah Urug / M3                                                  
      0,450 OH Pekerja     @       -  =       -                             
      0,045 OH Mandor      @       -  =       -                             
      1,200 m3 Tanah Urug  @       -                    -                   
                                      =       -         -                   
                         Profit & Overhead (10%) = -    -                   
                                   Total =    -         -  =       -        
  6 Urugan Pasir Urug / M3                                                  
      0,300 OH Pekerja     @       -  =       -                             
      0,010 OH Mandor      @       -  =       -                             
      1,200 m3 Pasir Urug  @       -            =       -                   
                                      =       - =       -                   
                         Profit & Overhead (10%) = -    -                   
                                   Total =    -         -  =       -        
                                                                            
  7 Pekerjaan Pasangan Pondasi Rolag 30x30 / M3                             
      0,513 OH Pekerja     @       -  =       -                             
      0,030 OH Mandor      @       -  =       -                             
      0,513 OH Tukang batu @       -  =       -                             
      0,020 OH Kepala Tukang @     -  =       -                             
      50,473 Kg Semen (50 Kg) @    -            =       -                   
      1,393 M3 Pasir Pasang @      -            =       -                   
     490,000 Bh Batu Bata          -            =       -                   
                                      =       - =       -                   
                         Profit & Overhead (10%) = -    -                   
                                   Total =    -         -  =       -        
  8 Pekerjaan Beton Fc. 7.4 Mpa atau K. 100 Kg/Cm2 / M3                     
      1,200 OH Pekerja     @       -  =       -                             
      0,120 OH Mandor      @       -  =       -                             
      0,275 OH Tukang Batu @       -  =       -                             
      0,020 OH Kepala Tukang @     -  =       -                             
      0,740 M3 Kerikil     @       -            =       -                   
      0,621 M3 Pasir Beton @       -            =       -                   
     225,000 Kg Semen      @       -            =       -                   
                                      =       - =       -                   
                         Profit & Overhead (10%) = -    -                   
                                   Total =    -         -  =       -        
  9 Pekerjaan Beton Fc. 14.5 Mpa atau K. 175 Kg/Cm2 / M3                    
      1,450 OH Pekerja     @       -  =       -                             
      0,083 OH Mandor      @       -  =       -                             
      0,275 OH Tukang Batu @       -  =       -                             
      0,028 OH Kepala Tukang @     -  =       -                             
      0,762 M3 Kerikil     @       -            =       -                   
      0,543 M3 Pasir Beton @       -            =       -                   
     300,000 Kg Semen      @       -            =       -                   
                                      =       - =       -                   
                         Profit & Overhead (10%) = -    -                   
                                   Total =    -         -  =       -        
  10 Pekerjaan Beton Fc. 18,86 Mpa atau K. 225 Kg/Cm2 / M3                  
      1,450 OH Pekerja     @       -  =       -                             
      0,083 OH Mandor      @       -  =       -                             
      0,275 OH Tukang Batu @       -  =       -                             
      0,028 OH Kepala Tukang @     -  =       -                             
      0,776 M3 Kerikil     @       -            =       -                   
      0,411 M3 Pasir Beton @       -            =       -                   
     371,000 Kg Semen      @       -            =       -                   
                                      =       - =       -                   
                         Profit & Overhead (10%) = -    -                   
                                   Total =    -         -  =       -        
  11 Pemasangan 1 m' PVC Waterstop Lebar 200 mm                             
      0,070 OH Pekerja     @       -  =       -                             
      0,035 OH Tukang Batu @       -  =       -                             
      0,004 OH Kepala Tukang @     -  =       -                             
      0,007 OH Mandor      @       -  =       -                             
      1,050 M' Water stop  @       -            =       -                   
                                      =       - =       -                   
                         Profit & Overhead (10%) = -    -                   
                                   Total =    -         -  =       -        
  12 Pekerjaan Besi 10 kg Besi Polos Ø 12 mm                                
      0,070 OH Pekerja     @       -  =       -                             
      0,070 OH Tukang Besi @       -  =       -                             
      0,007 OH Kepala Tukang @     -  =       -                             
      0,004 OH Mandor      @       -  =       -                             
      10,500 Kg Besi Beton panjang 12 meter d@ia 1 2 - = -                  
      0,150 Kg Kawat Beton @       -            =       -                   
                                      =       - =       -                   
                         Profit & Overhead (10%) = -    -                   
                                   Total =    -         -  =       -        
                                Untuk /Kg     -         -          -        
  13 Pekerjaan Besi 10 kg Besi Polos Ø 10 mm                                
      0,070 OH Pekerja     @       -  =       -                             
      0,070 OH Tukang Besi @       -  =       -                             
      0,007 OH Kepala Tukang @     -  =       -                             
      0,004 OH Mandor      @       -  =       -                             
      10,500 Kg Besi Beton panjang 12 meter d@ia 1 0 - = -                  
      0,150 Kg Kawat Beton @       -            =       -                   
                                      =       - =       -                   
                         Profit & Overhead (10%) = -    -                   
                                   Total =    -         -  =       -        
                                Untuk /Kg     -         -          -        
  14 Pekerjaan Besi 10 kg Besi Polos Ø 8 mm                                 
      0,070 OH Pekerja     @       -  =       -                             
      0,070 OH Tukang Besi @       -  =       -                             
      0,007 OH Kepala Tukang @     -  =       -                             
      0,004 OH Mandor      @       -  =       -                             
      10,500 Kg Besi Beton panjang 12 meter d@ia 8 - =  -                   
      0,150 Kg Kawat Beton @       -            =       -                   
                                      =       - =       -                   
                         Profit & Overhead (10%) = -    -                   
                                   Total =    -         -  =       -        
                                Untuk /Kg     -         -          -        
  15 Pekerjaan Besi 10 kg Besi Polos Ø 8 mm                                 
      0,070 OH Pekerja     @       -  =       -                             
      0,070 OH Tukang Besi @       -  =       -                             
      0,007 OH Kepala Tukang @     -  =       -                             
      0,004 OH Mandor      @       -  =       -                             
      10,500 Kg Besi Beton panjang 12 meter d@ia 6 - =  -                   
      0,150 Kg Kawat Beton @       -            =       -                   
                                      =       - =       -                   
                         Profit & Overhead (10%) = -    -                   
                                   Total =    -         -  =       -        
                                Untuk /Kg     -         -          -        
  16 Bekisting Sloof, Kolom dan Ring Balk Beton / M2                        
      0,660 OH Pekerja     @       -  =       -                             
      0,026 OH Mandor      @       -  =       -                             
      0,330 OH Tukang Kayu @       -  =       -                             
      0,026 OH Kepala Tukang @     -  =       -                             
      0,048 M3 Papan Kayu Kelas III @ -         =       -                   
      0,300 Kg Paku        @       -            =       -                   
                                      =       - =       -                   
                         Profit & Overhead (10%) = -    -                   
                                   Total =    -         -  =       -        
                             Untuk 2 x pakai = -        -          -        
  17 Bekisting balok Beton / M2                                             
      0,660 OH Pekerja     @       -  =       -                             
      0,033 OH Mandor      @       -  =       -                             
      0,330 OH Tukang Kayu @       -  =       -                             
      0,033 OH Kepala Tukang @     -  =       -                             
      0,400 Kg Paku        @       -            =       -                   
      0,200 Ltr Minyak Bekisting @ -            =       -                   
      0,018 M3 Balok Kayu Kelas III @ -         =       -                   
      0,675 Lbr Multiplek tebal 0,9 cm @ -      =       -                   
      2,000 Btg Kayu Dolken @      -            =       -                   
                                      =       - =       -                   
                         Profit & Overhead (10%) = -    -                   
                                   Total =    -         -  =       -        
                             Untuk 2 x pakai = -        -          -        
  18 Bekisting Dinding Beton/ M2                                            
      0,660 OH Pekerja     @       -  =       -                             
      0,033 OH Mandor      @       -  =       -                             
      0,330 OH Tukang Kayu @       -  =       -                             
      0,033 OH Kepala Tukang @     -  =       -                             
      0,400 Kg Paku        @       -            =       -                   
      0,200 liter Minyak bekisting @ -          =       -                   
      0,020 m³ Balok Kayu Kelas III @ -         =       -                   
      0,671 lembar Multiplek tebal 0,9 cm @ -   =       -                   
      2,000 batang Kayu Dolken @   -            =       -                   
                                      =       - =       -                   
                         Profit & Overhead (10%) = -    -                   
                                   Total =    -         -  =       -        
                             Untuk 2 x pakai = -        -          -        
  19 Bekisting lantai Beton / M2                                            
      0,660 OH Pekerja     @       -  =       -                             
      0,033 OH Mandor      @       -  =       -                             
      0,330 OH Tukang Kayu @       -  =       -                             
      0,033 OH Kepala Tukang @     -  =       -                             
      0,400 Kg Paku        @       -            =       -                   
      0,200 liter Minyak bekisting @ -          =       -                   
      0,016 m³ Kayu Kelas III @    -            =       -                   
      0,671 lembar Multiplek tebal 0,9 cm @ -   =       -                   
                                      =       - =       -                   
                         Profit & Overhead (10%) = -    -                   
                                   Total =    -         -  =       -        
                             Untuk 2 x pakai = -        -          -        
  20 1 m' ring balk beton bertulang (10x15) cm                              
      0,297 OH Pekerja     @       -  =       -                             
      0,015 OH Mandor      @       -  =       -                             
      0,033 OH Tukang Batu @       -  =       -                             
      0,033 OH Tukang Kayu @       -  =       -                             
      0,033 OH Tukang Besi @       -  =       -                             
      0,010 OH Kepala Tukang @     -  =       -                             
      0,003 M3 Papan       @       -            =       -                   
      0,020 Kg Paku        @       -            =       -                   
      3,600 Kg Besi Beton panjang 12 meter d@ia 1 0 - = -                   
      0,050 Kg Kawat Beton @       -            =       -                   
      0,015 M3 Kerikil     @       -            =       -                   
      0,009 M3 Pasir Beton @       -            =       -                   
      5,500 Kg Semen       @       -            =       -                   
                                      =       -         -                   
                         Profit & Overhead (10%) = -    -                   
                                   Total =    -         -  =       -        
  21 Pemasangan 1 m2 rangka atap baja ringan                                
      0,200 OH Pekerja     @       -  =       -                             
      0,050 OH Mandor      @       -  =       -                             
      0,450 OH Tukang      @       -  =       -                             
      0,010 OH Kepala Tukang @     -  =       -                             
      3,200 M C.75.75      @       -  `         =       -                   
         - buah Sekrup kait / roofing @ -       =       -                   
      3,000 M Reng R.34    @       -            =       -                   
         - buah Dynabolt dia 12mm (10-15cm@) -  =       -                   
      5,000 % Peralatan            -                    -                   
                                      =       -         -                   
                         Profit & Overhead (10%) = -    -                   
                                   Total =    -         -  =       -        
  C ANALISA PEKERJAAN ARSITEKTUR                                            
  1 Pasangan 1/2 Bata Spesi 1 semen : 6 pasir /M2                           
      0,075 OH Pekerja     @       -  =       -                             
         - OH Mandor       @       -  =       -                             
      0,075 OH Tukang Batu @       -  =       -                             
         - OH Kepala Tukang @      -  =       -                             
      70,000 Bh Batu Bata  @       -            =       -                   
      0,050 M3 Pasir Pasang @      -            =       -                   
      6,500 Kg Semen       @       -            =       -                   
                                      =       -         -                   
                         Profit & Overhead (10%) = -    -                   
                                   Total =    -         -  =       -        
  2 Pemasangan 1 m2 Dinding Terawang (Roster) uk. 20x20 cm camp. 1SP : 4PP  
      0,300 OH Pekerja     @       -  =       -                             
      0,015 OH Mandor      @       -  =       -                             
      0,100 OH Tukang Batu @       -  =       -                             
      0,010 OH Kepala Tukang @     -  =       -                             
      25,000 Bh Roster uk. 20x20 cm @ -         =       -                   
      0,035 M3 Pasir Pasang @      -            =       -                   
      11,000 Kg Semen      @       -            =       -                   
                                      =       -         -                   
                         Profit & Overhead (10%) = -    -                   
                                   Total =    -         -  =       -        
  3 Plesteran Tebal 1.5 cm Spesi 1 : 6 /M2                                  
      0,050 OH Pekerja     @       -  =       -                             
      0,015 OH Mandor      @       -  =       -                             
      0,100 OH Tukang Batu @       -  =       -                             
      0,015 OH Kepala Tukang @     -  =       -                             
      3,456 Kg Semen       @       -            =       -                   
      0,029 M3 Pasir Pasang @      -            =       -                   
                                      =       -         -  =                
                         Profit & Overhead (10%) = -    -                   
                                   Total =    -         -  =       -        
  4 Pemasangan Acian / M2                                                   
      0,050 OH Pekerja     @       -  =       -                             
      0,010 OH Mandor      @       -  =       -                             
      0,100 OH Tukang Batu @       -  =       -                             
      0,010 OH Kepala Tukang @     -  =       -                             
      3,250 Kg Semen       @       -            =       -                   
                                      =       -         -                   
                         Profit & Overhead (10%) = -    -                   
                                   Total =    -         -  =       -        
  5 Pemasangan 1 buah Pintu Pintu aluminium Lengkap                         
      0,131 OH Pekerja     @       -  =       -                             
      0,013 OH Mandor      @       -  =       -                             
      0,131 OH Tukang Besi @       -  =       -                             
      0,013 OH Kepala Tukang @     -  =       -                             
      1,000 set Pintu Alumunium @  -                    -                   
                                              -         -                   
                             Profit & Overhead (10% ) - -                   
                                   Total =    -         -  =       -        
  6 Mencat Tembok (1 plamuur, 1 cat dasar, 2 cat penutup) /M2               
      0,020 OH Pekerja     @       -  =       -                             
      0,003 OH Mandor      @       -  =       -                             
      0,063 OH Tukang Cat  @       -  =       -                             
      0,006 OH Kepala Tukang @     -  =       -                             
      0,100 Kg Plamuur     @       -            =       -                   
      0,100 Kg Cat dasar   @       -            =       -                   
      0,260 Kg Cat Penutup @       -            =       -                   
                                      =       -         -                   
                         Profit & Overhead (10%) = -    -                   
                                   Total =    -         -  =       -        
  7 Pasangan closet Jongkok / BH                                            
      0,054 OH Pekerja     @       -  =       -                             
           OH Mandor       @       -  =       -                             
      0,350 OH Tukang Batu @       -  =       -                             
           OH Kepala Tukang @      -  =       -                             
      1,000 Bh Closet Jongkok @    -  `         =       -                   
      0,120 kg Semen       @       -                    -                   
      0,010 m3 Pasangan bata @     -            =       -                   
                                      =       -         -                   
                         Profit & Overhead (10%) = -    -                   
                                   Total =    -         -  =       -        
  8 Pasangan Floor Drain/ BH                                                
      0,010 OH Pekerja     @       -  =       -                             
      0,005 OH Mandor      @       -  =       -                             
      0,100 OH Tukang Batu @       -  =       -                             
      0,010 OH Kepala Tukang @     -  =       -                             
      1,000 Bh Floor Drain @       -            =       -                   
                                      =       -         -                   
                         Profit & Overhead (10%) = -    -                   
                                   Total =    -         -  =       -        
  9 Pasangan Kran Air /Bh                                                   
      0,010 OH Pekerja     @       -  =       -                             
      0,005 OH Mandor      @       -  =       -                             
      0,005 OH Tukang Batu @       -  =       -                             
         - OH Kepala Tukang @      -  =       -                             
      1,000 Bh Kran 3/4"   @       -            =       -                   
      0,025 Bh Sealtape    @       -            =       -                   
                                      =       -         -                   
                         Profit & Overhead (10%) = -    -                   
                                   Total =    -         -  =       -        
  10 Pasang Lantai Keramik UK. 25 x 25 cm /M2                               
      0,050 OH Pekerja     @       -  =       -                             
      0,014 OH Mandor      @       -  =       -                             
      0,100 OH Tukang Batu @       -  =       -                             
      0,014 OH Kepala Tukang @     -  =       -                             
      1,050 Doos Keramik Ukuran 25 x 25 @ - `   =       -                   
      10,400 Kg Semen 50 Kg @      -            =       -                   
      0,045 M3 Pasir Pasang @      -            =       -                   
      0,500 Kg Semen Warna @       -            =       -                   
                                      =       -         -                   
                         Profit & Overhead (10%) = -    -                   
                                   Total =    -         -  =       -        
  11 Pasang dinding Keramik UK. 25 x 40 cm /M2                              
      0,075 OH Pekerja     @       -  =       -                             
      0,045 OH Mandor      @       -  =       -                             
      0,100 OH Tukang Batu @       -  =       -                             
      0,045 OH Kepala Tukang @     -  =       -                             
      1,050 Doos Keramik Ukuran 25 x 40 @ - `   =       -                   
      10,400 Kg Semen 50 Kg @      -            =       -                   
      0,045 M3 Pasir Pasang @      -            =       -                   
      0,500 Kg Semen Warna @       -            =       -                   
                                      =       -         -                   
                         Profit & Overhead (10%) = -    -                   
                                   Total =    -         -  =       -        
  12 Penutup Atap                                                           
      0,020 OH Pekerja     @       -  =       -                             
         - OH Mandor       @       -  =       -                             
      0,080 OH Tukang Besi @       -  =       -                             
         - OH Kepala Tukang @      -  =       -                             
      1,050 M2 Atap Spandek berpasir @ -        =       -                   
      6,000 bh Screw Cteks 12-4 x 50 @ -        =       -                   
      2,000 bh Screw Cteks 10 x 16 -16 @ -      =       -                   
                                      =       -         -                   
                         Profit & Overhead (10%) = -    -                   
                                   Total =    -         -  =       -        
  13 Listplank GRC tebal 10 mm lebar 30 cm cat waethershield                
      0,200 OH Pekerja     @       -  =       -                             
         - OH Mandor       @       -  =       -                             
      0,200 OH Tukang Kayu @       -  =       -                             
         - OH Kepala Tukang @      -  =       -                             
      0,458 btg GRC plank tebal 10 mm lebar@ 30 c m p a n j a n g 2 -,4 m = -
      0,300 Kg Cat Penutup (Tembok dan Pla@fond ) - =   -                   
                                      =       -         -                   
                         Profit & Overhead (10%) = -    -                   
                                   Total =    -         -  =       -        
  14 Pemasangan 1 M2 Bouvenlicht kisi-kisi Besi hollo 2 x2 cm finish cat    
      0,932 OH Pekerja     @       -  =       -                             
         - OH Mandor       @       -  =       -                             
      0,826 OH Tukang Las  @       -  =       -                             
      0,133 OH Tukang Cat  @       -  =       -                             
         - OH Kepala Tukang @      -  =       -                             
      21,167 Kg Profil besi hollow @ -          =       -                   
      0,213 Kg Cat Menie (Minyak) @ -           =       -                   
      0,507 Kg Cat Penutup (Minyak) @ -         =       -                   
      0,373 Kg Pengencer/Minyak Cat biasa @ -   =       -                   
      1,000 ls Peralatan   @       -                    -                   
                                      =       -         -                   
                         Profit & Overhead (10%) = -    -                   
                                   Total =    -         -  =       -        
  15 Waterproofing                                                          
      0,100 OH Pekerja     @       -  =       -                             
         - OH Mandor       @       -  =       -                             
      0,100 OH Tukang batu @       -  =       -                             
         - OH Kepala Tukang @      -  =       -                             
      3,400 Kg Waterproofing cementitious @ -   =       -                   
                                      =       -         -                   
                         Profit & Overhead (10%) = -    -                   
                                   Total =    -         -  =       -        
  16 Grill Besi                                                             
      1,641 OH Pekerja     @       -  =       -                             
         - OH Mandor       @       -  =       -                             
      1,373 OH Tukang Las  @       -  =       -                             
      0,335 OH Tukang Cat  @       -  =       -                             
         - OH Kepala Tukang @      -  =       -                             
      14,170 Kg Profil besi siku @ -            =       -                   
      21,043 Kg Profil besi Beton panjang 12 m@eter d i a 1 3 - = -         
      0,535 Kg Cat Menie (Minyak) @ -           =       -                   
      1,271 Kg Cat Penutup (Minyak) @ -         =       -                   
      0,937 Kg Pengencer/Minyak Cat biasa @ -   =       -                   
      1,000 ls Peralatan   @       -            =       -                   
                                      =       -         -                   
                         Profit & Overhead (10%) = -    -                   
                                   Total =    -         -  =       -        
  17 Pemasangan head shower tanam lengkap dengan stop Kran                  
      0,200 OH Pekerja     @       -  =       -                             
         - OH Mandor       @       -  =       -                             
      0,200 OH Tukang Pipa @       -  =       -                             
         - OH Kepala Tukang @      -  =       -                             
      1,000 bh Head shower tanam Lengkap d@eng a n k r a n t a n a m- = -   
      1,000 ls Peralatan   @       -            =       -                   
                                      =       -         -                   
                         Profit & Overhead (10%) = -    -                   
                                   Total =    -         -  =       -        
  18 Tempat Sabun                                                           
      0,125 OH Pekerja     @       -  =       -                             
         - OH Mandor       @       -  =       -                             
      0,125 OH Tukang Pipa @       -  =       -                             
         - OH Kepala Tukang @      -  =       -                             
      1,000 bh Tempat sabun @      -            =       -                   
      1,000 ls Peralatan   @       -            =       -                   
                                      =       -         -                   
                         Profit & Overhead (10%) = -    -                   
                                   Total =    -         -  =       -        
  D ANALISA PEKERJAAN ELEKTRIKAL                                            
  1 Pemasangan 1 BH titik Lampu                                             
      0,350 % Tukang Listrik @     -  =       -                             
      1,000 Btg Pipa Listrik 5/8" @ -           =       -                   
      6,000 m Kabel NYM 3x2,5 mm2 @ - `         =       -                   
      1,000 Bh Tee Doos    @       -            =       -                   
      2,000 Bh Elbow       @       -            =       -                   
      3,000 Bh Las Dop     @       -            =       -                   
      12,000 Bh Klem Pipa Listrik @ -           =       -                   
                                      =       -         -                   
                         Profit & Overhead (10%) = -    -                   
                                   Total =    -         -  =       -        
  2 Pek. MCB                                                                
      0,125 OH Pekerja     @       -  =       -                             
         - OH Mandor       @       -  =       -                             
      0,125 OH Tukang Listrik @    -  =       -                             
           OH Kepala Tukang @      -  =       -                             
      1,000 bh MCB 1phase 10A @    -            =       -                   
      1,000 ls Material pendukung @ -           =       -                   
                                      =       -         -                   
                         Profit & Overhead (10%) = -    -                   
                                   Total =    -         -  =       -        
  3 Pek. Box MCB                                                            
      0,125 OH Pekerja     @       -  =       -                             
         - OH Mandor       @       -  =       -                             
      0,125 OH Tukang Listrik @    -  =       -                             
         - OH Kepala Tukang @      -  =       -                             
      1,000 bh Box MCB     @       -            =       -                   
      1,000 ls Material pendukung @ -           =       -                   
                                      =       -         -                   
                         Profit & Overhead (10%) = -    -                   
                                   Total =    -         -  =       -        
  4 Pekerjaan Pemasangan lampu SL 18 Watt + Fitting                         
      0,028 OH Pekerja     @       -  =       -                             
         - OH Mandor       @       -  =       -                             
      0,056 OH Tukang Listrik @    -  =       -                             
         - OH Kepala Tukang @      -  =       -                             
      1,000 bh Lampu SL 18 Watt + Fitting@ -    =       -                   
      1,000 ls Material pendukung @ -           =       -                   
                                      =       -         -                   
                         Profit & Overhead (10%) = -    -                   
                                   Total =    -         -  =       -        
  5 Pekerjaan Pemasangan Sakelar                                            
      0,028 OH Pekerja     @       -  =       -                             
         - OH Mandor       @       -  =       -                             
      0,056 OH Tukang Listrik @    -  =       -                             
         - OH Kepala Tukang @      -  =       -                             
      1,000 bh Saklar (standar) - Gracio Bro@co - =     -                   
      1,000 ls Material pendukung @ -           =       -                   
                                      =       -         -                   
                         Profit & Overhead (10%) = -    -                   
                                   Total =    -         -  =       -        
  E ANALISA PEKERJAAN PLAMBING                                              
  1 Pasangan Pipa PVC AW diameter 4" / M1                                   
      0,081 OH Pekerja     @       -  =       -                             
      0,004 OH Mandor      @       -  =       -                             
      0,135 OH Tukang Pipa @       -  =       -                             
      0,014 OH Kepala Tukang @     -  =       -                             
      0,350 Bh Lem Pipa PVC @      -                    -                   
      1,100 M Pipa PVC tipe AW Ø 4 Inchi @panja n g 4 m - = -               
                                      =       -         -                   
                         Profit & Overhead (10%) = -    -                   
                                   Total =    -         -  =       -        
  2 Pemasangan 1 m' Pipa PVC Tipe AW Diameter 3/4"                          
      0,036 OH Pekerja     @       -  =       -                             
      0,002 OH Mandor      @       -  =       -                             
      0,060 OH Tukang Batu @       -  =       -                             
      0,006 OH Kepala Tukang @     -  =       -                             
      0,350 Bh Lem Pipa PVC @      -                    -                   
      1,200 M' Pipa PVC AW 3/4" @  -            =       -                   
                                      =       -         -                   
                         Profit & Overhead (10%) = -    -                   
                                   Total =    -         -  =       -        
  3 Pemasangan 1 bh Tee pipa PVC diameter 4”                                
      0,027 OH Pekerja     @       -  =       -                             
      0,004 OH Mandor      @       -  =       -                             
      0,045 OH Tukang Pipa @       -  =       -                             
      0,014 OH Kepala Tukang @     -  =       -                             
      1,000 bh Tee pipa PVC diameter 4 Inch@i - =       -                   
                                      =       -         -                   
                         Profit & Overhead (10%) = -    -                   
                                   Total =    -         -  =       -        
  4 Pemasangan 1 bh Fitting pipa PVC diameter 4”                            
      0,027 OH Pekerja     @       -  =       -                             
      0,004 OH Mandor      @       -  =       -                             
      0,045 OH Tukang Pipa @       -  =       -                             
      0,014 OH Kepala Tukang @     -  =       -                             
      1,000 bh Socket Pipa PVC 4" @ -           =       -                   
                                      =       -         -                   
                         Profit & Overhead (10%) = -    -                   
                                   Total =    -         -  =       -        
  5 Pemasangan 1 bh Fitting pipa PVC diameter 3”                            
      0,027 OH Pekerja     @       -  =       -                             
      0,004 OH Mandor      @       -  =       -                             
      0,045 OH Tukang Pipa @       -  =       -                             
      0,014 OH Kepala Tukang @     -  =       -                             
      1,000 bh Socket Pipa PVC 3" @ -           =       -                   
                                      =       -         -                   
                         Profit & Overhead (10%) = -    -                   
                                   Total =    -         -  =       -        
  6 Pemasangan 1 m’ Pipa PVC Tipe AW Diameter 3”                            
      0,081 OH Pekerja     @       -  =       -                             
      0,004 OH Mandor      @       -  =       -                             
      0,135 OH Tukang Pipa @       -  =       -                             
      0,014 OH Kepala Tukang @     -  =       -                             
      0,350 Bh Lem Pipa PVC @      -                    -                   
      1,200 M Pipa PVC tipe AW Ø 3" panja@ng 4 m - =    -                   
                                      =       -         -                   
                         Profit & Overhead (10%) = -    -                   
                                   Total =    -         -  =       -        
  7 Pemasangan 1 m’ Pipa PVC Tipe AW Diameter 2”                            
      0,054 OH Pekerja     @       -  =       -                             
      0,003 OH Mandor      @       -  =       -                             
      0,090 OH Tukang Pipa @       -  =       -                             
      0,009 OH Kepala Tukang @     -  =       -                             
      1,200 M Pipa PVC tipe AW Ø 2" panja@ng 4 m - =    -                   
      1,000 LS Perlengkapan @      -            =       -                   
                                      =       -         -                   
                         Profit & Overhead (10%) = -    -                   
                                   Total =    -         -  =       -        
  8 Pemasangan 1 m’ Pipa PVC Tipe AW Diameter 1”                            
      0,036 OH Pekerja     @       -  =       -                             
      0,002 OH Mandor      @       -  =       -                             
      0,060 OH Tukang Pipa @       -  =       -                             
      0,006 OH Kepala Tukang @     -  =       -                             
      1,200 M Pipa PVC tipe AW Ø 1" panja@ng 4 m - =    -                   
      1,000 LS Perlengkapan @      -            =       -                   
                                      =       -         -                   
                         Profit & Overhead (10%) = -    -                   
                                   Total =    -         -  =       -        
  9 Pemasangan 1 m’ Pipa PVC Tipe AW Diameter 1/2”                          
      0,034 OH Pekerja     @       -  =       -                             
      0,002 OH Mandor      @       -  =       -                             
      0,059 OH Tukang Pipa @       -  =       -                             
      0,006 OH Kepala Tukang @     -  =       -                             
      1,200 M Pipa PVC Dia 1/2" ( AW ) @ -      =       -                   
      1,000 LS Perlengkapan @      -            =       -                   
                                      =       -         -                   
                         Profit & Overhead (10%) = -    -                   
                                   Total =    -         -  =       -        
  F ANALISA PEKERJAAN IPAL                                                  
  1 Pemasangan 1 m2 dudukan media sarang tawon dengan bahan pipa PVC AW dia.1”
      0,200 OH Pekerja     @       -  =       -                             
      0,010 OH Mandor      @       -  =       -                             
      0,400 OH Tukang Pipa @       -  =       -                             
      0,040 OH Kepala Tukang @     -  =       -                             
      14,700 m Pipa PVC diameter 1” @ -         =       -                   
      1,000 ls Perlengkapan (tali pengikat, d@ll) - =   -                   
                                      =       -         -                   
                         Profit & Overhead (10%) = -    -                   
                                   Total =    -         -  =       -        
  2 Pemasangan media sarang tawon, bahan rigid PVC tebal 0,2 mm             
                                   Total =    -                             
  3 Pemasangan vent pipa Galvanish dia. 1"                                  
                                   Total =    -                             
  4 Floating Clorin Feeder (Pengumpan klorin apung)                         
                                   Total =    -                             
  5 Khlorin Tablet                                                          
                                   Total =    -                             
                                                                            
  6 Pemasangan Fine Screen Stainliststeel 304, diameter lubang 1,5 cm, Tebal Plat 2 mm
                                   Total =    -                             
  G COMMISSIONING TEST                                                      
                                                                            
  1 Uji Aliran dan Kebocoran Bak IPL                                        
                                   Total =    -                             
  2 Uji Analisa Laboratorium, Air Limbah Domestik                           
                                   Total =    -                             
                DAFTAR  HARGA  SATUAN UPAH  DAN BAHAN                       
 PROYEK                 : Penyediaan Sarana & Prasarana Sanitasi di Lembaga Pendidikan
                          Keagamaan (LPK) Lokasi 30                         
                                                                            
 PEKERJAAN              : Pembangunan Bilik MCK Wanita                      
 TAHUN ANGGARAN         : 2023                                              
                                                                            
                                                                            
 NO       UPAH                             SATUAN      HARGA SATUAN         
  1         2                                 3              4              
  I   UPAH                                                                  
  1   Kepala Tukang                        Org / Hari                       
  2   Tukang Batu                          Org / Hari                       
  3   Tukang Kayu                          Org / Hari                       
  4   Tukang Besi                          Org / Hari                       
  5   Tukang Pipa                          Org / Hari                       
  6   Tukang Las                           Org / Hari                       
                                                                            
  7   Tukang Cat                           Org / Hari                       
  8   Tukang Listrik                       Org / Hari                       
  9   Pekerja                              Org / Hari                       
 10   Mandor                               Org / Hari                       
 II.  BAHAN                                                                 
  A   BAHAN BATU-BATUAN                                                     
  1   Kerikil                                M3                             
  2   Pasir Pasang                           M3                             
  3   Pasir Beton                            M3                             
  4   Pasir Urug                             M3                             
  5   Tanah Urug                             M3                             
  6   Batu Bata                              Bh                             
  7   Roster uk. 20x20 cm                    Bh                             
  8   Keramik Ukuran 25 x 25                 Doos                           
  9   Keramik Ukuran 25 x 40                 Doos                           
 10   Logo PU Akrilik                        Bh                             
  B   BAHAN KAYU                                                            
  1   Papan Bekisting (terentang)            M3                             
  2   Kayu Kelas III                         M3                             
  3   Kayu Kelas II                          M3                             
  4   Kaso 5/7                               Btg                            
  5   Minyak bekisting                       Liter                          
  6   Kayu Dolken                           Batang                          
  7   Multiplek tebal 0,9 cm                lembar                          
  8   Formtie/penjaga jarak bekesting/spacer buah                           
  C   SEMEN                                                                 
  1   Semen (50 Kg)                          kg                             
  2   Semen Warna ( 40 Kg )                  kg                             
  3   Waterproofing cementitious             Kg                             
  D   BAHAN BESI DAN KAWAT                                                  
  1   Besi Beton panjang 12 meter dia 12     Kg                             
  2   Besi Beton panjang 12 meter dia 10     Kg                             
  3   Besi Beton panjang 12 meter dia 8      Kg                             
  4   Besi Beton panjang 12 meter dia 6      Kg                             
  5   Profil besi Beton panjang 12 meter dia 13 Kg                          
  6   Kawat Beton                            Kg                             
 NO       UPAH                             SATUAN      HARGA SATUAN         
  1         2                                 3              4              
                                                                            
  7   Profil besi siku                       Kg                             
  8   Profil besi siku tebal 5mm             Kg                             
  9   Profil besi hollow                     Kg                             
 10   Paku                                   Kg                             
 11   Plat embaded (konekting rangka)        bh                             
 12   Kawat las                              bh                             
 13   Akrilik Sign Indonesia Maju            set                            
  E   BAHAN ATAP                                                            
  1   Lem Kayu                               Kg                             
  2   Profil C.75.75                         M'                             
  3   Reng R.34                              M'                             
  4   Atap Spandek berpasir                  M2                             
  5   Screw Cteks 12-4 x 50                  bh                             
  6   Screw Cteks 10 x 16 -16                bh                             
  7   GRC plank tebal 10 mm lebar 30 cm panjang 2,4 m btg                   
  F   BAHAN CAT                                                             
  1   Plamuur                                Kg                             
  2   Cat Menie (Minyak)                     Kg                             
  3   Cat Dasar (Tembok)                     Kg                             
  4   Cat Penutup (Minyak)                   Kg                             
  5   Cat Penutup (Tembok dan Plafond)       Kg                             
  6   Pengencer/Minyak Cat biasa             Kg                             
 G    SANITER                                                               
  1   Kloset Jongkok                         Bh                             
  2   Kran Air dia 3/4" tipe tuas steinless  Bh                             
  3   Head shower tanam Lengkap dengan kran tanam bh                        
  4   Tempat sabun                           bh                             
  5   Saringan Floordrain 10x10 cm steinless Bh                             
 H    BAHAN PINTU                                                           
  1   Pintu Alumunium Kamar Mandi            Bh                             
  I   BAHAN LISTRIK                                                         
  1   Pipa Listrik 5/8"                      btg                            
  2   Tee Doos                               bh                             
  3   L.Bow                                  bh                             
  4   Las Dop                                bh                             
  5   Klem Pipa Listrik                      bh                             
  6   Mangkok (Listrik)                      bh                             
  7   Pipa PVC Dia 1/2" ( AW )               Btg                            
  8   MCB 1phase 10A                         bh                             
  9   Box MCB                                bh                             
 10   Lampu SL 18 Watt + Fitting             bh                             
 11   Isolasi                                bh                             
 12   Saklar (standar) -                     bh                             
 13   Kabel NYM 3x2,5 mm2 @100 mtr supreme    m                             
  J   BAHAN PLAMBING                                                        
  1   Pipa PVC tipe AW Ø 4 Inchi panjang 4 m  m                             
  2   Elbow PVC L 90 Derajat Diameter 4"     Bh                             
  3   Tee pipa PVC diameter 4 Inchi          Bh                             
  4   Socket Pipa PVC 4"                     Bh                             
  5   Socket Pipa PVC 3"                     Bh                             
  6   Pipa PVC tipe AW Ø 3 Inchi panjang 4 m  m                             
 NO       UPAH                             SATUAN      HARGA SATUAN         
  1         2                                 3              4              
  7   Pipa PVC tipe AW Ø 2 Inchi panjang 4 m  m                             
  8   Pipa PVC tipe AW Ø 1 Inchi panjang 4 m  m                             
  9   Pipa PVC AW 3/4"                        m                             
                                                                            
 10   Lem Pipa PVC                           Bh                             
 11   Sealtape                               Bh                             
 12   Water Stop lebar 200                   m'                             
 K    IPAL                                                                  
  1   Media Sarang Tawon                     M3                             
  2   Pemasangan vent pipa Galvanish dia. 2" bh                             
  3   Floating Clorin feeder                 Unit                           
  4   Khlorin Tablet                         kg                             
  5   Fine Screen Stainliststeel 304         Unit                           
  6   Uji Aliran dan Kebocoran Bak IPL        ls                            
  7   Uji Analisa Laboratorium, Air Limbah Domestik spl                     
  L   SM K3                                                                 
  1   Papan informasi K.3                    bh                             
  2   Helm proyek                            Bh                             
  3   Sarung tangan (Safety gloves)          Psg                            
  4   Sepatu keselamatan untuk pekerja (Rubber safety shoes) Psg            
  5   Rompi keselamatan (Safety vest)        Bh                             
  6   Peralatan P3K (Kotak P3K, Obat Luka, Perban, dll) set                 
  7   Rambu Petunjuk/police line             roll