Pemenuhan Prasarana Smpn 1 Bukateja (Dau)

Basic Information
Type: Public Tender
Tender Code: 4311140
Date: 8 May 2023
Year: 2023
KLPD: Kab. Purbalingga
Work Unit: Dinas Pendidikan Dan Kebudayaan
Procurement Type: Pekerjaan Konstruksi
Method: Tender - Pascakualifikasi Satu File - Harga Terendah Sistem Gugur
Contract Type: Harga Satuan
Financial Information
Value (Nilai Pagu): Rp 218,500,000
Estimated Value (Nilai HPS): Rp 218,500,000
Winner (Pemenang): CV Narendra
NPWP: 835425182529000
RUP Code: 43545551
Work Location: Bukateja - Purbalingga (Kab.)
Participants: 30
Applicants
0835425182529000Rp 172,600,000
0027680347529000Rp 185,700,000
0017956400522000Rp 211,851,000
0423432251529000-
0316698935529000-
0314010570529000-
0969425594529000-
0941269854521000-
Arjuna Karya
09*0**1****22**0-
0762270692529000-
0018483941521000-
0804457232529000-
0027675545529000-
0022580211521000-
0317424935529000-
0806943320529000-
0026254722529000-
CV Fathiyan
06*0**6****29**0-
0018487496529000-
CV Aso
00*4**6****21**0-
0632355160529000-
0031931942529000-
0710359712529000-
CV Empat Lima
0020066486521000-
0025299116529000-
0027675339529000-
CV Bulan Mas Konstruksi
0629077488529000-
0746117035521000-
CV Andong Sejahtera
04*2**9****29**0-
0837040583522000-
Attachment
PEMERINTAH  KABUPATEN   PURBALINGGA                
                           DINAS PENDIDIKAN  DAN KEBUDAYAAN                  
                                                                             
                      Alamat : Jln. Let Jend S. Parman No. 345 Telp (0281) 891004 Raya Purbalingga 53317
                                                                             
                                                                             
                                                                             
                                                                             
                                                                             
                                                                             
                                                                             
                                  BBOOQQ                                     
                                                                             
                                                                             
                      BBIILLLL OOFFFF QQUUAANNTTIITTYY                       
                                                                             
                                                                             
                                                                             
                                                                             
                                                                             
                                                                             
                              PEKERJAAN                                      
                                                                             
                                                                             
             PEMENUHAN   PRASARANA   SMP  NEGERI 1 BUKATEJA                  
                                                                             
                                                                             
                           SUB   PEKERJAAN                                   
                                                                             
                                                                             
                 1. REHABILITASI RUANG  PERPUSTAKAAN                         
                 2. REHABILITASI RUANG  UKS                                  
                                                                             
                                                                             
                                 LOKASI                                      
                                                                             
                                                                             
                         SMP  NEGERI 1 BUKATEJA                              
                        KABUPATEN   PURBALINGGA                              
                                                                             
                                                                             
                                                                             
                                                                             
                                                                             
                            TAHUN ANGGARAN 2023                              
                                KOP PERUSAHAAN                               
                           (REKAPITULASI TOTAL BOQ)                          
                                                                             
                                                                             
  PEKERJAAN    : PEMENUHAN PRASARANA SMP NEGERI 1 BUKATEJA                   
  LOKASI       : SMP NEGERI 1 BUKATEJA, PURBALINGGA                          
  TAHUN ANGGARAN : 2023                                                      
                                                                             
                                                     JUMLAH BIAYA  TKDN      
      NO                    PEKERJAAN                                        
                                                         (RP)       %        
       1                          2                      3          4        
       I         REHABILITASI RUANG PERPUSTAKAAN       156.750.000,00        
       II        REHABILITASI RUANG UKS                6 1.750.000,00        
                 JUMLAH                                218.500.000,00        
                 JUMLAH TOTAL                          218.500.000,00        
                 PEMBULATAN                            218.500.000,00        
                                                                             
                      TERBILANG: ….....................................................................
                                                                             
                                                     Kota.../tgl-bln-tahun   
                                                     Nama Perusahaan         
                                                      CV/PT………..             
                                                                             
                                                                             
                                                 Tanda tangan dan cap perusahaan
                                                                             
                                                                             
                                                                             
                                                       Nama Jelas            
                                                        Jabatan              
                                KOP PERUSAHAAN                               
                              (REKAPITULASI BOQ)                             
             REKAPITULASI BILL OF QUANTITY REHABILITASI PERPUSTAKAAN         
                                                                             
                                                                             
  PEKERJAAN    : PEMENUHAN PRASARANA SMP NEGERI 1 BUKATEJA                   
  SUB PEKERJAAN : REHABILITASI RUANG PERPUSTAKAAN                            
  LOKASI       : SMP NEGERI 1 BUKATEJA, PURBALINGGA                          
  TAHUN ANGGARAN : 2023                                                      
                                                     JUMLAH BIAYA  TKDN      
      NO                    PEKERJAAN                                        
                                                         (RP)       %        
       1                          2                      3          4        
       I         PEKERJAAN PERSIAPAN                    1 .700.000,00        
       II        BIAYA SMKK                             4 .700.000,00        
      III        PEKERJAAN TANAH                        1 .502.943,75        
      IV         PEKERJAAN BETON                       1 4.330.074,07        
      V          PEKERJAAN PASANGAN DAN PLESTERAN      1 3.441.180,24        
      VI         PEKERJAAN KUSEN PINTU DAN JENDELA KACA 1 6.045.527,89       
      VII        PEKERJAAN RANGKA DAN PENUTUP ATAP     6 0.873.459,89        
      VIII       PEKERJAAN PLAFOND                     1 2.153.163,00        
      IX         PEKERJAAN PENUTUP LANTAI DAN DINDING   5 .975.310,00        
      X          PEKERJAAN LISTRIK                      2 .445.000,00        
      XI         PEKERJAN PENGECATAN                    8 .049.763,01        
                 JUMLAH                                141.216.421,86        
                 PPN                              11%  15.533.806,40         
                 JUMLAH TOTAL                          156.750.228,26        
                 PEMBULATAN                            156.750.000,00        
                    TERBILANG: …....................................................................................
                                                                             
                                                     Kota.../tgl-bln-tahun   
                                                                             
                                                     Nama Perusahaan         
                                                      CV/PT………..             
                                                                             
                                                                             
                                                 Tanda tangan dan cap perusahaan
                                                                             
                                                                             
                                                       Nama Jelas            
                                                        Jabatan              
                               KOP PERUSAHAAN                                
                                                                             
                              REKAPITULASI BOQ                               
               REKAPITULASI BILL OF QUANTITY REHABILITASI RUANG UKS          
                                                                             
  PEKERJAAN    : PEMENUHAN PRASARANA SMP NEGERI 1 BUKATEJA                   
  SUB PEKERJAAN : REHABILITASI RUANG UKS                                     
  LOKASI       : SMP NEGERI 1 BUKATEJA, PURBALINGGA                          
  TAHUN ANGGARAN : 2023                                                      
                                                                             
                                                     JUMLAH BIAYA  TKDN      
      NO                    PEKERJAAN                                        
                                                        (RP)        %        
       1                          2                      3          4        
       I        PEKERJAAN TANAH                         6 63.615,98          
       II       PEKERJAAN PONDASI                      1 .284.130,98         
      III       PEKERJAAN BETON                        2 .180.467,42         
      IV        PEKERJAAN PASANGAN DAN PLESTERAN       4 .720.021,34         
      V         PEKERJAAN KUSEN PINTU DAN JENDELA KACA 11.906.115,63         
      VI        PEKERJAAN RANGKA DAN PENUTUP ATAP      3 .933.023,11         
      VII       PEKERJAAN PLAFOND                      5 .249.929,30         
      VIII      PEKERJAAN PENUTUP LANTAI DAN DINDING   9 .857.344,20         
      IX        PEKERJAN PENGECATAN                    7 .979.809,20         
      X         PEKERJAN SANITASI DALAM GEDUNG         7 .856.791,81         
                JUMLAH                                55.631.248,95          
                PPN                              11%   6 .119.437,38         
                JUMLAH TOTAL                          61.750.686,34          
                PEMBULATAN                            61.750.000,00          
                     TERBILANG: …....................................................................................
                                                                             
                                                    Kota.../tgl-bln-tahun    
                                                    Nama Perusahaan          
                                                     CV/PT………..              
                                                                             
                                                                             
                                                Tanda tangan dan cap perusahaan
                                                                             
                                                                             
                                                                             
                                                      Nama Jelas             
                                                       Jabatan               
                                KOP PERUSAHAAN                               
                                                                             
                                    ( BOQ)                                   
                      BILL OF QUANTITY REHABILITASI RUANG PERPUSTAKAAN       
    PEKERJAAN    : PEMENUHAN PRASARANA SMP NEGERI 1 BUKATEJA                 
    SUB PEKERJAAN : REHABILITASI RUANG PERPUSTAKAAN                          
    LOKASI       : SMP NEGERI 1 BUKATEJA, PURBALINGGA                        
    TAHUN ANGGARAN : 2023                                                    
                                                      HARGA  JUMLAH          
    NO            URAIAN PEKERJAAN     ANALISA VOLUME SATUAN HARGA  TKDN     
                                                       Rp.    Rp.            
    1                2                   3      4      5     6 = 4 x 5 7     
     I PEKERJAAN PERSIAPAN                                                   
     1 Direksi kit + Gudang Material    Taksir 1 ,000 Ls 1.000.000,00 1 .000.000,00
     2 Pekerjaan Bongkaran              Taksir 1 ,000 Ls 500.000,00 5 00.000,00
     3 Papan Nama Proyek                Taksir 1 ,000 bh 200.000,00 2 00.000,00
                             SUB TOTAL                        1.700.000,00   
    II BIAYA SMKK                       Diperhit                             
     1 Penyiapan dokumen penerapan SMKK :                                    
      a Pembuatan dokumen RKK, RKPPL,RMLLPP,RMPK 1 ,000 Set 500.000,00 5 00.000,00
     2 Sosialisasi, promosi dan pelatihan:                                   
       j Papan informasi keselamatan konstruksi 2 ,000 Bh 100.000,00 2 00.000,00
     3 Alat Pelindung Kerja dan Alat Pelindung Diri :                        
      b APD, antara lain:                                                    
        Topi Pelindung (safety Helmet)         5 ,000 Bh 35.000,00 1 75.000,00
        Sarung Tangan (Safety Gloves)         1 0,000 Psg 10.000,00 1 00.000,00
        Sepatu Keselamatan (Safety shoes ruber safety shoes and toe cap) 5 ,000 Psg 80.000,00 4 00.000,00
        Rompi Keselamatan (Safety Vest)        5 ,000 Bh 15.000,00 7 5.000,00
     4 Asuransi dan perizinan terkait keselamatan konstuksi :                
      a Asuransi BPJS (Consruction All Risk CAR) 1 ,000 Ls 1.500.000,00 1 .500.000,00
     5 Personel Keselamatan Kerja Konstruksi :                               
       f Petugas P3K                           1 ,000 Org 1.000.000,00 1 .000.000,00
     6 Fasilitas sarana, prasarana, dan alat kesehatan:                      
      a Peralatan P3K                          1 ,000 Set 450.000,00 4 50.000,00
     7 Rambu dan perlengkapan lalu lintas yang diperlukan atau manajemen lalu lintas
      a Rambu petunjuk                         2 ,000 Bh 100.000,00 2 00.000,00
     9 Kegiatan dan peralatan terkait Pengendalian Resiko Keselamatan Konstruksi:
      d Bendera K3                             1 ,000 Bh 100.000,00 1 00.000,00
                             SUB TOTAL                        4.700.000,00   
    III PEKERJAAN TANAH                                                      
    1 Mengurug Sirtu Padat / Padas     1.7.2.e (c) 7 ,500 m³ 200.392,50 1 .502.943,75
                             SUB TOTAL                        1.502.943,75   
    IV PEKERJAAN BETON                                                       
     1 BALOK LATAI (BLa)                                                     
      a.Beton K-175                    2.2.2.1.g.(a) 0 ,180 m³ 1.018.644,63 1 83.356,03
      b.Pembesian                      2.2.6.1.b.(c) 2 5,934 kg 16.900,95 4 38.309,24
      c.Begisting 2x pakai             A.4.1.1.19. 2 ,100 m² 73.164,85 1 53.646,19
     2 KOLOM PRAKTIS 15/15                                                   
      a.Beton K-175                    2.2.2.1.g.(a) 0 ,081 m³ 1.018.644,63 8 2.510,21
      b.Pembesian                      2.2.6.1.b.(c) 1 4,894 kg 16.900,95 2 51.729,51
      c.Begisting 2x pakai             A.4.1.1.19. 1 ,080 m² 73.164,85 7 9.018,04
     3 RING BALK 15/20                                                       
      a.Beton K-175                    2.2.2.1.g.(a) 1 ,755 m³ 1.018.644,63 1 .787.721,32
      b.Pembesian                      2.2.6.1.b.(c) 2 12,330 kg 16.900,95 3 .588.584,80
      c.Begisting 2x pakai             A.4.1.1.19. 2 3,400 m² 73.164,85 1 .712.057,49
     4 KONSOL 15/20                                                          
      a.Beton K-175                    2.2.2.1.g.(a) 0 ,495 m³ 1.018.644,63 5 04.229,09
      b.Pembesian                      2.2.6.1.b.(c) 6 1,869 kg 16.900,95 1 .045.651,64
      c.Begisting 2x pakai             A.4.1.1.19. 9 ,075 m² 73.164,85 6 63.971,01
     5 BALOK SEKLET 15/20                                                    
      a.Beton K-175                    2.2.2.1.g.(a) 0 ,498 m³ 1.018.644,63 5 07.285,03
      b.Pembesian                      2.2.6.1.b.(c) 6 0,552 kg 16.900,95 1 .023.382,94
      c.Begisting 2x pakai             A.4.1.1.19. 6 ,640 m² 73.164,85 4 85.814,60
     6 BALOK LATE 15/20                                                      
      a.Beton K-175                    2.2.2.1.g.(a) 0 ,450 m³ 1.018.644,63 4 58.390,08
      b.Pembesian                      2.2.6.1.b.(c) 5 4,756 kg 16.900,95 9 25.427,74
      c.Begisting 2x pakai             A.4.1.1.19. 6 ,000 m² 73.164,85 4 38.989,10
                                                      HARGA  JUMLAH          
    NO            URAIAN PEKERJAAN     ANALISA VOLUME SATUAN HARGA  TKDN     
                                                       Rp.    Rp.            
    1                2                   3      4      5     6 = 4 x 5 7     
                             SUB TOTAL                       14.330.074,07   
    V PEKERJAAN PASANGAN DAN PLESTERAN                                       
     1 Pemasangan Dinding Bata Merah Ukuran 1/2 Bata A.4.4.1.11 4 3,855 m² 123.354,22 5 .409.637,64
     2 Pemasangan Plesteran 1 Pc : 6 Pp Tebal 15 mm 3.2.2.(c) 8 7,709 m² 60.198,34 5 .279.935,85
     3 Acian                           3.2.2.2.36.(c). 8 7,709 m² 31.372,00 2 .751.606,75
                             SUB TOTAL                       13.441.180,24   
    VI PEKERJAAN KUSEN PINTU DAN JENDELA KACA                                
     1 Kusen Type P1                   An Kusen 1 1 ,000 Unit 2.140.794,06 2 .140.794,06
     3 Kusen Type P2                   An Kusen 1.1 1 ,000 Unit 1.170.826,83 1 .170.826,83
     3 Kusen Type J1                   An Kusen 2 4 ,000 Unit 3.183.476,75 1 2.733.907,00
                             SUB TOTAL                       16.045.527,89   
    VII PEKERJAAN RANGKA DAN PENUTUP ATAP                                    
     1 Pemasangan Kuda kuda Kayu Kruing A.4.6.1.13 1,004 m³ 12.738.440,00 1 2.785.317,46
     2 Pemasangan Gording BaruKayu Klas II A.4.6.1.15 0,478 m³ 11.712.734,00 5 .599.623,87
     3 Pemasangan Gording Lama         A.4.6.1.15.a 0,538 m³ 1.125.234,00 6 04.925,80
     4 Pemasangan Rangka Atap Genteng Plentong Baru, Kayu Klas II A.4.6.1.16 84,000 m² 195.657,00 1 6.435.188,00
     5 Pemasangan Rangka Atap Genteng Plentong Lama A.4.6.1.16.a 71,400 m² 26.257,00 1 .874.749,80
     6 Pemasangan Atap Genteng Plentong A.4.5.2.1 184,520 m² 106.135,70 1 9.584.159,36
     7 Pemasangan Genteng Bubung plentong A.4.5.2.4 14,000 m' 113.535,40 1 .589.495,60
     8 Pemasangan Calsiplank            taksir 40,000 m¹ 60.000,00 2 .400.000,00
                             SUB TOTAL                       60.873.459,89   
    VIII PEKERJAAN PLAFOND                                                   
     1 Memasang Langit-langit kalsi Board, Uk (120x240) tebal 3 mm A.4.5.1.7 7 5,308 m² 44.434,50 3 .346.251,11
     2 Rangka Langit-Langit (60 x 120) cm, Kayu Kelas III A.4.6.1.20 7 5,308 m² 104.043,50 7 .835.255,88
     3 List Langit-Langit Profil Kayu  A.4.5.1.10 4 3,150 m¹ 22.518,10 9 71.656,02
                             SUB TOTAL                       12.153.163,00   
    IX PEKERJAAN PENUTUP LANTAI DAN DINDING                                  
     1 Pasang Keramik Lantai 30/30     A.4.4.3.35.b 3 0,000 m² 1 99.177 5 .975.310,00
                             SUB TOTAL                        5.975.310,00   
    X PEKERJAAN LISTRIK                                                      
     1 Instalasi Listrik                taksir 8 ,000 ttk 200.000,00 1 .600.000,00
     2 Stop Kontak                      taksir 4 ,000 bh 45.500,00 1 82.000,00
     3 Saklar tunggal                   taksir 2 ,000 bh 45.500,00 9 1.000,00
     4 Saklar double                    taksir 1 ,000 bh 52.000,00 5 2.000,00
     5 Lampu LED 9 W - 24 W + Fiting    taksir 8 ,000 bh 65.000,00 5 20.000,00
                             SUB TOTAL                        2.445.000,00   
    XI PEKERJAN PENGECATAN                                                   
     1 Cat Kayu                         3.3.4.(c) 1 6,158 m² 38.842,10 6 27.591,23
     2 Cat tembok Catylac              3.3.10.(c) 1 88,314 m² 28.154,61 5 .301.918,49
     3 Cat plafond Decolith            3.3.10.(c) 7 5,308 m² 28.154,61 2 .120.253,29
                             SUB TOTAL                        8.049.763,01   
                              TOTAL                          141.216.421,86  
                                                    Kota.../tgl-bln-tahun    
                                                    Nama Perusahaan          
                                                     CV/PT………..              
                                                 Tanda tangan dan cap perusahaan
                                                     Nama Jelas              
                                                      Jabatan                
                                KOP PERUSAHAAN                               
                                                                             
                                   (BOQ )                                    
                          BILL OF QUANTITY REHABILITASI UKS                  
 PEKERJAAN      : PEMENUHAN PRASARANA SMP NEGERI 1 BUKATEJA                  
 SUB PEKERJAAN  : REHABILITASI RUANG UKS                                     
 LOKASI         : SMP NEGERI 1 BUKATEJA, PURBALINGGA                         
 TAHUN ANGGARAN : 2023                                                       
                                                                             
                                                       HARGA   JUMLAH        
  NO            URAIAN PEKERJAAN        ANALISA VOLUME SATUAN  HARGA  TKDN   
                                                        Rp.     Rp.          
  1                 2                    3       4      5      6 = 4 x 5 7   
  III PEKERJAAN TANAH                                                        
   1 Galian Tanah                      1.7.7.1.1.c (a) 2,25 m³ 73.122,50 1 64.525,63
   2 Urugan Tanah Kembali               1.7.2.a 0,75 m³ 52.305,00 3 9.228,75 
   3 Urugan Pasir                      1.7.2.d ( c ) 0,15 m³ 260.249,00 3 9.037,35
   4 Urugan Sirtu                      1.7.2.e (c) 2,1 m³ 200.392,50 4 20.824,25
                            SUB TOTAL                           6 63.615,98  
  IV PEKERJAAN PONDASI                                                       
   1 Pasangan Anstamping                2.1.1.d.(a) 0,60 m³ 522.310,80 3 13.386,48
   2 Pasangan Batu Belah 1:6            A.3.2.1.9. 1,13 m³ 862.884,00 9 70.744,50
                            SUB TOTAL                          1.284.130,98  
  V PEKERJAAN BETON                                                          
   1 BALOK SLOOF 15/20                                                       
    a. Beton K-175                     2.2.2.1.g.(a) 0 ,150 m³ 1 .018.644,63 1 52.796,69
    b. Pembesian                       2.2.6.1.b.(c) 18,532 kg 16.900,95 3 13.207,73
    c. Begisting 2x pakai              A.4.1.1.19. 2 ,000 m² 73.164,85 1 46.329,70
   2 KOLOM PRAKTIS 15/15                                                     
    a. Beton K-175                     2.2.2.1.g.(a) 0 ,189 m³ 1 .018.644,63 1 92.523,83
    b. Pembesian                       2.2.6.1.b.(c) 30,378 kg 16.900,95 5 13.421,12
    c. Begisting 2x pakai              A.4.1.1.20. 2 ,520 m² 99.148,50 2 49.854,22
   3 RING BALK 15/20                                                         
    a. Beton K-175                     2.2.2.1.g.(a) 0 ,150 m³ 1 .018.644,63 1 52.796,69
    b. Pembesian                       2.2.6.1.b.(c) 18,532 kg 16.900,95 3 13.207,73
    c. Begisting 2x pakai              A.4.1.1.19. 2 ,000 m² 73.164,85 1 46.329,70
                            SUB TOTAL                          2.180.467,42  
  VI PEKERJAAN PASANGAN DAN PLESTERAN                                        
   1 Pemasangan Dinding Bata Merah Ukuran 1/2 Bata A.4.4.1.11 15,400 m² 123.354,22 1 .899.654,99
   2 Pemasangan Plesteran 1 Pc : 6 Pp Tebal 15 mm 3.2.2.(c) 30,800 m² 60.198,34 1 .854.108,75
   3 Acian                             3.2.2.2.36.(c). 30,800 m² 31.372,00 9 66.257,60
                            SUB TOTAL                          4.720.021,34  
  VII PEKERJAAN KUSEN PINTU DAN JENDELA KACA                                 
   1 Kusen Type P1                     An Kusen 1 1 ,000 Unit 2 .140.794,06 2 .140.794,06
   2 Kusen Type J1                     An Kusen 2 2 ,000 Unit 3 .183.476,75 6 .366.953,50
   3 Kusen Type J2                     An Kusen 3 2 ,000 Unit 1 .699.184,04 3 .398.368,07
                            SUB TOTAL                          11.906.115,63 
  VIII PEKERJAAN RANGKA DAN PENUTUP ATAP                                     
   1 Pemasangan Gording BaruKayu Klas II A.4.6.1.15 0,058 m³ 1 1.712.734,00 6 74.653,48
   2 Pemasangan Rangka Atap Genteng Plentong Baru, Kayu Klas II A.4.6.1.16 6,900 m² 195.657,00 1 .350.033,30
   3 Pemasangan Atap Genteng Plentong   A.4.5.2.1 6,900 m² 106.135,70 7 32.336,33
   4 Pemasangan Calsiplank              taksir 19,600 m¹ 60.000,00 1 .176.000,00
                            SUB TOTAL                          3.933.023,11  
  IX PEKERJAAN PLAFOND                                                       
   1 Memasang Langit-langit kalsi Board, Uk (120x240) tebal 3 mm A.4.5.1.7 34,600 m² 44.434,50 1 .537.433,70
   2 Rangka Langit-Langit (60 x 120) cm, Kayu Kelas III A.4.6.1.20 34,600 m² 104.043,50 3 .599.905,10
   3 List Langit-Langit Profil Kayu     A.4.5.1.10 5 ,000 m¹ 22.518,10 1 12.590,50
                            SUB TOTAL                          5.249.929,30  
  X PEKERJAAN PENUTUP LANTAI DAN DINDING                                     
   1 Pasang Keramik Lantai 30/30       A.4.4.3.35.b 21,000 m² 1 99.177 4 .182.717,00
   2 Pasang Kamar Mandi 25/25          A.4.4.3.53.c 3 ,000 m² 2 36.443 7 09.328,40
   3 Pasang Keramik Dinding 25/40      A.4.4.3.53.d 21,000 m² 2 36.443 4 .965.298,80
                            SUB TOTAL                          9.857.344,20  
  XII PEKERJAN PENGECATAN                                                    
   1 Cat Kayu                           3.3.4.(c) 7 ,110 m² 38.842,10 2 76.167,33
   2 Cat tembok Catylac                 3.3.10.(c) 216,389 m² 28.154,61 6 .098.829,09
   3 Cat plafond                        3.3.10.(c) 57,000 m² 28.154,61 1 .604.812,77
                                                       HARGA   JUMLAH        
  NO            URAIAN PEKERJAAN        ANALISA VOLUME SATUAN  HARGA  TKDN   
                                                        Rp.     Rp.          
  1                 2                    3       4      5      6 = 4 x 5 7   
                            SUB TOTAL                          7.979.809,20  
  XIII PEKERJAN SANITASI DALAM GEDUNG                                        
   1 Memasang Closet Jongkok            A.5.1.1.1 1 ,000 bh 966.830,70 9 66.830,70
   2 Memasang Wastafel Gantung          A.5.1.1.5 2 ,000 bh 584.083,50 1 .168.167,00
   3 Pemasangan Floor Drain             A.5.1.1.36 1 ,000 bh 95.489,90 9 5.489,90
   4 Pemasangan Kran Ø ½" atau Ø ¾"     A.5.1.1.35 1 ,000 bh 80.553,96 8 0.553,96
   5 Pemasangan Pipa PVC tipe AW Ø ½"   A.5.1.1.25 10,000 m¹ 19.030,44 1 90.304,40
   6 Pemasangan Pipa PVC tipe AW Ø 3"   A.5.1.1.31 10,000 m¹ 82.832,64 8 28.326,40
   7 Pemasangan Pipa PVC tipe AW Ø 4"   A.5.1.1.32 5 ,000 m¹ 105.423,89 5 27.119,45
   8 Pemasangan Septictank              Taksir 1 ,000 unit 3 .000.000,00 3 .000.000,00
   9 Pintu Kamar mandi                  Taksir 1 ,000 unit 1 .000.000,00 1 .000.000,00
                            SUB TOTAL                          7.856.791,81  
                             TOTAL                             55.631.248,95 
                                                    Kota.../tgl-bln-tahun    
                                                    Nama Perusahaan          
                                                     CV/PT………..              
                                                                             
                                                                             
                                                                             
                                                 Tanda tangan dan cap perusahaan
                                                                             
                                                                             
                                                                             
                                                      Nama Jelas             
                                                       Jabatan               
                                 KOP PERUSAHAAN                              
                   PERINCIAN MATA PEMBAYARAN PENERAPAN SISTEM MANAJEMEN      
                         KESELAMATAN KONSTRUKSI (SMKK)                       
  PEKERJAAN                   : PEMENUHAN PRASARANA SMP NEGERI 1 BUKATEJA    
  SUB PEKERJAAN               : REHABILITASI RUANG PERPISTAKAAN DAN UKS      
  LOKASI                      : SMP NEGERI 1 BUKATEJA, PURBALINGGA           
  NILAI PEKERJAAN KONSTRUKSI  : Rp. …..........................              
  JANGKA WAKTU                : 90 HARI KALENDER                             
                              SATUAN KUANTITAS HARGA TOTAL                   
                                                                NILAI        
   NO         URAIAN PEKERJAAN UKURAN    SATUAN HARGA    KET        KETERANGAN
                                                                TKDN         
                                          (RP)  (RP)                         
    I             II            III IV    V    VI (IV*V) VII    VIII  IX     
  1 Penyiapan dokumen penerapan SMKK :                                       
                                                    Memperhatikan Jumlah     
    a Pembuatan dokumen RKK, RKPPL,RMLLPP,RMPK Set 1 5 00.000,00 5 00.000,00 
                                                    dan jenis pekerjaan      
    A Sub Total Penyiapan RKK                 jumlah (a-c) 500.000,00        
  2 Sosialisasi, promosi dan pelatihan:                                      
     j Papan informasi keselamatan konstruksi Bh 2 1 00.000,00 2 00.000,00 Sesuai kebutuhan
    B Sub Total Sosialisasi, Promosi dan Pelatihan jumlah (a-i) 200.000,00   
  3 Alat Pelindung Kerja dan Alat Pelindung Diri :                           
    b APD, antara lain:                                                      
    1) Topi Pelindung (safety Helmet) Bh 5 35.000,00 1 75.000,00 Sesuai kebutuhan
    7) Sarung Tangan (Safety Gloves) Psg 10 10.000,00 1 00.000,00 Sesuai kebutuhan
    8) Sepatu Keselamatan (Safety shoes ruber safety shoes and toe cap) Psg 5 80.000,00 4 00.000,00 Sesuai kebutuhan
    12) Rompi Keselamatan (Safety Vest) Bh 5 15.000,00 75.000,00 Sesuai kebutuhan
    C Sub Total Alat Pelindung Kerja dan Alat Pelindung Diri jumlah (a-b) 750.000,00
  4 Asuransi dan perizinan terkait keselamatan konstuksi :                   
                                                    Memperhatikan perkiraan  
    a Asuransi BPJS (Consruction All Risk CAR) Ls 1 1 .500.000,00 1 .500.000,00 Jumlah pekerja serta Nilai
                                                    Pekerjaan                
    D Sub Total Asuransi dan Perizinan        jumlah (a-c) 1 .500.000,00     
  5 Personel Keselamatan Kerja Konstruksi :                                  
     f Petugas P3K              Org 1    1 .000.000,00 1 .000.000,00         
    E Sub Total Personel Keselamatan Konstruksi jumlah (a-h) 1 .000.000,00   
  6 Fasilitas sarana, prasarana, dan alat kesehatan:                         
                                                    Memperhatikan perkiraan  
    a Peralatan P3K             Set 1    4 50.000,00 4 50.000,00 Jumlah pekerja dan Resiko
                                                    Keselamatan Konstruksi   
    F Sub Total Fasilitas, Sarana Dan Prasarana kesehatan jumlah (a-g) 450.000,00
  7 Rambu dan perlengkapan lalu lintas yang diperlukan atau manajemen lalu lintas
    a Rambu petunjuk            Bh  2    1 00.000,00 2 00.000,00 Sesuai kebutuhan
    G Sub Total Rambu-rambu yang diperlukan   jumlah (a-p) 200.000,00        
  9 Kegiatan dan peralatan terkait Pengendalian Resiko Keselamatan Konstruksi:
    d Bendera K3                Bh  1    1 00.000,00 1 00.000,00 Sesuai kebutuhan
      Kegiatan dan Peralatan Terkait dengan Pengendalian Resiko              
     I                                                                       
      Keselamatan Konstruksi                  jumlah (a-i) 100.000,00        
             Total Mata Pembayaran Penerapan SMKK Pekerjaan Gedung jumlah (A-I) 4 .700.000,00
                                                             Kota.../tgl-bln-tahun
                                                             Nama Perusahaan 
                                                              CV/PT………..     
                                                          Tanda tangan dan cap perusahaan
                                                              Nama Jelas     
                                                               Jabatan       
                                 KOP PERUSAHAAN                              
                                                                             
                       D A F T A R H A R G A S A T U A N P E K E R J A A N   
                                                                             
                                                            HARGA SATUAN     
                                                                      TKDN   
    NO. KODE                 URAIAN PEKERJAAN          SAT   PEKERJAAN       
                                                              (Rp)    %      
    II       HARGA SATUAN PEKERJAAN TANAH                                    
    1  1.7.7.1.1.c (a) Menggali Tanah Biasa Sedalam 1 m m3      7 3.122,50   
    5   1.7.2.a Pengurugan Kembali                     m3       5 2.305,00   
    7  1.7.2.d ( c ) Urugan Pasir                      m3       2 60.249,00  
    8  1.7.2.e (c) Mengurug Sirtu Padat / Padas        m3       2 00.392,50  
    III      HARGA SATUAN PEKERJAAN PONDASI                                  
    1   2.1.1.d.(a) Pemasangan Pondasi Batu Belah      m3       8 62.884,00  
    2   A.3.2.1.9. Pemasangan batu kosong (anstamping) m3       5 22.310,80  
    IV       HARGA SATUAN PEKERJAAN B E T O N                                
    2  2.2.2.1.g.(a) Membuat Beton mutu f'c=14,5 MPa (K175) m3 1 .018.644,63 
    6  2.2.6.1.b.(c) Pembesian dg Besi Polos atau Besi Ulir kg  1 6.900,95   
    8  A.4.1.1.19. Memasang bekisting untuk sloof      m2       1 46.329,70  
    9  A.4.1.1.20. Memasang Bekisting untuk Kolom      m2       2 03.627,60  
    V        HARGA SATUAN PEKERJAAN BESI & ALLUMUNIUM                        
    3   A.4.2.1.24 Pemasangan Kusen Pintu Allumunium   m'       1 40.775,80  
    9  A.4.2.1.26a Pemasangan Pintu jendela Kaca Rangka Allumunium m2 1 .383.505,20
    10 A.4.2.1.26b Pemasangan Kaca Kusen Allumunium    m2       2 39.913,96  
    VI       HARGA SATUAN PEKERJAAN PASANGAN DINDING                         
    2   A.4.4.1.11 Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 6PP m2 1 23.354,22
    VII      HARGA SATUAN PEKERJAAN PLESTERAN                                
    1   3.2.2.(c) Pemasangan Plesteran 1 Pc : 6 Pp Tebal 15 mm m2 6 0.198,34 
    3  3.2.2.2.36.(c). Pemasangan Acian                m2       3 1.372,00   
    VIII     HARGA SATUAN PEKERJAAN PENUTUP LANTAI dan DINDING               
    3  A.4.4.3.35.b Pemasangan Lantai Keramik 30 x 30 cm m2     1 99.177,00  
    4  A.4.4.3.53.c Pemasangan Dinding Keramik 25 x 40 cm m2    2 36.442,80  
    5  A.4.4.3.53.d Pemasangan Keramik kamar mandi 25 x 25 cm m2 2 36.442,80 
    IX       HARGA SATUAN PEKERJAAN LANGIT-LANGIT                            
    1   A.4.5.1.7 Memasang Langit-langit CalsiBoard, Uk (120x240) tebal 3 mm m2 4 4.434,50
    3   A.4.5.1.10 List Langit-Langit Kayu Profil      m1       2 2.518,10   
    X        HARGA SATUAN PEKERJAAN PENUTUP ATAP                             
    1   A.4.5.2.1 Pemasangan Atap Genteng Plentong kecil m2     1 06.135,70  
    3   A.4.5.2.4 Pemasangan Bubung Genteng Plentong kecil m'   1 13.535,40  
    XI       HARGA SATUAN PEKERJAAN K A Y U dan BAJA RINGAN                  
    5   A.4.6.1.13 Pemasangan Konstruksi Kuda-kuda Konvensional, Kayu Kelas I,II dan III Bentang Sampai Dengan 6 Meter m3 1 2.738.440,00
    6   A.4.6.1.15 Pemasangan Konstruksi Gordeng, Kayu kelas II m3 1 1.712.734,00
    6  A.4.6.1.15.a Pemasangan Kembali Konstruksi Gordeng lama m2 1 .125.234,00
    7   A.4.6.1.16 Pemasangan Rangka Atap Genteng Plentong, Kayu kelas II m2 1 95.657,00
    7  A.4.6.1.16.a Pemasangan kembali Rangka Atap Genteng Plentong Lama m2 2 6.257,00
    10  A.4.6.1.20 Rangka Langit-Langit (60 x 120) cm, Kayu Kelas III m2 1 04.043,50
    XIII     HARGA SATUAN PEKERJAAN PENGECATAN                               
    1   3.3.4.(c) Pengecatan Bidang Kayu Baru (1 lp Plamuur, 1 lp Cat dasar, 2 Lp Cat Penutup) m2 3 8.842,10
    2   3.3.10.(c) Pengecat Tembok Baru Interior (1lap plamur,1lap Cat Dasar 2 lap. Cat Penutup) m2 2 8.154,61
                                                            HARGA SATUAN     
                                                                      TKDN   
    NO. KODE                 URAIAN PEKERJAAN          SAT   PEKERJAAN       
                                                              (Rp)    %      
    XIV      HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG                    
    1   A.5.1.1.1 Memasang Closet Jongkok              Unit     9 66.830,70  
    2   A.5.1.1.5 Memasang Wastafel Gantung            Unit     5 84.083,50  
    4   A.5.1.1.36 Pemasangan Floor Drain              buah     9 5.489,90   
    6   A.5.1.1.35 Pemasangan Kran Ø ½" atau Ø ¾"      bh       8 0.553,96   
    11  A.5.1.1.25 Pemasangan Pipa PVC tipe AW Ø ½"    m'       1 9.030,44   
    26  A.5.1.1.31 Pemasangan Pipa PVC tipe AW Ø 3"    m'       8 2.832,64   
    28  A.5.1.1.32 Pemasangan Pipa PVC tipe AW Ø 4"    m'       1 05.423,89  
    XVI An Kusen HARGA SATUAN PEKERJAAN KUSEN                                
    1  An Kusen 1 Pintu type P1                        Unit    2 .140.794,06 
       An Kusen 1.1 Pintu type P2   0                  Unit    1 .170.826,83 
    2  An Kusen 2 Jendela Type J1                      Unit    3 .183.476,75 
                                                   Kota.../tgl-bln-tahun     
                                                   Nama Perusahaan           
                                                    CV/PT………..               
                                                                             
                                                Tanda tangan dan cap perusahaan
                                                                             
                                                                             
                                                                             
                                                     Nama Jelas              
                                                      Jabatan                
                         D A F T A R ANALISA HARGA SATUAN PEKERJAAN          
                                                                             
                                                                             
                                               HARGA          NILAI          
                                                       JUMLAH                
No.  SNI  KODE KOEF SAT.    URAIAN PEKERJAAN  BAHAN/UPAH      TKDN KETERANGAN
                                                Rp      Rp     %             
 II                    HARGA SATUAN PEKERJAAN TANAH                          
 1 1.7.7.1.1.c (a) 1,0000 m3 Menggali Tanah Biasa Sedalam 1 m 7 3.122,50     
                     A TENAGA                           6 6.475,00           
          L.01  0,7500 OH Pekerja                85.400,00 6 4.050,00        
          L.04  0,0250 OH Mandor                 97.000,00 2 .425,00         
                     B BAHAN                                                 
                     C PERALATAN                                             
                     D Jumlah A + B + C                 6 6.475,00           
                     E Overhead & Profit  10%            6 .647,50           
                     F Harga Satuan Pekerjaan (D+E)     7 3.122,50           
 5   1.7.2.a    1,0000 m3 Pengurugan Kembali            5 2.305,00           
                     A TENAGA                           4 7.550,00           
          L.01  0,5000 OH Pekerja                85.400,00 4 2.700,00        
          L.04  0,0500 OH Mandor                 97.000,00 4 .850,00         
                     B BAHAN                                                 
                     C PERALATAN                                             
                     D Jumlah A + B + C                 4 7.550,00           
                     E Overhead & Profit  10%            4 .755,00           
                     F Harga Satuan Pekerjaan (D+E)     5 2.305,00           
 7  1.7.2.d ( c ) 1,0000 m3 Urugan Pasir                2 60.249,00          
                     A TENAGA                           2 6.590,00           
          L.01  0,3000 OH Pekerja                85.400,00 2 5.620,00        
          L.04  0,0100 OH Mandor                 97.000,00 9 70,00           
                     B BAHAN                            2 10.000,00          
                1,2000 m3 Pasir Urug            175.000,00 2 10.000,00       
                     C PERALATAN                                             
                     D Jumlah A + B + C                 2 36.590,00          
                     E Overhead & Profit  10%           2 3.659,00           
                     F Harga Satuan Pekerjaan (D+E)     2 60.249,00          
 8  1.7.2.e (c) 1,0000 m3 Mengurug Sirtu Padat / Padas  2 00.392,50          
                     A TENAGA                           2 3.775,00           
                0,2500 OH Pekerja                85.400,00 2 1.350,00        
                0,0250 OH Mandor                 97.000,00 2 .425,00         
                     B BAHAN                            1 58.400,00          
                1,2000 m3 Sirtu                 132.000,00 1 58.400,00       
                     C PERALATAN                                             
                     D Jumlah A + B + C                 1 82.175,00          
                     E Overhead & Profit  10%           1 8.217,50           
                     F Harga Satuan Pekerjaan (D+E)     2 00.392,50          
 III                  HARGA SATUAN PEKERJAAN PONDASI                         
 1  2.1.1.d.(a) 1,0000 m3 Pemasangan Pondasi Batu Belah 8 62.884,00          
                     A TENAGA                           2 13.900,00          
          L.01  1,5000 OH Pekerja                85.400,00 1 28.100,00       
          L.02  0,7500 OH Tukang Batu            95.000,00 7 1.250,00        
          L.03  0,0750 OH Kepala Tukang          97.000,00 7 .275,00         
          L.04  0,0750 OH Mandor                 97.000,00 7 .275,00         
                     B BAHAN                            5 70.540,00          
                1,2000 m3 Batu Belah 15/20      240.000,00 2 88.000,00       
               117,0000 Kg Portland Sement       1.360,00 1 59.120,00        
                0,5610 m3 Pasir Pasang          220.000,00 1 23.420,00       
                     C PERALATAN                                             
                     D Jumlah A + B + C                 7 84.440,00          
                     E Overhead & Profit  10%           7 8.444,00           
                     F Harga Satuan Pekerjaan (D+E)     8 62.884,00          
 2  A.3.2.1.9.  1,0000 m3 Pemasangan batu kosong (anstamping) 5 22.310,80    
                     A TENAGA                           1 11.228,00          
          L.01  0,7800 OH Pekerja                85.400,00 6 6.612,00        
          L.02  0,3900 OH Tukang Batu            95.000,00 3 7.050,00        
          L.03  0,0390 OH Kepala Tukang          97.000,00 3 .783,00         
          L.04  0,0390 OH Mandor                 97.000,00 3 .783,00         
                     B BAHAN                            3 63.600,00          
                1,2000 m3 Batu Belah 15/20      240.000,00 2 88.000,00       
                0,4320 m3 Pasir Urug            175.000,00 7 5.600,00        
                     C PERALATAN                                             
                     D Jumlah A + B + C                 4 74.828,00          
                     E Overhead & Profit  10%           4 7.482,80           
                     F Harga Satuan Pekerjaan (D+E)     5 22.310,80          
                                               HARGA          NILAI          
                                                       JUMLAH                
No.  SNI  KODE KOEF SAT.    URAIAN PEKERJAAN  BAHAN/UPAH      TKDN KETERANGAN
                                                Rp      Rp     %             
 IV                    HARGA SATUAN PEKERJAAN B E T O N                      
 2 2.2.2.1.g.(a) 1,0000 m3 Membuat Beton mutu f'c=14,5 MPa (K175) 1 .018.644,63
                     A TENAGA                           1 77.802,00          
          L.01  1,6500 OH Pekerja                85.400,00 1 40.910,00       
          L.02  0,2750 OH Tukang Batu            95.000,00 2 6.125,00        
          L.03  0,0280 OH Kepala Tukang          97.000,00 2 .716,00         
          L.04  0,0830 OH Mandor                 97.000,00 8 .051,00         
                     B BAHAN                            7 48.238,57          
               326,0000 Kg Portland Semen        1.360,00 4 43.360,00        
               760,0000 Kg Pasir Beton            157,14 1 19.428,57         
               1.029,0000 Kg Kerikil (maksimum 30 mm) 175,00 1 80.075,00     
               215,0000 ltr Air                    25,00 5 .375,00           
                     C PERALATAN                                             
                     D Jumlah A + B + C                 9 26.040,57          
                     E Overhead & Profit  10%           9 2.604,06           
                     F Harga Satuan Pekerjaan (D+E)    1 .018.644,63         
 6 2.2.6.1.b.(c) 100,0000 Kg Pembesian dg Besi Polos atau Besi Ulir 1 6.900,95
                     A TENAGA                            1 .369,50           
          L.01  0,0070 OH Pekerja                85.400,00 5 97,80           
          L.02  0,0070 OH Tukang Besi            95.000,00 6 65,00           
          L.03  0,0007 OH Kepala Tukang          97.000,00 6 7,90            
          L.04  0,0004 OH Mandor                 97.000,00 3 8,80            
                     B BAHAN                            1 3.995,00           
                1,0500 Kg Besi Beton (polos/ulir) 13.000,00 1 3.650,00       
                0,0150 Kg Kawat Beton            23.000,00 3 45,00           
                     C PERALATAN                                             
                     D Jumlah A + B + C                 1 5.364,50           
                     E Overhead & Profit  10%            1 .536,45           
                     F Harga Satuan Pekerjaan (D+E)     1 6.900,95           
 8  A.4.1.1.19. 1,0000 m2 Memasang bekisting untuk sloof 1 46.329,70         
                     A TENAGA                           7 4.152,00           
          L.01  0,5200 OH Pekerja                85.400,00 4 4.408,00        
          L.02  0,2600 OH Tukang Kayu            95.000,00 2 4.700,00        
          L.03  0,0260 OH Kepala Tukang          97.000,00 2 .522,00         
          L.04  0,0260 OH Mandor                 97.000,00 2 .522,00         
                     B BAHAN                            5 8.875,00           
                0,0450 m3 Kayu Cetakan          2.500.000,00 1 12.500,00     
                0,3000 Kg Paku Biasa 2" - 5"     17.500,00 5 .250,00         
                0,1000 Ltr Minyak Bekisting                -                 
                     C PERALATAN                                             
                     D Jumlah A + B + C                 1 33.027,00          
                     E Overhead & Profit  10%           1 3.302,70           
                     F Harga Satuan Pekerjaan (D+E)     1 46.329,70          
 9  A.4.1.1.20. 1,0000 m2 Memasang Bekisting untuk Kolom 2 03.627,60         
                     A TENAGA                           9 4.116,00           
          L.01  0,6600 OH Pekerja                85.400,00 5 6.364,00        
          L.02  0,3300 OH Tukang Kayu            95.000,00 3 1.350,00        
          L.03  0,0330 OH Kepala Tukang          97.000,00 3 .201,00         
          L.04  0,0330 OH Mandor                 97.000,00 3 .201,00         
                     B BAHAN                            9 1.000,00           
                0,0400 m3 Kayu Cetakan          2.500.000,00 1 00.000,00     
                0,4000 Kg Paku Biasa 2" - 5"     17.500,00 7 .000,00         
                0,2000 Ltr Minyak Bekisting        0,00    -                 
                0,0150 m3 Balok Kayu                       -                 
                0,3500 Lbr Plywood tebal 9mm    100.000,00 3 5.000,00        
                2,0000 Btg Bambu                 20.000,00 4 0.000,00        
                     C PERALATAN                                             
                     D Jumlah A + B + C                 1 85.116,00          
                     E Overhead & Profit  10%           1 8.511,60           
                     F Harga Satuan Pekerjaan (D+E)     2 03.627,60          
 V                     HARGA SATUAN PEKERJAAN BESI & ALLUMUNIUM              
 3  A.4.2.1.24  1,0000 m' Pemasangan Kusen Pintu Allumunium 1 40.775,80      
                     A TENAGA                            8 .378,00           
          L.01  0,0430 OH Pekerja                85.400,00 3 .672,20         
          L.02  0,0430 OH Tukang Besi            95.000,00 4 .085,00         
          L.03  0,0043 OH Kepala Tukang          97.000,00 4 17,10           
          L.04  0,0021 OH Mandor                 97.000,00 2 03,70           
                     B BAHAN                            1 19.600,00          
                1,1000 m' Profil Allumunium     105.000,00 1 15.500,00       
                2,0000 buah Skrup Fixer          1.300,00 2 .600,00          
                0,0600 Tube Sealant              25.000,00 1 .500,00         
                     C PERALATAN                                             
                     D Jumlah A + B + C                 1 27.978,00          
                     E Overhead & Profit  10%           1 2.797,80           
                     F Harga Satuan Pekerjaan (D+E)     1 40.775,80          
                                               HARGA          NILAI          
                                                       JUMLAH                
No.  SNI  KODE KOEF SAT.    URAIAN PEKERJAAN  BAHAN/UPAH      TKDN KETERANGAN
                                                Rp      Rp     %             
 8  A.4.2.1.26  1,0000 m2 Pemasangan Pintu Kaca Rangka Allumunium 1 .383.505,20
                     A Tenaga                           1 6.692,00           
          L.01  0,0850 OH Pekerja                85.400,00 7 .259,00         
          L.02  0,0850 OH Tukang Besi            95.000,00 8 .075,00         
          L.03  0,0090 OH Kepala Tukang          97.000,00 8 73,00           
          L.04  0,0050 OH Mandor                 97.000,00 4 85,00           
                     B Bahan                           1 .241.040,00         
                4,4000 m' Profil Allumunium     105.000,00 4 62.000,00       
                4,5000 m2 Profil Kaca 5 mm      170.000,00 7 65.000,00       
                0,2700 tube Sealant              52.000,00 1 4.040,00        
                     C PERALATAN                                             
                     D Jumlah A + B + C                1 .257.732,00         
                     E Overhead & Profit  10%           1 25.773,20          
                     F Harga Satuan Pekerjaan (D+E)    1 .383.505,20         
 9  A.4.2.1.26a 1,0000 m2 Pemasangan Pintu jendela Kaca Rangka Allumunium 1 .383.505,20
                     A Tenaga                           1 6.692,00           
          L.01  0,0850 OH Pekerja                85.400,00 7 .259,00         
          L.02  0,0850 OH Tukang Besi            95.000,00 8 .075,00         
          L.03  0,0090 OH Kepala Tukang          97.000,00 8 73,00           
          L.04  0,0050 OH Mandor                 97.000,00 4 85,00           
                     B Bahan                           1 .241.040,00         
                4,4000 m' Profil daun Allumunium 105.000,00 4 62.000,00      
                4,5000 m2 Profil Kaca 5 mm      170.000,00 7 65.000,00       
                0,2700 tube Sealant              52.000,00 1 4.040,00        
                     C PERALATAN                                             
                     D Jumlah A + B + C                1 .257.732,00         
                     E Overhead & Profit  10%           1 25.773,20          
                     F Harga Satuan Pekerjaan (D+E)    1 .383.505,20         
 10 A.4.2.1.26b 1,0000 m2 Pemasangan Kaca Kusen Allumunium 2 39.913,96       
                     A Tenaga                           1 7.063,60           
          L.01  0,0150 OH Pekerja                85.400,00 1 .281,00         
          L.02  0,1500 OH Tukang Besi            95.000,00 1 4.250,00        
          L.03  0,0150 OH Kepala Tukang          97.000,00 1 .455,00         
          L.04  0,0008 OH Mandor                 97.000,00 7 7,60            
                     B Bahan                            2 01.040,00          
                1,1000 m2 Profil Kaca 5 mm      170.000,00 1 87.000,00       
                0,2700 tube Sealant              52.000,00 1 4.040,00        
                     C PERALATAN                                             
                     D Jumlah A + B + C                 2 18.103,60          
                     E Overhead & Profit  10%           2 1.810,36           
                     F Harga Satuan Pekerjaan (D+E)     2 39.913,96          
 VI                    HARGA SATUAN PEKERJAAN PASANGAN DINDING               
 1  A.4.4.1.11  1,0000 m2 Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Cam p . 1 S1 P23:. 365P4P,22
                     A TENAGA                           3 7.545,00           
          L.01  0,3000 OH Pekerja                85.400,00 2 5.620,00        
          L.02  0,1000 OH Tukang Batu            95.000,00 9 .500,00         
          L.03  0,0100 OH Kepala Tukang          97.000,00 9 70,00           
          L.04  0,0150 OH Mandor                 97.000,00 1 .455,00         
                     B BAHAN                            7 4.595,20           
                70,0000 Buah Bata Merah 5 x 11 x 22 750,00 5 2.500,00        
                8,3200 Kg Portland Semen         1.360,00 1 1.315,20         
                0,0490 m3 Pasir Pasang          220.000,00 1 0.780,00        
                     C PERALATAN                                             
                     D Jumlah A + B + C                 1 12.140,20          
                     E Overhead & Profit  10%           1 1.214,02           
                     F Harga Satuan Pekerjaan (D+E)     1 23.354,22          
VII                    HARGA SATUAN PEKERJAAN PLESTERAN                      
 1  3.2.2.(c)   1,0000 m2 Pemasangan Plesteran 1 Pc : 6 Pp Tebal 15 mm 6 0.198,34
                     A TENAGA                           4 2.780,00           
          L.01  0,3000 OH Pekerja                85.400,00 2 5.620,00        
          L.02  0,1500 OH Tukang batu            95.000,00 1 4.250,00        
          L.03  0,0150 OH Kepala Tukang          97.000,00 1 .455,00         
          L.04  0,0150 OH Mandor                 97.000,00 1 .455,00         
                     B BAHAN                            1 1.945,76           
                4,4160 Kg Portland Semen         1.360,00 6 .005,76          
                0,0270 m3 Pasir Pasang          220.000,00 5 .940,00         
                     C PERALATAN                                             
                     D Jumlah A + B + C                 5 4.725,76           
                     E Overhead & Profit  10%            5 .472,58           
                     F Harga Satuan Pekerjaan (D+E)     6 0.198,34           
 3 3.2.2.2.36.(c). 1,0000 m2 Pemasangan Acian           3 1.372,00           
                     A TENAGA                           2 8.520,00           
          L.01  0,2000 OH Pekerja                85.400,00 1 7.080,00        
          L.02  0,1000 OH Tukang batu            95.000,00 9 .500,00         
          L.03  0,0100 OH Kepala Tukang          97.000,00 9 70,00           
          L.04  0,0100 OH Mandor                 97.000,00 9 70,00           
                     B BAHAN                               -                 
                3,2500 Kg Portland Semen           -       -                 
                     C PERALATAN                                             
                     D Jumlah A + B + C                 2 8.520,00           
                     E Overhead & Profit  10%            2 .852,00           
                     F Harga Satuan Pekerjaan (D+E)     3 1.372,00           
                                               HARGA          NILAI          
                                                       JUMLAH                
No.  SNI  KODE KOEF SAT.    URAIAN PEKERJAAN  BAHAN/UPAH      TKDN KETERANGAN
                                                Rp      Rp     %             
VIII                   HARGA SATUAN PEKERJAAN PENUTUP LANTAI dan DINDING     
 3 A.4.4.3.35.b 1,0000 m2 Pemasangan Lantai Keramik 30 x 30 cm 1 99.177,00   
                     A TENAGA                           9 9.820,00           
          L.01  0,7000 OH Pekerja                85.400,00 5 9.780,00        
          L.02  0,3500 OH Tukang Batu            95.000,00 3 3.250,00        
          L.03  0,0350 OH Kepala Tukang          97.000,00 3 .395,00         
          L.04  0,0350 OH Mandor                 97.000,00 3 .395,00         
                     B BAHAN                            8 1.250,00           
                1,0500 Dus Ubin Keramik 30 x 30 cm 55.000,00 5 7.750,00      
                10,0000 Kg Portland Semen        1.360,00 1 3.600,00         
                0,0450 m3 Pasir Pasang          220.000,00 9 .900,00         
                0,5000 Kg Semen Warna              0,00    -                 
                     C PERALATAN                                             
                     D Jumlah A + B + C                 1 81.070,00          
                     E Overhead & Profit  10%           1 8.107,00           
                     F Harga Satuan Pekerjaan (D+E)     1 99.177,00          
 4 A.4.4.3.53.c 1,0000 m2 Pemasangan Dinding Keramik 25 x 40 cm 2 36.442,80  
                     A TENAGA                           1 28.340,00          
          L.01  0,9000 OH Pekerja                85.400,00 7 6.860,00        
          L.02  0,4500 OH Tukang Batu            95.000,00 4 2.750,00        
          L.03  0,0450 OH Kepala Tukang          97.000,00 4 .365,00         
          L.04  0,0450 OH Mandor                 97.000,00 4 .365,00         
                     B BAHAN                            8 6.608,00           
                10,0000 Buah Keramik             7.000,00 7 0.000,00         
                9,3000 Kg Portland Semen         1.360,00 1 2.648,00         
                0,0180 m3 Pasir Pasang          220.000,00 3 .960,00         
                1,9400 Kg Semen Warna              0,00    -                 
                     C PERALATAN                                             
                     D Jumlah A + B + C                 2 14.948,00          
                     E Overhead & Profit  10%           2 1.494,80           
                     F Harga Satuan Pekerjaan (D+E)     2 36.442,80          
 4 A.4.4.3.53.d 1,0000 m2 Pemasangan Keramik kamar mandi 25 x 25 cm 2 36.442,80
                     A TENAGA                           1 28.340,00          
          L.01  0,9000 OH Pekerja                85.400,00 7 6.860,00        
          L.02  0,4500 OH Tukang Batu            95.000,00 4 2.750,00        
          L.03  0,0450 OH Kepala Tukang          97.000,00 4 .365,00         
          L.04  0,0450 OH Mandor                 97.000,00 4 .365,00         
                     B BAHAN                            8 6.608,00           
                16,0000 Buah Keramik             4.375,00 7 0.000,00         
                9,3000 Kg Portland Semen         1.360,00 1 2.648,00         
                0,0180 m3 Pasir Pasang          220.000,00 3 .960,00         
                1,9400 Kg Semen Warna              0,00    -                 
                     C PERALATAN                                             
                     D Jumlah A + B + C                 2 14.948,00          
                     E Overhead & Profit  10%           2 1.494,80           
                     F Harga Satuan Pekerjaan (D+E)     2 36.442,80          
 IX                    HARGA SATUAN PEKERJAAN LANGIT-LANGIT                  
 1  A.4.5.1.7   1,0000 m2 Memasang Langit-langit CalsiBoard, Uk (120x240) tebal 3 mm 4 4.434,50
                     A TENAGA                           1 4.260,00           
          L.01  0,1000 OH Pekerja                85.400,00 8 .540,00         
          L.02  0,0500 OH Tukang Kayu            95.000,00 4 .750,00         
          L.03  0,0050 OH Kepala Tukang          97.000,00 4 85,00           
          L.04  0,0050 OH Mandor                 97.000,00 4 85,00           
                     B BAHAN                            2 6.135,00           
                0,3640 Lbr Calsiboard            65.000,00 2 3.660,00        
                0,1100 Kg Paku Sekrup            22.500,00 2 .475,00         
                     C PERALATAN                                             
                     D Jumlah A + B + C                 4 0.395,00           
                     E Overhead & Profit  10%            4 .039,50           
                     F Harga Satuan Pekerjaan (D+E)     4 4.434,50           
 3  A.4.5.1.10     1 m1 List Langit-Langit Kayu Profil  2 2.518,10           
                     A Tenaga                            9 .796,00           
          L.01   0,05 OH Pekerja                 85.400,00 4 .270,00         
          L.02   0,05 OH Tukang Kayu             95.000,00 4 .750,00         
          L.03   0,005 OH Kepala Tukang          97.000,00 4 85,00           
          L.04   0,003 OH Mandor                 97.000,00 2 91,00           
                     B Bahan                            1 0.675,00           
                 1,05 m1 List Kayu               10.000,00 1 0.500,00        
                 0,01 Kg Paku                    17.500,00 1 75,00           
                     C PERALATAN                                             
                     D Jumlah A + B + C                 2 0.471,00           
                     E Overhead & Profit  10%            2 .047,10           
                     F Harga Satuan Pekerjaan (D+E)     2 2.518,10           
 X                     HARGA SATUAN PEKERJAAN PENUTUP ATAP                   
 1  A.4.5.2.1   1,0000 m2 Pemasangan Atap Genteng Plentong kecil 1 06.135,70 
                     A TENAGA                           2 1.487,00           
          L.01  0,1500 OH Pekerja                85.400,00 1 2.810,00        
          L.02  0,0750 OH Tukang Kayu            95.000,00 7 .125,00         
          L.03  0,0080 OH Kepala Tukang          97.000,00 7 76,00           
          L.04  0,0080 OH Mandor                 97.000,00 7 76,00           
                     B BAHAN                            7 5.000,00           
                25,0000 Buah Genteng             3.000,00 7 5.000,00         
                     C PERALATAN                                             
                     D Jumlah A + B + C                 9 6.487,00           
                     E Overhead & Profit  10%            9 .648,70           
                     F Harga Satuan Pekerjaan (D+E)     1 06.135,70          
                                               HARGA          NILAI          
                                                       JUMLAH                
No.  SNI  KODE KOEF SAT.    URAIAN PEKERJAAN  BAHAN/UPAH      TKDN KETERANGAN
                                                Rp      Rp     %             
 3  A.4.5.2.4   1,0000 m' Pemasangan Bubung Genteng Plentong kecil 1 13.535,40
                     A TENAGA                           5 5.294,00           
          L.01  0,4000 OH Pekerja                85.400,00 3 4.160,00        
          L.02  0,2000 OH Tukang Kayu            95.000,00 1 9.000,00        
          L.03  0,0200 OH Kepala Tukang          97.000,00 1 .940,00         
          L.04  0,0020 OH Mandor                 97.000,00 1 94,00           
                     B BAHAN                            4 7.920,00           
                5,0000 Buah Genteng Bubung       6.000,00 3 0.000,00         
                8,0000 Kg Portland Semen         1.360,00 1 0.880,00         
                0,0320 m3 Pasir Pasang          220.000,00 7 .040,00         
                     C PERALATAN                                             
                     D Jumlah A + B + C                 1 03.214,00          
                     E Overhead & Profit  10%           1 0.321,40           
                     F Harga Satuan Pekerjaan (D+E)     1 13.535,40          
 XI                    HARGA SATUAN PEKERJAAN K A Y U dan BAJA RINGAN        
 1  A.4.6.1.13  1,0000 m3 Pemasangan Konstruksi Kuda-kuda Konvensional, Kayu Kelas I,II dan III B e 1 n2t.a7n3g8.S44a0m,0p0aiDengan6Meter
                     A TENAGA                          1 .617.400,00         
          L.01  4,0000 OH Pekerja                85.400,00 3 41.600,00       
          L.02  12,0000 OH Tukang Kayu           95.000,00 1 .140.000,00     
          L.03  1,2000 OH Kepala Tukang          97.000,00 1 16.400,00       
          L.04  0,2000 OH Mandor                 97.000,00 1 9.400,00        
                     B BAHAN                           9 .963.000,00         
                1,1000 m3 Kayu Klas II Kruing  8.750.000,00 9 .625.000,00    
                15,0000 Kg Besi Strip            16.000,00 2 40.000,00       
                5,6000 Kg Paku Biasa             17.500,00 9 8.000,00        
                     C PERALATAN                                             
                     D Jumlah A + B + C                1 1.580.400,00        
                     E Overhead & Profit  10%          1 .158.040,00         
                     F Harga Satuan Pekerjaan (D+E)    1 2.738.440,00        
 2  A.4.6.1.15  1,0000 m3 Pemasangan Konstruksi Gordeng, Kayu kelas II 1 1.712.734,00
                     A TENAGA                           9 70.440,00          
          L.01  2,4000 OH Pekerja                85.400,00 2 04.960,00       
          L.02  7,2000 OH Tukang Kayu            95.000,00 6 84.000,00       
          L.03  0,7200 OH Kepala Tukang          97.000,00 6 9.840,00        
          L.04  0,1200 OH Mandor                 97.000,00 1 1.640,00        
                     B BAHAN                           9 .677.500,00         
                1,1000 m3 Kayu Klas II Kruing  8.750.000,00 9 .625.000,00    
                15,0000 Kg Besi Strip              -       -                 
                3,0000 Kg Paku Biasa             17.500,00 5 2.500,00        
                     C PERALATAN                                             
                     D Jumlah A + B + C                1 0.647.940,00        
                     E Overhead & Profit  10%          1 .064.794,00         
                     F Harga Satuan Pekerjaan (D+E)    1 1.712.734,00        
 2 A.4.6.1.15.a 1,0000 m3 Pemasangan Kembali Konstruksi Gordeng lama 1 .125.234,00
                     A TENAGA                           9 70.440,00          
          L.01  2,4000 OH Pekerja                85.400,00 2 04.960,00       
          L.02  7,2000 OH Tukang Kayu            95.000,00 6 84.000,00       
          L.03  0,7200 OH Kepala Tukang          97.000,00 6 9.840,00        
          L.04  0,1200 OH Mandor                 97.000,00 1 1.640,00        
                     B BAHAN                            5 2.500,00           
                1,1000 m3 Kayu Klas II Kruing              -                 
                15,0000 Kg Besi Strip                      -                 
                3,0000 Kg Paku Biasa             17.500,00 5 2.500,00        
                     C PERALATAN                                             
                     D Jumlah A + B + C                1 .022.940,00         
                     E Overhead & Profit  10%           1 02.294,00          
                     F Harga Satuan Pekerjaan (D+E)    1 .125.234,00         
 3  A.4.6.1.16  1,0000 m2 Pemasangan Rangka Atap Genteng Plentong, Kayu kelas II 1 95.657,00
                     A TENAGA                           1 9.495,00           
          L.01  0,1000 OH Pekerja                85.400,00 8 .540,00         
          L.02  0,1000 OH Tukang Kayu            95.000,00 9 .500,00         
          L.03  0,0100 OH Kepala Tukang          97.000,00 9 70,00           
          L.04  0,0050 OH Mandor                 97.000,00 4 85,00           
                     B BAHAN                            1 58.375,00          
                 0,014 m3 Kaso-kaso 5 x 7cm    8.750.000,00 1 22.500,00      
                0,0036 m3 Reng 2 x 3 cm        8.750.000,00 3 1.500,00       
                0,2500 Kg Paku Biasa             17.500,00 4 .375,00         
                     C PERALATAN                                             
                     D Jumlah A + B + C                 1 77.870,00          
                     E Overhead & Profit  10%           1 7.787,00           
                     F Harga Satuan Pekerjaan (D+E)     1 95.657,00          
 3 A.4.6.1.16.a 1,0000 m2 Pemasangan kembali Rangka Atap Genteng Plentong Lama 2 6.257,00
                     A TENAGA                           1 9.495,00           
          L.01  0,1000 OH Pekerja                85.400,00 8 .540,00         
          L.02  0,1000 OH Tukang Kayu            95.000,00 9 .500,00         
          L.03  0,0100 OH Kepala Tukang          97.000,00 9 70,00           
          L.04  0,0050 OH Mandor                 97.000,00 4 85,00           
                     B BAHAN                             4 .375,00           
                 0,014 m3 Kaso-kaso 5 x 7cm                -                 
                0,0036 m3 Reng 2 x 3 cm                    -                 
                0,2500 Kg Paku Biasa             17.500,00 4 .375,00         
                     C PERALATAN                                             
                     D Jumlah A + B + C                 2 3.870,00           
                     E Overhead & Profit  10%            2 .387,00           
                     F Harga Satuan Pekerjaan (D+E)     2 6.257,00           
                                               HARGA          NILAI          
                                                       JUMLAH                
No.  SNI  KODE KOEF SAT.    URAIAN PEKERJAAN  BAHAN/UPAH      TKDN KETERANGAN
                                                Rp      Rp     %             
 1  A.4.6.1.20  1,0000 m2 Rangka Langit-Langit (60 x 120) cm, Kayu Kelas III 1 04.043,50
                     A TENAGA                           4 9.460,00           
          L.01  0,2000 OH Pekerja                85.400,00 1 7.080,00        
          L.02  0,3000 OH Tukang Kayu            95.000,00 2 8.500,00        
          L.03  0,0300 OH Kepala Tukang          97.000,00 2 .910,00         
          L.04  0,0100 OH Mandor                 97.000,00 9 70,00           
                     B BAHAN                            4 5.125,00           
                 0,0163 m3 Kaso-kaso 5 x 7cm   2.500.000,00 4 0.750,00       
                0,2500 Kg Paku Biasa             17.500,00 4 .375,00         
                     C PERALATAN                                             
                     D Jumlah A + B + C                 9 4.585,00           
                     E Overhead & Profit  10%            9 .458,50           
                     F Harga Satuan Pekerjaan (D+E)     1 04.043,50          
XII                    HARGA SATUAN PEKERJAAN KUNCI dan KACA                 
 1  A.4.6.2.17  1,0000 m2 Pemasangan Kaca Bening tebal 5 mm 2 25.839,63      
                     A TENAGA                           1 7.058,75           
          L.01  0,0150 OH Pekerja                85.400,00 1 .281,00         
          L.02  0,1500 OH Tukang Kayu            95.000,00 1 4.250,00        
          L.03  0,0150 OH Kepala Tukang          97.000,00 1 .455,00         
          L.04  0,0008 OH Mandor                 97.000,00 7 2,75            
                     B BAHAN                            1 88.250,00          
                1,1000 m2 Kaca tebal 5mm        170.000,00 1 87.000,00       
                0,0500 Tube Silicone Sealent 300 ml 25.000,00 1 .250,00      
                     C PERALATAN                                             
                     D Jumlah A + B + C                 2 05.308,75          
                     E Overhead & Profit  10%           2 0.530,88           
                     F Harga Satuan Pekerjaan (D+E)     2 25.839,63          
XIII                   HARGA SATUAN PEKERJAAN PENGECATAN                     
 1  3.3.4.(c)   1,0000 m2 Pengecatan Bidang Kayu Baru (1 lp Plamuur, 1 lp Cat dasar, 2 Lp Cat Pen u t u p ) 3 8.842,10
                     A TENAGA                            7 .706,00           
          L.01  0,0700 OH Pekerja                85.400,00 5 .978,00         
          L.02  0,0090 OH Tukang Cat             95.000,00 8 55,00           
          L.03  0,0060 OH Kepala Tukang          97.000,00 5 82,00           
          L.04  0,0030 OH Mandor                 97.000,00 2 91,00           
                     B BAHAN                            2 7.605,00           
                0,2000 kg Cat Menie                 -       -                
                0,1500 kg Plamuur                   -       -                
                0,1700 kg Cat Dasar              60.000,00 1 0.200,00        
                0,2600 kg Cat Penutup            60.000,00 1 5.600,00        
                0,0100 bh Kuas                   10.500,00 1 05,00           
                0,0300 kg Pengencer              30.000,00 9 00,00           
                0,2000 lbr Amplas                4.000,00 8 00,00            
                     C PERALATAN                                             
                     D Jumlah A + B + C                 3 5.311,00           
                     E Overhead & Profit  10%            3 .531,10           
                     F Harga Satuan Pekerjaan (D+E)     3 8.842,10           
 2  3.3.10.(c)  1,0000 m2 Pengecat Tembok Baru Interior (1lap plamur,1lap Cat Dasar 2 lap. Cat Pe n u t u p ) 2 8.154,61
                     A TENAGA                            8 .595,10           
          L.01  0,0200 OH Pekerja                85.400,00 1 .708,00         
          L.02  0,0630 OH Tukang Cat             95.000,00 5 .985,00         
          L.03  0,0063 OH Kepala Tukang          97.000,00 6 11,10           
          L.04  0,0030 OH Mandor                 97.000,00 2 91,00           
                     B BAHAN                            1 7.000,00           
                0,1000 Kg Plamur                   0,00    -                 
                0,1000 Kg Cat Dasar              40.000,00 4 .000,00         
                0,2600 Kg Cat Penutup 2 kali     50.000,00 1 3.000,00        
                     C PERALATAN                                             
                     D Jumlah A + B + C                 2 5.595,10           
                     E Overhead & Profit  10%            2 .559,51           
                     F Harga Satuan Pekerjaan (D+E)     2 8.154,61           
XIV                    HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG          
 1  A.5.1.1.1   1,0000 Unit Memasang Closet Jongkok     9 66.830,70          
                     A TENAGA                           4 01.937,00          
          L.01  3,3000 OH Pekerja                85.400,00 2 81.820,00       
          L.02  1,1000 OH Tukang Batu            95.000,00 1 04.500,00       
          L.03  0,0010 OH Kepala Tukang          97.000,00 9 7,00            
          L.04  0,1600 OH Mandor                 97.000,00 1 5.520,00        
                     B BAHAN                            4 77.000,00          
                1,0000 Buah Kloset Jongkok      450.000,00 4 50.000,00       
                0,0600 Kelengkapan 6% dari harga Kloset 450.000,00 2 7.000,00
                     C PERALATAN                                             
                     D Jumlah A + B + C                 8 78.937,00          
                     E Overhead & Profit  10%           8 7.893,70           
                     F Harga Satuan Pekerjaan (D+E)     9 66.830,70          
 2  A.5.1.1.5   1,0000 Unit Memasang Wastafel Gantung   5 84.083,50          
                     A TENAGA                           1 36.625,00          
          L.01  1,2000 OH Pekerja                85.400,00 1 02.480,00       
          L.02  0,1450 OH Tukang Batu            95.000,00 1 3.775,00        
          L.03  0,1500 OH Kepala Tukang          97.000,00 1 4.550,00        
          L.04  0,0600 OH Mandor                 97.000,00 5 .820,00         
                     B BAHAN                            3 94.360,00          
                1,2000 Buah Wastafel            320.000,00 3 84.000,00       
                6,0000 Kg Portland Semen         1.360,00 8 .160,00          
                0,0100 m3 Pasir Pasang          220.000,00 2 .200,00         
                     C PERALATAN                                             
                     D Jumlah A + B + C                 5 30.985,00          
                     E Overhead & Profit  10%           5 3.098,50           
                     F Harga Satuan Pekerjaan (D+E)     5 84.083,50          
                                               HARGA          NILAI          
                                                       JUMLAH                
No.  SNI  KODE KOEF SAT.    URAIAN PEKERJAAN  BAHAN/UPAH      TKDN KETERANGAN
                                                Rp      Rp     %             
 4  A.5.1.1.36  1,0000 buah Pemasangan Floor Drain      9 5.489,90           
                     A TENAGA                           1 1.809,00           
          L.01  0,0100 OH Pekerja                85.400,00 8 54,00           
          L.02  0,1000 OH Tukang Batu            95.000,00 9 .500,00         
          L.03  0,0100 OH Kepala Tukang          97.000,00 9 70,00           
          L.04  0,0050 OH Mandor                 97.000,00 4 85,00           
                     B BAHAN                            7 5.000,00           
                1,0000 bh Floor Drain            75.000,00 7 5.000,00        
                     C PERALATAN                                             
                     D Jumlah A + B + C                 8 6.809,00           
                     E Overhead & Profit  10%            8 .680,90           
                     F Harga Satuan Pekerjaan (D+E)     9 5.489,90           
 6  A.5.1.1.35  1,0000 bh Pemasangan Kran Ø ½" atau Ø ¾" 8 0.553,96          
                     A TENAGA                           4 3.219,00           
          L.01  0,0100 OH Pekerja                85.400,00 8 54,00           
          L.02  0,4000 OH Tukang Batu            95.000,00 3 8.000,00        
          L.03  0,0400 OH Kepala Tukang          97.000,00 3 .880,00         
          L.04  0,0050 OH Mandor                 97.000,00 4 85,00           
                     B BAHAN                            3 0.011,88           
                1,0000 bh Kran Air               30.000,00 3 0.000,00        
                0,0025 bh Sealtape               4.750,00 1 1,88             
                     C PERALATAN                                             
                     D Jumlah A + B + C                 7 3.230,88           
                     E Overhead & Profit  10%            7 .323,09           
                     F Harga Satuan Pekerjaan (D+E)     8 0.553,96           
 11 A.5.1.1.25  1,0000 m' Pemasangan Pipa PVC tipe AW Ø ½" 1 9.030,44        
                     A TENAGA                            9 .550,40           
          L.01  0,0360 OH Pekerja                85.400,00 3 .074,40         
          L.02  0,0600 OH Tukang Batu            95.000,00 5 .700,00         
          L.03  0,0060 OH Kepala Tukang          97.000,00 5 82,00           
          L.04  0,0020 OH Mandor                 97.000,00 1 94,00           
                     B BAHAN                             7 .750,00           
                1,2000 m' Pipa PVC Ø ½"          5.000,00 6 .000,00          
                0,3500 Ls Perlengkapan 35% x pipa 5.000,00 1 .750,00         
                     C PERALATAN                                             
                     D Jumlah A + B + C                 1 7.300,40           
                     E Overhead & Profit  10%            1 .730,04           
                     F Harga Satuan Pekerjaan (D+E)     1 9.030,44           
 26 A.5.1.1.31  1,0000 m' Pemasangan Pipa PVC tipe AW Ø 3" 8 2.832,64        
                     A TENAGA                           2 1.439,90           
          L.01  0,0810 OH Pekerja                85.400,00 6 .917,40         
          L.02  0,1350 OH Tukang Batu            95.000,00 1 2.825,00        
          L.03  0,0135 OH Kepala Tukang          97.000,00 1 .309,50         
          L.04  0,0040 OH Mandor                 97.000,00 3 88,00           
                     B BAHAN                            5 3.862,50           
                1,2000 m' Pipa PVC Ø 3"          34.750,00 4 1.700,00        
                0,3500 Ls Perlengkapan 35% x pipa 34.750,00 1 2.162,50       
                     C PERALATAN                                             
                     D Jumlah A + B + C                 7 5.302,40           
                     E Overhead & Profit  10%            7 .530,24           
                     F Harga Satuan Pekerjaan (D+E)     8 2.832,64           
 28 A.5.1.1.32  1,0000 m' Pemasangan Pipa PVC tipe AW Ø 4" 1 05.423,89       
                     A TENAGA                           2 1.439,90           
          L.01  0,0810 OH Pekerja                85.400,00 6 .917,40         
          L.02  0,1350 OH Tukang Batu            95.000,00 1 2.825,00        
          L.03  0,0135 OH Kepala Tukang          97.000,00 1 .309,50         
          L.04  0,0040 OH Mandor                 97.000,00 3 88,00           
                     B BAHAN                            7 4.400,00           
                1,2000 m' Pipa PVC Ø 4"          48.000,00 5 7.600,00        
                0,3500 Ls Perlengkapan 35% x pipa 48.000,00 1 6.800,00       
                     C PERALATAN                                             
                     D Jumlah A + B + C                 9 5.839,90           
                     E Overhead & Profit  10%            9 .583,99           
                     F Harga Satuan Pekerjaan (D+E)     1 05.423,89          
                             ANALISA HARGA KUSEN                             
                                                                             
                                                                             
                                                HARGA SATUAN JUMLAH HARGA NILAI TKDN
  NO   KODE         URAIAN PEKERJAAN     VOLUME                              
                                                   (RP)     (RP)     %       
  XVI An Kusen  HARGA SATUAN PEKERJAAN KUSEN                                 
  1  An Kusen 1       Pintu type P1                                          
            Kusen Alumunium               3 ,31 m' 140.775,80 465.967,90     
            Daun Pintu Double Triplek Rangka Aluminium 2,80 m2 100.000,00 280.000,00
            Finishing HPL                 5,60 m2  120.000,00 672.000,00     
            Kaca Bening 5 mm              0,53 m2  239.913,96 127.826,16     
            Engsel Pintu                  6,00 buah 25.000,00 150.000,00     
            Grendel Tanam                 2,00 set  75.000,00 150.000,00     
            Handle                        2,00 Unit 120.000,00 240.000,00    
            Kunci                         1,00 set  55.000,00 55.000,00      
                                                   Sub Jumlah 2.140.794,06   
                                          Perlengkapan dan Pemasangan        
                                                  Jumlah Total 2.140.794,06  
  1  An Kusen 1.1     Pintu type P2                                          
            Kusen Alumunium               2 ,11 m' 140.775,80 297.036,94     
            Daun Pintu Double Triplek Rangka Aluminium 1 ,40 m2 100.000,00 140.000,00
            Finishing HPL                 2,80 m2  120.000,00 336.000,00     
            Kaca Bening 5 mm              0,30 m2  239.913,96 72.789,90      
            Engsel Pintu                  3,00 buah 25.000,00 75.000,00      
            Grendel Tanam                 1,00 set  75.000,00 75.000,00      
            Handle                        1,00 Unit 120.000,00 120.000,00    
            Kunci                         1,00 set  55.000,00 55.000,00      
                                                   Sub Jumlah 1.170.826,83   
                                          Perlengkapan dan Pemasangan        
                                                  Jumlah Total 1.170.826,83  
  2  An Kusen 2       Jendela Type J1                                        
            Kusen Alumunium              1 0,68 m' 140.775,80 1.503.485,54   
            Kaca Bening 5 mm rangka alumunium 0,84 m2 1.383.505,20 1.162.144,37
            Kaca Bening 5 mm              1,41 m2  239.913,96 337.846,84     
            Rambuncis                     2,00 bh   25.000,00 50.000,00      
            Casement                      2,00 set  35.000,00 70.000,00      
            Engsel                        4,00 bh   15.000,00 60.000,00      
                                                   Sub Jumlah 3.183.476,75   
                                          Perlengkapan dan Pemasangan        
                                                  Jumlah Total 3.183.476,75  
  3  An Kusen 3       Jendela Type J2                                        
            Kusen Alumunium               6 ,72 m' 140.775,80 946.013,38     
            Kaca Bening 5 mm rangka alumunium 0,36 m2 1.383.505,20 498.061,87
            Kaca Bening 5 mm              0,69 m2  239.913,96 165.108,79     
            Rambuncis                     1,00 bh   25.000,00 25.000,00      
            Casement                      1,00 set  35.000,00 35.000,00      
            Engsel                        2,00 bh   15.000,00 30.000,00      
                                                   Sub Jumlah 1.699.184,04   
                                          Perlengkapan dan Pemasangan        
                                                  Jumlah Total 1.699.184,04  
                    D A F T A R H A R G A S A T U A N B A H A N B A N G U N A N
                                                                             
                                                                             
                                                                             
                                               HARGA                         
    NO.          J E N I S B A H A N  SATUAN                 KETERANGAN      
                                                (Rp)                         
    I  B A H A N D A S A R                                                   
      1 BATU KALI                                                            
                     Batu blonos       m3         195.000,00                 
                     batu belah manual m3         240.000,00                 
                     batu belah manual 5/7 m3     250.000,00                 
                     batu belah manual 3/5 m3     275.000,00                 
      2 KERIKIL                                                              
                     Timbun            m3         245.000,00                 
                     Beton       0,5/1 m3         245.000,00                 
                     Beton       ,1/2  m3         245.000,00                 
                     Beton       ,2/3  m3         245.000,00                 
      3 BATU BATA                                                            
                     ex lokal          bh           750,00                   
      4 PASIR                                                                
                     Urug              m3         175.000,00                 
                     Pasang            m3         220.000,00                 
                     Beton             m3         220.000,00                 
      5 TANAH                                                                
                     Urug              m3         80.000,00                  
      6 PORTLAND CEMENT                                                      
                     Semen Dynamix 50kg kg                                   
                     Tiga Roda   50kg  kg         68.000,00                  
                     Gresik      50kg  kg         66.000,00                  
                     Bima        50kg  kg                                    
                     Semen Dynamix 1 kg kg                                   
                     Tiga Roda   1 kg  kg          1.360,00                  
                     Gresik      1 kg  kg          1.320,00                  
                     Bima        1 kg  kg                                    
                     Semen putih 40 kg kg         100.000,00                 
                     Semen putih 1 Kg  kg          3.000,00                  
                     semen warna       kg                                    
                     sika Grout        kg                                    
                     Mu 800            kg                                    
    II B A H A N P E N U T U P A T A P                                       
      1 GENTENG TANAH LIAT                                                   
                     Genteng Plentong  bh          3.000,00                  
                     Nok Genteng Plentong bh       6.000,00                  
                     Genteng magas                 2.500,00                  
                     Genteng Kodok                 5.500,00                  
                     Nok genteng Magas                                       
                     Nok genteng Kodok                                       
      2 SENG PLAT                                                            
                     BJLS 30 lebar 90 cm m'       45.000,00                  
      3 SENG GELOMBANG                                                       
                     BJLS 30 panjang 180 cm lbr   67.500,00                  
      4 GALVALUM     sheet tebal 0,25 mm lebar 90 cm m1 36.500,00            
                     sheet tebal 0,3 mm lebar 90 cm m1 36.500,00             
    III B A H A N K A Y U                                                    
      1 KRUING                                                               
                     Papan             m3        8.750.000,00 Untuk Harga Papan dipasaran lebih tinggi
                     Balok/pesagen     m3        8.500.000,00 dari harga kayu balok dan kaso
                     Kaso              m3        8.000.000,00                
      2 MERANTI                                                              
                     Papan             m3         4.000.000                  
                     Balok/pesagen     m3         3.400.000                  
                     Kaso              m3         3.000.000                  
      3 ALBA                                                                 
                     Papan             m3         2.750.000                  
                                               HARGA                         
    NO.          J E N I S B A H A N  SATUAN                 KETERANGAN      
                                                (Rp)                         
                     Balok/pesagen     m3         2.500.000                  
                     Kaso              m3         2.250.000                  
      4 DOLKEN                                                               
                     Bambu             bt         20.000,00                  
                     Kayu Taun         m3        2.500.000,00                
    IV BAHAN PENUTUP DINDING / LANTAI                                        
      1 Keramik kls A (Mulia,Garuda,Arwana)                                  
                       25 x 40 cm Motif m2        70.000,00                  
                       25 x 25 cm Antislip m2     70.000,00                  
                       30 x 30 cm Putih m2        55.000,00 Harga di SHS Zona I Rp. 58.000,-
    VI B A H A N B E S I                                                     
      1 BESI BETON                                                           
                     besi beton polos  kg         13.000,00 harga di SHS Kab. Purbalingga 14.000,-
                     besi beton ulir   kg         13.000,00                  
      4 KAWAT                                                                
                     Ikat beton/bendrat kg        23.000,00                  
    VIII B A H A N L A N G I T - L A N G I T                                 
      1 SOFT BOARD-uk: 4'X 8'                                                
       Gypsum tebal 9 mm               lbr          75.000                   
       Gypsum tebal 12 mm              lbr          92.200                   
       Gypsumboard water resist 9 mm   lbr          78.000                   
       kalsiboard 3 mm                 lbr        65.000,00                  
       List profil Gypsum              m'         14.000,00                  
       List kayu profil                m'         10.000,00                  
       kalsiplank                      lbr        40.000,00                  
      2 PLY WOOD                                                             
        Tripleks                                                             
        . 120 X 240  X 3 mm            lbr        60.000,00 Harga Triplek 3 mm di SHS Rp. 61.500,-
        Multipleks                                             60.000,-      
        . 120 X 240  X 9 mm            lbr        100.000,00                 
        . 120 X 240  X 18 mm           lbr        250.000,00                 
    IX B A H A N F I N I S H I N G                                           
      1 KAYU                                                                 
       Menie                           kg         42.000,00                  
       Dempul plamur                   kg         45.000,00                  
       Ambril/amplas                   lbr         4.000,00                  
       Cat dasar                       kg         60.000,00                  
       cat besi kayu envi              kg         60.000,00                  
       - Koas                          bh         10.500,00                  
      2 TEMBOK                                                               
       Plamur                          kg         22.000,00 Harga di SHS Rp. 23.200
       Cat Dasar untuk Pengecatan Tembok kg       40.000,00                  
       Cat Interior  catylac           kg         50.000,00                  
       Cat Eksterior catylac           kg         95.000,00                  
    X  B A H A N K A C A                                                     
      1 POLOS                                                                
                     3 mm              m2         122.000,00 Harga di SHS Rp. 124.200,-
                     5 mm              m2         170.000,00                 
    XI ALAT PENGIKAT KAYU                                                    
      1 PAKU - ukuran 1" s/d 4"        kg         17.500,00                  
      2 PAKU - sekrup                  kg         22.500,00                  
      3 PAKU - beton                   kg         35.000,00                  
      4 LEM KAYU                       bh         16.000,00                  
                                               HARGA                         
    NO.          J E N I S B A H A N  SATUAN                 KETERANGAN      
                                                (Rp)                         
    XII SANITASI                                                             
      1 Kloset Duduk / Monoblok (sekelas toto) unit Rp 4 .800.000,00 46,90%  
      2 Kloset Jongkok (sekelas American Standart) unit Rp 4 50.000,00 70,68%
      3 Urinoir                        bh  Rp    3 .600.000,00               
      4 Wastafel gantung               unit Rp    3 20.000,00                
      5 Jet spray                      unit Rp    2 00.000,00                
      6 Floordrain stainlesstel        bh  Rp     7 5.000,00                 
      7 Kran Air                       bh  Rp     3 0.000,00                 
      8 Pipa PVC AW 1/2"               m'  Rp      5 .000,00                 
      9 Pipa PVC AW 2"                 m'  Rp     1 5.000,00                 
      10 Pipa PVC AW 3"                m'  Rp     3 4.750,00                 
      11 Pipa PVC AW 4"                m'  Rp     4 8.000,00                 
    XIII LISTRIK                                                             
      1 Pipa Listrik 5/8"              m'  Rp      2 .500,00                 
      2 Kabel NYA                      m'  Rp      3 .000,00                 
      3 T Dus                          bh  Rp      3 .000,00                 
      4 L Bow                          bh  Rp       5 00,00    43,97%        
      5 Klem Biasa                     bh  Rp       5 00,00                  
      6 Mangkok                        bh  Rp      5 .000,00                 
      7 Saklar Tunggal                 bh  Rp     3 5.000,00                 
      8 Saklar Ganda                   bh  Rp     4 0.000,00                 
      9 Stop Kontak                    bh  Rp     3 5.000,00                 
      10 Fitting Lampu                 bh  Rp     1 5.000,00                 
      11 Pasang Lampu LED 10 watt merek Philips bh Rp 5 0.000,00             
    XIV L A I N - L A I N                                                    
      1 Naco per Daun                  bh         11.000,00                  
      2 Kusen Almunium 4" inkalum      m'         105.000,00                 
      3 Minyak Beton & bekisting       ltr         5.000,00                  
      4 Batako                         bh          3.000,00                  
      5 Air                            ltr          25,00                    
      6 Formite/Penjaga jarak / Spacer (alat bantu) buah 5.000,00            
      7 Casting Gypsum                 kg          2.400,00                  
      8 Sealant                        Tube       25.000,00                  
      9 Skrup Fixer                    bh          1.300,00                  
      10 Baja Rigan                    btng       125.000,00                 
      11 Reng Baja Rigan               btng       45.000,00                  
      12 Glass blok 20 x 20            bh         30.000,00    65,97%        
      13 Rooster Krawangan Tanah Liat  bh         18.000,00                  
      14 Soda Api                      kg         30.000,00                  
      15 Genteng Metal Berpasir        bh         40.000,00                  
      16 Bubungan genteng Metal Berpasir bh       35.000,00                  
      17 Baut (Screw driver)           bh           350,00                   
      18 Dynabolt                      bh          3.500,00                  
                                                            Kota.../tgl-bln-tahun
                                                            Nama Perusahaan  
                                                             CV/PT………..      
                                                         Tanda tangan dan cap perusahaan
                                                                             
                                                              Nama Jelas     
                                                              Jabatan        
                                KOP PERUSAHAAN                               
                                                                             
                            D A F T A R U P A H P E K E R J A                
                                                                             
                                                                             
                                                                             
                                                                             
                                               HARGA                         
     NO.          J E N I S B A H A N SATUAN                   KET.          
                                                (Rp)                         
       1 M a n d o r                   Hr           97.000                   
       2 P e k e r j a                 Hr           85.400                   
       3 T u k a n g k a y u           Hr           95.000                   
       4 K e p . t k . k a y u         Hr           97.000                   
       5 T u k a n g b a t u           Hr           95.000                   
       6 K e p . t k . b a t u         Hr           97.000                   
       7 T u k a n g b e s i           Hr           95.000                   
       8 K e p . t k . b e s i         Hr           97.000                   
       9 T u k a n g c a t             Hr           95.000                   
       1 0 K e p . t k . c a t         Hr           97.000                   
                                                            Kota.../tgl-bln-tahun
                                                                             
                                                            Nama Perusahaan  
                                                             CV/PT………..      
                                                                             
                                                                             
                                                                             
                                                         Tanda tangan dan cap perusahaan
                                                                             
                                                                             
                                                                             
                                                                             
                                                              Nama Jelas     
                                                              Jabatan
URAIAN SINGKAT PEKERJAAN                            
                                                                       
              PEMENUHAN PRASARANA SMPN 1 BUKATEJA                      
                                                                       
                                                                       
Pengelolaan Pendidikan Sekolah Menengah Pertama merupakan salah satu aspek
penting dalam upaya meningkatkan mutu pembelajaran di SMP NEGERI 1 BUKATEJA.
                                                                       
Ketercukupan sarana pembelajaran di SMP NEGERI 1 BUKATEJA menjadi salah satu
stimulant bagi stakeholder untuk bersinergi meningkatkan kualitas dan mutu SMP
                                                                       
NEGERI 1 BUKATEJA.                                                     
                                                                       
                                                                       
Adapun ruang lingkup pekerjaan utama terdiri dari:                     
(1) Rehabilitasi Ruang UKS                                             
(2) Rehabilitasi Ruang Perpustakaan                                    
                                                                       
                                                                       
Pemenuhan Prasarana SMP Negeri 1 Bukateja merupakan bangunan gedung negara yang
                                                                       
dalam pelaksanaan pembangunannya harus memenuhi azas dan prinsip kemanfaatan,
keselamatan, keselarasan bangunan gedung dengan lingkungan, efektif, efisien, terarah
dan terkendali sesuai program dan fungsi. Klasifikasi Bangunan Gedung Kantor adalah
                                                                       
bangunan sederhana dengan memiliki kompleksitas dan/atau teknologi sederhana.
                                                                       
Untuk itu dalam pelaksanaannya haruslah benar-benar dilakukan dengan baik dan sesuai
dengan apa yang telah direncanakan serta sesuai dengan ketentuan teknis pengadaaan
bangunan aset Pemerintah sehingga prosesnya dapat berlangsung dengan arah yang benar.
                                                                       
Pada tahap pelaksanaan pembangunan fisik di lapangan diserahkan kepada pihak ketiga,
yaitu Kontraktor pelaksana pekerjaan.
Tenders also won by CV Narendra
Authority
14 June 2022Pemenuhan Prasarana Smp Maarif KaranggedangKab. PurbalinggaRp 585,000,000
3 August 2021Rekonstruksi / Peningkatan Kapasitas Struktur Jalan Sirau - KramatPemerintah Daerah Kabupaten PurbalinggaRp 500,000,000
18 June 2021Pemenuhan Prasarana Smp Diponegoro 2 KarangmoncolPemerintah Daerah Kabupaten PurbalinggaRp 422,557,000
3 August 2021Pembangunan Jalan Kebutuh - KarangcengisPemerintah Daerah Kabupaten PurbalinggaRp 383,130,000
14 June 2022Pemenuhan Prasarana Smp N 1 KarangmoncolKab. PurbalinggaRp 351,000,000
28 March 2023Rehabilitasi Jaringan Irigasi D.I Dagan Kec. BobotsariKab. PurbalinggaRp 336,270,000
14 June 2023Pemenuhan Prasarana Smpn 2 Kutasari (Dau)Kab. PurbalinggaRp 289,750,000
4 June 2022Rehabilitasi Ruang Kelas Smp Negeri 4 RembangKab. PurbalinggaRp 236,000,000
9 June 2023Pemenuhan Prasarana Smpn 2 Kalimanah (Dau)Kab. PurbalinggaRp 218,500,000
15 June 2023Pemenuhan Prasarana Smp Negeri 1 Padamara (Dau)Kab. PurbalinggaRp 217,170,000