| Reason | |||
|---|---|---|---|
| 0706852985127000 | Rp 582,080,052 | - | |
| 0952371557128000 | Rp 555,077,500 | Tidak menghadiri Undangan Klarifikasi Teknis | |
| 0750534430127000 | Rp 546,038,509 | Tidak menghadiri Klarifikasi Teknis | |
| 0436205645127000 | - | - | |
| 0311826366113000 | - | - | |
Eben Ezer | 0210027009127000 | - | - |
| 0413873050128000 | - | - | |
CV Pintu Angin Sukses | 04*1**1****28**0 | - | - |
CV Sinangga | 06*0**0****27**0 | - | - |
| 0437097298125000 | - | - | |
| 0312977366127000 | - | - | |
| 0022597041127000 | - | - | |
| 0022599435127000 | - | - | |
| 0832419469122000 | - | - | |
| 0635354699121000 | - | - | |
Roy Abadi Sejahtera | 05*8**1****25**0 | - | - |
| 0947346896121000 | - | - | |
| 0633428511128000 | - | - |
PEMERINTAH KABUPATEN SAMOSIR
DINAS PEKERJAAN UMUM DAN TATA RUANG
Jln. Simanindo Desa Sianting - anting Pangururan 22392
Telp./ Fax. (0626) 20908 Email. : [email protected]
BILL OF QUANTITY
SPESIFIKASI UMUM 2018
REVISI 2
NAMA PEKERJAAN :
Rekonstruksi Jalan Menuju Perkampungan Siraja Lontung Desa Sabulan Kecamatan Sitiotio
TAHUN ANGGARAN 2023
INFORMASI UMUM
No. U R A I A N I N F O R M A S I
1. Nama Paket
2. Nama Pekerjaan : Rekonstruksi Jalan Menuju Perkampungan Siraja Lontung Desa
Sabulan Kec. Sitiotio
3 Kecamatan : Sitio-tio
4 Kabupaten : Samosir
4. Lokasi pekerjaan Periksa lampiran
5. Kondisi jalan lama . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
6. Panjang efektif ( lihat sketsa di bawah ) 0.85 Kilometer ( Leff = a + b )
7. Lebar jalan lama ( bahu + perkerasan + bahu ) ( 1.00 + 4.00 + 1.00 ) meter
8. Lebar Rencana ( bahu + perkerasan + bahu ) ( 0.50 + 4.00 + 0.50 ) meter
9. Penampang jalan, jenis dan volume pekerjaan pokok Lihat lampiran.
10. Jangka waktu pelaksanaan pekerjaan 180 hari kalender
Atau : 6.00 bulan (Masa Pelaksanaan)
11. Jarak rata-rata B.C Sidikalang ke lokasi pekerjaan ---> L = 95.64 Kilometer
11.2 Jarak rata-rata Ibu Kota Kecamatan ke lokasi pekerjaan ---> L = 10.64 Kilometer
Perhitungan didasarkan pada sketsa di bawah ini : L = { (c+d+a/2)*a + (c+e+b/2)*b } / (a+b)
bagian dari panjang efektif
C
0.43 km = d km = b
A 0.43 km = a 0.43 km = e B
bagian dari panjang efektif
Base Camp ---------> 95.0 km = c B.C Sidikalang
D
: panjang efektif
12. Jam kerja efektif dalam 1 hari 7.0 jam
13. Asuransi, Pajak, dsb. untuk Peralatan 0.002 x Harga Pokok Alat
14. Tingkat Suku Bunga Investasi Alat 9.25 % (bi rate rata-rata setahun + 5%)
15. Biaya Umum dan Keuntungan 10.00 % x Biaya Langsung
16. RINGKASAN METODE PELAKSANAAN
a. Mobilisasi dilaksanakan sesuai ketentuan yang berlaku dalam Kontrak.
b. Pekerjaan Tanah dilaksanakan untuk Galian Biasa Pelebaran Badan Jalan, Timbunan Biasa dan Penyiapan Badan Jalan
c. Pekerjaan Lapis Pondasi Agregat dilaksanakan untuk pondasi badan jalan
d. Pekerjaan Campuran Aspal Panas dilaksanakan untuk peningkatan dan/atau rekonstruksi badan jalan
e. Pekerjaan Pasangan Batu dilaksanakan untuk drainase dan tembok penahan tanah
f. Pekerjaan Pengembalian Kondisi dilaksanakan untuk perbaikan lapis pondasi atau perkerasan eksisting
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
g. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
17. Lokasi Quarry Periksa lampiran.
18 Jumlah Jembatan = ...................... Buah Periksa lampiran.
19 Total Bentang Jembatan = .................. Buah Periksa lampiran.
20 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
21 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
22 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
REKAPITULASI
PERKIRAAN HARGA PEKERJAAN
Nama Pekerjaan : Rekonstruksi Jalan Menuju Perkampungan Siraja Lontung Desa Sabulan Kec. Sitiotio
Kecamatan : Sitio-tio
Kabupaten : Samosir
Jumlah Harga
No. Divisi Uraian Pekerjaan
(Rupiah)
1 Umum 13,962,880.92
SKh 1-22 Sistem Manajemen Keselamatan Konstruksi (SMKK) 6,900,000.00
3 Pekerjaan Tanah Dan Geosintetik 5,875,971.55
7 Struktur 495,840,352.24
10 Pekerjaan Pemeliharaan 17,961,335.83
(A) Jumlah Harga Pekerjaan ( termasuk Biaya Umum dan Keuntungan ) 540,540,540.54
(B) Pajak Pertambahan Nilai ( PPN ) = 11% x (A) 59,459,459.46
(C) JUMLAH TOTAL HARGA PEKERJAAN = (A) + (B) 600,000,000.00
(D) DIBULATKAN 600,000,000.00
Terbilang : Enam Ratus Juta Rupiah.
……………………...…….., 2023
Dibuat Oleh :
PT/CV. …………..
……………………..
Direktur/ W. Direktur
DAFTAR KUANTITAS DAN HARGA
SPESIFIKASI UMUM 2018 Revisi 2
Nama Pekerjaan : Rekonstruksi Jalan Menuju Perkampungan Siraja Lontung Desa Sabulan Kec. Sitiotio
Kecamatan : Sitio-tio
Prop. / Kab. / Kec. : Samosir
No. Mata Uraian Satuan Perkiraan Harga Jumlah
Pembayaran Kuantitas Satuan Harga-Harga
(Rupiah) (Rupiah)
a b c d e f = (d x e)
DIVISI 1. UMUM
1.2 Mobilisasi
1.2 Mobilisasi LS 1 .00 1 3,962,880.92 1 3,962,880.92
Jumlah Harga Pekerjaan DIVISI 1 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 1 3,962,880.92
SKh-1.22. SISTEM MANAJEMEN KESELAMATAN KONSTRUKSI (SMKK)
3 Alat Pelindung Kerja dan Alat Pelindung Diri:
3b APD, antara lain :
SKh-1.1.22.(3b1) Topi pelindung (Safety Helmet) Bh 1 2.00 7 5,000.00 9 00,000.00
SKh-1.1.22.(3b8) Sepatu keselamatan (Safety Shoes, rubber safety shoes and toe cap) Psg 1 2.00 3 00,000.00 3 ,600,000.00
SKh-1.1.22.(3b11) Rompi keselamatan (Safety Vest) Bh 1 2.00 1 00,000.00 1 ,200,000.00
7 Rambu dan Perlengkapan lalu lintas yang diperlukan atau manajemen lalu lintas:
SKh-1.1.22.(7a) Rambu petunjuk Bh 1 .00 3 00,000.00 3 00,000.00
SKh-1.1.22.(7b) Rambu larangan Bh 1 .00 3 00,000.00 3 00,000.00
SKh-1.1.22.(7c) Rambu peringatan Bh 1 .00 3 00,000.00 3 00,000.00
SKh-1.1.22.(7e) Rambu informasi Bh 1 .00 3 00,000.00 3 00,000.00
Jumlah Harga Pekerjaan SKh-1.22. SISTEM MANAJEMEN KESELAMATAN KONSTRUKSI (SMKK) (masuk pada Rekapitulasi Perkiraan H a r g a P 6 e,k9e0r0ja,0a0n0).00
DIVISI 3. PEKERJAAN TANAH DAN GEOSINTETIK
3.3.(1) Penyiapan Badan Jalan M2 3 ,404.00 1 ,726.20 5 ,875,971.55
Jumlah Harga Pekerjaan DIVISI 3 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 5 ,875,971.55
DIVISI 7. STRUKTUR
7.1 (8) Beton , fc’15 Mpa M3 2 87.29 1 ,725,937.79 4 95,840,352.24
Jumlah Harga Pekerjaan DIVISI 7 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 4 95,840,352.24
DIVISI 10. PEKERJAAN PEMELIHARAAN KINERJA
10.1.(5) Perbaikan Lapis Fondasi Agregat Kelas B M3 2 4.00 7 48,388.99 1 7,961,335.83
Jumlah Harga Pekerjaan DIVISI 10 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 1 7,961,335.83
Analisa EI-331
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
NAMA PEKERJAAN : Rekonstruksi Jalan Menuju Perkampungan Siraja Lontung Desa Sabulan Kec. Sitiotio
KECAMATAN : Sitio-tio
KABUPATEN : Samosir
ITEM PEMBAYARAN NO. : 3.3.(1) PERKIRAAN VOL. PEK. : 3,404.00
JENIS PEKERJAAN : Penyiapan Badan Jalan TOTAL HARGA (Rp.) : 5,875,971.55
SATUAN PEMBAYARAN : M2 0 % THD. BIAYA PROYEK : 1.09
PERKIRAAN HARGA JUMLAH
NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)
A. TENAGA
1. Pekerja (L01) jam 0.0034 15,585.71 53.65
2. Mandor (L02) jam 0.0017 17,257.14 29.70
JUMLAH HARGA TENAGA 83.35
B. BAHAN
JUMLAH HARGA BAHAN 0.00
C. PERALATAN
1. Motor Grader (E13) jam 0.0017 508,292.58 874.86
2. Tandem / Vibro Roller (E17) jam 0.0014 432,791.46 611.06
3 Alat Bantu Ls 1.0000 0.00 0.00
JUMLAH HARGA PERALATAN 1,485.92
D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 1,569.27
E. OVERHEAD & PROFIT 10.0 % x D 156.93
F. HARGA SATUAN PEKERJAAN ( D + E ) 1,726.20
Note: 1 Satuan dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta (IKP)
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa El-718
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
NAMA PEKERJAAN : Rekonstruksi Jalan Menuju Perkampungan Siraja Lontung Desa Sabulan Kec. Sitiotio
KECAMATAN : Sitio-tio
KABUPATEN : Samosir
ITEM PEMBAYARAN NO. :7.1 (8) PERKIRAAN VOL. PEK. : 287.29
JENIS PEKERJAAN :Beton struktur fc’ 15 Mpa TOTAL HARGA (Rp.) : 495,840,352.24
SATUAN PEMBAYARAN :M3 % THD. BIAYA PROYEK : 91.73
PERKIRAAN HARGA JUMLAH
NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)
A. TENAGA
1. Pekerja (L01) jam 5.2369 15,585.71 81,621.57
2. Tukang (L02) jam 5.2369 18,671.43 97,781.30
3. Mandor (L03) jam 0.3273 17,257.14 5,648.42
JUMLAH HARGA TENAGA 185,051.29
B. BAHAN
1. Semen (M12) Kg 298.8600 1,689.99 505,069.29
2. Agregat Halus Beton (M01a) M3 0.7083 335,100.00 237,362.50
3. Agregat Kasar (M03) M3 0.7555 223,935.80 169,185.24
4. Kayu Perancah (M19) M3 0.0500 4,681,981.98 234,099.10
5. Paku (M18) Kg 0.6000 24,774.77 14,864.86
6. Air (M170) Ltr 199.0408 15.65 3,114.99
7. Plastik micron m2 6.6000 17,000.00 112,200.00
JUMLAH HARGA BAHAN 1,275,895.99
C. PERALATAN
1. Wheel Loader (E15) jam 0.0000 - 0.00
2 CONCRETE MIXER 0.3-0.6 M3 (E06) jam 0.3273 88,500.41 28,967.00
3 Truck Mixer (E49) jam 0.0000 0.00 0.00
4 Water Tank Truck (E23) jam 0.0400 405,391.86 16,202.71
5 Concrete Vibrator (E20) jam 0.6546 53,710.17 35,159.67
6 Alat Bantu Ls 1.0000 27,758 27,757.69
JUMLAH HARGA PERALATAN 108,087.08
D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 1,569,034.35
E. OVERHEAD & PROFIT 10.0 % x D 156,903.44
F. HARGA SATUAN PEKERJAAN ( D + E ) 1,725,937.79
Note: 1 Satuan dapat atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta (IKP)
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
ITEM PEMBAYARAN NO. :7.1 (8) Analisa El-718
JENIS PEKERJAAN :Beton struktur fc’ 15 Mpa
SATUAN PEMBAYARAN :M3 URAIAN ANALISA HARGA SATUAN
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
No. U R A I A N KODE KOEF. SATUAN KETERANGAN
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : Struktur Jembatan
3 Bahan dasar (Agregat Kasar, Agregat Halus, Semen) diterima
diterima seluruhnya di lokasi pekerjaan
4 Jarak rata-rata Batching Plan ke lokasi pekerjaan L 0.00 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Perbandingan Camp. : Semen Sm 293.00 Kg/M3 slump = 50 mm
: Agregat Halus Ps 850.00 Kg/M3 FM pasir = 2,75
: Agregat Kasar Kr 921.00 Kg/M3 Max Size 19 mm
: Air W 195.14 Kg/M3 f.a.s.= 0,666
: Super Plasticizer Plt 4.40 Kg/M3 1,5% terhadap semen
7 Berat Isi :
- Agregat Halus D1 1.26 T/M3
- Agregat Kasar D2 1.28 T/M3
8 Faktor kehilangan bahan : Semen Fh1 1.02
: Agregat/Agregat Halus Fh2 1.05
II. URUTAN KERJA
1 Semen, Agregat Halus, Agregat Kasar ditakar dan dimuat
kedalam Concrete Mixer
2 Dituang kedalam Concrete Mixer dan dicampur dengan air dan diaduk,
di lokasi pekerjaan
3 Beton di-cor ke dalam bekisting yang telah disiapkan dan dipadatkan
4 Penyelesaian dan perapihan setelah pengecoran oleh pekerja secara manual
III. PEMAKAIAN BAHAN, ALAT DAN TENAGA
1. BAHAN
1.a. Semen (PC) = Sm x Fh1 (M12) 298.8600 Kg 893
1.b. Agregat Halus Beton = (Ps/1000 : D1) x Fh2 (M01a) 0.7083 M3 967
1.c. Agregat Kasar = (Kr/1000 : D2) x Fh2 (M03) 0.7555 M3
Sesuai dengan
1.d. Kayu Perancah dan/atau Bekisting (M19) 0.0500 M3
Gambar/Peruntukanny
1.e. Paku = M19 x 12 (M18) 0.6000 Kg
a
1.f. Air = Air x Fh1 (M170) 199.0408 Ltr
1.g. Plastik Micron = Plt x Fh1 5.0000 m2
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 0.80 M3 (lepas)
Faktor bucket Fb 0.85 -
Faktor efisiensi alat Fa 0.83 -
Waktu Siklus
- Memuat Agregat ke Batching Plant T1 2.00 menit
- Hauling material dan Lain lain T2 0.80 menit
Ts1 2.80 menit
Kap. Prod. / jam = V x Fb x Fa x 60 Q1 12.094 M3
Ts1
Koefisien Alat/M2 = 1 : Q1 0.0827 Jam
2.b. Concrete Mixer (E06)
Kapasitas Alat V1 500.00 liter
Faktor Efisiensi Alat Fa 0.83 -
Waktu siklus : (T1 + T2 + T3 + T4) Ts
- Memuat T1 2.00 menit
- Mengaduk T2 6.00 menit
- Menuang T3 0.15 menit
- Tunggu, dll. T4 0.00 menit
Ts2 8.15 menit
Kap. Prod. / jam = V1 x Fa x 60 Q2 3.055 M3/jam
1000 x Ts2
Koefisien Alat / M3 = 1 : Q2 (E06) 0.3273 jam
Berlanjut ke hal. berikut.
ITEM PEMBAYARAN NO. :7.1 (8) Analisa El-718
JENIS PEKERJAAN :Beton struktur fc’ 15 Mpa
SATUAN PEMBAYARAN :M3 URAIAN ANALISA HARGA SATUAN
Lanjutan
No. U R A I A N KODE KOEF. SATUAN KETERANGAN
2.c. TRUCK MIXER AGITATOR; UD Q CVE28064; 5 M3; 280 HP (E49)
Kapasitas drum V2 5.00 M3
Faktor Efisiensi alat Fa 0.83 -
Kecepatan rata-rata isi v1 10.00 KM / Jam area: uphill or downhill
Kecepatan rata-rata kosong v2 20.00 KM / Jam area: uphill or downhill
Waktu Siklus
- mengisi = (V : Q2) x 60 T1 98.19 menit
- mengangkut = (L : v1) x 60 menit T2 0.00 menit
- Kembali = (L : v2) x 60 menit T3 0.00
- menumpahkan dll T4 5.00 menit
Ts3 103.19 menit
Kap.Prod. / jam = V2 x Fa x 60 Q3 2.4130 M3
Ts3
Koefisien Alat / M3 = 1 : Q3 (E49) 0.4144 Jam
2.d. WATER TANK TRUCK (E23)
Volume Tanki Air V 4.00 M3
Kebutuhan air / M3 beton Wc 0.20 M3
Faktor Efiesiensi Alat Fa 0.83 -
Kapasitas pompa air Pa 100.00 liter/menit
Kap. Prod. / jam = pa x Fa x 60 Q4 25.02 M3
1000 x Wc
Koefisien Alat / M3 = 1 : Q4 (E23) 0.0400 jam
2.e. CONCRETE VIBRATOR; GX 160; 5,5 HP (E20)
Kebutuhan alat penggetar beton disesuaikan dengan
kapasitas produksi alat pencampur (concrete mixing pdliabnutt)uhkan n vib 2 buah Spesifikasi Umum Tabel 7.1.4.1)
butuh 6 bh untuk 20m3
Kap. Prod. / jam = Q2/ n vib Q5 1.528 M3
Koefisien Alat / M3 = 1 : Q5 (E20) 0.6546 jam
2.f. ALAT BANTU
Alat bantu lumpsum
Palu
Alat pemotong, dlsb
Berlanjut ke hal. berikut.
ITEM PEMBAYARAN NO. :7.1 (8) Analisa El-718
JENIS PEKERJAAN :Beton struktur fc’ 15 Mpa
SATUAN PEMBAYARAN :M3 URAIAN ANALISA HARGA SATUAN
Lanjutan
No. U R A I A N KODE KOEF. SATUAN KETERANGAN
3. TENAGA
Produksi Beton dalam 1 hari = Tk x Q1 Qt 21.39 M3
Kebutuhan tenaga : - Mandor M 1.00 orang
- Tukang : Tb 16.00 orang
Tk batu/cor = 8
Tk Kayu/bekisting = 8
- Pekerja P 16.00 orang
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.3273 jam
- Tukang = (Tk x Tb) : Qt (L02) 5.2369 jam
- Pekerja = (Tk x P) : Qt (L01) 5.2369 jam
4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT
Lihat lampiran.
5. ANALISA HARGA SATUAN PEKERJAAN
Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA
SATUAN.
Didapat Harga Satuan Pekerjaan :
Rp. 1,725,937.79 / M3
6. MASA PELAKSANAAN YANG DIPERLUKAN
Masa Pelaksanaan : ………………… bulan
7. VOLUME PEKERJAAN YANG DIPERLUKAN
Volume pekerjaan : 287.29 M3
Analisa EI-1015
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
NAMA PEKERJAAN Rekonstruksi Jalan Menuju Perkampungan Siraja Lontung Desa Sabulan Kec. Sitiotio
KECAMATAN Sitio-tio
KABUPATEN Samosir
ITEM PEMBAYARAN NO. : 10.1.(5) PERKIRAAN VOL. PEK. : 24.00
JENIS PEKERJAAN : Perbaikan Lapis Fondasi Agregat Kelas B TOTAL HARGA : 17,961,335.83
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : 3.32
PERKIRAAN HARGA JUMLAH
NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)
A. TENAGA
1. Pekerja (L01) jam 0.7889 15,585.71 12,295.10
2. Mandor (L03) jam 0.1315 17,257.14 2,268.94
JUMLAH HARGA TENAGA 14,564.04
B. BAHAN
1. Agregat B M27 M3 1.2777 211,882.11 270,730.18
JUMLAH HARGA BAHAN 270,730.18
C. PERALATAN
1 Jack Hammer E26 jam 0.0000 0.00 0.00
2 Air Compressor E05 jam 0.0000 0.00 0.00
3 Wheel Loader E15 jam 0.0000 0.00 0.00
4 FLAT BED TRUCK 4 TON E11 jam 1.1822 321,482.13 380,047.04
5 Baby Vibratory Roller E19a jam 0.1315 97,565.67 12,827.77
6 Alat Bantu Ls 1.0000 2,184.61 2,184.61
JUMLAH HARGA PERALATAN 395,059.41
D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 680,353.63
E. OVERHEAD & PROFIT 10.0 % x D 68,035.36
F. HARGA SATUAN PEKERJAAN ( D + E ) 748,388.99
Note: 1 Satuan dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta (IKP)
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
ITEM PEMBAYARAN NO. : 1.2
JENIS PEKERJAAN : MOBILISASI
% TERHADAP TOTAL BIAYA PROYEK = 2.5831 %
Lembar 1.2-1
HARGA JUMLAH
No. U R A I A N SATUAN VOL. SATUAN HARGA
(Rp.) (Rp.)
B. PERALATAN
Periksa lembar 1.2-2 8,500,000
C. Kantor Lapangan dan Fasilitas
1 Base Camp
2 Kantor
3 Barak 1 1,412,880.92 1,412,881
4 Bengkel
5 Gudang, dan lain-lain
6 Pengukuran Kembali . . . . 1 1,500,000.00 1,500,000
7 Papan Nama Proyek 1 300,000
F. Manajemen dan Keselamatan lalu lintas LS 0
G. DEMOBILISASI LS 1 2,550,000 2,550,000
E TOTAL BIAYA MANAJEMEN DAN KESELAMATAN LALU LINTAS 13,962,881
F OVERHEAD & PROFIT 10.00 % x D
G HARGA SATUAN PEKERJAAN ( E + F ) 13,962,880.92
Catatan : Harga Satuan Personil tersebut sudah termasuk seluruh pajak dan bea (kecuali PPN),
Asuransi Tenaga Kerja dan pengeluaran lainnya.
ITEM PEMBAYARAN NO. : 1.2
JENIS PEKERJAAN : M O B I L I S A SI
Lembar 1.2-2
KODE HARGA JUMLAH
No. JENIS ALAT ALAT SATUAN VOL. SATUAN HARGA
(Rp.) (Rp.)
B. PERALATAN
6 #REF! #REF! Unit 1 1,000,000 1,000,000
13 #REF! #REF! Unit 1 5,000,000 5,000,000
24 #REF! #REF! Unit 1 2,500,000 2,500,000
Total untuk Item B pada Lembar 1 8,500,000
HARGA DASAR SATUAN UPAH
HARGA HARGA
No. U R A I A N KODE SATUAN YG DIGUNAKAN SATUAN KETERANGAN
( Rp.) ( Rp.)
1. Pekerja (L01) Jam 15,585.71 109,100.00 Sesuai dengan peraturan
2. Tukang (L02) Jam 18,671.43 130,700.00 dan ketentuan yang
3. M a n d o r (L03) Jam 17,257.14 120,800.00 berlaku
4. Operator (L04) Jam 24,842.86 173,900.00 (Perpres yg berlaku)
5. Pembantu Operator (L05) Jam 16,742.86 117,200.00 contoh :
6. Sopir / Driver (L06) Jam 18,414.29 128,900.00 Pergub DKI No.10 Tahun 2020
7. Pembantu Sopir / Driver (L07) Jam 15,585.71 109,100.00
8. Mekanik (L08) Jam 24,842.86 173,900.00
9. Pembantu Mekanik (L09) Jam 16,742.86 117,200.00
10. Kepala Tukang (L10) Jam 20,600.00 144,200.00
11. Tenaga Ahli Muda S1 (1 Tahun) (L11) Jam 114,523.81 8 01,666.67 2 0,041,666.67
12. Tenaga Ahli Muda S1 (5 Tahun) (L12) Jam 151,666.67 1,061,666.67 2 6,541,666.67
13. CAD / CAM OPERATOR (L16) Jam 64,071.43 4 48,500.00 1 1,212,500.00
14. SOFTWARE PROGRAMMER / IMPLEMENTER (L17) Jam 75,214.29 5 26,500.00 1 3,162,500.00
15. HARDWARE TECHNICIAN (L18) Jam 64,071.43 4 48,500.00 1 1,212,500.00
16. FACILITATOR (L19) Jam 64,071.43 4 48,500.00 1 1,212,500.00
17. SENIOR ASSISTANT PROFESSIONAL STAFF (L20) Jam 81,714.29 5 72,000.00 1 4,300,000.00
18. ASSISTANT PROFESSIONAL STAFF (L21) Jam 77,071.43 5 39,500.00 1 3,487,500.00
19. SPECIAL TECHNICIAN / INSPECTOR (L22) Jam 75,214.29 5 26,500.00 1 3,162,500.00
20. TECHNICIAN (L23) Jam 64,071.43 4 48,500.00 1 1,212,500.00
21. INSPECTOR (L24) Jam 64,071.43 4 48,500.00 1 1,212,500.00
22. SURVEYOR (L25) Jam 57,571.43 4 03,000.00 1 0,075,000.00
DAFTAR
HARGA DASAR SATUAN BAHAN
HARGA
No. U R A I A N KODE SATUAN SATUAN KETERANGAN
( Rp.)
1 Pasir Pasang M01b M3 334,500.00 Lokasi Pekerjaan
2 Pasir Kasar (Beton, Lapis Drainase) M01a M3 335,100.00 Lokasi Pekerjaan
3 Pasir Halus (HRS) M01c M3 335,100.00 Base Camp
4 Pasir Urug M01d M3 300,000.00 Lokasi Pekerjaan
139,200.00 B.C Sidikalang
5 Batu Kali M02 M3 341,800.00 Lokasi Pekerjaan
6 Agregat Pecah Kasar (5 sd 20 mm) M03 M3 223,935.80 Base Camp
7 Boulder (Berangkal) M04 M3 137,300.00 B.C Sidikalang
155,300.00 B.C Sidikalang
8 F i l l e r (non semen) (limestone dust, kapur padam, dolomit, fly ash)M05 Kg 2,086.82 Base Camp
9 Batu Belah M06 M3 341,800.00 Lokasi Pekerjaan
10 Gravel / Kerakal / Koral M07 M3 352,900.00 Lokasi Pekerjaan
11 Bahan Timbunan Biasa (Tanah Urug) M08 M3 121,600.00 Lokasi Pekerjaan
12 Bahan Timbunan Pilihan M09 M3 80,200.00 Base Camp
13 Aspal 60/70 M10 Kg 14,127.27 Base Camp
14 Kerosen / Minyak Tanah M11 Ltr 10,540.54 Base Camp
15 Semen / PC (50kg) - Zak 84,499.31 Base Camp
16 Semen / PC (kg) M12 Kg 1,689.99 Base Camp
17 Silica Fume (powder) M13 Kg 90,090.09 Base Camp
18 Kawat Beton M14 Kg 32,774.77 Lokasi Pekerjaan
19 Kawat Bronjong M15 Kg 31,531.53 Lokasi Pekerjaan
20 Besi Siku M16 Kg 11,396.40 Lokasi Pekerjaan
21 S i r t u (4 ≤ PI ≤10 ; LL ≤ 35 %) M16a M3 447,900.00 Lokasi Pekerjaan
22 S i r t u (4 ≤ PI ≤15 ; LL ≤ 35 %) M16b M3 447,900.00 Lokasi Pekerjaan
157,500.00 B.C Sidikalang
23 Cat Marka (Non Thermoplas) M17a Kg 74,954.95 Lokasi Pekerjaan
24 Cat Marka (Thermoplastic) M17b Kg 74,954.95 Lokasi Pekerjaan
25 P a k u M18 Kg 24,774.77 Lokasi Pekerjaan
26 Kayu Perancah M19 M3 4,681,981.98 Lokasi Pekerjaan
27 B e n s i n M20 Ltr 10,000.00 Lokasi Pekerjaan
28 S o l a r M21 Ltr 14,000.00 Lokasi Pekerjaan
29 Minyak Pelumas / Oli M22 Ltr 43,500.00 Lokasi Pekerjaan
30 Geotextile Filter Kelas 2 M23 M2 46,717.00 Base Camp
31 Poliurerhane foam raw material M24 Kg 178,473.00 Base Camp
32 Pipa Porous diameter 4" M25 M' 40,000.00 Lokasi Pekerjaan
33 Agegat Kelas A M26 M3 228,073.05 Base Camp
34 Agegat Kelas B M27 M3 211,882.11 Base Camp
35 Agegat Kelas S M29a M3 212,696.14 Base Camp
36 Agegat Kelas C M29b M3 189,631.85 Base Camp
37 Lapis Drainase M38 M3 274,569.87 Base Camp
38 Aspal Emulsi Modifikasi Polimer 1h M30 Liter 12,300.00 Base Camp
39 Aspal Emulsi M31 Liter 8,303.73 Base Camp
40 Lem Kayu M32 Kg 40,100.90 Base Camp
41 Thinner M33 Ltr 31,439.64 Lokasi Pekerjaan
42 Glass Bead M34 Kg 41,842.34 Lokasi Pekerjaan
43 Rambu (Eng. Grade) - Jalan Nasional Kelas 1 Dia 90 mm M35a Bh 222,522.52 Lokasi Pekerjaan
44 Rambu (High I. Grade) - Jalan Nasional Kelas 1 Dia 90 mm M35b Bh 274,774.77 Lokasi Pekerjaan
45 Rel Pengaman M36 M' 567,567.57 Lokasi Pekerjaan
46 Beton Struktur Fc' 25 MPa M37 M3 3,827,678.92 Lokasi Pekerjaan
47 BjTP 280 M39a Kg 18,918.92 Lokasi Pekerjaan
48 BjTS 280 M39b Kg 19,819.82 Lokasi Pekerjaan
49 Kapur M40 M3 185,000.00 Base Camp
50 Chipping M41 M3 243,014.81 Base Camp
51 Chipping (kg) M41 Kg 166.67 Base Camp
52 Performed joint sealent M42 M' 24,723.00 Base Camp
53 Geotextile stabilisator Kelas 1 M44 M2 58,700.00 Base Camp
54 Aspal Modifikasi PG 70 M45 Kg. 13,700.00 Base Camp
55 Baja Bergelombang M46 Kg 24,324.32 Base Camp
56 Beton Fc' 10 MPa M47 M3 2,878,651.00 Lokasi Pekerjaan
57 Baja Struktur Grade 240 (Kuat Leleh 240 MPa) M48 Kg 36,486.49 Base Camp
58 Baja Struktur Baja Grade 250 (Kuat Leleh 250 Mpa) M49 Kg 36,486.49 Base Camp
59 Tiang Pancang Beton Pratekan M50 M3 423,957.93 Lokasi Pekerjaan
60 Kawat Las M51 Dos 70,000.00 Lokasi Pekerjaan
61 Pipa Baja M52 Kg 48,872.97 Lokasi Pekerjaan
62 Baja Grade 345 (Kuat Leleh 345 Mpa) M53 Kg 176,162.16 Base Camp
63 Baja Grade 485 (Kuat Leleh 485 Mpa) M54 Kg 14,000.00 Base Camp
64 BjTS 420A M57a Kg 14,500.00 Lokasi Pekerjaan
65 BjTS 420B M57b Kg 19,819.82 Lokasi Pekerjaan
66 BjTS 520 M57c Kg 19,819.82 Lokasi Pekerjaan
67 BjTS 550 M57d Kg 9,902.00 Lokasi Pekerjaan
68 BjTS 700 M57e Kg 10,943.00 Lokasi Pekerjaan
69 Geotextile separator Kelas 1 M58a M2 12,252.25 Base Camp
70 Geotextile separator Kelas 2 M58b M2 25,135.14 Base Camp
71 Geotextile separator Kelas 3 M58c M2 28,108.11 Base Camp
72 Beton Struktur Fc' 30 MPa M59 M3 3,995,382.35 Lokasi Pekerjaan
73 Beton Struktur Fc' 15 MPa M60 M3 1,569,034.35 Lokasi Pekerjaan
74 Cerucuk M61 M 78,829 Lokasi Pekerjaan
75 Paku Jalan Memantul Bulat M64 buah 117,117 Base Camp
76 Anti strpping agent M66 Kg 89,000.00 Base Camp
77 Beton Struktur Fc' 50 MPa M68 M3 4,281,000.35 Lokasi Pekerjaan
78 Beton Struktur Fc' 40 MPa M69 M3 3,946,493.85 Lokasi Pekerjaan
79 Beton Fc' 35 MPa M72 M3 3,867,450.00 Lokasi Pekerjaan
80 Multipleks 12 mm M73 Lbr 150,850.00 Lokasi Pekerjaan
81 Agregat 14 mm - 20 mm M76 Zak 150,000.00 Lokasi Pekerjaan
82 Agregat 14 mm - 20 mm M77 Kg 3,750.00 Lokasi Pekerjaan
83 Paving Block M78 M2 132,000.00 Lokasi Pekerjaan
84 Mini Timber Pile M79 M 27,000.00 Lokasi Pekerjaan
85 Strip Bearing M81 M 229,500.00 Lokasi Pekerjaan
86 Pipa Galvanis Dia 3" M24a M 68,333.00 Base Camp
87 Agregat Pecah Mesin 0-5 mm M91 M3 223,935.80 Base Camp
88 Agregat Pecah Mesin 5-10 & 10-20 mm M92 M3 223,935.80 Base Camp
89 Agregat Pecah Mesin 20-30 mm M93 M3 221,027.55 Base Camp
90 Joint Sealent M94 Kg 34,100.00 Lokasi Pekerjaan
91 Cat Anti Karat M95 Kg 35,750.00 Lokasi Pekerjaan
92 Expansion Cap M96 Kg 6,050.00 Lokasi Pekerjaan
93 Plastik MembranePolytene 125 mikron M97 M2 63,200.00 Lokasi Pekerjaan
94 Curing Compound M98 Ltr 38,500.00 Lokasi Pekerjaan
95 Additive M67a Kg 38,500.00 Lokasi Pekerjaan
96 Casing Dia 800 mm M100 M 24,000.00 Lokasi Pekerjaan
97 Polimer Latex M102 Ltr 45,000.00 Base Camp
98 Elastomer Sintetis 450 x 400 x 45 mm M112 buah 300,000.00 Lokasi Pekerjaan
99 Anchorage M113 buah 255,750.00 Lokasi Pekerjaan
100 - hidup M114 buah 750,000.00 Lokasi Pekerjaan
101 - mati M115 buah 400,000.00 Lokasi Pekerjaan
102 Kabel Prategang M116 Kg 13,288.00 Lokasi Pekerjaan
103 - Selongsong M117 M' 98,400.00 Lokasi Pekerjaan
104 - Baja Prategang M118 Kg 13,288.00 Lokasi Pekerjaan
105 - Grouting M119 M2 6,759.16 Lokasi Pekerjaan
106 Angkur Kabel Prategang, Tipe............... M120 M2 17,000.00 Lokasi Pekerjaan
107 Angkur Kabel Prategang, Tipe............ M121 buah 17,000.00 Lokasi Pekerjaan
108 Baja Profil M122 Kg 17,000.00 Lokasi Pekerjaan
109 Cairan Perekat (Epoxy Resin) M125 Kg 175,000.00 Lokasi Pekerjaan
110 Epoxy Bahan Penutup (sealant) M126 Kg 125,000.00 Lokasi Pekerjaan
111 Alat Penyuntik Anti Gravitasi M127 Buah 165,000.00 Lokasi Pekerjaan
112 Polymer Mortar M128 Kg 45,000.00 Lokasi Pekerjaan
113 Anti Korosif Baja M129 Kg 65,500.00 Lokasi Pekerjaan
114 Acuan/multipleks M130 M2 170,000.00 Lokasi Pekerjaan
115 Coating anti UV min 100 mikron jenis PU (Poly Uretane) 0,25 ltr/m2 M131 Ltr 150,000.00 Base Camp
116 Pipa Galvanis Dia 8" M132 M 481,250.00 Base Camp
117 Baut Angkur M134 Kg 19,425.00 Lokasi Pekerjaan
118 Retarder M135 Kg' 13,406.00 Base Camp
119 Cat Galvanis M136 Kg 92,000.00 Lokasi Pekerjaan
120 Baut Mutu Tinggi A325 1" x 3" M137 Buah 29,465.00 Lokasi Pekerjaan
121 Bahan Grouting M141 Kg 3,004,072.00 Base Camp
122 Kayu Kelas 1 M142 M3 27,500,000.00 Lokasi Pekerjaan
123 Kerucut lalu lintas (rubber cone) tinggi 70 cm M143 Buah 286,000.00 Base Camp
124 Timbunan/urugan Porous M144 M3 332,920.24 Base Camp
125 Topi pelindung (Safety helmet) M145 Buah 65,000.00 Base Camp
126 Pelindung mata (Goggles, Spectacles) M146 Set 150,000.00 Base Camp
127 Tameng muka (Face shield) M147 Buah 250,000.00 Base Camp
128 Masker selam (Breathing apparatus) M148 Buah 5,037,500.00 Base Camp
129 Pelindung telinga (Ear plug, ear nuff) M149 Set 50,000.00 Base Camp
130 Pelindung pernafasan dan mulut (Masker) M150 Buah 2,000.00 Base Camp
131 Sarungbtangan (Safety gloves) M151 Set 5,000.00 Base Camp
132 Sepatu keselamatan (Safety shoes) M152 Set 300,000.00 Base Camp
133 Penunjang seluruh tubuh (Full bodu harness) M153 Buah 600,000.00 Base Camp
134 Jaket pelampung (Life vest) M154 Buah 100,000.00 Base Camp
135 Rompi keselamatan (Safety vest) M155 Buah 120,000.00 Base Camp
136 Celemek (Apron/coveralls) M156 Buah 500,000.00 Base Camp
137 Pelindung jatuh (Fall arrester) M157a Buah 100,000.00 Base Camp
138 Penahan jatuh (Harness) M15b Buah 800,000.00 Base Camp
139 Aspal Emulsi CSS-1 atau SS-1 M31a Liter 10,700.00 Base Camp
140 Aspal Emulsi CRS-1 atau RS-1 M31b Liter 12,300.00 Base Camp
141 Aspal Modifikasi PG 70 M31c Kg 16,000.00 Base Camp
142 Aspal Emulsi Modifikasi Polimer 2h M31d Liter 12,300.00 Base Camp
143 Serat Selulosa M158 Kg 22,500.00 Base Camp
144 Zeolit M159 Kg 6,000.00 Base Camp
145 Wax M160 Kg 32,085.00 Base Camp
146 Asbuton B 5/20 M161 Kg 2,825.45 Base Camp
147 CPHMA M162 Ton 900,000.00 Base Camp
148 Backer rod 3/8 inci M165 Kg 10,833.33 Base Camp
149 Cairan Perekat (Epoxy Resin) 2 komponen M166 Ltr 350,000.00 Lokasi Pekerjaan
150 Alat pemadam api ringan (APAR) M167 Buah 485,000.00 Base Camp
151 Sirine M168 Buah 100,000.00 Base Camp
152 Bendera K3 M134 Buah 50,000.00 Base Camp
153 Lampu darurat (Emergency lamp) M169 Buah 180,000.00 Base Camp
154 Air M170 Liter 15.65 Lokasi Pekerjaan
155 Super plastiziser, maks 0,3 % Sm M171 Kg 40,000.00 Base Camp
156 Tyfo S Priming M172 ltr 425,000.00 Base Camp
157 Tyfo SEH51A M173 ltr 800,000.00 Base Camp
158 Concrete Grouting Non srinkage HWR M174 Kg 6,759.16 Lokasi Pekerjaan
159 Mortar semen cepat mengeras (RSC) M176 Kg 4,296.30 Lokasi Pekerjaan
160 Mortar pre-packed untuk stiching M177 Kg 7,100.00 Lokasi Pekerjaan
161 Termoplastik (sealant tuang panas) M178 Kg 28,985.00 Lokasi Pekerjaan
162 Backer rod 1 1/6 inci M179 M1 16,554.86 Lokasi Pekerjaan
163 Termoseting (sealant tuang dingin) M180 Kg 65,333.33 Lokasi Pekerjaan
164 Bahan grouting tersedia jenis preformed M181 Kg 24,775.00 Lokasi Pekerjaan
165 Plastizier M182 Kg 40,000.00 Base Camp
166 Thermocouple M184 Buah 25,000.00 Base Camp
167 Curing membrane M259 Kg 200,000.00 Lokasi Pekerjaan
168 Sambungan siar muai tipe Karet (Preformed T-shape) M260 Kg 800,000.00 Lokasi Pekerjaan
169 Bridging Plate PL 125 x 6 M261 Kg 15,500.00 Lokasi Pekerjaan
170 Perletakan logam tipe fixed 150 Ton M262 Buah 1,500,000.00 Lokasi Pekerjaan
171 Perletakan logam tipe movable 150 Ton M263 Buah 2,000,000.00 Lokasi Pekerjaan
172 Elastomer bearing pad; (450x400x45) mm3 M264 Buah 838,000.00 Lokasi Pekerjaan
173 Beton fc 10 MPa M265 M3 2,061,423.84 Lokasi Pekerjaan
174 Marmer M266 M2 400,000.00 Lokasi Pekerjaan
175 Mortar M279 M3 1,900,000.00 Lokasi Pekerjaan
176 Plastik micron - - 17,000.00 Lokasi Pekerjaan
DAFTAR BIAYA SEWA PERALATAN PER JAM KERJA
BIAYA
No. URAIAN KODE HP KAP. HARGA SEWA KETERANGAN
ALAT ALAT/JAM
(di luar PPN)
1 ASPHALT MIXING PLANT E01 294.0 60.0 T/Jam 5,500,000,000 9,895,084.53
2 ASPHALT MIXING PLANT (WARM MIX) E01a 294.0 60.0 T/Jam 5,500,000,000 9,223,084.53
3 ASPHALT MIXING PLANT (MODIFIKASI, ASBUTON) E01b 294.0 60.0 T/Jam 5,500,000,000 10,567,084.53
4 ASPHALT FINISHER E02 72.4 10.0 Ton 600,000,000 277,327.00
5 POWER BROOM E03 12.0 4,000.0 M2/Jam 34,452,000 70,236.69
6 BULLDOZER 100-150 HP E04 155.0 - - 2,500,000,000 826,897.68
7 COMPRESSOR 4000-6500 L\M E05 75.0 5,000.0 CPM/(L/m) 19,800,000 160,036.58
8 CONCRETE MIXER 0.3-0.6 M3 E06 20.0 500.0 Liter 35,000,000 88,500.41
9 CRANE 10-15 TON E07 138.0 15.0 Ton 1,951,950,000 683,105.18
10 DUMP TRUCK 4 TON E08 134.0 4.0 Ton 360,000,000 341,232.08
11 DUMP TRUCK 7 TON E09 220.0 7.0 Ton 420,000,000 518,786.79
12 EXCAVATOR 80-140 HP E10 133.0 0.9 M3 1,800,000,000 602,872.42
13 MINI EXCAVATOR 40-60 HP E10a 50.0 0.2 M3 4 50,000,000 2 37,355.49
14 FLAT BED TRUCK 4 TON E11 134.0 4.0 Ton 266,200,000 321,482.13
15 FLAT BED TRUCK 10 TON E11a 217.0 10.0 Ton 850,000,000 589,160.54
16 GENERATOR SET E12 180.0 135.0 KVA 207,000,000 385,860.35
17 MOTOR GRADER >100 HP E13 135.0 - - 1,145,500,000 508,292.58
18 TRACK LOADER 75-100 HP E14 70.0 0.8 M3 1,100,000,000 363,930.55
19 WHEEL LOADER 1.0-1.6 M3 E15 96.0 1.5 M3 1,700,000,000 517,434.87
20 THREE WHEEL ROLLER 6-8 T E16 55.0 8.0 Ton 700,000,000 265,869.59
21 SHEEPFOOT ROLLER 12-14 T E16a 116.7 13.0 Ton 609,000,000 362,863.09
22 TANDEM ROLLER 6-8 T. E17 74.3 6.9 Ton 1,698,750,000 432,791.46
23 TANDEM ROLLER 8-10 T. E17a 100.0 10.0 Ton 1,550,000,000 4 98,297.41
24 TIRE ROLLER 8-10 T. E18 135.0 10.9 Ton 1,425,000,000 540,370.78
25 VIBRATORY ROLLER 5-8 T. E19 82.0 7.1 Ton 644,300,000 305,512.46
26 BABY VIBRATORY ROLLER 1-2 T. E19a 7.6 1.5 Ton 1 20,000,000 97,565.67
27 PADFOOT VIBRATORY ROLLER 25 T E19b 207.7 25.0 Ton 1,566,000,000 6 98,453.82
28 CONCRETE VIBRATOR E20 5.5 25.0 - 12,500,000 53,710.17
29 STONE CRUSHER E21 220.0 60.0 T/Jam 2,000,000,000 814,309.63
30 WATER PUMP 70-100 mm E22 6.0 - - 7,467,000 53,760.77
31 WATER TANKER 3000-4500 L. E23 135.0 4,000.0 Liter 660,000,000 405,391.86
32 PEDESTRIAN ROLLER E24 8.8 835.00 Ton 667,380,560 216,924.67
33 TAMPER E25 4.7 121.00 kg 102,900,000 80,175.19
34 JACK HAMMER E26 0.0 - - 46,000,000 49,702.09
35 PULVI MIXER E27 345.0 - - 600,000,000 745,768.33
36 CONCRETE PUMP E28 150.0 100.00 M3/jam 800,000,000 481,822.25
37 SEMI TRAILER 20 TON E29 245.0 20.00 Ton 852,100,000 640,834.07
38 SEMI TRAILER 30 TON E29a 245.0 30.00 Ton 724,050,000 618,240.54
39 PILE DRIVER + HAMMER E30 25.0 2.50 Ton 400,000,000 167,257.51
40 CRANE ON TRACK 35 TON E31 125.0 35.0 Ton 5,970,000,000 1,323,981.86
41 WELDING SET E32 11.0 250.0 Amp 11,350,000 61,217.01
42 BORE PILE MACHINE E33 150.0 2,000.0 Meter 2,250,000,000 637,795.94
43 ASPHALT LIQUID MIXER E34 40.0 20,000.0 Liter 1 50,000,000 144,342.69
44 ASPHALT LIQUID MIXER (ASPAL MODIFIKASI) E34a 40.0 20,000.0 Liter 1 50,000,000 1 44,342.69
45 DUMP TRUCK TRONTON 10 TON E35 217.0 10.0 Ton 874,850,000.0 593,545.1
46 COLD MILLING E36 240.0 1,000.0 m 5,300,000,000 1 ,558,440.79
47 ROCK DRILL BREAKER E37 138.0 0.7 M3 1,650,000,000 6 19,528.46
48 COLD RECYCLER E38 900.0 2.2 M 7,400,000,000 2 ,996,289.14
49 HOT RECYCLER E39 400.0 3.0 M 16,000,000,000 3 ,597,574.20
50 AGGREGAT (CHIP) SPREADER E40 115.0 3.5 M 3 95,000,000 3 28,327.25
51 ASPHALT DISTRIBUTOR E41 115.0 5,000.0 Liter 5 55,000,000 3 63,501.77
52 SLIP FORM PAVER E42 174.0 7.0 M 6 00,000,000 4 57,034.88
53 CONCRETE PAN MIXER E43 15.4 500.0 Liter 2 0,988,000 72,339.72
54 CONCRETE BREAKER E44 290.0 20.0 m3/jam 9 00,000,000 7 31,736.94
55 ASPHALT TANKER E45 190.0 4,000.0 liter 5 00,000,000 4 70,244.60
56 CEMENT TANKER E46 190.0 4,000.0 liter 5 00,000,000 4 70,244.60
57 VIBRATING RAMMER E48 4.2 80.0 KG 8,190,000 50,429.48
58 TRUK MIXER (AGITATOR) E49 254.8 5.0 M3 1,002,350,000 6 85,300.69
59 BORE PILE MACHINE E50 125.0 60.0 CM 1,170,000,000 4 30,128.53
60 CRANE ON TRACK 75-100 TON E51 200.0 75.0 Ton 10,540,000,000 2 ,267,745.25
61 BLENDING EQUIPMENT E52 50.0 30.0 Ton 5 00,000,000 2 01,918.54
62 BAR BENDER E53 3.0 0.0 - 8 2,500,000 68,172.88
63 BAR CUTTER E54 3.0 0.0 - 8 2,500,000 68,172.88
64 BREAKER E55 170.0 15.0 m3/jam 1,650,000,000 6 44,199.21
65 GROUTING PUMP E56 100.0 15.0 Ton 2 4,000,000 2 29,045.35
66 JACK HIDROLIC E57 10.0 - - 1 2,000,000 62,025.53
67 MESIN LAS E58 33.0 2.0 Kw 2 6,800,000 99,578.12
68 PILE DRIVER LEADER, 75 kw E59 70.0 75.0 kw 5,850,000,000 1 ,337,876.82
69 PILE HAMMER E60 75.0 2.0 Ton 3,000,000,000 1 ,073,061.29
70 PILE HAMMER, 2,5 Ton E61 75.0 2.5 Ton 4,000,000,000 9 77,659.92
71 STRESSING JACK E62 89.0 15.0 Ton 3 00,000,000 2 53,426.35
72 WELDING MACHINE, 300 A E63 5.0 0.0 - 3 5,530,000 58,630.37
73 WATER JET BLASTING E64 6.5 100.0 Liter 1 6,000,000 57,327.72
74 MESIN POTONG RUMPUT E65 1.0 3,500,000 44,165.84
75 PONTON + TUG BOAT; 40 TON; 80 HP E66 36.0 50.0 Ton 2,500,000,000 5 74,619.56
76 SILICON SEAL PUMP E67 0.0 0.0 - 23,500 41,595.81
77 POMPA UNTUK EPOXY E68 0.0 0.0 - 1 0,000,000 46,597.03
78 GERINDA TANGAN GWS 750-1000 4" 1 HP E69 2.2 0.0 - 1 0,000,000 49,916.28
79 HAND MIXER E70 7.5 0.0 - 3,000,000 54,404.73
80 MESIN BOR E71 0.5 0.0 - 575,000 42,628.24
81 CRAWLER CRANE 25 TON E72 191.0 25.0 Ton 2,640,000,000 857,355.06
82 CRAWLER CRANE 55 TON E73 220.0 55.0 Ton 3,808,000,000 1,116,575.77
83 KUNCI TORSI 200-1000N.M E74 0.0 1.0 buah baut 15,000,000.00 49,102.68
84 POMPA + MIXER EPOXY, 810 Watt E75 1.1 0.8 l/mnt 7,000,000.00 46,723.08
85 CONCRETE CUTTER (0,5-0,7 m/menit) E76 13.0 39.6 m/menit 26,000,000.00 74,228.88
86 SAND BLASTING E77 75.0 10.0 m2/jam 7,500,000.00 1 58,500.45
87 MOBILE CRANE 1 TON E78 190.0 1.0 Ton 900,000,000.00 5 48,511.94
88 DRUM MIXER E79 20.0 4.0 Ton/jam 600,000,000.00 3 72,439.48
89 CONCRETE BATCHING PLANT E80 120.0 25.0 M3/jam 1,400,000,000 5 77,457.48
90 STAMPER E81 22.0 60.0 m2/jam 30,000,000.00 89,812.15
91 JACK HIDROLIK JEMBATAN E82 22.0 50.0 Ton 75,000,000.00 94,833.59
92 HYDROLIC PUMP E83 22.0 30.0 Mpa 16,000,000.00 79,056.70
93 MANIFOLD GAUGE E84 0.0 1.0 Mpa 5,000,000.00 44,091.37
94 THERMOPLASTIC ROAD MARKING MACHINE E85 5.5 1,300.0 m/jam 120,000,000.00 81,972.45
95 COLD PAINT SRAY MACHINE E86 5.5 1,300.0 m/jam 70,000,000.00 68,602.19
96 TRAILER 44 TON E87 350.0 44.0 Ton 1,225,050,000 8 97,232.77
97 TRUCK 2 TON E88 107.8 2.0 Ton 220,200,000 268,029.56
98 DROP HAMMER 2,5 TON E91 120.0 2.5 Ton 2,000,000,000 614,341.78
99 DIESEL HAMMER SINGLE ACTING 2,5 TON E92 120.0 2.5 Ton 2,200,000,000 649,630.38
100 DIESEL HAMMER DOUBLE ACTING 2,5 TON E93 120.0 2.5 Ton 2,500,000,000 702,563.29
101 HOT COMPRESSOR AIR LANCE (HCA) 10000C E94 5.0 5,000.0 CPM/(L/m) 56,000,000 77,192.82
102 PRE HEATER/BOILER E95 10.0 5,000.0 CPM/(L/m) 70,000,000 91,752.40
103 MACHINE BEAM LAUNCHER CRANE 100 TON E96 0.0 100.0 Ton 1,600,000,000 323,894.56
104 MACHINE BEAM LAUNCHER CRANE 300 TON E97 0.0 300.0 Ton 2,400,000,000 465,048.99