| Reason | |||
|---|---|---|---|
| 0030961411121000 | Rp 2,562,489,426 | - | |
CV Maju Andalan Abadi | 09*3**3****24**0 | Rp 2,600,000,000 | Tidak menyampaikan Daftar Peralatan |
| 0954564183128000 | Rp 2,406,404,782 | Tidak dapat menunjukkan Surat Perjanjian Sewa Peralatan Asli pada saat Klarifikasi teknis | |
| 0312175920127000 | - | - | |
| 0015976210113000 | - | - | |
| 0315428003122000 | - | - | |
| 0600509608128000 | - | - | |
| 0631580149127000 | - | - | |
| 0718870058124000 | - | - | |
| 0724180179121000 | - | - | |
| 0920416039122000 | - | - | |
| 0720619535127000 | - | - | |
| 0020713855101000 | - | - | |
| 0028746378121000 | - | - | |
| 0923407225121000 | - | - | |
| 0941267445117000 | - | - | |
| 0763668522124000 | - | - | |
| 0026844522121000 | - | - | |
PT Putra Irian Cahaya | 0720451814955000 | - | - |
| 0832419469122000 | - | - | |
CV Repiktra Apari | 00*7**2****21**0 | - | - |
| 0315193961128000 | - | - | |
CV Karya Nauli | 07*0**9****27**0 | - | - |
URAIAN SINGKAT PEKERJAAN
PEMBANGUNAN FASILITAS REKREASI PENUNJANG KEGIATAN WISATA
DTW PANTAI PALLOMBUAN KECAMATAN PALIPI
Lingkup Kegiatan Pembangunan Fasilitas Rekreasi Penunjang Kegiatan Wisata DTW Pantai
Pallombuan Kecamatan Palipi mencakup beberapa item pekerjaan sebagai
berikut:
I PEKERJAAN PERSIAPAN, PENDAHULUAN, DAN AKHIR
1 Papan Nama Proyek
2 SMKK
3 Pekerjaan pembersihan dan perataan
4 Pekerjaan Bowplank
II PEKERJAAN PLAZA / AREA PENGUNJUNG
1 Taman Kios
a Pekerjaan Taman
Pot Taman
Galian Tanah
Pasangan 1 Batu Bata camp. 1 : 4
Plesteran 1SP : 4PP tebal 15 mm
b Pekerjaan Paving Block
Urugan Tanah untuk Perataan
Paving Block berwarna K-225 t = 6 cm
c Pekerjaan Bangku dan Meja
d Pekerjaan Dyk / TPT
Galian Tanah
Pasangan batu kali
Plesteran 1SP : 4PP tebal 15 mm
Pipa Suling PVC Dia.1"
2 Situs Batu Rante
a Pekerjaan Pagar
Galian Tanah
Pondasi Tapak 25 x 40, K175
Balok Sloof 20x20, K175
Besi Hollow 15 x 30
Besi Hollow 30 x 30
Besi sloof dia 10 mm
Bekisting
Pengecatan Besi
Pengecatan Balok Sloof (ornamen batak)
Rantai SS 304 10 mm Stainles Stainless Chain
b Pekerjaan Paving Block
Galian Tanah
Cor pengunci K175
Acian
Pengecatan kanstin
Paving Block K-225, t = 6 cm
3 Situs Batu Saung
Galian Tanah
Pondasi Tapak 25 x 40, K175
Balok Sloof 20x20, K175
Besi Hollow 15 x 30
Besi Hollow 30 x 30
Besi sloof dia 10 mm
Bekisting
Pengecatan Besi
Pengecatan Balok Sloof (ornamen batak)
Lantai keramik 30 x 30 motif Batu Alam
4 Situs Namartua Siauga
1 Pondasi Menerus
Galian Tanah Pondasi
Urugan Tanah Kembali
Urugan Pasir ; t = 5 cm
Lantai Kerja ; t = 5 cm
Pondasi Pas. Batu Kali 1:4
2 Sloof (S1), Uk. 20 x 25 cm
Beton K200
Pembesian
Bekisting Sloof
3 Kolom K1 25 X 40 cm
Beton K200
Pembesian
Bekisting Kolom
4 Dinding
Pasangan 1/2 Batu Bata camp. 1 : 4
Plesteran 1SP : 4PP tebal 15 mm
Acian Kolom
Pengecatan
Besi Hollow 30 x 30
Besi Hollow 15 x 30
Pengelasan
Pengecatan
5 Pagar di tempat Monumen
Galian Tanah
Pondasi Tapak 25 x 40, cor K175
Balok Sloof 20x20, cor K175
Besi Sloof dia 10 mm
Besi Hollow 15 x 30
Besi Hollow 30 x 30
Besi sloof dia 10 mm
Bekisting
Pengecatan Besi
Pengecatan Balok Sloof (ornamen batak)
Paving Block K-225, t = 6 cm
6 Pengadaan Lampu
Lampu taman
Instalasi Lampu taman
Kabel NYM 2 x 1,5 mm (50 meter)
Saklar tunggal
7 Pekerjaan Saluran Tertutup
Galian Tanah Pondasi
Urugan Tanah Kembali
Beton K175
Besi Drill Penutup Saluran
1 | H a l a m a n
III BANGKU TAMAN
- Bangku taman
IV GAZEBO
a Pekerjaan Struktur
1 Pondasi Menerus
Galian Tanah Pondasi
Urugan Tanah Kembali
Urugan Pasir ; t = 5 cm
Lantai Kerja ; t = 5 cm
Pondasi Pas. Batu Kali 1:4
2 Sloof (S1), Uk. 20 x 25 cm
Beton K200
Pembesian
Bekisting Sloof
3 Kolom K1 25 X 40 cm
Beton K200
Pembesian
Bekisting Kolom
b Pekerjaan Arsitektur
1 Dinding
Pasangan 1/2 Batu Bata camp. 1 : 4
Plesteran 1SP : 4PP tebal 15 mm
Acian Kolom
Pengecatan
2 Lantai dan Selasar
Pondasi batu Bata Pas. 1/2 Batubata Camp. 1:4
Urugan Tanah (Peninggian lantai)
Urugan Pasir ; t = 5 cm
Beton lantai kerja K100, t = 5 cm
Pemasangan Deco foor board straigh6 grain 6" (Papan silikat)
3 Pekerjaan Atap dan Dinding pergola
Atap Spandek, t = 0.30 mm
Reng Atap Besi Hollow 20.40.2,5 mm
Pengelasan Besi Hollow
Pengecatan Besi Hollow
List Plank Kayu Kls 2
Gorga List Plank (lebar 20 cm)
Pengecatan
4 Pekerjaan Dinding Pergola
Besi Hollow 80.50.2,3 mm
Besi Hollow 20.40.2,5 mm
Angkur L beton HDG m10 x 200 mm x 50 mm
Pengelasan Besi Hollow
Pengecatan Besi Hollow
V PLAZA KULINER
a Taman
Pot Taman
Galian Tanah
Pasangan 1 Batu Bata camp. 1 : 4
Plesteran 1SP : 4PP tebal 15 mm
Pengecatan kanstin taman
2 | H a l a m a n
b Paving Block
Galian Tanah
Cor pengunci K175
Acian
Pengecatan kanstin
Paving Block K-225, t = 6 cm
c Bangku taman 37 m
Galian Tanah
Beton K200
Pembesian
Bekisting Sloof
Finising keramik 30 x 30 unpolish motif batu alam
Finising keramik 50 x 50 unpolish motif batu alam
Acian
Pengecatan kanstin
VI KIOS KULINER
a Pekerjaan Struktur
1 Pondasi Menerus
Galian Tanah (Pondasi dan Sloof)
Urugan Tanah Kembali
Urugan Pasir ; t = 5 cm
Lantai Kerja ; t = 5 cm
Tulangan Angkur Sambungan Kolom
Pondasi Pasangan Batu Kali 1SP : 4PP
2 Sloof (S1), Uk. 20 x 25 cm
Beton K200
Pembesian
Bekisting Sloof
3 Sloof (S1), Uk. 30 x 25 cm
Beton K200
Pembesian
Bekisting Sloof
4 Kolom (K), Uk. 15 x 20 cm
Beton K200
Pembesian
Bekisting Kolom
5 Kolom (K), Uk. 15 x 30 cm
Beton K200
Pembesian
Bekisting Kolom
6 Ring Balok (RB), Uk. 15 x 20 cm
Beton K200
Pembesian
7 Balok Latei (BL), Uk. 10 x 15 cm
Beton K200
Pembesian
Bekisting
8 Plat Lantai Dag, t = 12 cm
Beton K200
Pembesian
bekisting plat Lantai
Pengecatan Atap dag
3 | H a l a m a n
b Pekerjaan Arsitektur
1 Dinding
Pasangan 1/2 Batu Bata camp. 1 : 4
Plesteran 1SP : 4PP tebal 15 mm
Batu Terawang
Pengecatan Tembok
2 Pekerjaan Balok Kisi-kisi
Pasangan 1 Batu Bata camp. 1 : 4
Plesteran 1SP : 4PP tebal 15 mm
Pengecatan Tembok
3 Lantai
Urugan Tanah (Peninggian lantai)
Urugan Pasir ; t = 5 cm
Beton K100, t = 5 cm
keramik 40x40
4 Selasar
Pasangan 1/2 Batu Bata camp. 1 : 4
Urugan Tanah (Peninggian lantai)
Urugan Pasir ; t = 5 cm
Beton K100, t = 5 cm
keramik 40x40
5 Pintu dan Jendela
Pintu Koboi
Pekerjaan Kusen kayu Kls II
Pintu Kayu Kls II (Pintu Koboi)
Engsel Pintu
Handle Pintu
Kunci tanam
Kunci Slot
Pengecatan Kayu
Jendela
Jendela kaca lipat atas (komplit Frame alluminium)
c Pekerjaan Sanitasi
1 Instalasi air bersih Pipa PVC 1" Type Aw
2 Wastafel Komplit Kran + Pembuang
3 Pekerjaan dudukan tempat memasak dan Wastafel
4 Pipa PVC 1" Type aw (Pipa input ke water tank)
5 Water Tank 2000 liter (Merk Penguin)
6 Pompa Air
7 Pekerjaan Septick Tank
8 Pekerjaan Bak Resapan
9 Pekerjaan Bak Kontrol
10 Pipa PVC 4" Type Aw
11 Tee PVC 4"
12 ElboePVC 4"
13 Instalasi Pipa air di Taman PVC 3/4" Type Aw
14 Kran air dia 1/2''
d Pekerjaan Elektrikal
1 Lampu SL 11 Watt
3 Kabel NYM 2 x 1,5 mm (50 meter)
4 MCB
5 Saklar Ganda
6 Stop Kontak
7 Pipa kabel Listrik
4 | H a l a m a n
8 Instalasi Titik Lampu
9 Biaya Penyambungan Daya Baru (11 unit baru)
10 Biaya Jaminan Langganan (11 unit baru)
11 SLO + SIL Daya Baru (11 unit baru)
VII KIOS CENDERAMATA
a Pekerjaan Struktur
1 Pondasi Menerus
Galian Tanah (Pondasi dan Sloof)
Urugan Tanah Kembali
Urugan Pasir ; t = 5 cm
Lantai Kerja ; t = 5 cm
Tulangan Angkur Sambungan Kolom
Pondasi Pasangan Batu Kali 1SP : 4PP
2 Sloof (S1), Uk. 20 x 25 cm
Beton K200
Pembesian
Bekisting Sloof
3 Sloof (S1), Uk. 25 x 30 cm
Beton K200
Pembesian
Bekisting Sloof
4 Kolom (K), Uk. 15 x 20 cm
Beton K200
Pembesian
Bekisting Kolom
5 Kolom (K), Uk. 15 x 30 cm
Beton K200
Pembesian
Bekisting Kolom
6 Ring Balok (RB), Uk. 15 x 20 cm
Beton K200
Pembesian
7 Plat Lantai Dag, t = 12 cm
Beton K200
Pembesian
bekisting plat Lantai
Pengecatan Plat Dag
b Pekerjaan Arsitektur
1 Dinding
Pasangan 1/2 Batu Bata camp. 1 : 4
Plesteran 1SP : 4PP tebal 15 mm
Pekerjaan dinding batu terawang
Pengecatan Tembok
2 Pekerjaan Balok Kisi-kisi
Pasangan 1 Batu Bata camp. 1 : 4
Plesteran 1SP : 4PP tebal 15 mm
Pengecatan Tembok
3 Lantai
Urugan Tanah (Peninggian lantai)
Urugan Pasir ; t = 5 cm
Beton K100, t = 5 cm
keramik 40x40
5 | H a l a m a n
4 Selasar
Pasangan 1/2 Batu Bata camp. 1 : 4
Urugan Tanah (Peninggian lantai)
Urugan Pasir ; t = 5 cm
Beton K100, t = 5 cm
Keramik 40x40
5 Pintu Besi Lipat
Pintu besi lipat luar + Pasang, Tebal plat 1.8 mm
c Pekerjaan Elektrikal
1 Lampu SL 11 Watt
2 Lampu Sorot Led 5 Watt
3 Kabel NYM 2 x 1,5 mm (50 meter)
4 MCB
5 Saklar Ganda
6 Stop Kontak
7 Instalasi Titik Lampu
8 Biaya Penyambungan Daya Baru (10 unit baru)
9 Biaya Jaminan Langganan (10 unit baru)
10 SLO + SIL Daya Baru (10 unit baru)
VIII PEKERJAAN TANGGA KIOS
a 2 buah tangga menuju atap Dag Kios
1 Pondasi
Pekerjaan Galian Tanah
Pekerjaan Cor Pondasi K200
2 Struktur tangga
Pekerjaan Tiang Kolom Pipa Besi Æ 4", t = 3.0 (L=6m)
Pekerjaan Besi Hollow uk. 50.50.2,5
Pekerjaan Besi Hollow uk. 40.40.2,5
Besi WF 100.100
Pekerjaan Pelat Besi (Ceker plate tbl 1,0mm)
Pekerjaan Hand Railing (Rangka Hollow 50 dan 40)
Pengecatan
6 | H a l a m a n