| 0018518464117000 | Rp 2,343,176,700 | |
| 0941332991121000 | - | |
| 0916336340117000 | - | |
| 0931153142121000 | - | |
| 0824698211124000 | - | |
| 0026459958117000 | - | |
| 0026459966117000 | - | |
| 0820041978117000 | - | |
CV Bintang Prima Jaya | 07*5**2****17**0 | - |
| 0020815908117000 | - | |
| 0920416039122000 | - | |
| 0022598130127000 | - | |
| 0313065815117000 | - | |
| 0920409869121000 | - | |
Jogi Pratama Makmur | 09*3**3****21**0 | - |
| 0018516872117000 | - | |
| 0317423002117000 | - | |
| 0030606578124000 | - | |
| 0021874235009000 | - | |
| 0603098666115000 | - | |
| 0026260281122000 | - | |
| 0029317120128000 | - | |
| 0312870884117000 | - | |
| 0015305907117000 | - | |
| 0763876570121000 | - | |
| 0316774744121000 | - | |
Roy Abadi Sejahtera | 05*8**1****25**0 | - |
| 0951882281122000 | - | |
| 0704740943121000 | - | |
| 0720497627117000 | - | |
| 0314931403124000 | - | |
| 0701461774117000 | - | |
| 0312023476122000 | - | |
| 0021948328127000 | - | |
| 0706607082127000 | - | |
| 0026842757125000 | - | |
| 0946618410117000 | - | |
| 0210507315122000 | - | |
| 0314124371117000 | - |
DAFTAR KUANTITAS DAN HARGA
(HARGA PERKIRAAN SENDIRI/ HPS)
Paket Pekerjaan : Penggantian Jembatan Bah Bolon pada Jalan Jurusan Simp. Marihat - Gerak Tani Kec. Siantar
Penanganan : Jembatan Beton Uk. 18,00 M' x 4,50 M
Prop / Kab : Sumatera Utara/ Simalungun
Kecamatan : Siantar
No. Mata Perkiraan Harga Jumlah
Uraian Satuan
Pemb. Kuantitas Satuan Harga-Harga
(Rupiah) (Rupiah)
a b c d e f = (d x e)
1.2 Mobilisasi Ls 1,00 6 0.660.158,61 6 0.660.158,61
1.22 (7) Jembatan Sementara Ls 1,00 6 3.821.482,19 6 3.821.482,19
Skh-1.1.22 (3) Alat Pelindung Kerja dan Alat Pelindung Diri Set 1,00 1 0.000.000,00 1 0.000.000,00
Skh-1.1.22 (5) Personel Keselamatan Konstruksi Set 1,00 3 3.500.000,00 3 3.500.000,00
Skh-1.1.22 (6) Fasilitas Sarana, Prasarana dan Alat Kesehatan Set 1,00 5 00.000,00 5 00.000,00
Rambu dan Perlengkapan Lalu Lintas yang Diperlukan
Skh-1.1.22 (7) Set 1,00 5 8.446.941,03 58.446.941,03
atau Manajemen Lalu Lintas
3.1 (4)-1 Galian Struktur dengan Kedalaman 0-2 Meter (manual) M3 149,05 1 27.034,66 1 8.934.516,07
Timbunan Biasa dari Sumber Galian (pemadat
3.2 (1a)-1 M3 137,50 233.552,80 32.113.510,00
pedesterian roller)
Timbunan Pilihan dari Sumber Galian (pemadat
3.2 (2a)-1 M3 188,51 342.033,33 64.476.703,04
pedesterian roller)
3.2 (3c) Timbunan Pilihan Berbutir M3 12,00 4 97.136,59 5 .965.639,08
5.3 (1a) Perkerasan Beton Semen M3 37,50 2 .567.024,71 9 6.263.426,63
7.1 (6a) Beton Struktur fc’= 25 MPa Lantai Jembatan M3 30,03 4 .097.161,06 1 23.037.746,63
7.1 (7a) Beton Struktur fc’= 20 MPa M3 111,95 2 .834.685,36 3 17.343.026,05
7.1 (10) Beton fc’= 10 Mpa M3 6,09 1 .984.297,65 1 2.084.372,69
7.3 (1) Baja Tulangan Polos BjTP 280 Kg 13.889,58 2 2.318,05 3 09.988.340,92
Penyediaan Baja Struktur Grade 250 (Kuat Leleh 250
7.4 (1a) Kg 15.850,75 25.421,47 402.949.365,60
MPa)
7.4 (1a)-1 Penyediaan Baut Mutu Tinggi (Tipe A325) Kg 496,00 4 0.250,00 1 9.964.000,00
7.4 (2) Pemasangan Baja Struktur Kg 15.850,75 7 .489,90 1 18.720.532,43
7.9 (1) Pasangan Batu M3 213,38 1 .131.904,93 2 41.525.873,96
7.11 (10) Expansion Joint Tipe Baja Bersudut M' 19,20 2 17.084,65 4 .168.025,28
Landasan Elastomerik Karet Alam Berlapis Baja uk. 350
7.12 (2a) Buah 8,00 4 48.500,00 3 .588.000,00
x 300 x 36 mm
7.13 (1) Sandaran (Railing) M' 72,00 9 20.964,06 6 6.309.412,32
7.14 (1) Papan Nama Jembatan Buah 1,00 5 75.000,00 5 75.000,00
7.15 (1) Pembongkaran Pasangan Batu M3 42,00 4 19.040,71 1 7.599.709,82
7.15 (6) Pembongkaran Balok Baja (Steel Stringers) M' 250,00 1 56.720,55 3 9.180.137,50
7.15 (7) Pembongkaran Lantai Jembatan Kayu M2 60,00 5 1.322,91 3 .079.374,60
7.16 (2b) Pipa Drainase Baja diameter 100 mm M' 3,60 2 25.400,00 8 11.440,00
8.7 (1a) Pengecatan Struktur Baja pada Daerah Kering M2 314,81 9 6.661,51 3 0.430.009,96
Pengecatan pada Elemen Sandaran dan/atau Pagar
8.7 (3a)-1 M2 60,33 71.188,25 4 .294.787,12
Pengaman (Guardrail) Baru