| 0947588000117000 | Rp 660,549,990 | |
| 0763876570121000 | Rp 682,460,403 | |
Lazor Jaya Kontruksi | 03*1**0****21**0 | Rp 704,797,430 |
CV Laksana Permata | 06*8**3****21**0 | - |
| 0436205645127000 | Rp 772,898,648 | |
| 0940713555127000 | Rp 757,295,195 | |
| 0629974205436000 | Rp 779,753,850 | |
| 0022598130127000 | Rp 741,052,703 | |
| 0723891230412000 | Rp 700,677,034 | |
| 0018516872117000 | Rp 767,215,853 | |
| 0403335235117000 | Rp 804,971,300 | |
| 0724180179121000 | Rp 758,183,799 | |
| 0029318334128000 | Rp 750,477,521 | |
| 0416678589115000 | - | |
| 0920409869121000 | - | |
PT Gara Samudra Perkasa | 06*9**2****03**0 | - |
| 0668887813117000 | - | |
| 0413873050128000 | - | |
| 0702068651127000 | - | |
| 0026260281122000 | - | |
| 0928045459125000 | - | |
| 0313489775124000 | - | |
| 0315193961128000 | - | |
| 0829695808117000 | - | |
| 0417307196127000 | - | |
| 0313065815117000 | - | |
| 0958687311121000 | - | |
CV Pidiesia Jaya Perkasa | 06*2**9****08**0 | - |
| 0020817755117000 | - | |
| 0021068242127000 | - | |
| 0616912325115000 | - | |
| 0928130954128000 | - | |
| 0705339406121000 | - | |
| 0667125397107000 | - | |
| 0954099511125000 | - | |
CV Karya Bakti Sejati | 05*6**4****19**0 | - |
| 0012296489117000 | - | |
| 0317684884122000 | - | |
| 0702715517117000 | - | |
| 0836093211122000 | - | |
| 0769438078121000 | - | |
| 0316979129121000 | - | |
| 0026842757125000 | - | |
| 0018518464117000 | - | |
| 0314124371117000 | - | |
CV Bona | 03*2**6****27**0 | - |
Jogi Pratama Makmur | 09*3**3****21**0 | - |
Lo…Sk…taos…AniQ Me…Pu Pe…Ca nrdr…Lgruay os…n=hla …e…hr.La…. nra Ktam-r’ata = …… Km’Lo…Sk…taos…niQ e…Pu e…Canrr…B--gruyoaLs…hhl La=L…ea hro… rna.a…kQ. t…n:aa…u-s…rai a rK…Qtramyu… =a’1.rL .r…. yra… ta -Krmata’ = …… Km’L rata-rata = …… KLmB-- raa’htaLa-o…nrakQ …t:aaus… ai= r…Qr …yu… a2….r.r. Ky mB--a’hSLauo…npk …pa:lsi…ei rS… uB…pal.hl.i.aenr
R E K A P I T U L A S I
RENCANA ANGGARAN BIAYA ( RAB )
Pembangunan Ruang Kelas Baru (RKB) SD Negeri 091477 Dolok Marlawan (4 Ruang)
SUB
URAIAN PEKERJAAN JUMLAH HARGA (Rp.)
TOTAL
1 2 3
I. PEKERJAAN PENDAHULUAN -
II. PEKERJAAN PONDASI -
III. PEKERJAAN DINDING DAN BETON -
IV. PEKERJAAN KOSEN, PINTU, DAN JENDELA -
V. PEKERJAAN ATAP -
VI. PEKERJAAN PLAFOND -
VII. PEKERJAAN LANTAI -
VIII. PEKERJAAN CAT -
IX. PEKERJAAN TIANG TERAS -
X. PEKERJAAN ELEKTRIKAL -
XI. PEKERJAAN PARIT KELILING SEP. 90 M -
XII. PEKERJAAN LAIN - LAIN -
A JUMLAH HARGA PEKERJAAN -
B PAJAK PERTAMBAHAN NILAI (PPN) = 11 % X (A) -
C JUMLAH HARGA PEKERJAAN = (A) + (B) -
D DIBULATKAN -
Terbilang : -
Pematang Raya, 2023
Diperiksa Oleh: Dibuat Oleh :
PEJABAT PELAKSANA TEKNIS KEGIATAN CV. BALAKOSA CONSULTANT
PPTK
FAROLAN SINTAPRAJA SIDAURUK, SE JAYA IRAWAN, ST
NIP. 19741126 200604 1003 Team Leader
Disetujui Oleh: Diketahui Oleh:
PEJABAT PEMBUAT KOMITMEN KEPALA DINAS PENDIDIKAN
PPK KABUPATEN SIMALUNGUN
DEDDY YUSMAN SARAGIH, S.Pd SUDIAHMAN SARAGIH, SH
NIP. 19820917 200904 1007 NIP. 19681206 199703 1005
(RENCANA ANGGARAN BIAYA / ENGINEERING ESTIMATE)
PEKERJAAN : Pembangunan Ruang Kelas Baru (RKB) SD Negeri 091477 Dolok Marlawan (4 Ruang)
LOKASI KEGIATAN : Kecamatan Jorlang Hataran
SUMBER DANA : Dana Alokasi Khusus (DAK) Fisik Tahun Anggaran 2023
Harga Satuan
No. Uraian Pekerjaan Kode Analisa volume Sat Jumlah Harga (Rp.)
(Rp.)
I. PEKERJAAN PENDAHULUAN
1. Pengukuran dan Pemasangan Bowplank A.2.2.1.4 78,00 m' - -
2. Air Kerja Ls 1,00 Lot - -
3. Papan nama proyek Ls 1,00 Lot - -
4. Sewa Gudang/Pondok Kerja Ls 1,00 Lot - -
5. Alat Pelindung Kerja dan Alat Pelindung Diri A. 2.3 1,00 set - -
SUB JUMLAH - PEKERJAAN PENDAHULUAN ………………………………………………………………………………………… … … … … … … … … … - ………………...…
II. PEKERJAAN PONDASI
1. Pek. Galian Tanah A.2.3.1.1 35,64 m3 - -
2. Pek. Urugan Pasir A.2.3.1.11 2,97 m3 - -
3. Pek. Lantai Kerja Beton Cor A.4.1.1.4 2,97 m3 - -
4. Pek. Pondasi Batu Padas A.3.2.1.2 21,04 m3 - -
5. Pek. Urugan Tanah Kembali A.2.3.1.9 11,63 m3 - -
6. Pek. Sloof Beton Bertulang 12/20
Beton Cor A.4.1.1.3 8,46 m3 - -
Besi Beton A.4.1.1.17 930,60 kg - -
Bekesting Sloof (2 x Pakai) A.4.1.1.21 (a) 84,60 m2 - -
SUB JUMLAH - PEKERJAAN PONDASI ………………………………………………………………………………………………… … … … … … … … … … -………...…
III. PEKERJAAN DINDING DAN BETON
1. Pek. Dinding Batu Bata Camp. 1 : 4 A.4.4.1.9 332,55 m2 - -
2. Pek. Kolom Beton Bertulang 20/20
Beton Cor A.4.1.1.3 5,10 m3 - -
Besi Beton A.4.1.1.17 816,13 kg - -
Bekesting Kolom (2 x Pakai) A.4.1.1.22 (a) 99,20 m2 - -
3. Pek. Kolom Beton Bertulang 12/12
Beton Cor A.4.1.1.3 - m3 - -
Besi Beton A.4.1.1.17 - kg - -
Bekesting Kolom (2 x Pakai) A.4.1.1.22 (a) - m2 - -
4. Pek. Ringbalk Beton Bertulang 20/20
Beton Cor A.4.1.1.3 3,96 m3 - -
Besi Beton A.4.1.1.17 633,60 kg - -
Bekesting Balok (2 x Pakai) A.4.1.1.23 (a) 39,60 m2 - -
5. Pek. Plesteran Dinding 1 : 4 A.4.4.2.4 534,07 m2 - -
6. Pek. Acian Kolom A.4.4.2.27 45,56 m2 - -
7. Pek. Dinding Keramik Uk. 25 x 40 (Corak Batu Alam) A.4.4.3.54 (d) 93,50 m2 - -
SUB JUMLAH - PEKERJAAN DINDING DAN BETON ………………………………………………………………………………… … … … … … … … … … -………………………...…
IV. PEKERJAAN KOSEN, PINTU, DAN JENDELA
1. Pek. Kosen Pintu dan Jendela Kayu Kls II A.4.6.1.2 1,91 m3 - -
2. Pintu Type P1 uk 90 x 210 cm dan Asesories Dihitung.P1 1,00 unit - -
3. Jendela uk 60 x 80 cm dan Asesories Dihitung.J1 68,00 unit - -
4. Lubang Angin Beton Ls 12,00 bh - -
SUB JUMLAH - PEKERJAAN KOSEN, PINTU, DAN JENDELA ……………………………………………………………………… … … … … … … … … … -…………………………………...…
V. PEKERJAAN ATAP
1. Pek. Kudakuda Kayu Kls II A.4.6.1.13 - m3 - -
2. Pek. Gording uk. 2/3" Kayu kls II A.4.6.1.15 - m3 - -
3. Pek. Rangka atap baja ringan C.75, t=0.75 mm A.4.2.1.23 (a) 385,55 m3 - -
4. Pek.Atap Spandeck (t=0,3 mm) A.4.5.2.44 393,75 m2 - -
5. Pek. Rabung Spandeck A.4.5.2.46 34,15 m' - -
6. Pekerjaan Lisplank A.4.6.1.21 90,88 m2 - -
SUB JUMLAH - PEKERJAAN ATAP ……………………………………………………………………………………………………… … … … … … … … … … - …...…
VI. PEKERJAAN PLAFOND
1. Pek. Rangka Plafond Kayu Kls II A.4.6.1.20.A 343,29 m2 - -
2. Pekerjaan Plafond Tripleks t = 4mm A.4.5.1.5.a 343,29 m2 - -
SUB TOTAL - PEKERJAAN PLAFOND …………………………………………………………………………………………………… … … … … … … … … … - ……...…
Harga Satuan
No. Uraian Pekerjaan Kode Analisa volume Sat Jumlah Harga (Rp.)
(Rp.)
VII. PEKERJAAN LANTAI
1. Pek. Urugan Tanah A.2.3.1.15 32,56 m3 - -
2. Pek. Urugan Pasir dibawah Lantai A.2.3.1.11 16,28 m3 - -
3. Pek. Lantai Keramik 40 x 40 cm A.4.4.3.35 (a) 329,34 m2 - -
4. Pek. Lantai Beton Cor A.4.1.1.4 - m3 - -
SUB JUMLAH - PEKERJAAN LANTAI …………………………………………………………………………………………………… … … … … … … … … … - ……...…
VIII. PEKERJAAN CAT
1. Pek. Cat Tembok Baru A.4.7.1.10 500,33 m2 - -
2. Pek. Cat Plafond Dihitung.CPl 343,29 m2 - -
3. Pek. Cat Kilat Kayu Kosen dan Listplank A.4.7.1.4 194,94 m2 - -
SUB JUMLAH - PEKERJAAN CAT ………………………………………………………………………………………………………… … … … … … … … … -…...…
IX. PEKERJAAN TIANG TERAS
1. Pek. Galian Tanah A.2.3.1.1 1,63 m3 - -
2. Pek. Beton Cor A.4.1.1.4 0,33 m3 - -
3. Pek. Kolom Beton Bertulang 20/20
Beton Cor A.4.1.1.3 0,10 m3 - -
Besi Beton A.4.1.1.17 16,00 kg - -
Bekesting Kolom (2 x Pakai) A.4.1.1.22 (a) 27,61 m2 - -
4. Pek. Ringbalk Beton Bertulang 20/20
Beton Cor A.4.1.1.3 1,28 m3 - -
Besi Beton A.4.1.1.17 204,80 kg - -
Bekesting Balok (2 x Pakai) A.4.1.1.23 (a) 12,80 m2 - -
5. Pek. Pas. Batu Bata Camp. 1 : 4 A.4.4.1.9 9,10 m2 - -
6. Pek. Plesteran 1 : 4 A.4.4.2.4 13,65 m2 - -
7. Pek. Plesteran Motif A.4.4.2.28 3,64 m2 - -
SUB JUMLAH PEKERJAAN TIANG TERAS ……………………………………………………………………………………………… … … … … … … … … … - …………...…
X. PEKERJAAN ELEKTRIKAL
1. Lampu XL 18 Watt Ls 2 0,000 bh - -
2. Saklar Ganda Ls 4 ,000 bh - -
3. Saklar Tunggal Ls 4 ,000 bh - -
4. Stop Kontak Ls 4 ,000 bh - -
5. Kabel Listrik NYA 2,5 mm2 Ls 4 00,000 m' - -
6. Pipa Listrik Ls 4 0,000 btg - -
7. Biaya Instalasi Listrik Ls 1 ,000 Ls - -
SUB JUMLAH PEKERJAAN ELEKTRIKAL ……………………………………………………………………………………………… … … … … … … … … … -…………...…
XI. PEKERJAAN PARIT KELILING SEP. 90 M
1. Pek. Galian Tanah A.2.3.1.1 2 2,500 m3 - -
2. Pek. Pas. Batu Bata Camp. 1 : 4 A.4.4.1.9 7 2,000 m2 - -
3. Pek. Lantai Beton Cor A.4.1.1.4 4 ,500 m3 - -
4. Pek. Plesteran 1 : 4 A.4.4.2.4 8 1,000 m2 - -
SUB JUMLAH PEKERJAAN PARIT KELILING SEP. 90 M ……………………………………………………………………………… … … … … … … … … -……………………………...…
XII. PEKERJAAN LAIN - LAIN
1. Photo Dokumentasi Ls 1,00 lot - -
2. Pembersihan Akhir Ls 1,00 lot - -
3. Pembuatan Prasasti Ls 4,00 lot - -
SUB JUMLAH - PEKERJAAN LAIN - LAIN ……………………………………………………………………………………………… … … … … … … … … … - …………...…