| 0012296489117000 | Rp 330,827,859 | |
| 0964847255117000 | Rp 334,125,932 | |
| 0403335235117000 | - | |
| 0317684884122000 | - | |
| 0769438078121000 | - | |
| 0018518464117000 | - | |
| 0018516872117000 | - | |
| 0748839560124000 | - | |
PT Gara Samudra Perkasa | 06*9**2****03**0 | - |
| 0719528721117000 | - | |
CV Bona | 04*0**8****17**0 | - |
| 0313065815117000 | - | |
| 0020817755117000 | - | |
| 0314124371117000 | - | |
| 0015976210113000 | - | |
| 0015305907117000 | - | |
| 0763876570121000 | - |
REKAPITULASI
PEKERJAAN : Rehabilitasi Ruang Kelas SMP Negeri 3 Raya
LOKASI KEGIATAN : Kecamatan Raya
SUMBER DANA : Anggaran Pendapatan dan Belanja Daerah (A P B D) TA. 2023
JUMLAH HARGA
NO. URAIAN PEKERJAAN
(Rp)
A. PEKERJAAN PENDAHULUAN -
B. BANGUNAN BLOK - A
1. PEKERJAAN DINDING DAN BETON -
2. PEKERJAAN KOSEN, PINTU DAN JENDELA -
3. PEKERJAAN ATAP -
4. PEKERJAAN PLAFOND -
5. PEKERJAAN LANTAI -
6. PEKERJAAN CAT -
7. PEKERJAAN TIANG TERAS -
8. PEKERJAAN ELEKTRIKAL -
C. BANGUNAN BLOK - B
1. PEKERJAAN DINDING DAN BETON -
2. PEKERJAAN KOSEN, PINTU DAN JENDELA -
3. PEKERJAAN ATAP -
4. PEKERJAAN PLAFOND -
5. PEKERJAAN LANTAI -
6. PEKERJAAN CAT -
7. PEKERJAAN TIANG TERAS -
8. PEKERJAAN ELEKTRIKAL -
D. PEKERJAAN LAIN - LAIN -
A. JUMLAH HARGA PEKERJAAN (TERMASUK KEUNTUNGAN) ……………… … … … … … … … … … … … -………………………………………………..
B. PAJAK PERTAMBAHAN NILAI (PPN) = 11 % X (A) …………………………… … … … … … … … … … … … - …………………..
C. JUMLAH HARGA PEKERJAAN = (A) + (B) …………………………………… … … … … … … … … … … … -…………..
D. DIBULATKAN ……………………………………………………………………… … … . . -
Terbilang : -
BILL OF QUANTITY (BQ)
PEKERJAAN : Rehabilitasi Ruang Kelas SMP Negeri 3 Raya
LOKASI KEGIATAN : Kecamatan Raya
SUMBER DANA : Anggaran Pendapatan dan Belanja Daerah (A P B D) TA. 2023
HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME SAT ANALISA SATUAN H A R G A
(Rp.) (Rp.)
1 2 3 4 5 6 7
A. PEKERJAAN PENDAHULUAN
1. Pek. Bongkaran 1,000 lot Ls -
2. Air Kerja dan Listrik Kerja 1,000 lot Ls -
3. Papan nama proyek 1,000 lot Ls -
4. Sewa Gudang/Pondok Kerja 1,000 lot Ls -
5. Alat Pelindung Kerja dan Alat Pelindung Diri 1,000 lot A. 2.3 -
SUB. TOTAL PEKERJAAN PENDAHULUAN ………………………………………………………………………………… … … … … … … … -
B. BANGUNAN BLOK - A
1. PEKERJAAN DINDING DAN BETON
1. Pek. Sisip Plesteran 1 : 4 9,600 m2 A.4.4.2.4 -
2. Pek. Dinding Keramik Uk. 25 x 40 (Corak Batu Alam) 14,300 m2 A.4.4.3.54 (d) -
SUB. TOTAL PEKERJAAN DINDING DAN BETON …………………………………………………………………………… … … … … … … … - ……
2. PEKERJAAN KOSEN, PINTU DAN JENDELA
1. Pek. Sisip/ Dempul Kosen Pintu dan Jendela Kayu 1,000 lot Ls -
2. Pintu Type P2 uk 2 x 60 x 200 cm dan Asesories 2,000 unit Dihitung.P2b -
3. Jendela uk 58 x 60 cm dan Asesories 20,000 unit Dihitung.J1.b -
4. Jendela uk 60 x 85 cm dan Asesories 20,000 unit Dihitung.J1 -
SUB. TOTAL PEKERJAAN KOSEN, PINTU DAN JENDELA ………………………………………………………………… … … … … … … … - ………………
3. PEKERJAAN ATAP
1. Pek. Sisip Rangka Atap Kayu Kls. II 0,396 m3 A.4.6.1.15 -
2. Pek.Atap Spandeck (t = 0,3 mm) 247,244 m2 A.4.5.2.44 -
3. Pek. Rabung Spandeck 28,200 m' A.4.5.2.46 -
4. Pekerjaan Lisplank Kayu Kls. II 29,000 m' A.4.6.1.21 -
SUB. TOTAL PEKERJAAN ATAP ……………………………………………………………………………………………… … … -
4. PEKERJAAN PLAFOND
1. Pek. Rangka Plafond Kayu Kls II 80,244 m2 A.4.6.1.20.a -
2. Pekerjaan Plafond Tripleks t = 4mm 200,610 m2 A.4.5.1.5.a -
SUB. TOTAL PEKERJAAN PLAFOND ………………………………………………………………………………………… … … … … -
5. PEKERJAAN LANTAI
1. Pek. Urugan Tanah 2,903 m3 A.2.3.1.15 -
2. Pek. Urugan Pasir dibawah Lantai 1,451 m3 A.2.3.1.11 -
3. Pek. Lantai Keramik 40 x 40 cm 163,175 m2 A.4.4.3.35 (a) -
4. Pek. Lantai Rabat Plester 1,451 m3 A.4.1.1.1 -
5. Pek. Rolag Pas. Batu Bata 1 : 4 8,963 m2 A.4.4.1.9 -
5. Pek. Plesteran 1 : 4 7,170 m2 A.4.4.2.4 -
SUB. TOTAL PEKERJAAN LANTAI …………………………………………………………………………………………… … … … -
6. PEKERJAAN CAT
1. Pek. Cat Tembok Baru 303,340 m2 A.4.7.1.10 -
2. Pek. Cat Plafond 200,610 m2 Dihitung.CPl -
3. Pek. Cat Kilat Kayu Kosen dan Listplank 115,717 m2 A.4.7.1.4 -
SUB. TOTAL PEKERJAAN CAT ………………………………………………………………………………………………… … -
HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME SAT ANALISA SATUAN H A R G A
(Rp.) (Rp.)
1 2 3 4 5 6 7
7. PEKERJAAN TIANG TERAS
1. Pek. Galian Tanah 0,875 m3 A.2.3.1.1 -
2. Pek. Urugan Pasir 0,088 m3 A.2.3.1.11 -
3. Pek. Beton Cor (Tbl: 10 Cm) 0,175 m3 A.4.1.1.4 -
4. Pek. Kolom Beton Bertulang 20/20
Beton Cor 0,755 m3 A.4.1.1.3 -
Besi Beton 86,786 kg A.4.1.1.17 -
Bekesting Kolom (2 x Pakai) 17,640 m2 A.4.1.1.22 (a) -
5. Pek. Ringbalk Beton Bertulang 12/20
Beton Cor 0,542 m3 A.4.1.1.3 -
Besi Beton 73,127 kg A.4.1.1.17 -
Bekesting Balok (2 x Pakai) 9,028 m2 A.4.1.1.23 (a) -
6. Pek. Pas. Batu Bata Camp. 1 : 4 4,900 m2 A.4.4.1.9 -
2. Pek. Plesteran 1 : 4 7,350 m2 A.4.4.2.4 -
8. Pek. Plesteran Motif 1,960 m2 A.4.4.2.28 -
SUB. TOTAL PEKERJAAN TIANG TERAS ……………………………………………………………………………………… … … … … … -
8. PEKERJAAN ELEKTRIKAL
1. Fitting Lampu 10,000 bh Ls -
2. Lampu XL 23 Watt 10,000 bh Ls -
3. Saklar Ganda 2,000 bh Ls -
4. Stop Kontak 2,000 bh Ls -
5. Kabel Listrik NYA 2,5 mm2 2,000 rol Ls -
6. Pipa Listrik 20,000 btg Ls -
7. Biaya Instalasi Listrik 1,000 Ls Ls -
SUB. TOTAL PEKERJAAN ELEKTRIKAL ……………………………………………………………………………………… … … … … … -
C. BANGUNAN BLOK - B
1. PEKERJAAN DINDING DAN BETON
1. Pek. Sisip Plesteran 1 : 4 9,600 m2 A.4.4.2.4 -
2. Pek. Dinding Keramik Uk. 25 x 40 (Corak Batu Alam) 14,300 m2 A.4.4.3.54 (d) -
SUB. TOTAL PEKERJAAN DINDING DAN BETON …………………………………………………………………………… … … … … … … … - ……
2. PEKERJAAN KOSEN, PINTU DAN JENDELA
1. Pek. Sisip/ Dempul Kosen Pintu dan Jendela Kayu 1,000 lot Ls -
2. Pintu Type P2 uk 2 x 60 x 200 cm dan Asesories 2,000 unit Dihitung.P2b -
3. Jendela uk 58 x 60 cm dan Asesories 20,000 unit Dihitung.J1.b -
4. Jendela uk 60 x 85 cm dan Asesories 22,000 unit Dihitung.J1 -
SUB. TOTAL PEKERJAAN KOSEN, PINTU DAN JENDELA ………………………………………………………………… … … … … … … … - ………………
3. PEKERJAAN ATAP
1. Pek. Sisip Rangka Atap Kayu Kls. II 0,396 m3 A.4.6.1.15 -
2. Pek.Atap Spandeck (t = 0,3 mm) 247,244 m2 A.4.5.2.44 -
3. Pek. Rabung Spandeck 28,200 m' A.4.5.2.46 -
4. Pekerjaan Lisplank Kayu Kls. II 29,000 m' A.4.6.1.21 -
SUB. TOTAL PEKERJAAN ATAP ……………………………………………………………………………………………… … … -
4. PEKERJAAN PLAFOND
1. Pek. Rangka Plafond Kayu Kls II 80,244 m2 A.4.6.1.20.a -
2. Pekerjaan Plafond Tripleks t = 4mm 200,610 m2 A.4.5.1.5.a -
SUB. TOTAL PEKERJAAN PLAFOND ………………………………………………………………………………………… … … … … -
HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME SAT ANALISA SATUAN H A R G A
(Rp.) (Rp.)
1 2 3 4 5 6 7
5. PEKERJAAN LANTAI
1. Pek. Urugan Tanah 2,903 m3 A.2.3.1.15 -
2. Pek. Urugan Pasir dibawah Lantai 1,451 m3 A.2.3.1.11 -
3. Pek. Lantai Keramik 40 x 40 cm 163,175 m2 A.4.4.3.35 (a) -
4. Pek. Lantai Rabat Plester 1,451 m3 A.4.1.1.1 -
5. Pek. Rolag Pas. Batu Bata 1 : 4 8,963 m2 A.4.4.1.9 -
5. Pek. Plesteran 1 : 4 7,170 m2 A.4.4.2.4 -
SUB. TOTAL PEKERJAAN LANTAI …………………………………………………………………………………………… … … … -
6. PEKERJAAN CAT
1. Pek. Cat Tembok Baru 303,340 m2 A.4.7.1.10 -
2. Pek. Cat Plafond 200,610 m2 Dihitung.CPl -
3. Pek. Cat Kilat Kayu Kosen dan Listplank 120,020 m2 A.4.7.1.4 -
SUB. TOTAL PEKERJAAN CAT ………………………………………………………………………………………………… … -
7. PEKERJAAN TIANG TERAS
1. Pek. Galian Tanah 0,875 m3 A.2.3.1.1 -
2. Pek. Urugan Pasir 0,088 m3 A.2.3.1.11 -
3. Pek. Beton Cor (Tbl: 10 Cm) 0,175 m3 A.4.1.1.4 -
4. Pek. Kolom Beton Bertulang 20/20
Beton Cor 0,755 m3 A.4.1.1.3 -
Besi Beton 86,786 kg A.4.1.1.17 -
Bekesting Kolom (2 x Pakai) 17,640 m2 A.4.1.1.22 (a) -
5. Pek. Ringbalk Beton Bertulang 12/20
Beton Cor 0,542 m3 A.4.1.1.3 -
Besi Beton 73,127 kg A.4.1.1.17 -
Bekesting Balok (2 x Pakai) 9,028 m2 A.4.1.1.23 (a) -
6. Pek. Pas. Batu Bata Camp. 1 : 4 4,900 m2 A.4.4.1.9 -
2. Pek. Plesteran 1 : 4 7,350 m2 A.4.4.2.4 -
8. Pek. Plesteran Motif 1,960 m2 A.4.4.2.28 -
SUB. TOTAL PEKERJAAN TIANG TERAS ……………………………………………………………………………………… … … … … … -
8. PEKERJAAN ELEKTRIKAL
1. Fitting Lampu 10,000 bh Ls -
2. Lampu XL 23 Watt 10,000 bh Ls -
3. Saklar Ganda 2,000 bh Ls -
4. Stop Kontak 2,000 bh Ls -
5. Kabel Listrik NYA 2,5 mm2 2,000 rol Ls -
6. Pipa Listrik 20,000 btg Ls -
7. Biaya Instalasi Listrik 1,000 Ls Ls -
SUB. TOTAL PEKERJAAN ELEKTRIKAL ……………………………………………………………………………………… … … … … … -
D. PEKERJAAN LAIN - LAIN
1. Photo Dokumentasi 1,000 lot Ls -
2. Pembersihan Akhir 1,000 lot Ls -
SUB. TOTAL PEKERJAAN LAIN - LAIN ……………………………………………………………………………………… … … … … … -