| Reason | |||
|---|---|---|---|
| 0025020322113000 | Rp 2,022,313,744 | - | |
| 0720248475124000 | Rp 1,809,317,581 | Tidak menghadiri undangan klarifikasi penawaran | |
| 0929018588125000 | - | - | |
| 0027594795112000 | - | - | |
| 0838698439117000 | - | - | |
| 0020815908117000 | - | - | |
Jogi Pratama Makmur | 09*3**3****21**0 | - | - |
| 0763876570121000 | - | - | |
| 0958687311121000 | - | - | |
| 0633428511128000 | - | - | |
| 0210006383122000 | - | - | |
| 0018518464117000 | - | - | |
| 0733159453331000 | - | - | |
| 0916336340117000 | - | - | |
| 0737823963127000 | - | - | |
| 0022599435127000 | - | - | |
| 0421344649127000 | - | - | |
| 0317423002117000 | - | - | |
| 0314124371117000 | - | - | |
CV Asa Citra Persada | 05*4**6****15**0 | - | - |
| 0710311242127000 | - | - | |
| 0016515835122000 | - | - | |
| 0842799587121000 | - | - | |
| 0018516872117000 | - | - | |
| 0316172832124000 | - | - | |
| 0725672810122000 | - | - | |
| 0838347979212000 | - | - |
Jenis Barang/ Jasa Satuan Volume
I. Pek. Pendahuluan -
1 Pembersihan Trase Pipa - Ls Lot 1.00
2 Pematokan/Pengukuran - Ls Lot 1.00
3 Papan nama proyek - Ls Lot 1.00
4 Sewa Gudang/Pondok Kerja - Ls Lot 1.00
5 Commisioning Test & Pembersihan Akhir - Ls Lot 1.00
II. Penerapan Sistem Manajemen Dan Keselamatan
Kerja (SMKK) -
1 Alat Pelindung Kerja dan Alat Pelindung Diri - Ls Set 1.00
2 Personel Keselamatan Konstruksi - Ls Set 1.00
3 Fasilitas Sarana, Prasarana dan Alat Kesehatan - Ls Set 1.00
4 Rambu dan Perlengkapan Lalu Lintas yang Diperlukan
Set 1.00
atau Manajemen Lalu Lintas - Ls
III. Pekerjaan Utama -
A. Pek. Broncaptering dan Rumah Pompa -
1 Pekerjaan Galian Tanah Cadas - A.2.3.1.4 M3 2.41
- Pekerjaan Beton Umpak K-250 (Site Mix) - M3 0.70
2 Pek. Sloof - A.4.1.1.8
- Beton Cor K-250 (Site Mix) untuk Sloof - A.4.1.1.17 M3 1.71
- Pembesian Sloof - Kg 34.56
3 Pek. Dinding - A.4.1.1.8
- Beton Cor K-250 (Site Mix) untuk Dinding - A.4.1.1.17 M3 3.36
- Pembesian Dinding - A.4.1.1.25 (a) Kg 130.45
- Bekisting Dinding - M2 33.60
4 Pek. Cor lantai - A.4.1.1.8
- Beton Cor K-250 (Site Mix) untuk Lantai - A.4.1.1.17 M3 0.60
- Pembesian Lantai - Kg 24.35
5 Pek. Kolom - A.4.1.1.8
- Beton Cor K-250 (Site Mix) untuk Kolom - A.4.1.1.17 M3 0.58
- Pembesian Kolom - A.4.1.1.24 Kg 57.40
- Bekisting Kolom - A.8.4.1.37 M2 5.12
6 Pek. Cor Plat Penutup - Ls
- Beton Cor K-250 (Site Mix) untuk Plat Penutup - Ls M3 1.02
- Pembesian Plat Lantai - A.8.4.2.21.7 (a) Kg 48.70
- Bekisting Plat - Ls M2 6.00
7 Pek. Pas Batu Bata 1:4 - A.8.4.2.40.5 M2 10.15
8 Plesteran 1:4 - M2 27.20
9 Pek. Cor Plat Penutup Atap - A.2.3.1.4
- Beton Cor K-250 (Site Mix) untuk Plat Penutup Atap - M3 0.46
- Pembesian Plat Lantai - A.4.1.1.8 Kg 23.36
- Bekisting Plat - A.4.1.1.17 M2 4.56
10 Pintu Besi 1,5x0,7 - M2 1.05
11 Pipa Gip Ø 2" - A.4.1.1.8 M' 3.40
12 Bend Gip Ø 2" - A.4.1.1.17 Buah 2.00
13 Gate Valve Ø 2" - Buah 1.00
B. Pek. Menara Air -
1 Pek. Galian Tanah Biasa - A.4.1.1.17 M3 8.82
2 Pekerjaan Beton Cor Lantai Kerja K-100 (Site Mix) -
A.4.1.1.25 (a) M3 0.30
3 Pekerjaan Beton Cor Tapak -
- Beton Cor K-250 (Site Mix) untuk Tapak Pondasi -
A.4.1.1.8 M3 1.80
- Pembesian Tapak Pondasi - A.4.1.1.17 Kg 85.76
4 Pek. Pedestal Pondasi - A.4.1.1.24
- Beton Cor K-250 (Site Mix) untuk Pondasi - M3 0.96
- Pembesian Pondasi - Ls Kg 53.00
- Bekisting Pondasi - Ls M2 7.20
5 Pek. Sloof - A.8.4.2.40.5
- Beton Cor K-250 (Site Mix) untuk Sloof - A.8.4.2.40.3 M3 1.06
- Pembesian Sloof - A.8.4.2.40.2 Kg 97.82
6 Pek. Kolom - A.4.7.1.10
- Beton Cor K-250 (Site Mix) untuk Kolom - M3 4.22
- Pembesian Kolom - Kg 130.47
- Bekisting Kolom - A.8.4.1.37 M2 42.24
7 Pek. Balok Gantung - A.8.4.1.5
- Beton Cor K-250 (Site Mix) untuk Balok - A.8.4.2.21.7
(a) M3 0.58
- Pembesian Balok - Ls Kg 97.82
- Bekisting Balok - A.8.4.2.16.5 M2 13.20
8 Pek. Balok Atas - A.2.3.1.1
- Beton Cor K-250 (Site Mix) untuk Balok - A.2.3.1.9 M3 0.29
- Pembesian Balok - Kg 25.38
- Bekisting Balok - A.8.4.1.36 M2 7.92
9 Pek. Plat Lantai - A.8.4.1.4
- Beton Cor K-250 (Site Mix) untuk Plat Lantai -
A.8.4.2.21.7 M3 2.39
- Pembesian Plat Lantai - Ls Kg 147.47
- Bekisting Plat Lantai - A.8.4.2.16.4 M2 11.96
10 Pek. Dinding - Ls
- Beton Cor K-250 (Site Mix) untuk Dinding - A.2.3.1.1 M3 4.76
- Pembesian Dinding - A.2.3.1.9 Kg 172.62
- Bekisting Dinding - M2 40.32
11 Pek. Plat Penutup - A.8.4.1.35
- Beton Cor K-250 (Site Mix) untuk Plat Penutup -
A.8.4.1.3 M3 1.79
- Pembesian Plat Penutup - A.8.4.2.21.7 (b) Kg 73.73
- Bekisting Plat Penutup - A.8.4.2.16.3 M2 11.96
12 Pekerjaan Pengecatan Tembok - M2 88.56
13 Pipa Gip Ø 4" - Ls M' 6.50
14 Pipa Gip Ø 2" - A.2.3.1.1 M' 2.50
15 Pipa Gip Ø 1,5" - A.2.3.1.9 M' 7.30
16 Bend Gip Ø 4" - Buah 2.00
17 Bend Gip Ø 2" - A.8.4.1.34 Buah 2.00
18 Bend Gip Ø 1,5" - A.8.4.1.33 Buah 1.00
19 Socket Drat Luar PVC Ø 1,5" - A.8.4.1.1 Buah 1.00
20 Tee stuck Gip Ø 2" - A.8.4.2.21.7 (d) Buah 1.00
21 Gate Valve Ø 4" - A.8.4.2.16.1 Buah 1.00
22 Gate Valve Ø 2" - Ls Buah 1.00
23 Flens Spigot PVC Ø 4" - Ls Buah 2.00
C Pek. Pompa dan Listrik -
1 Pompa Sentrifugal CNP Type CDLF 2-16 Power 5.5 Kw
7.5HP 3 Phase - A.2.3.1.1 Unit 1.00
2 Kabel TIC 4x25 - M' 400.00
3 Izin Pemasukan Listrik dari PLN 6.600 VA 3 Phase -
A.4.1.1.8 Unit 1.00
4 Tiang Listrik Pipa Hitam Ø 3", 2", 1,5" - A.4.1.1.17 Titik 6.00
5 Galian Tanah Tiang Listrik - M3 0.38
6 Beton Cor Tiang Listrik - M3 0.49
D Pek. Pipa Transmisi dan Gantungan Pipa -
I Pekerjaan Pipa -
1 Pipa GIP Ø 2" - A.4.1.1.8 m3 60.00
2 Pipa PVC Ø 2" - A.4.1.1.17 kg 120.00
3 Pipa PVC Ø 1,5" - A.4.1.1.25 (a) m2 246.00
4 Galian Tanah Biasa - 43.92
5 Mengurug Tanah Hasil Galian Pipa - A.4.1.1.8 m3 43.40
II Accessories -
Bend Gip Ø 2" - Buah 13.00
Reducer PVC Ø2"x1,5" - Buah 1.00
Beton Cor Sokong - M3 0.05
Kabel Sling Ø 8" - M' 20.00
Spand Panjang 25 cm - Buah 1.00
Baut Klem Sling Ø 8mm - Buah 12.00
Besi Siku 40.40.4 - M' 1.00
E Pek. Pipa Distribusi -
I Pipa Ø 4" -
1 Pipa PVC Ø 4" - M' 664.00
2 Galian Tanah Biasa - M3 34.77
3 Timbunan Kembali - M3 29.39
4 Bongkaran Cor Beton - M3 9.90
5 Pengecoran Kembali - A.4.1.1.8 M3 9.90
6 Crossing 6m - A.4.1.1.17 Ttk 2.00
7 Crossing 4m - A.8.4.2.40.4 Ttk 1.00
8 Teestuck PVC 4"x4"x4" - A.8.4.2.40.3 Buah 1.00
9 Teestuck PVC 4"x4"x3" - A.8.4.2.28.1 Buah 2.00
10 Teestuck PVC 4"x4"x1,5" - Buah 2.00
11 Reducer PVC 4" x 3" - Buah 2.00
12 Gate Valve 4" - A.8.4.1.35 Buah 1.00
13 Flange Spigot PVC 4" - Buah 2.00
II Pipa Ø 3" -
1 Pipa PVC Ø 3" - M' 1652.00
2 Pipa GIP Ø 3" - Buah 24.00
3 Galian Tanah Biasa - M3 92.33
4 Timbunan Kembali - M3 84.80
5 Bongkaran Cor Beton - M3 10.50
6 Pengecoran Kembali - M3 10.50
7 Crossing 4m - Ttk 4.00
8 Teestuck PVC 3"x3"x2" - Buah 3.00
9 Teestuck PVC 3"x3"x1,5" - A.8.4.1.2 Buah 8.00
10 Bend Gip 3" - A.2.3.1.1 Buah 8.00
11 Reducer PVC 3" x 2" - A.2.3.1.9 Buah 4.00
12 Flange Spigot PVC 3" - Buah 4.00
III Pipa Ø 2" -
1 Pipa PVC Ø 2" - M' 2862.00
2 Pipa GIP Ø 2" - M' 24.00
3 Galian Tanah Biasa - M3 114.48
4 Timbunan Kembali - A.2.3.1.9 M3 111.22
5 Crossing 4m - Ttk 4.00
6 Teestuck PVC 2"x2"x1,5" - A.8.4.1.1 (a) Buah 4.00
7 Reducer PVC 2" x 1,5" - Ls Buah 2.00
8 Bend Gip 2" - Ls Buah 6.00
9 Dop PVC 2" - Ls Buah 1.00
IV Pipa Ø 1,5" -
1 Pipa PVC Ø 1,5" - M' 4608.00
2 Galian Tanah Biasa - M3 184.32
3 Timbunan Kembali - M3 181.98628
4 Crossing 4m - Dihitung Ttk 2.00
5 Teestuck PVC 1,5"x1,5"x1,5" - Dihitung Buah 4.00
6 Dop PVC 1,5" - Dihitung Buah 25.00
F Biaya Pikul -
1 Semen PC - Zak 88.01
2 Pasir pasang - M3 5.25
3 Batu pecah 1-2 cm - M3 6.48
4 Besi - kg 334.77
5 Kayu Bekisting - m3 2.37
G Pekerjaan Pemasangan Sambungan Rumah (SR) -
1 Pekerjaan Sambungan Rumah - Unit 316.00