| Reason | |||
|---|---|---|---|
| 0391071057701000 | Rp 1,423,419,171 | - | |
| 0846729002706000 | - | - | |
Attaya Karya | 07*4**4****04**0 | - | - |
CV Permata Lestari Konstruksi | 05*2**8****06**0 | Rp 1,252,088,284 | CV. PERMATA LESTARI KONSTRUKSI gugur karena tidak melampirkan Surat Keterangan Memenuhi Persyaratan Keselamatan dan Kesehatan Kerja (K3) pada peralatan HDPE Butt Fusion Welding Machine |
| 0033080250701000 | - | - | |
| 0029167400706000 | - | - | |
Lintas Utama Karya | 09*7**5****04**0 | - | - |
| 0032599136701000 | - | - | |
| 0920525821706000 | - | - | |
| 0840197503704000 | - | - | |
| 0020748117702000 | - | - | |
| 0748878519701000 | - | - | |
CV Rozaq | 06*3**7****04**0 | - | - |
| 0749449393701000 | - | - | |
| 0942879214705000 | - | - | |
PT Sanni Jaya Abadi | 06*2**7****02**0 | - | - |
| 0663464964701000 | - | - | |
| 0814794087706000 | - | - | |
| 0615610565701000 | - | - | |
| 0015057623705000 | - | - | |
| 0736372079706000 | - | - | |
CV Sentosa Karya Lestari | 10*0**0****78**4 | - | - |
| 0810201624706000 | - | - | |
| 0406670232706000 | - | - | |
| 0014061147706000 | - | - | |
| 0712205020706000 | - | - | |
| 0747791259701000 | - | - | |
| 0015495179701000 | - | - | |
| 0024397440706000 | - | - | |
| 0922841101704000 | - | - | |
CV Satu Konstruksi | 06*6**4****06**0 | - | - |
| 0014067003701000 | - | - | |
CV Karas | 02*1**4****06**0 | - | - |
PEMERINTAH KABUPATEN SINTANG
DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN
Jalan YC Oevang Oeray Telp.0565 (2025274) fax.0565 (2025274)
SINTANG - 78612
URAIAN SINGKAT PEKERJAAN
SSAATTKKEERR//SSKKPPDD :: DDIINNAASS PPEERRUUMMAAHHAANN RRAAKKYYAATT DDAANN KKAAWWAASSAANN
PPEERRMMUUKKIIMMAANN KKAABBUUPPAATTEENN SSIINNTTAANNGG
NNAAMMAA PPPPKK :: HHEENNDDRRIIKKUUSS,, SSTT..,, MM..MM..
NNAAMMAA KKEEGGIIAATTAANN :: PPEEMMBBAANNGGUUNNAANN SSIISSTTEEMM PPEENNYYEEDDIIAAAANN AAIIRR MMIINNUUMM
((SSPPAAMM)) JJAARRIINNGGAANN PPEERRPPIIPPAAAANN
NNAAMMAA PPAAKKEETT
PPEEKKEERRJJAAAANN :: PPEEMMBBAANNGGUUNNAANN BBAARRUU SSPPAAMM JJAARRIINNGGAANN PPEERRPPIIPPAAAANN
DDEESSAA SSUUNNGGAAII SSEEGGAAKK KKEECCAAMMAATTAANN SSEEPPAAUUKK
LLOOKKAASSII PPEEKKEERRJJAAAANN :: KKEECCAAMMAATTAANN SSEEPPAAUUKK
KKOODDEE RRUUPP :: 5599665588663344
PPAAGGUU DDAANNAA :: 11..445555..000000..000000,,--
SSUUMMBBEERR DDAANNAA :: DDAAKK FFIISSIIKK--BBIIDDAANNGG AAIIRR MMIINNUUMM
TAHUN ANGGARAN 2025
URAIAN SINGKAT PEKERJAAN
AA.. RRUUAANNGG LLIINNGGKKUUPP PPEEKKEERRJJAAAANN
Ruang Lingkup Pekerjaan Pembangunan Baru SPAM Jaringan Perpipaan Desa
Sungai Segak Kecamatan Sepauk Tahun Anggaran 2025, meliputi :
NO. URAIAN PEKERJAAN
I PEKERJAAN PERSIAPAN
1. Mobilisasi dan Demobilisasi
2. Pembersihan Lapangan
3. Pengukuran Jaringan Pipa Penyediaan Air Baku
4. Pembuatan Direksiket
5. Papan Nama Proyek
SUB TOTAL PEKERJAAN PERSIAPAN (I)
II PEMBUATAN BRONKAPTERING
A PEKERJAAN TANAH
1 Galian Tanah
B PEKERJAAN COR BETON TULANGAN
1 Pek. Bekesting
2 Pek. Pembesian 10 mm
3 Pengecoran Bendungan
4 Plesteran Camp 1 : 2
C PEKERJAAN PERPIPAAN
1 Pipa GIP Ø 6 "
2 Flanget GIP Ø 6"
3 Gate Valve Ø 6 "
4 Pipa Penguras PVC Ø 4 "
5 Stop Kran Penguras PVC Ø 4 "
6 Dop PVC Ø 6 "
7 Bend Elbow PVC Ø 6 "
8 Tee PVC Ø 6 "
9 Baut `
10 Pipa Saringan PVC Ø 6 "
11 Pemasangan dan Biaya Angkut
SUB TOTAL PEKERJAAN BRONKAPTERING (II)
III
PEKERJAAN PENGADAAN & PEMASANGAN JARINGAN PERPIPAAN
1. PEKERJAAN TANAH
1). Galian Tanah
2). Urugan Kembali Tanah Galian
2. PEKERJAAN PENGADAAN & PEMASANGAN PIPA
1). Penggadaan & Pemasangan Pipa HDPE PE100 Ø 6"
2). Penggadaan & Pemasangan Pipa PVC SNI Ø 6"
3). Penggadaan & Pemasangan Pipa PVC SNI Ø 4"
4). Penggadaan & Pemasangan Pipa PVC SNI Ø 3"
5). Penggadaan & Pemasangan Pipa PVC SNI Ø 2"
3. PEKERJAAN PENGADAAN ACCECORIS PIPA
1). Stub Flange HDPE Ø 150 6"
2). Flange Spigot Ø 6 "
3). Baut
4). Paken
5). Reduser PVC Ø 6"x Ø 4"
6). Reduser PVC Ø 4"x Ø 3"
7). Reduser PVC Ø 3"x Ø 2"
8). Stop Kran PVC Ø 2"
9). Stop Kran PVC Ø 3"
10). Tee PVC Ø 4 "x 3"
SUB TOTAL PEKERJAAN PENGADAAN & PEMASANGAN JARINGAN PERPIPAAN (III)
IV PEKERJAAN SAMBUNGAN RUMAH
1 BAHAN SAMBUNGAN RUMAH (SR) 97 UNIT
1). Pemasangan Water Meter Ø 1/2 MM Setara Bestini
2). Clamp Sadle HDPE Ø 63 MM x 1/4 Inc
3). Gate Valve Brass Ø 1/2 Inc
4). Kran Air Ø 1/2 Inc Besi SNI
5). Thermoplastic Ferulle Type Panjang Ø 1 1/4 x 25 MM
6). Pipa HDPE Ø 20 MM
7). Check Valve Ø 1/2 Inc
8). Pipa GII 20 mm + 2 senai
9). Female Bend HDPE Ø 20 mm x 1/2 Inc
10). Redusing Coupling Push On Ø 25 x 20 mm
11). Knee Gii Ø 20 mm x 1/2 Inc
12). Double Nipple Gi Ø 1/2 Inc
13). TEE GII Ø 20 mm x 1/2 Inc
14). Socket Male PVC 1/2 Inc (Sambungan Derat Dalam)
15). Plug Kran (Kuningan)
16). Seal Tape
B PEMASANGAN 97 UNIT SAMBUNGAN RUMAH (SR)
1). Galian Pipa Sambungan Rumah
2) Pengecoran Lantai SR
SUB TOTAL PEKERJAAN PEKERJAAN SAMBUNGAN RUMAH (IV)
V SMKK
1. Penyiapan RKK (Pembuatan Prosedur dan Instruksi Kerja)
2. Sosialisasi, Promosi Dan Pelatihan K3
3. Alat Pelindung Kelselamatan (APK) & Alat Pelindung Diri (APD)
1). Topi Pelindung (Safety Helmet)
2). Pelindung Pernapasan dan Mulut (Masker)
3). Sarung Tangan (Safety Gloves)
4). Rompi Keselamatan (Safety Vest)
5). Sepatu Karet Keselamatan
4. Asuransi (Asuransi Kecelakaan Kerja Risiko Sangat Rendah)
1). Mandor
2). Kepala Tukang
3). Tukang
4). Pekerja
5. Personel K3 Konstruksi
6. Fasilitas Sarana & Prasarana Kesehatan
1). Peralatan P3K (Kotak K3, Obat Luka, Obat Umum, Perban)
7.
Rambu-Rambu ( Rambu Petunjuk, Rambu Larangan, Rambu Peringatan)
8.
Bendera K3
SUB TOTAL PEKERJAAN PENERAPAN SMKK (V)
BB.. LLOOKKAASSII PPEEKKEERRJJAAAANN
Lokasi Pekerjaan Pembangunan Baru SPAM Jaringan Perpipaan Desa Sungai Segak
Kecamatan Sepauk berlokasi di Kecamatan Sepauk.
CC.. SSUUMMBBEERR DDAANNAA DDAANN HHAARRGGAA PPEERRKKIIRRAAAANN SSEENNDDIIRRII ((HHPPSS))
• SUMBER DANA
Sumber dana dari kegiatan ini menggunakan DAK Fisik-Bidang Air Minum
Tahun Anggaran 2025.
•• HHAARRGGAA PPEERRKKIIRRAAAANN SSEENNDDIIRRII ((HHPPSS))
Total Harga Perkiraan Sendiri (HPS) yang diperlukan untuk membiayai pengadaan
pekerjaan konstruksi ini sebesar Rp. 1.455.000.000,- (Satu Milyar Empat
Ratus Lima Puluh Lima Juta Rupiah)
DD.. PPEEKKEERRJJAAAANN UUTTAAMMAA
Ruang Lingkup Pekerjaan Utama sebagai berikut:
NO. PEKERJAAN UTAMA
I PEKERJAAN PERSIAPAN
II PEMBUATAN BRONKAPTERING
PEKERJAAN PENGADAAN & PEMASANGAN
III
JARINGAN PERPIPAAN
IV PEKERJAAN SAMBUNGAN RUMAH
V SMKK
EE.. JJAANNGGKKAA WWAAKKTTUU PPEELLAAKKSSAANNAAAANN PPEEKKEERRJJAAAANN DDAANN MMAASSAA PPEEMMEELLIIHHAARRAAAANN
a. Jangka waktu pelaksanaan pekerjaan konstruksi ini adalah :
150 (Seratus Lima Puluh) Hari Kalender terhitung sejak ditanda tanganinya
surat perintah mulai kerja (SPMK) pekerjaan konstruksi.
b. Masa Pemeliharaan Pekerjaan konstruksi ini adalah :
180 (Seratus Delapan Puluh) Hari Kalender , terhitung sejak diterbitkannya
Berita Acara Serah Terima Pertama Pekerjaan (BASTP 1).
FF.. SSPPEESSIIFFIIKKAASSII BBAAHHAANN BBAANNGGUUNNAANN KKOONNSSTTRRUUKKSSII DDAANN GGAAMMBBAARR
Sesuai pada Dokumen Spesifikasi Teknis dan Gambar kerja.
Demikian Uraian Singkat Pekerjaan ini dibuat dan dapat dipergunakan sebagaimana mestinya.
SSiinnttaanngg,, JJuunnii 22002255
PPEEJJAABBAATT PPEEMMBBUUAATT KKOOMMIITTMMEENN ((PPPPKK))
HHEENNDDRRIIKKUUSS,, SSTT..,, MM..MM..
NIP. 19770101 200312 1 009