| Reason | |||
|---|---|---|---|
| 0814794087706000 | Rp 1,177,618,522 | - | |
| 0819663329701000 | - | - | |
| 0615610565701000 | Rp 1,060,761,421 | Sampai batas akhir Klarifikasi Administrasi, Kualifikasi, Teknis, dan Harga, peserta CV. PELANGI PUTRA KHATULISTIWA tidak hadir Klarifikasi Administrasi, Kualifikasi, Teknis, dan Harga. | |
| 0625984463701000 | - | - | |
| 0026824177701000 | - | - | |
| 0014067003701000 | - | - | |
CV Karas | 02*1**4****06**0 | - | - |
| 0029167400706000 | - | - | |
Lintas Utama Karya | 09*7**5****04**0 | - | - |
CV Kubu Raya Sejahtera | 00*7**5****01**0 | - | - |
| 0032599136701000 | - | - | |
| 0920525821706000 | - | - | |
| 0840197503704000 | - | - | |
| 0415748979701000 | - | - | |
| 0747693240704000 | - | - | |
| 0948382957701000 | - | - | |
| 0663553352701000 | - | - | |
Attaya Karya | 07*4**4****04**0 | - | - |
CV Rozaq | 06*3**7****04**0 | - | - |
PT Sanni Jaya Abadi | 06*2**7****02**0 | - | - |
| 0032690448701000 | - | - | |
| 0015057623705000 | - | - | |
| 0736372079706000 | - | - | |
CV Sentosa Karya Lestari | 10*0**0****78**4 | - | - |
| 0810201624706000 | - | - | |
| 0406670232706000 | - | - | |
| 0014061147706000 | - | - | |
| 0712205020706000 | - | - | |
| 0747791259701000 | - | - | |
| 0846729002706000 | - | - | |
| 0024397440706000 | - | - | |
| 0916437528707000 | - | - | |
CV Satu Konstruksi | 06*6**4****06**0 | - | - |
Tiga Pilar Borneo | 10*1**1****72**3 | - | - |
PEMERINTAH KABUPATEN SINTANG
DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN
Jalan YC Oevang Oeray Telp.0565 (2025274) fax.0565 (2025274)
SINTANG - 78612
URAIAN SINGKAT PEKERJAAN
SSAATTKKEERR//SSKKPPDD :: DDIINNAASS PPEERRUUMMAAHHAANN RRAAKKYYAATT DDAANN KKAAWWAASSAANN
PPEERRMMUUKKIIMMAANN KKAABBUUPPAATTEENN SSIINNTTAANNGG
NNAAMMAA PPPPKK :: HHEENNDDRRIIKKUUSS,, SSTT..,, MM..MM..
NNAAMMAA KKEEGGIIAATTAANN :: PPEERRLLUUAASSAANN SSIISSTTEEMM PPEENNYYEEDDIIAAAANN AAIIRR MMIINNUUMM ((SSPPAAMM))
JJAARRIINNGGAANN PPEERRPPIIPPAAAANN
NNAAMMAA PPAAKKEETT
PPEEKKEERRJJAAAANN :: PPEERRLLUUAASSAANN SSPPAAMM JJAARRIINNGGAANN PPEERRPPIIPPAAAANN DDEESSAA DDAAKK
JJAAYYAA KKEECCAAMMAATTAANN BBIINNJJAAII HHUULLUU
LLOOKKAASSII PPEEKKEERRJJAAAANN :: KKEECCAAMMAATTAANN BBIINNJJAAII HHUULLUU
KKOODDEE RRUUPP :: 5599665588778844
PPAAGGUU DDAANNAA :: 11..119955..000000..000000,,--
SSUUMMBBEERR DDAANNAA :: DDAAKK FFIISSIIKK--BBIIDDAANNGG AAIIRR MMIINNUUMM
TAHUN ANGGARAN 2025
URAIAN SINGKAT PEKERJAAN
AA.. RRUUAANNGG LLIINNGGKKUUPP PPEEKKEERRJJAAAANN
Ruang Lingkup Pekerjaan Perluasan SPAM Jaringan Perpipaan Desa Dak Jaya
Kecamatan Binjai Hulu Tahun Anggaran 2025, meliputi :
NO. URAIAN PEKERJAAN
I PEKERJAAN PERSIAPAN
1. Mobilisasi
2. Pembersihan Lapangan
3. Pengukuran Jaringan Pipa Penyediaan Air Baku
4. Pembuatan Direksiket
5. Papan Nama Proyek
SUB TOTAL PEKERJAAN PERSIAPAN (I)
II PEKERJAAN PENGADAAN & PEMASANGAN JARINGAN PERPIPAAN
1. PEKERJAAN TANAH
1). Galian Tanah
2). Urugan Kembali Tanah Galian
3). Galian Tanah Berbatu (Galian Cor Beton)
4). Cor beton/Perbaikan Rabat Beton
2. Cor beton/Perbaikan Rabat Beton
1). Penggadaan & Pemasangan Pipa HDPE Ø 2"
2). Penggadaan & Pemasangan Pipa HDPE Ø 3"
3). Penggadaan & Pemasangan Pipa HDPE Ø 4"
3. PEKERJAAN PENGADAAN ACCECORIS PIPA
1). All Socket Tee HDPE Ø 6"x 4"
2). All Socket Tee HDPE Ø 4" x 4"
3). All Socket Tee HDPE Ø 4" x 3"
4). All Socket Tee HDPE Ø 3" x 3"
5). All Socket Tee HDPE Ø 3" x 2"
6). All Socket Bend HDPE 90^ PVC Ø 4"
7). All Socket Bend HDPE 90^ PVC Ø 3"
8). Reduser HDPE 4" - 3"
9). Reduser HDPE 3" - 2"
10). Giboult Joint Ø 150 mm
11). Pekerjaan Gate Valve Ø 4" 2 Unit
1). Gate Valve Ø 4"
2). Stub Flange HDPE Ø 4"
3). Baut
4). Box Gate Valve ( Tutup Beton )
12). Pekerjaan Gate Valve Ø 3" 2 Unit
1). Gate Valve Ø 3"
2). Stub Flange HDPE Ø 3"
3). Baut
4). Box Gate Valve ( Tutup Beton )
13). Pekerjaan Gate Valve Ø 2"1 unit
1). Gate Valve Ø 2"
2). Stub Flange HDPE Ø 2"
3). Baut
4). Box Gate Valve ( Tutup Beton )
14). Pekerjaan Air Valve (Di Pipa Ǿ 4") Ǿ 2" = 1 Unit
1). Tee HDPE Ǿ 4" x 2" (Butt Fusion/ BF)
2). Stub Flange HDPE Ǿ 2" (Butt Fusion/ BF)
3). Single Air Valve Ǿ 2"
4). Baut
5). Box Valve Ǿ 2"
15). Pekerjaan Air Valve (Di Pipa Ǿ 3") Ǿ 2" = 1 Unit
1). Tee HDPE Ǿ 3" x 2" (Butt Fusion/ BF)
2). Stub Flange HDPE Ǿ 2"(Butt Fusion/ BF)
3). Single Air Valve Ǿ 2"
4). Baut
5). Box Valve Ǿ 2"
16). Dop HDPE Ø 4"
17). Dop HDPE Ø 3"
18). Dop HDPE Ø 2"
19). Lem Pipa Kaleng Besar
20). Pengurasan Dan Pengetesan Tekanan Pipa Ø 4"
21). Pengurasan Dan Pengetesan Tekanan Pipa Ø 2"
22). Pengurasan Dan Pengetesan Tekanan Pipa Ø 3"
23). Biaya Pemasangan Accecoris & Tapping Pipa Eksisting
24). Biaya Pengeceran Pipa
SUB TOTAL PEKERJAAN PENGADAAN & PEMASANGAN JARINGAN PERPIPAAN (II)
III PEKERJAAN SAMBUNGAN RUMAH
1 BAHAN SAMBUNGAN RUMAH (SR) 239 UNIT
1). Pemasangan Water Meter Ø 1/2 MM Setara Bestini
2). Clamp Sadle HDPE Ø 63 MM x 1/4 Inc
3). Gate Valve Brass Ø 1/2 Inc
4). Kran Air Ø 1/2 Inc Besi SNI
5). Thermoplastic Ferulle Type Panjang Ø 1 1/4 x 25 MM
6). Pipa HDPE Ø 20 MM
7). Check Valve Ø 1/2 Inc
8). Pipa GII 20 mm + 2 senai
9). Female Bend HDPE Ø 20 mm x 1/2 Inc
10). Redusing Coupling Push On Ø 25 x 20 mm
11). Knee Gii Ø 20 mm x 1/2 Inc
12). Double Nipple Gi Ø 1/2 Inc
13). TEE GII Ø 20 mm x 1/2 Inc
14). Socket Male PVC 1/2 Inc (Sambungan Derat Dalam)
15). Plug Kran (Kuningan)
16). Seal Tape
B PEMASANGAN 239 UNIT SAMBUNGAN RUMAH (SR)
1). Galian Pipa Sambungan Rumah
2) Pengecoran Lantai SR
SUB TOTAL PEKERJAAN PEKERJAAN SAMBUNGAN RUMAH (III)
IV SMKK
1. Penyiapan RKK (Pembuatan Prosedur dan Instruksi Kerja)
2. Sosialisasi, Promosi Dan Pelatihan K3
3. Alat Pelindung Kelselamatan (APK) & Alat Pelindung Diri (APD)
1). Topi Pelindung (Safety Helmet)
2). Pelindung Pernapasan dan Mulut (Masker)
3). Sarung Tangan (Safety Gloves)
4). Rompi Keselamatan (Safety Vest)
5). Sepatu Karet Keselamatan
4. Asuransi (Asuransi Kecelakaan Kerja Risiko Sangat Rendah)
1). Mandor
2). Kepala Tukang
3). Tukang
4). Pekerja
5. Personel K3 Konstruksi
6. Fasilitas Sarana & Prasarana Kesehatan
1). Peralatan P3K (Kotak K3, Obat Luka, Obat Umum, Perban)
7.
Rambu-Rambu ( Rambu Petunjuk, Rambu Larangan, Rambu Peringatan)
8.
Bendera K3
SUB TOTAL PEKERJAAN PENERAPAN SMKK (IV)
BB.. LLOOKKAASSII PPEEKKEERRJJAAAANN
Lokasi Pekerjaan Perluasan SPAM Jaringan Perpipaan Desa Dak Jaya Kecamatan
Binjai Hulu berlokasi di Kecamatan Binjai Hulu.
CC.. SSUUMMBBEERR DDAANNAA DDAANN HHAARRGGAA PPEERRKKIIRRAAAANN SSEENNDDIIRRII ((HHPPSS))
• SUMBER DANA
Sumber dana dari kegiatan ini menggunakan DAK Fisik-Bidang Air Minum
Tahun Anggaran 2025.
•• HHAARRGGAA PPEERRKKIIRRAAAANN SSEENNDDIIRRII ((HHPPSS))
Total Harga Perkiraan Sendiri (HPS) yang diperlukan untuk membiayai pengadaan
pekerjaan konstruksi ini sebesar Rp. 1.195.000.000,- (Satu Milyar Seratus
Sembilan Puluh Lima Juta Rupiah)
DD.. PPEEKKEERRJJAAAANN UUTTAAMMAA
Ruang Lingkup Pekerjaan Utama sebagai berikut:
NO. PEKERJAAN UTAMA
I PEKERJAAN PERSIAPAN
PEKERJAAN PENGADAAN & PEMASANGAN
II
JARINGAN PERPIPAAN
III PEKERJAAN SAMBUNGAN RUMAH
IV SMKK
EE.. JJAANNGGKKAA WWAAKKTTUU PPEELLAAKKSSAANNAAAANN PPEEKKEERRJJAAAANN DDAANN MMAASSAA PPEEMMEELLIIHHAARRAAAANN
a. Jangka waktu pelaksanaan pekerjaan konstruksi ini adalah :
150 (Seratus Lima Puluh) Hari Kalender terhitung sejak ditanda tanganinya
surat perintah mulai kerja (SPMK) pekerjaan konstruksi.
b. Masa Pemeliharaan Pekerjaan konstruksi ini adalah :
180 (Seratus Delapan Puluh) Hari Kalender , terhitung sejak diterbitkannya
Berita Acara Serah Terima Pertama Pekerjaan (BASTP 1).
FF.. SSPPEESSIIFFIIKKAASSII BBAAHHAANN BBAANNGGUUNNAANN KKOONNSSTTRRUUKKSSII DDAANN GGAAMMBBAARR
Sesuai pada Dokumen Spesifikasi Teknis dan Gambar kerja.
Demikian Uraian Singkat Pekerjaan ini dibuat dan dapat dipergunakan sebagaimana mestinya.
SSiinnttaanngg,, JJuunnii 22002255
PPEEJJAABBAATT PPEEMMBBUUAATT KKOOMMIITTMMEENN ((PPPPKK))
HHEENNDDRRIIKKUUSS,, SSTT..,, MM..MM..
NIP. 19770101 200312 1 009