| 0019695451656000 | Rp 2,503,840,660 | |
| 0018298521656000 | Rp 2,526,175,767 | |
| 0025997636608000 | - | |
| 0029694601609000 | - | |
| 0032115131656000 | - | |
PT Mega Sakina Raya | 02*7**8****54**0 | - |
| 0211070495602000 | - | |
| 0754630481656000 | - | |
| 0702871070626000 | - | |
| 0025295874612000 | - | |
Kreatif Media Raya | 09*5**9****27**0 | - |
CV De_toekang | 0812416923644000 | - |
CV Adhikari Raya | 06*0**5****26**0 | - |
PT Epithu Logica Sembada | 09*5**4****15**0 | - |
CV Luthfiah | 00*5**7****27**0 | - |
Bumdesa Bersama Abadi Djaya Lkd | 04*4**9****56**0 | - |
| 0831253604626000 | - | |
| 0722984598624000 | - | |
| 0027851716654000 | - | |
| 0022682702656000 | - | |
| 0021625306656000 | - | |
| 0210266615656000 | - | |
CV Solusi Inti Pembangunan | 08*2**3****06**0 | - |
| 0028438877624000 | - | |
| 0724366539615000 | - | |
| 0015171200656000 | - | |
| 0016286619008000 | - | |
| 0018300681656000 | - | |
PT Wahanatama Indo Sejahtera | 09*3**8****02**0 | - |
| 0621827088627000 | - | |
| 0210240263656000 | - | |
PT Setvi Tunas Utama | 04*7**9****11**0 | - |
| 0659507800626000 | - | |
CV Semeru Ladang Karya | 01*8**9****43**0 | - |
LINGKUP PEKERJAAN
( TERM OF REFERENCE/TOR )
RESTORASI PENDOPO DAN SELASAR KAWEDANAN
ANGGARAN PENDAPATAN DAN BELANJA DAERAH (APBD) 2025
KECAMATAN BESUKI KABUPATEN SITUBONDO
TAHUN ANGGARAN 2025
Pekerjaan Restorasi Pendopo dan Selasar Kawedanan terletak di Kecamatan
Besuki Kabupaten Situbondo mencakup pekerjaan :
I. SISTEM MANAJEMEN KESELAMATAN DAN KESEHATAN KERJA (SMK3)
NO. JENIS PEKERJAAN VOLUME
a b c
I SISTEM MANAJEMEN KESELAMATAN DAN KESEHATAN KERJA (SMK3)
A RENCANA KESELAMATAN KONSTRUKSI (RKK)
1 pembuatan dokumen rencana keselamatan konstruksi 1.00 buku
2 pembuatan prosedur dan instruksi kerja 1.00 buku
B SOSIALISASI & PROMOSI K3
1 Spanduk (banner) 3.00 lbr
2 Papan informasi K3 1.00 ls
C ALAT PELINDUNG KERJA & ALAT PELINDUNG DIRI
1 Topi pelindung (safety helmet) 30.00 bh
2 Sarung tangan (safety gloves) 30.00 bh
3 Rompi keselamatan (safety vest) 30.00 bh
D ASURANSI & PERIZINAN
1 Asuransi dan perizinan 1.00 ls
E PERSONEL KESELAMATAN KONSTRUKSI
1 Personel keselamatan konstruksi 2.00 org/bln
F FASILITAS SARANA, PRASARANA & ALAT KESEHATAN
1 Peralatan P3K (Kotak P3K, Obat luka, Perban, dll) 1.00 set
G RAMBU & PERLENGKAPAN LALU LINTAS
1 rambu petunjuk 3.00 bh
2 rambu larangan 3.00 bh
3 rambu peringatan 3.00 bh
4 rambu kewajiban 3.00 bh
5 rambu informasi 2.00 bh
6 rambu pekerjaan sementara 1.00 bh
7 kerucut lalu lintas (traffic cone) 5.00 bh
KEGIATAN & PERALATAN TERKAIT PENGENDALIAN RESIKO
H
KESELAMATAN KONSTRUKSI
1 Bendera K3 2.00 bh
II. RESTORASI GAPURA
Restorasi gapura merupakan proses pekerjaan mengembalikan bangunan
cagar budaya gapura seperti bentuk awal, Dimana perlakuan perbaikan
plesteran dan acian serta pengecatannya menggunakan mortar khusus,
rincian pekerjaan restorasi gapura meliputi :
NO. JENIS PEKERJAAN VOLUME
1 2 3
I PEKERJAAN STRUKTUR
A PEKERJAAN PERSIAPAN
1 Pembersihan Lokasi 1.00 ls
2 Pembongkaran Ruangan Sisi Kiri 9.14 m³
3 Penurunan Genteng Lama dan pembersihan genteng (disikat) 1 75.77 m²
4 Sewa Direksi Keet dan Gudang 1.00 ls
5 Pembuatan Papan Nama & Informasi Proyek 1.00 ls
6 Dokumentasi Proyek 1.00 ls
B PEKERJAAN ATAP
1 Pas. Rangka Genteng (Reng Kayu Jati Baru) yang rusak persentase 10% 17.05 m²
2 Pas. Genteng
- Pas. Genteng Lama Kembali 1 70.49 m²
- Pas. Genteng Baru yang Rusak persentase 10% 17.05 m²
3 Pas. Bubungan 30.74 m'
II PEKERJAAN ARSITEKTUR
A PEKERJAAN PASANGAN
1 Pasangan 1 Bata 1sp : 6pp 4.68 m²
B PEKERJAAN PLESTERAN DAN BENANGAN
1 Pengerokan Dinding Lama
- Pengerokan Dinding Interior 1 68.04 m²
- Pengerokan Dinding Eksterior 1 93.26 m²
2 Plesteran dengan Material Uzin Persentase 40%
- Plesteran Dinding Interior 67.22 m²
- Plesteran Dinding Eksterior 77.30 m²
3 Acian dengan Material Uzin Persentase 40%
- Acian Dinding Interior 67.22 m²
- Acian Dinding Eksterior 77.30 m²
4 Benangan Sudut dengan Material Uzin untuk perbaikan pilar, jendela & pintu baru 1 13.18 m'
C PEKERJAAN LANTAI
1 Pasang Kanstin Beton 15.30.50 50.67 m'
2 Pasang Tegel Kunci Polos 20 x 20 50.81 m²
D PEKERJAAN PINTU & JENDELA
1 Pasang Kusen dan Daun Pintu Panel Kayu Jati Kelas 1 (P1) 1.00 bh
2 Pasang Kusen dan Daun Pintu Panel Kayu Jati Kelas 1 (P2) 1.00 bh
3 Pasang Kusen dan Panel Kayu Jati Kelas 1 dengan tralis besi Jendela Gapura (J1) 5.00 bh
E PEKERJAAN CAT - CATAN
1 Cat Tembok Interior dengan Material Uzin 1 68.04 m²
2 Cat Tembok Exterior dengan Material Uzin 1 93.26 m²
3 Cat Plafond Kayu Dengan Material Uzin SC36 Std 1 16.96 m²
4 Cat Lisplang Kayu Lama Dengan Material Uzin SC36 Color 15.73 m²
5 Cat Kanstein 20.27 m²
F PEKERJAAN LAIN-LAIN
1 Kanopi Dome Awning 4.00 Unit
2 Penanaman rumput + tanah subur pedestarian 2 49.07 m²
3 Penanaman Pohon Pucuk Merah + tanah subur 30.00 bh
N O
1
I I
A
1
1
2
3
4
5
1
2
3
4
5
6
7
8
1
2
I
.
P
P
E
E
P
P
P
K
K
K
K
G
P
In
D
A
A
A
A
A
S
S
P
In
In
J E N I S P E K E R J A
2
K E R J A A N M E K A N I K A L , E L E K T R I K A L & P L U M B I
K E R J A A N I N S T A L A S I L I S T R I K
e n g a d a a n d a n P e m a s a n g a n P a n e l L is tr ik
a n e l S D P 2 ( P a n e l D is tr ib u s i M a in G a te )
e n g a d a a n d a n P e m a s a n g a n K a b e l P o w e r
a b e l P o w e r N Y Y 2 x 2 , 5 m m ( In s ta la s i P J U )
a b e l P o w e r N Y Y 2 x 2 , 5 m m ( In s ta la s i T a m a n )
a b e l N Y Y 2 x 4 m m ( S D P 2 k e S D P 1 )
a b e l N Y A G r o u n d in g 4 m m + P ip a C o n d u it 2 0 m m
r o u n d in g R o a d
e n g a d a a n d a n P e m a s a n g a n K o m p o n e n J a r in g a n
s ta la s i P e n e r a n g a n , S to p K o n ta k & E x h a u s t F a n
L L E D 1 3 w a tt / In b o w / 6 5 0 0 k
r m a tu r G a n tu n g S in g le / 1 9 w a tt/ L E D
r m a tu r L E D T a n a m S o r o t/ 7 w a tt/ M R 1 6 / 3 0 0 0 k / IP 6 5 / 2
r m a tu r D in d in g V in ta g e / O u td o o r / 1 0 w a tt/ L E D / 3 0 0 0 K
r m a tu r K la s ik P J U 3 - 4 m e te r / V in ta g e / E 2 7 / L E D 2 5 w
r m a tu r F lo o d L ig h t L E D / 1 0 w a tt/ 3 0 0 0 k / IP 6 5 / 2 2 0 V a c
a k la r S e r i/ 1 a r a h / 1 6 A / P u tih / P o ly c a r b o n a te
to p K o n ta k / D in d in g / 1 6 A / 1 g a n g / 2 P + E / In b o w
e k e r ja a n In s ta la s i J a r in g a n L is tr ik
s ta la s i ja r in g a n lis tr ik titik P e n e r a n g a n
s ta la s i ja r in g a n lis tr ik titik S to p K o n ta k
A N
N G
E le k tr ik
2 0 V a c
/ 2 2 0 V a
a tt/ 2 2 0 v
a
c
a
l
c
V O
6
5
8
1
1
3
L
1
6
5
0
5
1
4
1
2
4
3
8
6
4
2
4
U
3
. 0
. 0
. 0
. 0
. 0
. 0
. 0
. 0
. 0
. 0
. 0
. 0
. 0
. 0
. 0
. 0
M
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
E
m
m
m
s e t
e te
e te
e te
m
u n it
u n it
u n it
u n it
u n it
u n it
u n it
u n it
u n it
T itik
T itik
r
r
r
III. RESTORASI PENDOPO
Restorasi Pendopo merupakan proses pekerjaan mengembalikan bangunan
cagar budaya Pendopo seperti bentuk awal, Dimana perlakuan perbaikan
plesteran dan acian serta pengecatannya menggunakan mortar khusus,
rincian pekerjaan restorasi pendopo meliputi :
NO. JENIS PEKERJAAN VOLUME
1 2 3
I PEKERJAAN STRUKTUR
A PEKERJAAN PERSIAPAN
1 Pembongkaran Genteng Metal Lama ls
1.00
2 Pembongkaran Pagar Besi dan Partisi ls
1.00
3 Pembongkaran Penutup Lantai Lama ls
1.00
B PEKERJAAN ATAP
m²
1 Pas. Rangka Genteng (Reng Kayu Jati Baru 3/4) Persentase 40% 256.95
m²
2 Pas. Rangka Genteng (Reng Kayu Jati Lama 3/4) Persentase 60% 385.42
m²
3 Pas. Genteng Karang Pilang Model Prentol/Kodok 642.36
m'
4 Pas. Lisplang Kayu Custom 89.18
5 Pas. Bubungan 61.73 m'
TOTAL PEKERJAAN STRUKTUR
II PEKERJAAN ARSITEKTUR
A PEKERJAAN PASANGAN
1 Pasangan Bata Merah 1/2 Bata 1SP : 3PP m²
1.92
2 Plesteran 1SP : 3PP m²
3.84
3 Acian m²
3.84
B PEKERJAAN LANTAI
1 Pasang Tegel Kunci Motif 20 x 20 m²
15.52
2 Pasang Tegel Kunci Polos 20 x 20 m²
547.15
PEKERJAAN PLAFOND
C
1 m²
Penambahan Rangka Plafond Persetase 20% 110.19
2 m²
Pasang Plafond Kalsiboard 440.76
3 m²
Pas. Dudukan Multiplek 12mm Lampu T5 21.50
4 m'
Pas. List Kayu 15mm 995.41
D PEKERJAAN PLESTERAN DAN BENANGAN
1 Pengerokan Dinding Lama m²
358.33
2 Plesteran dengan Material Uzin Persentase 20% m²
71.67
3 Acian dengan Material uzin Persentase 20% m²
71.67
4 Benangan Sudut dengan Material Uzin Jendela Baru m'
65.28
PEKERJAAN PINTU & JENDELA
E
bh
1 Pasang Kusen dan Panel Kayu Jati Kelas 1 dengan tralis besi (J1) 4.00
F PEKERJAAN CAT - CATAN
1 Cat Tembok Exterior dengan Material Uzin m²
373.51
Cat Lisplank, Balok, Plafond & Kolom Kayu Dengan Material Uzin SC36
2 m²
Color 227.26
3 Cat Plafond Dengan Material Uzin SC36 Std m²
440.76
G PEKERJAAN LAIN-LAIN
1 Pasang Kursi Taman (Plaza) bh
2.00
2 Pot Porselen bh
2.00
TOTAL PEKERJAAN ARSITEKTUR
III PEKERJAAN MEKANIKAL,ELEKTRIKAL & PLUMBING
A PEKERJAAN INSTALASI LISTRIK
Pengadaan dan Pemasangan Panel Listrik
1 Panel SDP 1 (Panel Distribusi Pendopo) 1.00 set
Pengadaan dan Pemasangan Kabel Power
1 Kabel NYY 2x4mm (SDP 1 ke KWH Meter, Pipa Conduit 20mm) meter
65.00
2 Kabel NYA Grounding 4mm + Pipa Conduit 20mm 15.00 m
3 Grounding Road 1.00 unit
Pengadaan dan Pemasangan Komponen Jaringan Elektrikal
Instalasi Penerangan, Stop Kontak & Exhaust Fan
1 Armatur LED Tube Light/T5/14watt/3000k/220vac (@4 titik) 68.00 unit
2 Armatur LED Tanam Sorot/7watt/MR16/3000k/IP65/220Vac 22.00 unit
3 Armatur LED Sorot 7watt/3000k/220-240Vac/Outdoor/MR16 14.00 unit
4 Armatur Dinding Vintage/Outdoor/10watt/LED /3000K/220Vac 16.00 unit
5 Armatur Lampu Gantung Klasik/ 7x12watt/E27 1.00 unit
6 Armatur Lampu Gantung Klasik/ 5x12watt/E27 2.00 unit
8 Saklar Tunggal/1 arah/16A/Putih/Polycarbonate 1.00 unit
9 Saklar Seri/1 arah/16A/Putih/Polycarbonate 7.00 unit
10 Stop Kontak/Dinding/16A/1 gang/2P+E/Inbow 6.00 unit
Pekerjaan Instalasi Jaringan Listrik
1 Instalasi jaringan listrik titik Penerangan 59.00 Titik
2 Instalasi jaringan listrik titik Stop Kontak 6.00 Titik
IV. RESTORASI SELASAR KAWEDANAN
Restorasi Selasar merupakan proses pekerjaan mengembalikan bangunan
cagar budaya Selasar seperti bentuk awal, Dimana perlakuan perbaikan
plesteran dan acian serta pengecatannya menggunakan mortar khusus,
rincian pekerjaan restorasi pendopo meliputi :
NO. JENIS PEKERJAAN VOLUME
1 2 3
I PEKERJAAN STRUKTUR
A PEKERJAAN PERSIAPAN
1 Penurunan Genteng Lama dan pembersihan genteng (disikat) m²
224.48
B PEKERJAAN ATAP
m²
1 Pas. Rangka Genteng (Reng Kayu Jati Baru) yang rusak persentase 10% 22.45
2 Pas. Genteng
m²
- Pas. Genteng Lama Kembali 202.03
m²
- Pas. Genteng Baru yang Rusak persentase 10% 22.45
m'
3 Pas. Lisplang Kayu Custom 60.66
4 Pas. Bubungan 39.57 m'
5 Pas. Talang Datar Seng 11.64 m'
5 Pas. Pipa PVC AW 4" 10.60 m'
C PEKERJAAN TANAH
Galian Tanah Pas Trasram m³
1 17.26
Pasir Urug m²
2 9.51
TOTAL PEKERJAAN STRUKTUR
II PEKERJAAN ARSITEKTUR
A PEKERJAAN PASANGAN
1 Pasangan Bata Merah 1/2 Bata 1SP : 3PP m²
13.81
B PEKERJAAN LANTAI
1 Pasang Tegel Kunci Motif 20 x 20 m²
12.42
2 Pasang Tegel Kunci Polos 20 x 20 m²
121.13
C PEKERJAAN PLAFOND
m²
1 Pasang Plafond Kalsiboard Rangka Lama 163.08
D PEKERJAAN CAT - CATAN
1 Cat Tembok Exterior dengan Material Uzin m²
45.93
2 Cat Lisplank & Kolom Kayu Dengan Material Material Uzin SC36 Color m²
64.62
3 Cat Plafond Dengan Material Uzin SC36 Std m²
163.08
TOTAL PEKERJAAN ARSITEKTUR
III PEKERJAAN MEKANIKAL,ELEKTRIKAL & PLUMBING
A PEKERJAAN INSTALASI LISTRIK
Pengadaan dan Pemasangan Kabel Power
1 Kabel NYM 3x2,5mm (Saklar Seri ke Lampu, Pipa Conduit 20mm)
20.00 meter
Pengadaan dan Pemasangan Komponen Jaringan Elektrikal
Instalasi Penerangan, Stop Kontak & Exhaust Fan
1 DL LED 13 watt /Inbow/6500k unit
8.00
2 Armatur Dinding Vintage/Outdoor/10watt/LED /3000K/220Vac unit
8.00
3 Saklar Seri/1 arah/16A/Putih/Polycarbonate unit
1.00
Pekerjaan Instalasi Jaringan Listrik
1 Instalasi jaringan listrik titik Penerangan Titik
16.00
TOTAL PEKERJAAN MEKANIKAL, ELEKTRIKAL & PLUMBING
IV. PEMBANGUNAN PLAZA DAN AIR MANCUR
Pembangunan Plaza dan Air Mancur merupakan pekerjaan pembuatan
plaza dan air mancur di depan bangunan Pendopo. rincian pekerjaannya
meliputi :
NO. JENIS PEKERJAAN VOLUME
1 2 3
I PEKERJAAN STRUKTUR
A PEKERJAAN PERSIAPAN
1 Pembongkaran dan Pembersihan Lokasi 1.00 ls
2 Penebangan Pohon 10.00 bh
B PEKERJAAN TANAH DAN URUGAN
1 Galian Tanah 58.06 m³
2 Urugan Pasir Bawah Rabatan 58.06 m³
C PEKERJAAN BETON
1 Rabat Beton K175 12.73 m³
2 Rabat Beton Lantai Kolam
- Beton f'c 14,5 / K 175 1.96 m³
- Pembesian Ø12 9 28.77 kg
3 Rabat Beton dengan Wiremesh M8
- Beton f'c 14,5 / K 175 54.74 m³
- Begisting Lantai 2x pakai 10.70 m²
- Pembesian Wiremesh M8 2,485.69 kg
4 Cor Beton Dinding Kolam tinggi 1m
- Beton f'c 14,5 / K 175 1.34 m³
- Begisting Kolom 2x pakai 20.72 m²
- Pembesian Ø12 & Ø10 2 56.34 kg
5 Cor Beton Dinding Kolam tinggi 0.45m
- Beton f'c 14,5 / K 175 0.87 m³
- Begisting Kolom 2x pakai 7.07 m²
- Pembesian Ø12 & Ø10 76.25 kg
6 Cor Beton Plat
- Beton f'c 14,5 / K 175 0.31 m³
- Begisting Plat 2x pakai 3.11 m²
- Pembesian Ø12 & Ø10 45.97 kg
II PEKERJAAN ARSITEKTUR
A PEKERJAAN PASANGAN
1 Pasangan Bata Merah 1/2 Bata 1SP : 3PP 68.01 m²
2 Pas. Batu Raen 11.68 m²
B PEKERJAAN PLESTERAN & ACIAN
1 Plesteran 1SP : 3PP 1 53.62 m²
2 Acian 1 53.62 m²
C PEKERJAAN LANTAI
1 Pasang Granit Tile 60x60 5 62.27 m²
2 Pasang Grass Block 6 70.30 m²
3 Pasang Kanstin Beton 15.30.50 2 08.20 m'
D PEKERJAAN CAT - CATAN
1 Cat Tembok Exterior / wheathershield 1 53.62 m²
2 Cat Waterproofing 6.22 m²
3 Coating Batu 11.68 m²
4 Cat Kanstein 83.28 m²
E PEKERJAAN LAIN-LAIN
1 Penanaman rumput + tanah subur area kolam dan grass block 5 29.22 m²
2 Penanaman Mawar Jambe + tanah subur 4.00 bh
3 Penanaman Bunga Yolanda + tanah subur 42.00 bh
4 Penanaman Bunga Kana + tanah subur 42.00 bh
NO. JENIS PEKERJAAN VOLUME
1 2 3
III PEKERJAAN MEKANIKAL,ELEKTRIKAL & PLUMBING
A PEKERJAAN INSTALASI LISTRIK
Pengadaan dan Pemasangan Kabel Power
1 Kabel Power NYY 2x2,5mm (Instalasi Pompa Kolam) 35.00 meter
Pengadaan dan Pemasangan Komponen Jaringan Elektrikal
Instalasi Penerangan, Stop Kontak & Exhaust Fan
1 DL LED 13 watt /Inbow/6500k 4.00 unit
2 Kap Lampu Plat finis cutting plat t=1.45 m 4.00 unit
3 Saklar Tunggal/1 arah/16A/Putih/Polycarbonate 1.00 unit
4 Stop Kontak/Dinding/16A/1 gang/2P+E/Inbow 2.00 unit
Pekerjaan Instalasi Jaringan Listrik
1 Instalasi jaringan listrik titik Penerangan 8.00 Titik
2 Instalasi jaringan listrik titik Stop Kontak 2.00 Titik
B PEKERJAAN SANITAIR
1 Pas Filter dan Rumah Pompa 1.00 Unit
2 Pek. Pemasangan Pompa Submersible 1.00 Unit
3 Pek. Pancuran Kolam 1.00 Unit
V. PEMBANGUNAN PAGAR DEPAN
Merupakan pembangunan pagar baru mengikuti pagar lama kawedanan
yang telah hilang. rincian pekerjaan restorasi pendopo meliputi :
NO. JENIS PEKERJAAN VOLUME
1 2 3
I PEKERJAAN STRUKTUR
A PEKERJAAN TANAH DAN URUGAN
1 Galian Tanah Pondasi 16.24 m³
2 Urugan Pasir Bawah Pondasi 2.03 m³
B PEKERJAAN BETON
1 Beton Sloof (15/30)
- Beton f'c 14,5 / K 175 1.62 m³
- Begisting Sloof 2x pakai 32.40 m²
- Pembesian Ø12 & Ø10 3 36.61 kg
2 Cor Beton Kolom 15/30
- Beton f'c 14,5 / K 175 0.59 m³
- Begisting Kolom 2x pakai 8.19 m²
- Pembesian Ø12 & Ø10 1 70.17 kg
3 Cor Beton RingBalk (15/30)
- Beton f'c 14,5 / K 175 1.62 m³
- Begisting Balok 2x pakai 32.40 m²
- Pembesian Ø12 & Ø10 3 36.61 kg
II PEKERJAAN ARSITEKTUR
A PEKERJAAN PASANGAN,PLESTERAN & ACIAN
1 Pas Anstamping 4.06 m²
2 Pas Batu Kali 1sp : 6pp 10.15 m²
3 Pasangan Bata Merah 1/2 Bata 1SP : 6PP dipasang berdiri 35.48 m²
4 Pasangan 1 Bata 1sp : 6pp 17.40 m²
5 Plesteran 1SP : 6PP 1 23.62 m²
6 Acian 1 23.62 m²
7 Benangan 8 40.00 m'
B PEKERJAAN PENGECATAN
1 Cat Tembok Exterior / wheathershield 1 23.62 m²
Lain – Lain :
▪ Melakukan pengukuran kembali lokasi pekerjaan existing dengan pengawas
▪ Sebelum pekerjaan dimulai, papan nama kegiatan harus dipasang di lokasi kegiatan
▪ Sewa direksi keet sesuai petunjuk direksi
▪ Mengatur lalu lintas dan memasang rambu - rambu di lokasi pekerjaan untuk
keselamatan masyarakat dan pekerja sesuai petunjuk direksi
▪ Mengambil foto dokumentasi 0 %, 50 % dan 100 % pada setiap item pekerjaan.
▪ Untuk lebih jelasnya setiap ítem pekerjaan ( lihat gambar dan volume EE terlampir ).
▪ Sebelum mendatangkan bahan material harus memberikan contoh terlebih dahulu /
mock up untuk mendapatkan persetujuan pengawas.
▪ Semua ítem pekerjaan supaya mengikuti spesifikasi teknis/RKS.
▪ Hal–hal yang tidak tercantum dalam lingkup ini khususnya yang menyangkut masalah
teknis serta pekerjaan penambahan, pengurangan dan pemindahan supaya
berkonsultasi dengan Pejabat Pembuat Komitmen dan disetujui oleh Kepala Bidang
Cipta Karya Kabupaten Situbondo dan diketahui Kepala Dinas Pekerjaan Umum Dan
Perumahan Permukiman Kabupaten Situbondo