| Reason | |||
|---|---|---|---|
| 0017904046542000 | Rp 6,133,000,000 | - | |
| 0015989908542000 | Rp 6,223,592,504 | - | |
| 0021045414542000 | Rp 6,236,586,735 | - | |
| 0019539790542000 | Rp 6,229,634,634 | 1. Daftar Peralatan tidak dilampiri dengan lampiran bukti kepemilikan alat 2. Personil tidak melampirkan syarat surat keterangan kesanggupan penuh waktu | |
| 0806153540542000 | - | - | |
| 0022058028542000 | - | - | |
| 0916107808542000 | - | - | |
| 0012463469542000 | - | - | |
| 0012467213542000 | - | - | |
| 0026826370542000 | - | - | |
| 0632947826542000 | - | - | |
| 0313668873542000 | - | - | |
| 0867818981542000 | - | - | |
Berkah Sejahtera Mandiri | 0029711330101000 | - | - |
| 0014787238542000 | - | - | |
| 0661775163542000 | - | - | |
| 0962609871542000 | - | - | |
| 0316830835544000 | - | - | |
PT Cahaya Kencana Perkasa | 04*3**7****17**0 | - | - |
PT Jogja Info Service | 00*1**7****41**0 | - | - |
| 0813251998612000 | - | - | |
| 0959013764542000 | - | - | |
CV Permata Karya | 00*6**0****45**1 | - | - |
| 0956408579542000 | - | - | |
| 0210683793542000 | - | - | |
| 0721444446542000 | - | - |
URAIAN PEKERJAAN
KEGIATAN:
PENYELENGGARAAN JALAN KABUPATEN / KOTA
SUB KEGIATAN:
PEMBANGUNAN JALAN
PEKERJAAN:
PENINGKATAN JALAN PAKET 2 KRONGGAHAN - JABAN
APBD KABUPATEN SLEMAN
TAHUN ANGGARAN 2023
URAIAN PEKERJAAN
PENINGKATAN JALAN PAKET 2 KRONGGAHAN – JABAN
TAHUN ANGGARAN 2023
DIVISI 1. UMUM
1.2 Mobilisasi
A. Peralatan
1. Asphalt Finisher
2. Compressor 4000-6500 L\M
3. Concrete Mixer 0.3-0.6 M3
4. Dump Truck 4 Ton (2-3 M3)
5. Excavator 80-140 Hp
6. Flat Bed Truck 3-4 Ton
7. Generator Set
8. Tandem Roller 6-8 T
9. Tire Roller 8-10 T
10. Water Tanker 3000-4500 L
11. Tamper
12. Asphalt Distributor
B. Kantor Lapangan dan Fasilitas
1. Kantor
2. Gudang, dan lain-lain
C. Demobilisasi
1.8.(1) Manajemen dan Keselamatan Lalu Lintas
A. DATA DAN ASUMSI
1. Panjang Lokasi Pekerjaan : 0,8 KM
2. Total Masa Pelaksanaan Kegiatan : 4 Bulan
3. Masa Mobilisasi : 2 Bulan
4. Periode Pekerjaan Perkerasan Jalan : 4 Bulan
5. Panjang zona kerja Perkerasan Jalan : 800 M
B. PERALATAN KESELAMATAN LALU LINTAS
1. Rambu Batas Kecepatan
2. Rambu Peringatan Pekerjaan di Jalan
3. Police Line
4. Lampu Selang Lalu Lintas
C. TENAGA / PERSONIL
1. Pekerja (Flagman)
2. Koordinator / Pengatur
1.19 Keselamatan dan Kesehatan Kerja
A. Sosialisasi dan Promosi K3 terdiri atas:
1. Pengarahan Keselamatan Konstruksi (Safety briefing).
2. Spanduk (banner);
B. Alat Pelindung Diri, terdiri atas:
1. Topi Pelindung (Safety Helmet);
2. Sarung Tangan (Safety Gloves);
3. Sepatu Keselamatan (Safety Shoes);
4. Rompi Keselamatan (Safety Vest);
C. Personil K3 terdiri atas:
1. Petugas Keselamatan Konstruksi
D. Fasilitas sarana kesehatan;
1. Peralatan P3K (Kotak P3K, Obat Luka, Perban, dll);
Skh-1.18 Relokasi Papan Informasi Ruas Jalan 150 x 240 cm
Skh-1.18.(5) Relokasi Tiang Listrik yang Ada, Tegangan Menengah
Skh-1.18.(10) Relokasi APIL
DIVISI 2. DRAINASE
2.3.(26) Saluran berbentuk U Tipe DS 3 (tanpa tutup), ukuran 60 cm x 60 cm
A. TENAGA
1. Pekerja
2. Tukang
3. Mandor
B. BAHAN
1. U-ditch precast Uk. 60x60 cm K-350
2. Lantai Kerja Fc' 10 Mpa
C. PERALATAN
1. Flat Bed Truck
2. Alat Bantu
2.3.(27) Saluran berbentuk U Tipe DS 3a (dengan tutup), ukuran 60 cm x 60 cm
A. TENAGA
1. Pekerja
2. Tukang
3. Mandor
B. BAHAN
1. U-ditch precast Uk. 60x60 cm K-350
2. Cover Uditch HD 600-125 K-350
3. Lantai Kerja Fc' 10 Mpa
C. PERALATAN
1. Flat Bed Truck
2. Alat Bantu
Skh- 2.9.3.(3d) Unit Menhole cover untuk Drainase Kotak (Ukuran Custom)
DIVISI 3. PEKERJAAN TANAH DAN GEOSINTETIK
3.1.(1) Galian Biasa
A. TENAGA
1. Pekerja
2. Mandor
B. PERALATAN
1. Excavator
2. Dump truck
3. Alat bantu
3.1.(9) Galian Perkerasan berbutir
A. TENAGA
1. Pekerja
2. Mandor
B. PERALATAN
1. Excavator
2. Dump truck
3. Alat bantu
3.1.(10) Galian Perkerasan Beton
A. TENAGA
1. Pekerja
2. Mandor
B. PERALATAN
1. Concrete Cutter
2. Jack Hammer
3. Compressor
4. Dump truck
5. Alat bantu
3.2.(2a) Timbunan Pilihan dari Sumber Galian
A. TENAGA
1. Pekerja
2. Mandor
B. BAHAN
1. Bahan pilihan
C. PERALATAN
1. Wheel Loader
2. Dump truck
3. Motor Grader
4. Tandem
5. Water Tanker
6. Alat bantu
3.4.(2) Pemotongan Pohon Pilihan diameter 15 – 30 cm
A. TENAGA
1. Pekerja
2. Mandor
B. BAHAN
1. Bahan pilihan
C. PERALATAN
1. Track Loader
2. Dump truck
3. Chainsaw
4. Excavator
5. Stamper
6. Alat bantu
3.4.(3) Pemotongan Pohon Pilihan diameter > 30 – 50 cm
A. TENAGA
1. Pekerja
2. Mandor
B. BAHAN
1. Bahan pilihan
C. PERALATAN
1. Track Loader
2. Dump truck
3. Chainsaw
4. Excavator
5. Stamper
6. Alat bantu
3.4.(4) Pemotongan Pohon Pilihan diameter > 50 – 75 cm
A. TENAGA
1. Pekerja
2. Mandor
B. BAHAN
1. Bahan pilihan
C. PERALATAN
1. Track Loader
2. Dump truck
3. Chainsaw
4. Excavator
5. Stamper
6. Alat bantu
3.4.(5) Pemotongan Pohon Pilihan diameter > 75 cm
A. TENAGA
1. Pekerja
2. Mandor
B. BAHAN
1. Bahan pilihan
C. PERALATAN
1. Track Loader
2. Dump truck
3. Chainsaw
4. Excavator
5. Stamper
6. Alat bantu
DIVISI 4. PEKERJAAN PREVENTIF
DIVISI 5. PERKERASAN BERBUTIR DAN PERKERASAN BETON SEMEN
5.1.(1) Lapis Pondasi Agregat Kelas A
A. TENAGA
1. Pekerja
2. Mandor
B. BAHAN
1. Agregat A
C. PERALATAN
1. Wheel loader
2. Dump truck
3. Motor grader
4. Vibratory roller
5. Alat Bantu
DIVISI 6. PERKERASAN ASPAL
6.1 (1) Lapis Resap Pengikat - Aspal Cair/Emulsi
A. TENAGA
1. Pekerja
2. Mandor
B. BAHAN
1. Aspal emulsi CSS-1 atau SS-1
C. PERALATAN
1. Aspal distributor
2. Compressor
3. Alat Bantu
6.1 (2a) Lapis Perekat - Aspal Cair/Emulsi
A. TENAGA
1. Pekerja
2. Mandor
B. BAHAN
1. Aspal emulsi CRS-1 atau RS-1
C. PERALATAN
1. Aspal distributor
2. Compressor
3. Power broom
4. Alat Bantu
6.3(5a) Laston Lapis Aus (AC-WC)
A. TENAGA
1. Pekerja
2. Mandor
B. BAHAN
1. Agr Pch Mesin 5-10 & 10-15
2. Agr Pch Mesin 0-5
3. Semen
4. Aspal
C. PERALATAN
1. Wheel Loader
2. AMP
3. Genset
4. Dump Truck
5. Asp. Finisher
6. Tandem Roller
7. Pneumatic Tyre Roller
8. Alat Bantu
6.3(6a) Laston Lapis Antara (AC-BC)
A. TENAGA
1. Pekerja
2. Mandor
B. BAHAN
1. Agr Pch Mesin 5-10 & 10-20
2. Agr Pch Mesin 0-5
3. Semen
4. Aspal
C. PERALATAN
1. Wheel Loader
2. AMP
3. Genset
4. Dump Truck
5. Asphalt Finisher
6. Tandem Roller
7. Pneumatic Tyre Roller
8. Alat Bantu
6.3.(8) Bahan anti pengelupasan
A. TENAGA
1. Pekerja
2. Mandor
B. BAHAN
1. Bahan anti pengelupasan
DIVISI 7. STRUKTUR
7.1 (7a) Beton strukur, fc’20 MPa (Saluran & Plat Penutup)
A. TENAGA
1. Pekerja
2. Tukang
3. Mandor
B. BAHAN
1. Semen
2. Agregat Halus Beton
3. Agregat Kasar
4. Kayu Perancah
5. Paku
6. Air
7. Super Plastizier
C. PERALATAN
1. Wheel Loader
2. Concrete Batching Plant
3. Truck Mixer
4. Concrete Vibrator
5. Water Tank Truck
6. Alat Bantu
7.1 (7a) Beton strukur, fc’20 MPa (Pelebaran Jalan)
A. TENAGA
1. Pekerja
2. Tukang
3. Mandor
B. BAHAN
1. Semen
2. Agregat Halus Beton
3. Agregat Kasar
4. Air
5. Super Plastizier
C. PERALATAN
1. Wheel Loader
2. Concrete Batching Plant
3. Truck Mixer
4. Concrete Vibrator
5. Water Tank Truck
6. Alat Bantu
7.1 (8) Beton , fc’15 Mpa
A. TENAGA
1. Pekerja
2. Tukang
3. Mandor
B. BAHAN
1. Semen
2. Agregat Halus Beton
3. Agregat Kasar
4. Air
5. Super Plastizier
C. PERALATAN
1. Wheel Loader
2. Concrete Batching Plant
3. Truck Mixer
4. Concrete Vibrator
5. Water Tank Truck
6. Alat Bantu
7.1 (10) Beton , fc’10 Mpa
A. TENAGA
1. Pekerja
2. Tukang
3. Mandor
B. BAHAN
1. Semen
2. Agregat Halus Beton
3. Agregat Kasar
4. Air
5. Super Plastizier
C. PERALATAN
1. Wheel Loader
2. Concrete Batching Plant
3. Truck Mixer
4. Concrete Vibrator
5. Water Tank Truck
6. Alat Bantu
7.3 (1) Baja Tulangan Polos-BjTP 280
A. TENAGA
1. Pekerja
2. Tukang
3. Mandor
B. BAHAN
1. Baja Tulangan Polos BjTP 280
2. Kawat Beton
C. PERALATAN
1. Alat bantu
7.9.(1) Pasangan Batu
A. TENAGA
1. Pekerja
2. Tukang
3. Mandor
B. BAHAN
1. Batu Kali
2. Semen (PC)
3. Pasir
C. PERALATAN
1. Concrete Mixer
2. Water Tanker
3. Alat Bantu
7.11.(1a) Sambungan Siar Muai Tipe Asphaltic Plug, Fixed
A. TENAGA
1. Pekerja
2. Tukang
3. Mandor
B. BAHAN
1. Bridging Plate
2. Road Backer
3. Rubber bitumen (25 x 7,5 x 100) cm3
4. Agregat 14 - 20 mm
C. PERALATAN
1. Aspal Cutter
2. Jack Hammer
3. Compressor AHX-10, 10 HP
4. Drum Mixer Khusus
5. Hot Compressor Air Lance (HCA)
6. Pre Heater
7. Tamper
8. Generator Set
9. Alat Bantu
7.15.(1) Pembongkaran Pasangan Batu
A. TENAGA
1. Pekerja
2. Mandor
B. PERALATAN
1. Jack Hammer; 1 m2 / 5 menit
2. Wheel Loader 1,5 m3; 96 HP
3. Dump Truck 3-4 M3
4. Alat Bantu
7.15.(2) Pembongkaran Beton
A. TENAGA
1. Pekerja
2. Mandor
B. PERALATAN
1. Jack Hammer; 1 m2 / 5 menit
2. Wheel Loader 1,5 m3; 96 HP
3. Dump Truck 3-4 M3
4. Alat bantu
DIVISI 8. REHABILITASI JEMBATAN
DIVISI 9. PEKERJAAN HARIAN & PEKERJAAN LAIN-LAIN
9.2.(1) Marka Jalan Termoplastik
A. TENAGA
1. Pekerja
2. Tukang
3. Mandor
B. BAHAN
1. Cat Marka Thermoplastic
2. Glass Bead
C. PERALATAN
1. Dump Truck
2. Thermoplastic Road Marking Machine
3. Alat Bantu
9.2.(3a) Rambu Jalan Tunggal dengan Permukaan Pemantul Engineering Grade
A. TENAGA
1. Pekerja
2. Tukang
3. Mandor
B. BAHAN
1. Plat Rambu
2. Pipa Galvanis Dia. 5"
3. Beton Fc 20 Mpa
C. PERALATAN
1. Dump Truck
2. Alat Bantu
9.2.(5) Patok pengarah
A. TENAGA
1. Pekerja
2. Tukang
3. Mandor
B. BAHAN
1. Beton fc 20 Mpa
2. Baja Tulangan
3. Cat, dan material lainnya
C. PERALATAN
1. Dump Truck
2. Alat Bantu
9.2(10a) Kerb Pracetak Jenis 1 (Peninggi/Mountable)
A. TENAGA
1. Pekerja
2. Tukang
3. Mandor
B. BAHAN
1. Beton Fc' 25 MPa
2. Mortar
C. PERALATAN
1. Flat Bed Truck
2. Alat Bantu
9.2.(10f) Kereb Pracetak Jenis 6 (Kereb dengan Bukaan)
A. TENAGA
1. Pekerja
2. Tukang
3. Mandor
B. BAHAN
1. Beton Fc' 25 MPa
2. Mortar
C. PERALATAN
1. Concrete Mixer
2. Flat Bed Truck
3. Alat Bantu
9.2.(12a) Perkerasan Blok Beton pada Trotoar dan Median (Batu Andesit )
A. TENAGA
1. Pekerja
2. Tukang
3. Mandor
B. BAHAN
1. Batu Alam Andesit
2. Pasir
C. PERALATAN
1. Tamper
2. Alat Bantu
Pembongkaran Ubin Eksisting atau Perkerasan Blok Beton Eksisting pada
9.2.(12b)
Trotoar atau Median
A. TENAGA
1. Pekerja
2. Tukang
3. Mandor
B. PERALATAN
1. Jack Hammer
2. Dump Truck
3. Alat Bantu
SKh-9.2.(5b) Papan Informasi Ruas Jalan 150 x 240 cm
A. TENAGA
1. Pekerja
2. Tukang
3. Mandor
B. BAHAN
1. Pelat Rambu
2. Pia Galvanis Dia. 6”
3. Beton Fc 20 Mpa
4. Pipa Galvanis diameter 2"
5. Pipa Galvanis diameter 1.5"
6. Rangka Besi Siku 3 cm x 3 cm x 3 mm
7. Angkur diameter 1"
8. Baja Tulangan Polos
9. Plat baja tebal 1 cm
10. Rib base plat tebal 1 cm
11. Rib plat flange tebal 1 cm
12. Tutup pipa galvanis 6"
13. Tutup pipa galvanis 2.5"
14. Pemotongan dan Pengeboran
15. Pengelasan
16. Pekerjaan Galian Tanah
17. Pekerjaan Urugan
18. Cat, dan bahan lainnya
C. PERALATAN
1. Dump Truck
2. Crane
3. Alat Bantu| Authority | |||
|---|---|---|---|
| 10 May 2019 | 22. Pembangunan Bendung Klontongan, Sendangtirto, Berbah | Pemerintah Daerah Kabupaten Sleman | Rp 13,506,600,000 |
| 7 March 2022 | Pembangunan Embung Piat Ugm Berbah Kab. Sleman; DIY; 1 Unit; 0,005 M3/Det; F; K; Syc | Kementerian Pekerjaan Umum dan Perumahan Rakyat | Rp 9,600,000,000 |
| 2 February 2022 | Pemeliharaan Berkala Jalan Paket 2 Beran-Balong | Kab. Sleman | Rp 4,400,000,000 |
| 24 March 2022 | Peningkatan Jalan Paket 5 Karang Kalasan - Salakan (Dak Reguler) | Kab. Sleman | Rp 3,420,477,000 |
| 9 January 2020 | Peningkatan Di Pendekan, Prambanan (Dak) | Kab. Sleman | Rp 2,862,639,000 |
| 1 July 2016 | Pembangunan Embung Jetis Suruh, Sleman Tahap 2 | Provinsi DI Yogyakarta | Rp 2,686,591,000 |
| 12 September 2014 | Paket 1 - Pemel. Berkala Jalan Gorongan - Gowok - Pemel. Berkala Jalan Tlukan - Kadisoko | Pemerintah Daerah Kabupaten Sleman | Rp 2,310,000,000 |
| 8 September 2017 | Peningkatan Jalan Bugisan | Pemerintah Daerah Kota Yogyakarta | Rp 2,293,200,000 |
| 15 February 2018 | Pembangunan Perkuatan Tebing Sungai Gajah Wong (Kanggotan) Kab. Bantul | Kementerian Pekerjaan Umum dan Perumahan Rakyat | Rp 2,287,260,000 |
| 16 July 2019 | Pembangunan Saluran Drainase Paket VII (Kecamatan Depok) | Pemerintah Daerah Kabupaten Sleman | Rp 2,250,000,000 |