| Reason | |||
|---|---|---|---|
| 0314561267544000 | Rp 1,152,111,145 | - | |
| 0721444446542000 | Rp 1,017,231,068 | tidak bisa menunjukkan kelengkapan dokumen personil asli | |
CV Arah Perkasa | 04*0**9****42**0 | Rp 923,441,634 | Tidak melampirkan persyaratan kualifikasi sesuai dokpemil pada pengalaman kerja perusahaan |
| 0813251998612000 | - | - | |
| 0412804742542000 | - | - | |
| 0019539790542000 | - | - | |
| 0022058028542000 | - | - | |
| 0916107808542000 | - | - | |
| 0033329756542000 | - | - | |
| 0017904046542000 | - | - | |
| 0012467213542000 | - | - | |
| 0959013764542000 | - | - | |
| 0867818981542000 | - | - | |
Berkah Sejahtera Mandiri | 0029711330101000 | - | - |
| 0531095263542000 | - | - | |
| 0014787238542000 | - | - | |
| 0661775163542000 | - | - | |
| 0962609871542000 | - | - | |
| 0026830844542000 | - | - | |
| 0030410096541000 | - | - | |
| 0316944586542000 | - | - | |
| 0632947826542000 | - | - | |
| 0956408579542000 | - | - | |
| 0021045414542000 | - | - |
URAIAN PEKERJAAN
KEGIATAN:
PENYELENGGARAAN JALAN KABUPATEN / KOTA
SUB KEGIATAN:
PENGGANTIAN JEMBATAN
PEKERJAAN:
PENINGKATAN JEMBATAN GLAGAHOMBO
APBD KABUPATEN SLEMAN
TAHUN ANGGARAN 2023
URAIAN PEKERJAAN
PENINGKATAN JEMBATAN GLAGAHOMBO
TAHUN ANGGARAN 2023
DIVISI 1. UMUM
1.2 Mobilisasi
A. Peralatan
1. Asphalt Finisher
2. Compressor 4000-6500 L\M
3. Concrete Mixer 0.3-0.6 M3
4. Dump Truck 4 Ton (2-3 M3)
5. Excavator 80-140 Hp
6. Generator Set
7. Tandem Roller 6-8 T
8. Tire Roller 8-10 T
9. Concrete Vibrator
10. Water Tanker 3000-4500 L
11. Tamper
12. Jack Hammer
13. Asphalt Distributor
B. Kantor Lapangan dan Fasilitas
1. Kantor
2. Gudang, dan lain-lain
C. Demobilisasi
1.8.(1) Manajemen dan Keselamatan Lalu Lintas
A. DATA DAN ASUMSI
1. Panjang Lokasi Pekerjaan : 0,1 KM
2. Total Masa Pelaksanaan Kegiatan : 4 Bulan
3. Masa Mobilisasi : 2 Bulan
4. Periode Pekerjaan Jembatan : 4 Bulan
5. Periode Pekerjaan Pekerjaan Jalan : 1 Bulan
6. Panjang Zona Kerja Perkerasan Jalan : 100 M
B. PERALATAN KESELAMATAN LALU LINTAS
1. Rambu portabel informasi pengalihan/pengaturan lalu lintas
2. Rambu Peringatan
3. Rambu Petunjuk
C. TENAGA / PERSONIL
1. Pekerja (Flagman)
1.19 Keselamatan dan Kesehatan Kerja
A. Sosialisasi dan Promosi K3 terdiri atas:
1. Pengarahan Keselamatan Konstruksi (Safety briefing).
2. Spanduk (banner);
B. Alat Pelindung Diri, terdiri atas:
1. Topi Pelindung (Safety Helmet);
2. Sarung Tangan (Safety Gloves);
3. Sepatu Keselamatan (Safety Shoes);
4. Rompi Keselamatan (Safety Vest);
C. Personil K3 terdiri atas:
1. Petugas Keselamatan Konstruksi
D. Fasilitas sarana kesehatan;
1. Peralatan P3K (Kotak P3K, Obat Luka, Perban, dll);
E. Lain - Lain Terkait Pengendalian Risiko K3
1. Lampu Darurat (Emergency Lamp);
DIVISI 2. DRAINASE
DIVISI 3. PEKERJAAN TANAH DAN GEOSINTETIK
3.1.(1) Galian Biasa
A. TENAGA
1. Pekerja
2. Mandor
B. PERALATAN
1. Excavator
2. Dump truck
3. Alat bantu
3.1.(4) Galian Struktur dengan kedalaman 0 - 2 meter
A. TENAGA
1. Pekerja
2. Mandor
B. PERALATAN
1. Excavator
2. Dump truck
3. Alat bantu
3.1.(8) Galian Perkerasan Beraspal tanpa Cold Milling Machine
A. TENAGA
1. Pekerja
2. Mandor
B. PERALATAN
1. Concrete Cutter
2. Jack Hammer
3. Compresor
4. Dump truck
5. Alat bantu
3.1.(9) Galian Perkerasan berbutir
A. TENAGA
1. Pekerja
2. Mandor
B. PERALATAN
1. Excavator
2. Dump truck
3. Alat bantu
3.1.(10) Galian Perkerasan Beton
A. TENAGA
1. Pekerja
2. Mandor
B. PERALATAN
1. Concrete Cutter
2. Jack Hammer
3. Compressor
4. Dump truck
5. Alat bantu
3.2.(2a) Timbunan Pilihan dari Sumber Galian
A. TENAGA
1. Pekerja
2. Mandor
B. BAHAN
1. Bahan pilihan
C. PERALATAN
1. Wheel Loader
2. Dump truck
3. Motor Grader
4. Tandem
5. Water Tanker
6. Alat bantu
DIVISI 4. PEKERJAAN PREVENTIF
DIVISI 5. PERKERASAN BERBUTIR DAN PERKERASAN BETON SEMEN
5.1.(1) Lapis Pondasi Agregat Kelas A
A. TENAGA
1. Pekerja
2. Mandor
B. BAHAN
1. Agregat A
C. PERALATAN
1. Wheel loader
2. Dump truck
3. Motor grader
4. Vibratory roller
5. Alat Bantu
DIVISI 6. PERKERASAN ASPAL
6.1 (1) Lapis Resap Pengikat - Aspal Cair/Emulsi
A. TENAGA
1. Pekerja
2. Mandor
B. BAHAN
1. Aspal emulsi CSS-1 atau SS-1
C. PERALATAN
1. Aspal distributor
2. Compressor
3. Alat Bantu
6.1 (2a) Lapis Perekat - Aspal Cair/Emulsi
A. TENAGA
1. Pekerja
2. Mandor
B. BAHAN
1. Aspal emulsi CRS-1 atau RS-1
C. PERALATAN
1. Aspal distributor
2. Compressor
3. Power broom
4. Alat Bantu
6.3(5a) Laston Lapis Aus (AC-WC)
A. TENAGA
1. Pekerja
2. Mandor
B. BAHAN
1. Agr Pch Mesin 5-10 & 10-15
2. Agr Pch Mesin 0-5
3. Semen
4. Aspal
C. PERALATAN
1. Wheel Loader
2. AMP
3. Genset
4. Dump Truck
5. Asp. Finisher
6. Tandem Roller
7. Pneumatic Tyre Roller
8. Alat Bantu
6.3(6a) Laston Lapis Antara (AC-BC)
A. TENAGA
1. Pekerja
2. Mandor
B. BAHAN
1. Agr Pch Mesin 5-10 & 10-20
2. Agr Pch Mesin 0-5
3. Semen
4. Aspal
C. PERALATAN
1. Wheel Loader
2. AMP
3. Genset
4. Dump Truck
5. Asphalt Finisher
6. Tandem Roller
7. Pneumatic Tyre Roller
8. Alat Bantu
6.3.(8) Bahan anti pengelupasan
A. TENAGA
1. Pekerja
2. Mandor
B. BAHAN
1. Bahan anti pengelupasan
DIVISI 7. STRUKTUR
7.1 (5a) Beton struktur fc’ 30 Mpa
A. TENAGA
1. Pekerja
2. Tukang
3. Mandor
B. BAHAN
1. Semen
2. Agregat Halus Beton
3. Agregat Kasar
4. Kayu Perancah
5. Paku
6. Air
7. Super Plastizier
C. PERALATAN
1. Wheel Loader
2. Concrete Batching Plant
3. Truck Mixer
4. Concrete Vibrator
5. Water Tank Truck
6. Alat Bantu
7.1 (6a) Beton strukur, fc’25 MPa
A. TENAGA
1. Pekerja
2. Tukang
3. Mandor
B. BAHAN
1. Semen
2. Agregat Halus Beton
3. Agregat Kasar
4. Kayu Perancah
5. Paku
6. Air
7. Super Plastizier
C. PERALATAN
1. Wheel Loader
2. Concrete Batching Plant
3. Truck Mixer
4. Concrete Vibrator
5. Water Tank Truck
6. Alat Bantu
7.1 (8) Beton , fc’15 Mpa
A. TENAGA
1. Pekerja
2. Tukang
3. Mandor
B. BAHAN
1. Semen
2. Agregat Halus Beton
3. Agregat Kasar
4. Air
5. Super Plastizier
C. PERALATAN
1. Wheel Loader
2. Concrete Batching Plant
3. Truck Mixer
4. Concrete Vibrator
5. Water Tank Truck
6. Alat Bantu
7.1 (10) Beton , fc’10 Mpa
A. TENAGA
1. Pekerja
2. Tukang
3. Mandor
B. BAHAN
1. Semen
2. Agregat Halus Beton
3. Agregat Kasar
4. Air
5. Super Plastizier
C. PERALATAN
1. Wheel Loader
2. Concrete Batching Plant
3. Truck Mixer
4. Concrete Vibrator
5. Water Tank Truck
6. Alat Bantu
7.3 (1) Baja Tulangan Polos-BjTP 280
A. TENAGA
1. Pekerja
2. Tukang
3. Mandor
B. BAHAN
1. Baja Tulangan Polos BjTP 280
2. Kawat Beton
C. PERALATAN
1. Alat bantu
7.3 (3) Baja Tulangan Sirip-BjTS 420A
A. TENAGA
1. Pekerja
2. Tukang
3. Mandor
B. BAHAN
1. Baja Tulangan Sirip-BjTS 420A
2. Kawat Beton
C. PERALATAN
1. Alat bantu
7.9.(1) Pasangan Batu
A. TENAGA
1. Pekerja
2. Tukang
3. Mandor
B. BAHAN
1. Batu Kali
2. Semen (PC)
3. Pasir
C. PERALATAN
1. Concrete Mixer
2. Water Tanker
3. Alat Bantu
7.11.(1a) Sambungan Siar Muai Tipe Asphaltic Plug, Fixed
A. TENAGA
1. Pekerja
2. Tukang
3. Mandor
B. BAHAN
1. Bridging Plate
2. Road Backer
3. Rubber bitumen (25 x 7,5 x 100) cm3
4. Agregat 14 - 20 mm
C. PERALATAN
1. Aspal Cutter
2. Jack Hammer
3. Compressor AHX-10, 10 HP
4. Drum Mixer Khusus
5. Hot Compressor Air Lance (HCA)
6. Pre Heater
7. Tamper
8. Generator Set
9. Alat Bantu
7.12.(3) Landasan Elastomerik Karet Sintetis Berlapis Baja
A. TENAGA
1. Pekerja
2. Tukang
3. Mandor
B. BAHAN
1. Elastomerik Karet Sintetis Berlapis Baja Ukuran 350 mm x 300 mm x
36mm
C. PERALATAN
1. Alat Bantu
7.13.(1) Sandaran (Railing)
A. TENAGA
1. Pekerja
2. Tukang
3. Mandor
B. BAHAN
1. Pipa d = 3 inch Galvanised
2. Dudukan, mur, baut dll
3. Beton fc’ 20 MPa
4. Penulangan Polos
C. PERALATAN
1. Alat Bantu
7.13.(1)a Leuning Jembatan Uk. 3,00m (Finishing cat weathershield sekualitas Dulux)
A. BAHAN
1. Pasangan Batu dengan Mortar
2. Sponengan
3. Pengecatan Dinding Luar (Kualitas Dulux)
4. Ornamen Kuncup Melati
B. PERALATAN
1. Alat Bantu
7.14.(1) Papan Nama Jembatan
A. TENAGA
1. Pekerja
2. Mandor
B. PERALATAN
1. Jack Hammer; 1 m2 / 5 menit
2. Wheel Loader 1,5 m3; 96 HP
3. Dump Truck 3-4 M3
4. Alat Bantu
7.15.(1) Pembongkaran Pasangan Batu
A. TENAGA
1. Pekerja
2. Mandor
B. PERALATAN
1. Jack Hammer; 1 m2 / 5 menit
2. Wheel Loader 1,5 m3; 96 HP
3. Dump Truck 3-4 M3
4. Alat bantu
7.15.(2) Pembongkaran Beton
A. TENAGA
1. Pekerja
2. Mandor
B. PERALATAN
1. Jack Hammer; 1 m2 / 5 menit
2. Wheel Loader 1,5 m3; 96 HP
3. Dump Truck 3-4 M3
4. Alat bantu
DIVISI 8. REHABILITASI JEMBATAN
DIVISI 9. PEKERJAAN HARIAN & PEKERJAAN LAIN-LAIN
9.2.(1) Marka Jalan Termoplastik
A. TENAGA
1. Pekerja
2. Tukang
3. Mandor
B. BAHAN
1. Cat Marka Thermoplastic
2. Glass Bead
C. PERALATAN
1. Dump Truck
2. Thermoplastic Road Marking Machine
3. Alat Bantu
9.2.(3a) Rambu Jalan Tunggal dengan Permukaan Pemantul Engineering Grade
A. TENAGA
1. Pekerja
2. Tukang
3. Mandor
B. BAHAN
1. Plat Rambu
2. Pipa Galvanis Dia. 5"
3. Beton Fc 20 Mpa
C. PERALATAN
1. Dump Truck
2. Alat Bantu
9.2.(5) Patok pengarah
A. TENAGA
1. Pekerja
2. Tukang
3. Mandor
B. BAHAN
1. Beton fc 20 Mpa
2. Baja Tulangan
3. Cat, dan material lainnya
C. PERALATAN
1. Dump Truck
2. Alat Bantu