| 0956408579542000 | Rp 271,585,921 | |
| 0021045414542000 | - | |
| 0661775163542000 | - | |
| 0019539790542000 | - | |
| 0022058028542000 | - | |
| 0916107808542000 | - | |
| 0017904046542000 | - | |
| 0012467213542000 | - | |
| 0632947826542000 | - | |
| 0313668873542000 | - | |
| 0867818981542000 | - | |
Berkah Sejahtera Mandiri | 0029711330101000 | - |
| 0014355606542000 | - | |
| 0014787238542000 | - | |
| 0018125617514000 | - | |
| 0962609871542000 | - | |
PT Cahaya Kencana Perkasa | 04*3**7****17**0 | - |
| 0959013764542000 | - | |
| 0316944586542000 | - |
URAIAN PEKERJAAN
KEGIATAN:
PENYELENGGARAAN JALAN KABUPATEN / KOTA
SUB KEGIATAN:
PENGGANTIAN JEMBATAN
PEKERJAAN:
PENINGKATAN GORONG - GORONG NGARAN
APBD KABUPATEN SLEMAN
TAHUN ANGGARAN 2023
URAIAN PEKERJAAN
PENINGKATAN JEMBATAN CEPITSARI
TAHUN ANGGARAN 2023
DIVISI 1. UMUM
1.2 Mobilisasi
A. Peralatan
1. Asphalt Finisher
2. Compressor 4000-6500 L\M
3. Concrete Mixer 0.3-0.6 M3
4. Dump Truck 4 Ton (2-3 M3)
5. Excavator 80-140 Hp
6. Flat Bed Truck 3-4 Ton
7. Generator Set
8. Tandem Roller 6-8 T
9. Tire Roller 8-10 T
10. Water Tanker 3000-4500 L
11. Tamper
12. Asphalt Distributor
B. Kantor Lapangan dan Fasilitas
1. Kantor
2. Gudang, dan lain-lain
C. Demobilisasi
1.8.(1) Manajemen dan Keselamatan Lalu Lintas
A. DATA DAN ASUMSI
1. Total Masa Pelaksanaan Kegiatan : 4 Bulan
2. Masa Mobilisasi : 2 Bulan
3. Periode Pekerjaan Perkerasan Jalan : 4 Bulan
4. Panjang zona kerja Perkerasan Jalan
B. PERALATAN KESELAMATAN LALU LINTAS
1. Rambu Batas Kecepatan
2. Rambu Peringatan Pekerjaan di Jalan
3. Police Line
4. Lampu Selang Lalu Lintas
C. TENAGA / PERSONIL
1. Pekerja (Flagman)
2. Koordinator / Pengatur
1.19 Keselamatan dan Kesehatan Kerja
A. Sosialisasi dan Promosi K3 terdiri atas:
1. Pengarahan Keselamatan Konstruksi (Safety briefing).
2. Spanduk (banner);
B. Alat Pelindung Diri, terdiri atas:
1. Topi Pelindung (Safety Helmet);
2. Sarung Tangan (Safety Gloves);
3. Sepatu Keselamatan (Safety Shoes);
4. Rompi Keselamatan (Safety Vest);
C. Personil K3 terdiri atas:
1. Petugas Keselamatan Konstruksi
D. Fasilitas sarana kesehatan;
1. Peralatan P3K (Kotak P3K, Obat Luka, Perban, dll);
DIVISI 2. DRAINASE
2.2.(1) Pasangan Batu dengan Mortar
A. TENAGA
1. Pekerja
2. Tukang batu
3. Mandor
B. BAHAN
1. Batu
2. Semen (PC)
3. Pasir
C. PERALATAN
1. Concrete Mixer
2. Alat Bantu
DIVISI 3. PEKERJAAN TANAH DAN GEOSINTETIK
3.1.(1) Galian Biasa
A. TENAGA
1. Pekerja
2. Mandor
B. PERALATAN
1. Excavator
2. Dump truck
3. Alat bantu
3.1.(4) Galian Struktur dengan kedalaman 0 - 2 meter
C. TENAGA
3. Pekerja
4. Mandor
D. PERALATAN
4. Excavator
5. Dump truck
6. Alat bantu
3.1.(8) Galian Perkerasan Beraspal tanpa Cold Milling Machine
A. TENAGA
1. Pekerja
2. Mandor
B. PERALATAN
1. Concrete Cutter
2. Jack Hammer
3. Compressor
4. Dump truck
5. Alat bantu
3.1.(9) Galian Perkerasan berbutir
A. TENAGA
1. Pekerja
2. Mandor
B. PERALATAN
1. Excavator
2. Dump truck
3. Alat bantu
3.1.(10) Galian Perkerasan Beton
A. TENAGA
1. Pekerja
2. Mandor
B. PERALATAN
1. Concrete Cutter
2. Jack Hammer
3. Compressor
4. Dump truck
5. Alat bantu
3.2.(2a) Timbunan Pilihan dari Sumber Galian
A. TENAGA
1. Pekerja
2. Mandor
B. BAHAN
1. Bahan pilihan
C. PERALATAN
1. Wheel Loader
2. Dump truck
3. Motor Grader
4. Tandem
5. Water Tanker
6. Alat bantu
DIVISI 4. PEKERJAAN PREVENTIF
DIVISI 5. PERKERASAN BERBUTIR DAN PERKERASAN BETON SEMEN
5.1.(1) Lapis Pondasi Agregat Kelas A
A. TENAGA
1. Pekerja
2. Mandor
B. BAHAN
1. Agregat A
C. PERALATAN
1. Wheel loader
2. Dump truck
3. Motor grader
4. Vibratory roller
5. Alat Bantu
DIVISI 6. PERKERASAN ASPAL
6.1 (1) Lapis Resap Pengikat - Aspal Cair/Emulsi
A. TENAGA
1. Pekerja
2. Mandor
B. BAHAN
1. Aspal emulsi CSS-1 atau SS-1
C. PERALATAN
1. Aspal distributor
2. Compressor
3. Alat Bantu
6.1 (2a) Lapis Perekat - Aspal Cair/Emulsi
A. TENAGA
1. Pekerja
2. Mandor
B. BAHAN
1. Aspal emulsi CRS-1 atau RS-1
C. PERALATAN
1. Aspal distributor
2. Compressor
3. Power broom
4. Alat Bantu
6.3(5a) Laston Lapis Aus (AC-WC)
A. TENAGA
1. Pekerja
2. Mandor
B. BAHAN
1. Agr Pch Mesin 5-10 & 10-15
2. Agr Pch Mesin 0-5
3. Semen
4. Aspal
C. PERALATAN
1. Wheel Loader
2. AMP
3. Genset
4. Dump Truck
5. Asp. Finisher
6. Tandem Roller
7. Pneumatic Tyre Roller
8. Alat Bantu
6.3(6a) Laston Lapis Antara (AC-BC)
A. TENAGA
1. Pekerja
2. Mandor
B. BAHAN
1. Agr Pch Mesin 5-10 & 10-20
2. Agr Pch Mesin 0-5
3. Semen
4. Aspal
C. PERALATAN
1. Wheel Loader
2. AMP
3. Genset
4. Dump Truck
5. Asphalt Finisher
6. Tandem Roller
7. Pneumatic Tyre Roller
8. Alat Bantu
6.3.(8) Bahan anti pengelupasan
A. TENAGA
1. Pekerja
2. Mandor
B. BAHAN
1. Bahan anti pengelupasan
DIVISI 7. STRUKTUR
7.1 (6a) Beton strukur, fc’25 MPa
A. TENAGA
1. Pekerja
2. Tukang
3. Mandor
B. BAHAN
1. Semen
2. Agregat Halus Beton
3. Agregat Kasar
4. Kayu Perancah
5. Paku
6. Air
7. Super Plastizier
C. PERALATAN
1. Wheel Loader
2. Concrete Batching Plant
3. Truck Mixer
4. Concrete Vibrator
5. Water Tank Truck
6. Alat Bantu
7.1 (7a) Beton strukur, fc’20 MPa (Saluran & Plat Penutup)
A. TENAGA
1. Pekerja
2. Tukang
3. Mandor
B. BAHAN
1. Semen
2. Agregat Halus Beton
3. Agregat Kasar
4. Kayu Perancah
5. Paku
6. Air
7. Super Plastizier
C. PERALATAN
1. Wheel Loader
2. Concrete Batching Plant
3. Truck Mixer
4. Concrete Vibrator
5. Water Tank Truck
6. Alat Bantu
7.1 (8) Beton , fc’15 Mpa
A. TENAGA
1. Pekerja
2. Tukang
3. Mandor
B. BAHAN
1. Semen
2. Agregat Halus Beton
3. Agregat Kasar
4. Air
5. Super Plastizier
C. PERALATAN
1. Wheel Loader
2. Concrete Batching Plant
3. Truck Mixer
4. Concrete Vibrator
5. Water Tank Truck
6. Alat Bantu
7.1 (10) Beton , fc’10 Mpa
A. TENAGA
1. Pekerja
2. Tukang
3. Mandor
B. BAHAN
1. Semen
2. Agregat Halus Beton
3. Agregat Kasar
4. Air
5. Super Plastizier
C. PERALATAN
1. Wheel Loader
2. Concrete Batching Plant
3. Truck Mixer
4. Concrete Vibrator
5. Water Tank Truck
6. Alat Bantu
7.3 (1) Baja Tulangan Polos-BjTS 420 A
A. TENAGA
1. Pekerja
2. Tukang
3. Mandor
B. BAHAN
1. Baja Tulangan Polos BjTP 280
2. Kawat Beton
C. PERALATAN
1. Alat bantu
7.9.(1) Pasangan Batu
A. TENAGA
1. Pekerja
2. Tukang
3. Mandor
B. BAHAN
1. Batu Kali
2. Semen (PC)
3. Pasir
C. PERALATAN
1. Concrete Mixer
2. Water Tanker
3. Alat Bantu
7.14.(1) Papan Nama Jembatan
A. TENAGA
1. Pekerja
2. Tukang Cat
3. Mandor
B. BAHAN
1. Marmer ukuran 40x60cm Tebal 3cm
2. Adukan Semen
A. PERALATAN
1. Alat bantu
7.15.(1) Pembongkaran Pasangan Batu
A. TENAGA
1. Pekerja
2. Mandor
B. PERALATAN
1. Jack Hammer; 1 m2 / 5 menit
2. Wheel Loader 1,5 m3; 96 HP
3. Dump Truck 3-4 M3
4. Alat Bantu
7.15.(2) Pembongkaran Beton
B. TENAGA
1. Pekerja
2. Mandor
C. PERALATAN
1. Jack Hammer; 1 m2 / 5 menit
2. Wheel Loader 1,5 m3; 96 HP
3. Dump Truck 3-4 M3
4. Alat bantu
7.13.(1)a Leuning Jembatan (Finishing cat weathershield sekualitas Dulux)
A. TENAGA
1. Pekerja
2. Tukang Cat
3. Mandor
B. BAHAN
1. Pasangan Batu Kali dan Mortar Plester + Aci
2. Sponengan
3. Pengecetan Dinding Luar Weathershield
4. Ornamen Kuncup Melati
C. PERALATAN
1. Alat bantu
DIVISI 8. REHABILITASI JEMBATAN
DIVISI 9. PEKERJAAN HARIAN & PEKERJAAN LAIN-LAIN
9.2.(1) Marka Jalan Termoplastik
A. TENAGA
1. Pekerja
2. Tukang
3. Mandor
B. BAHAN
1. Cat Marka Thermoplastic
2. Glass Bead
C. PERALATAN
1. Dump Truck
2. Thermoplastic Road Marking Machine
3. Alat Bantu
9.2.(5) Patok pengarah
A. TENAGA
1. Pekerja
2. Tukang
3. Mandor
B. BAHAN
1. Beton fc 20 Mpa
2. Baja Tulangan
3. Cat, dan material lainnya
C. PERALATAN
1. Dump Truck
2. Alat Bantu
9.2.(3a) Rambu Jalan Tunggal dengan Permukaan Pemantul Engineering Grade
A. TENAGA
1. Pekerja
2. Tukang
3. Mandor
B. BAHAN
1. Plat Rambu
2. Pipa Galvanis Dia. 5"
3. Beton Fc 20 Mpa
C. PERALATAN
1. Dump Truck
2. Alat Bantu| Authority | |||
|---|---|---|---|
| 12 August 2023 | Pembangunan Saluran Drainase Paket 3: Berbah, Kalasan | Kab. Sleman | Rp 1,262,164,270 |
| 9 August 2022 | Pembangunan Jaringan Air Bersih Tempel | Kab. Sleman | Rp 850,000,000 |
| 4 July 2022 | Rehab Di Cangkring 7 Kali Gondang, Purwobinangun, Pakem Dan Rehab Di Bendo Kali Dure, Nangsri Lor, Girikerto, Turi | Kab. Sleman | Rp 690,095,978 |
| 20 May 2023 | Pembangunan Jalan Ksct Paket 7: Godean | Kab. Sleman | Rp 555,238,000 |