| Reason | |||
|---|---|---|---|
| 0959013764542000 | Rp 1,927,417,459 | - | |
| 0019539790542000 | Rp 1,976,896,635 | - | |
| 0531095263542000 | Rp 1,967,191,853 | tidak menyampaikan bukti pengalaman kerja dan Berita Acara Penyerahan Akhir Pekerjaan BA-FHO | |
| 0033288705521000 | - | - | |
| 0721444446542000 | - | - | |
| 0806153540542000 | - | - | |
| 0653100560422000 | - | - | |
| 0210683793542000 | - | - | |
| 0632947826542000 | - | - | |
| 0021045414542000 | - | - | |
| 0022058028542000 | - | - | |
| 0916107808542000 | - | - | |
| 0012463469542000 | - | - | |
| 0025418393543000 | - | - | |
| 0017904046542000 | - | - | |
| 0012467213542000 | - | - | |
| 0313668873542000 | - | - | |
| 0867818981542000 | - | - | |
Berkah Sejahtera Mandiri | 0029711330101000 | - | - |
| 0014787238542000 | - | - | |
| 0661775163542000 | - | - | |
| 0318013380542000 | - | - | |
| 0020331344646000 | - | - | |
| 0962609871542000 | - | - | |
PT Cahaya Kencana Perkasa | 04*3**7****17**0 | - | - |
PT Jogja Info Service | 00*1**7****41**0 | - | - |
| 0851609586524000 | - | - | |
| 0026830844542000 | - | - | |
CV Permata Karya | 00*6**0****45**1 | - | - |
| 0956408579542000 | - | - |
URAIAN PEKERJAAN PEMELIHARAAN BERKALA JALAN PAKET 1. NGANGKRUK-BABADAN (1.0 Km)
DIVISI 1. UMUM
1.2 Mobilisasi
A. Sewa Tanah
B. PERALATAN
Periksa lembar 1.2-2
C. Kantor Lapangan dan Fasilitas
1. Base Camp
2. Kantor
3. Barak
4. Gudang, dan lain-lain
D. Manajemen dan Keselamatan lalu lintas
E. DEMOBILISASI
1.8.(1) Manajemen dan Keselamatan Lalu Lintas
A. DATA DAN ASUMSI
1. Panjang Lokasi Pekerjaan
2. Total Masa Pelaksanaan Kegiatan
3. Masa Mobilisasi
4. Periode Pekerjaan Perkerasan Jalan
5. Panjang zona kerja Perkerasan Jalan
B. URUTAN KERJA
1. Penyedia menyiapkan perlengkapan keselamatan jalan selama periode
konstruksi sesuai ketentuan
2. Buat rencana kerja manajemen lalu-lintas sesuai schedule pekerjaan
dan koordinasikan dengan seluruh personil yang terkait
3. Kelompok kerja pengatur lalu-lintas selama konstruksi menggunakan
tenaga pengatur dan flagman dengan 3 shift
4. Pengalihan arus lalu-lintas harus ijin PPK dan pihak terkait
5. Semua rambu harus jelas dan terbaca oleh Pengguna Jalan
C. PERALATAN KESELAMATAN LALU LINTAS
1. Rambu panah berkedip
2. Rambu tetap informasi pengalihan/pengaturan lalu lintas
3. Rambu portabel informasi pengalihan/pengaturan lalu lintas
4. Rambu penghalang lalu-lintas jenis plastic
5. Rambu Peringatan
6. Rambu Petunjuk
7. Peralatan komunikasi dan Lainnya
D. TENAGA / PERSONIL
1. Pekerja (Flagman)
2. Koordinator / Pengatur
1.19 Keselamatan dan Kesehatan Kerja
A. Penyiapan RK3K terdiri atas:
1. Pembuatan Manual, Prosedur, Instruksi Kerja, Ijin Kerja dan Formulir;
2. Pembuatan Kartu Identitas Pekerja (KIP);
B. Sosialisasi dan Promosi K3 terdiri atas:
1. Pengarahan K3 (safety briefing) : Pertemuan Keselamatan (Safety
Talk dan/atau Tool Box Meeting);;
2. Spanduk (banner);
3. Poster;
4. Papan Informasi K3
C. Alat Pelindung Diri teridi atas:
1. Topi Pelindung (Safety Helmet);
2. Pelindung Pernafasan dan Mulut (Masker);
3. Sarung Tangan (Safety Gloves);
4. Sepatu Keselamatan (Safety Shoes);
5. Rompi Keselamatan (Safety Vest);
D. Personil K3 terdiri atas:
1. Petugas K3;
E. Fasilitas sarana kesehatan;
1. Peralatan P3K (Kotak P3K, Obat Luka, Perban, dll);
F. Lain - Lain Terkait Pengendalian Risiko K3
1. Alat Pemadam Api Ringan (APAR);
2. Bendera K3;
3. Pelaporan dan Penyelidikan Insiden
1.18 (3) Relokasi Utilitas (2 Tiang Listrik)
1.18 (4) Relokasi Utilitas (Lampu APILL)
URAIAN PEKERJAAN PEMELIHARAAN BERKALA JALAN PAKET 1. NGANGKRUK-BABADAN (1.0 Km)
1.18 (4) Relokasi Utilitas (Tiang Telpon)
1.18 (4)
Relokasi Utilitas (Box Dishub)
DIVISI 2. DRAINASE
2.1.(1) Galian untuk Selokan Drainase dan Saluran Air
A. TENAGA
1. Pekerja
2. Mandor
B. BAHAN
C. PERALATAN
1. Mini Excavator
2. Dump Truck
2.2.(1) Pasangan Batu dengan Mortar
A. TENAGA
1. Pekerja
2. Tukang batu
3. Mandor
B. BAHAN
1. Batu
2. Semen (PC)
3. Pasir
C. PERALATAN
1. Conc. Mixer
Skh2. 1 Gorong-gorong Kotak Beton Bertulang, ukuran dalam 100 x 100
A. Tenaga
1. Pekerja
2. Tukang
3. Mandor
B. Bahan
1. Box Culvert 100x100
2. Lantai kerja fc’10 Mpa
3. Pengisi Bekas Galian Fc’10 Mpa
C. Peralatan
1. Temper
2. Flat bed truck
3. Crane
4. Excavator
5. Dump Truck
Skh2. 2 Gorong-gorong Beton Bertulang precast, ukuran dalam 80 x 80 cm fc 30 MPa
A. Tenaga
1. Pekerja
2. Tukang
3. Mandor
B. Bahan
1. Box Culvert 80x80
2. Lantai Kerja fc’10 Mpa
3. Pengisi Bekas Galian fc’ 10 Mpa
C. Peralatan
1. Temper
2. Flat bed truck
3. Crane
4. Excavator
5. Dump Truck
2.3.(23) Saluran Berbentuk U (beton precast U-Ditch 400 x 600 x 1000 mm
A. TENAGA
1. Pekerja
2. Tukang
3. Mandor
B. MATERIAL
1. U-ditch precast Uk. 400 x 600 x 1000 mm
2. Lantai Kerja Fc' 10 Mpa
3. Pengisi Bekas Galian fc’ 10 Mpa
C. PERALATAN
1. Excavator
2. Crane
Skh2.4.a Saluran Berbentuk U (beton precast U-Ditch 600 x 800 x 1200 mm
D. TENAGA
1. Pekerja
2. Tukang
3. Mandor
E. MATERIAL
1. U-ditch precast Uk. 600 x 800 x 1200 mm
2. Lantai Kerja Fc' 10 Mpa
3. Pengisi Bekas Galian fc’ 10 Mpa
URAIAN PEKERJAAN PEMELIHARAAN BERKALA JALAN PAKET 1. NGANGKRUK-BABADAN (1.0 Km)
F. PERALATAN
1. Exavator
2. Crane
2.3.(28) Saluran Berbentuk U (beton precast U-Ditch 800 x 800 x 1200 mm
G. TENAGA
1. Pekerja
2. Tukang
3. Mandor
H. MATERIAL
1. U-ditch precast Uk. 800 x 800 x 1200 mm
2. Lantai Kerja Fc' 10 Mpa
3. Pengisi Bekas Galian fc’ 10 Mpa
I. PERALATAN
1. Exavator
1. Crane
2.3.(25) Saluran berbentuk U Tipe DS 2 a (dengan tutup) (600 x 800 x 1200 mm)
A. TENAGA
1. Pekerja
2. Tukang
3. Mandor
B. MATERIAL
1. U-ditch precast Uk. 60x60 fc’30Mpa
2. Lantai Kerja Fc' 10 Mpa
3. Pengisi Bekas Galian fc’ 10 Mpa
4. Cover U-Ditch 600 - 125 / 600 mm, HD Lubang
C. PERALATAN
1. Excavator
2. Crane
DIVISI 3. PEKERJAAN TANAH DAN GEOSINTETIK
3.1.(1) Galian Biasa
A. TENAGA
1. Pekerja
2. Mandor
B. PERALATAN
1. Excavator
2. Dump truck
3. Alat bantu
3.1.(8) Galian Perkerasan Beraspal tanpa Cold Milling Machine
A. TENAGA
1. Pekerja
2. Mandor
B. PERALATAN
1. Jack Hammer
2. Compresor
3. Dump truck
3.1.(9) Galian Perkerasan berbutir
A. TENAGA
1. Pekerja
2. Mandor
B. PERALATAN
1. Excavator
2. Dump truck
3.1.(10). Galian Perkerasan Beton
A. TENAGA
1. Pekerja
2. Mandor
B. PERALATAN
1. Jack hammer
2. Compressor
3. Dump truck
4. Concrete Cutter
3.2.(2a) Timbunan Biasa dari sumber galian
A. TENAGA
1. Pekerja
2. Mandor
B. BAHAN
1. Bahan timbunan
C. PERALATAN
1. Excavator
2. Dump truck
3. Motor grader
4. Water tanker
5. Vibro roller
3.4.(2) Pemotongan Pohon Pilihan diameter 15 – 30 cm
A. TENAGA
1. Pekerja biasa
2. Mandor
URAIAN PEKERJAAN PEMELIHARAAN BERKALA JALAN PAKET 1. NGANGKRUK-BABADAN (1.0 Km)
B. PERALATAN
1. Track loader
2. Dump truck
3. Chainsaw
4. Alat bantu
3.4.(3) Pemotongan Pohon Pilihan diameter > 30 – 50 cm
A. TENAGA
1. Pekerja biasa
2. Mandor
B. PERALATAN
1. Track loader
2. Dump truck
3. Chainsaw
4. Alat bantu
3.4.(4) Pemotongan Pohon Pilihan diameter > 50 – 75 cm
A. TENAGA
1. Pekerja biasa
2. Mandor
B. PERALATAN
1. Track loader
2. Dump truck
3. Chainsaw
4. Alat bantu
DIVISI 4. PEKERJAAN PREVENTIF
DIVISI 5. PERKERASAN BERBUTIR DAN PERKERASAN BETON SEMEN
5.1.(1) Lapis Pondasi Agregat Kelas A
A. TENAGA
1. Pekerja
2. Mandor
B. BAHAN
1. Agregat A
C. PERALATAN
1. Wheel loader
2. Dump truck
3. Motor grader
4. Water Tanker
5.1.(2) Lapis Pondasi Agregat Kelas B
A. TENAGA
1. Pekerja
2. Mandor
B. BAHAN
1. Agregat A
C. PERALATAN
1. Wheel loader
2. Dump truck
3. Motor grader
4. Vibratory roller
DIVISI 6. PERKERASAN ASPAL
6.1 (1) Lapis Resap Pengikat - Aspal Cair/Emulsi
A. TENAGA
1. Pekerja
2. Mandor
B. BAHAN
1. Aspal emulsi CSS-1 atau SS-1
C. PERALATAN
1. Aspal Distributor
2. Compressor
6.1 (2a) Lapis Perekat - Aspal Cair/Emulsi
A. TENAGA
1. Pekerja
2. Mandor
B. BAHAN
1. Aspal
2. Kerosone
C. PERALATAN
1. Aspal distributor
2. Compressor
6.3(5a) Laston Lapis Aus (AC-WC)
A. TENAGA
1. Pekerja
2. Mandor
B. BAHAN
1. Lolos screen2 ukuran 5 – 10 & 10-15
2. Lolos screen2 ukuran 0 – 5
3. Semen
4. Aspal
URAIAN PEKERJAAN PEMELIHARAAN BERKALA JALAN PAKET 1. NGANGKRUK-BABADAN (1.0 Km)
C. PERALATAN
1. Wheel Loader
2. AMP
3. Genset
4. Dump Truck
5. Asp. Finisher
6. Tandem Roller
7. P. Tyre Roller
6.3(6a) Laston Lapis Antara (AC-BC)
A. TENAGA
1. Pekerja
2. Mandor
B. BAHAN
1. Agr Pch Mesin 5-10 & 10-20
2. Agr Pch Mesin 0 – 5
3. Semen
4. Aspal
C. PERALATAN
1. Wheel Loader
2. AMP
3. Genset
4. Dump Truck
5. Asphalt Finisher
6. Tandem Roller
7. P. Tyre Roller
6.3.(8) Bahan anti pengelupasan
A. BAHAN
1. Bahan anti pengelupasan
DIVISI 7. STRUKTUR
7.1 (5a) Beton struktur, fc’30 MPa
A. TENAGA
1. Pekerja
2. Tukang
3. Mandor
B. BAHAN
1. Semen
2. Pasir Beton
3. Agregat Kasar
4. Kayu Perancah
5. Paku
6. Air
7. Plastizier
C. PERALATAN
1. Concrete Mixing Plant
2. Truck Mixer
3. Concrete Vibrator
4. Water Tank Truck
7.1 (7a) Beton strukur, fc’20 MPa
A. TENAGA
1. Pekerja
2. Tukang
3. Mandor
B. BAHAN
1. Semen
2. Pasir Beton
3. Agregat Kasar
4. Kayu Perancah
5. Paku
6. Air
7. Plastizier
C. PERALATAN
1. Concrete Mixer
2. Concrete Vibrator
3. Water Tang Truck
7.1 (8) Beton , fc’15 Mpa
A. TENAGA
1. Pekerja
2. Tukang
3. Mandor
B. BAHAN
1. Semen
2. Pasir Beton
3. Agregat Kasar
4. Kayu Perancah
5. Paku
URAIAN PEKERJAAN PEMELIHARAAN BERKALA JALAN PAKET 1. NGANGKRUK-BABADAN (1.0 Km)
6. Air
7. Plastizier
C. PERALATAN
1. Concrete Mixer
2. Concrete Vibrator
3. Water Tang Truck
7.3 (3) Baja Tulangan Polos BjTP 420
A. TENAGA
1. Pekerja biasa
2. Tukang
3. Mandor
B. BAHAN
1. Baja Tulangan Polos BjTP 420
2. Kawat Beton
C. PERALATAN
1. Alat bantu
7.9.(1) Pasangan Batu
A. TENAGA
1. Pekerja biasa
2. Tukang
3. Mandor
B. BAHAN
1. Batu Kali
2. Semen (PC)
3. Pasir
C. PERALATAN
1. Conc. Mixer
2. Water Tanker
3. Alat Bantu
7.15.(1) Pembongkaran Pasangan Batu
A. TENAGA
1. Pekerja
2. Mandor
B. PERALATAN
1. Jack Hammer; 1 m2 / 5 menit
2. Wheel Loader 1,5 m3; 96 HP
3. Dump Truck 3-4 M3
4. Alat bantu
7.15.(2) Pembongkaran Beton
A. TENAGA
1. Pekerja
2. Mandor
B. PERALATAN
1. Jack Hammer; 1 m2 / 5 menit
2. Wheel Loader 1,5 m3; 96 HP
3. Dump Truck 3-4 M3
4. Alat bantu
Skh Leuning Gorong - gorong ( Finishing cat weathershield sekualitas dulux )
A. TENAGA
1. Pekerja Terampil
2. Kepala Tukang
3. Tukang Batu
4. Mandor
B. BAHAN
1. Pasangan Batu dengan mortar
2. Sponengan
3. Cat, dan material lainnya
4. Ornamen Kuncup Melati
Skh Papan Nama gorong - gorong 20 x 30cm
A. TENAGA
1. Pekerja biasa
2. Tukang
3. Mandor
B. BAHAN
1. Papan nama 20x30cm
DIVISI 8. REHABILITASI JEMBATAN
DIVISI 9. PEKERJAAN HARIAN & PEKERJAAN LAIN-LAIN
9.2.(1) Marka Jalan Termoplastik
A. TENAGA
1. Pekerja biasa
2. Tukang
3. Mandor
B. BAHAN
1. Cat Marka Thermoplastic
2. Glass Bead
URAIAN PEKERJAAN PEMELIHARAAN BERKALA JALAN PAKET 1. NGANGKRUK-BABADAN (1.0 Km)
C. PERALATAN
1. Dump Truck
2. Thermoplastic Road Marking Machine
3. Alat Bantu
9.2.(3a) Rambu Jalan Tunggal dengan Permukaan Pemantul Engineering Grade
A. TENAGA
1. Pekerja biasa
2. Tukang
3. Mandor
B. BAHAN
1. Pelat Rambu
2. Pipa Galvanis Dia. 5"
3. Beton Fc 20 Mpa
4. Sticker Engineering Grade
C. PERALATAN
1. Dump Truck
2. Alat Bantu
9.2(10a) Kerb Pracetak Jenis 1 (Peninggi/Mountable)
A. TENAGA
1. Pekerja biasa
2. Tukang
3. Mandor
B. BAHAN
1. Beton Fc' 25 MPa
2. Mortar
C. PERALATAN
1. Flat Bed Truck
2.
Skh Papan Nama Jalan
A. TENAGA
1. Pekerja biasa
2. Tukang
3. Mandor
B. BAHAN
1. Tiang besi Galvanis Ø 2”, tebal 2.5 mm
2. Tiang Besi Galvanis Ø 6”, tebal 4.2 mm
3. Plat alumunium, tebal 2.0 mm
4. Plat Sirip, T = 1 cm
5. Plat Plendes tebal 1 cm
6. Besi angkur Ø 1”
7. Besi Tulang Ø 8
8. Besi tulangan Ø 12
9. Beton Fc 20 Mpa
C. PERALATAN
1. Dump Truck
2. Alat Bantu
DIVISI 10. PEKERJAAN PEMELIHARAAN KINERJA| Authority | |||
|---|---|---|---|
| 24 March 2022 | Peningkatan Jalan Paket 7 Kemasan - Grogolan (Dak Tematik Pengembangan Food Estate Dan Sentra Produksi Pangan) | Kab. Sleman | Rp 7,476,195,000 |
| 12 August 2023 | Pembangunan Saluran Drainase Paket 1: Mlati, Sleman, Turi, Seyegan | Kab. Sleman | Rp 2,123,780,000 |
| 20 July 2022 | Pembangunan Saluran Drainase Paket 2: Seyegan, Sleman | Kab. Sleman | Rp 1,956,496,900 |
| 9 October 2022 | Pembangunan Jalan Desa Ksct Paket 8: Minggir, Moyudan | Kab. Sleman | Rp 1,269,642,500 |
| 11 May 2023 | Rehabilitasi Bendung Dan Saluran Di. Denokan, Kali Grojogan, Maguwoharjo, Depok | Kab. Sleman | Rp 500,000,000 |
| 31 July 2023 | Pemeliharaan Berkala Bangunan Pelengkap Jalan Paket 4 Plumbon-Mudal | Kab. Sleman | Rp 433,390,000 |
| 21 June 2019 | Pembangunan/Perbaikan Bp4 Wilayah VII | Pemerintah Daerah Kabupaten Sleman | Rp 350,000,000 |
| 10 May 2021 | Paket 2. Pemeliharaan Berkala Bangunan Pelengkap Jalan Perengkembang - Jitengan, Bendosari - Goser | Kab. Sleman | Rp 350,000,000 |