| Reason | |||
|---|---|---|---|
| 0012463469542000 | Rp 442,705,909 | - | |
| 0021045414542000 | Rp 439,693,474 | Surat Referensi Kerja dari pemberi pekerjaan tidak memenuhi persyaratan sesuai dengan hasil klarifikasi yang telah dilakukan, | |
| 0019539790542000 | Rp 435,062,324 | Peralatan dan Personel digunakan untuk paket pekerjaan Peningkatan Jembatan Tapan (5x5 m). | |
| 0024778813542000 | - | - | |
| 0027551035543000 | - | - | |
| 0014355606542000 | - | - | |
| 0956408579542000 | - | - | |
| 0959013764542000 | - | - | |
| 0020344339542000 | - | - | |
| 0014787238542000 | - | - | |
| 0316708924542000 | - | - | |
| 0017904046542000 | - | - | |
| 0210683793542000 | - | - | |
Putra Jaya | 03*5**2****44**0 | - | - |
PT Rajawali Jaya Konstruksi | 06*4**2****47**0 | - | - |
| 0661775163542000 | - | - | |
| 0937989887542000 | - | - | |
| 0012467213542000 | - | - | |
| 0314561267544000 | - | - | |
| 0721444446542000 | - | - | |
| 0814918942541000 | - | - | |
| 0022058028542000 | - | - | |
CV Wira Kencana | 02*0**7****25**0 | - | - |
| 0962609871542000 | - | - | |
| 0806153540542000 | - | - |
URAIAN PEKERJAAN
KEGIATAN:
PENYELENGGARAAN JALAN KABUPATEN / KOTA
SUB KEGIATAN:
PENGGANTIAN JEMBATAN
PEKERJAAN:
PENINGKATAN JEMBATAN GESIKAN (2,5 X 18 M)
APBD KABUPATEN SLEMAN
TAHUN ANGGARAN 2024
URAIAN PEKERJAAN
PENINGKATAN JEMBATAN GESIKAN (2,5 X 18 M)
TAHUN ANGGARAN 2024
DIVISI 1. UMUM
1.2 Mobilisasi
A. Peralatan
1. Compressor 4000-6500 L\M
2. Concrete Mixer 0.3-0.6 M3
3. Excavator 80-140 Hp
4. Dump Truck 4 Ton
5. Generator Set
6. Tandem Roller 6-8 T
7. Tire Roller 8-10 T
8. Concrete Vibrator
9. Water Pump 70-100 mm
10. Tamper
11. Jack Hammer
B. Kantor Lapangan dan Fasilitas
1. Kantor
2. Gudang, dan lain-lain
C. Demobilisasi
1 Penyiapan dokumen penerapan SMKK
SKh-1.1.22 (1a) Pembuatan dokumen RKK, RMPK, RKPPL, dan RMLLP
SKh-1.1.22 (1b) Pembuatan prosedur dan instruksi kerja
SKh-1.1.22 (1c) Penyusunan pelaporan penerapan SMKK
2 Sosialisasi, promosi dan pelatihan
SKh-1.1.22.(2b) Pengarahan Keselamatan Konstruksi (Safety Briefing)
3 Alat Pelindung Kerja dan Alat Pelindung Diri
3b APD
SKh-1.1.22.(3b1) Topi pelindung (Safety Helmet)
SKh-1.1.22.(3b6) Pelindung pernafasan dan mulut (masker, masker respirator)
SKh-1.1.22.(3b7) Sarung tangan (Safety Gloves)
SKh-1.1.22.(3b8) Sepatu keselamatan (Safety Shoes, rubber safety shoes and toe cap)
SKh-1.1.22.(3b11) Rompi keselamatan (Safety Vest)
5 Personel Keselamatan Konstruksi
SKh-1.1.22.(5c) Petugas Keselamatan Konstruksi, Petugas K3 Konstruksi
SKh-1.1.22.(5h) Petugas pengatur lalu lintas
6 Fasilitas sarana, prasarana, dan alat kesehatan
SKh-1.1.22.(6a) Peralatan P3K
Rambu dan Perlengkapan lalu lintas yang diperlukan atau
7
manajemen lalu lintas
SKh-1.1.22.(7a) Rambu petunjuk
SKh-1.1.22.(7b) Rambu larangan
SKh-1.1.22.(7c) Rambu peringatan
SKh-1.1.22.(7e) Rambu informasi
SKh-1.1.22.(7h) Kerucut lalu lintas (traffic cone)
SKh-1.1.22.(7i) Tongkat pengatur lalu lintas (Warning Lights Stick)
SKh-1.1.22.(7m) Lampu/alat penerangan sementara
Kegiatan dan peralatan terkait Pengendalian Risiko Keselamatan
9
Konstruksi
SKh-1.1.22.(9a4) Bendera K3
DIVISI 2. DRAINASE
2.3.(15-1) Box Culvert , ukuran dalam 200 cm x 200 cm mutu f'c 30 Mpa
DIVISI 3. PEKERJAAN TANAH DAN GEOSINTETIK
3.1.(1) Galian Biasa
A. TENAGA
1. Pekerja
2. Mandor
B. PERALATAN
1. Excavator
2. Dump truck
3. Alat bantu
3.1.(8) Galian Perkerasan Beraspal tanpa Cold Milling Machine
A. TENAGA
1. Pekerja
2. Mandor
B. PERALATAN
1. Concrete Cutter
2. Jack Hammer
3. Compresor
4. Dump Truck
3.1.(9) Galian Perkerasan berbutir
A. TENAGA
1. Pekerja
2. Mandor
B. PERALATAN
1. Excavator
2. Dump truck
3. Alat Bantu
3.1.(10) Galian Perkerasan Beton
A. TENAGA
1. Pekerja
2. Mandor
B. PERALATAN
1. Concrete Cutter
2. Jack Hammer
3. Compresor
4. Dump Truck
3.2.(1b) Timbunan Biasa dari hasil galian
A. TENAGA
1. Pekerja
2. Mandor
B. BAHAN
1. Bahan pilihan
C. PERALATAN
1. Wheel Loader
2. Dump Truck
3. Motor Grader
4. Sheepfoot Roller
5. Tandem Roller
6. Water tank truck
7. Alat Bantu
3.2.(2a) Timbunan Pilihan dari Sumber Galian
A. TENAGA
1. Pekerja
2. Mandor
B. BAHAN
1. Bahan pilihan
C. PERALATAN
1. Excavator
2. Dump truck
3. Motor Grader
4. Tandem
5. Water Tanker
6. Alat bantu
DIVISI 4. PEKERJAAN PREVENTIF
DIVISI 5. PERKERASAN BERBUTIR DAN PERKERASAN BETON SEMEN
5.1.(1) Lapis Pondasi Agregat Kelas A
A. TENAGA
1. Pekerja
2. Mandor
B. BAHAN
1. Agregat A
C. PERALATAN
1. Wheel loader
2. Dump truck
3. Motor grader
4. Vibratory roller
5. Alat Bantu
5.1.(2) Lapis Pondasi Agregat Kelas B
A. TENAGA
1. Pekerja
2. Mandor
B. BAHAN
1. Agregat B
C. PERALATAN
1. Wheel loader
2. Dump truck
3. Motor grader
4. Vibratory roller
5. Alat Bantu
5.3.(3) Lapis Pondasi bawah Beton Kurus (Concrete Vibrator)
A. TENAGA
1. Pekerja
2. Mandor
B. BAHAN
1. Semen
2. Pasir
3. Agregat Kasar
4. Air
5. Plasticizer
6. Formwork Plate (LC)
C. PERALATAN
1. Wheel Loader
2. Concrete Batching Plant
3. Concrete Truck Mixer
4. Concrete Vibrator
5. Alat Bantu
DIVISI 6. PERKERASAN ASPAL
6.1 (1) Lapis Resap Pengikat - Aspal Cair/Emulsi
A. TENAGA
1. Pekerja
2. Mandor
B. BAHAN
1. Aspal emulsi CSS-1 atau SS-1
C. PERALATAN
1. Aspal distributor
2. Compressor
6.1 (2a) Lapis Perekat - Aspal Cair/Emulsi
A. TENAGA
1. Pekerja
2. Mandor
B. BAHAN
1. Aspal emulsi CRS-1 atau RS-1
C. PERALATAN
1. Aspal distributor
2. Compressor
3. Power broom
6.3(5a) Laston Lapis Aus (AC-WC)
A. TENAGA
1. Pekerja
2. Mandor
B. BAHAN
1. Agr Pch Mesin 5-10 & 10-15
2. Agr Pch Mesin 0-5
3. Semen
4. Aspal
C. PERALATAN
1. Wheel Loader
2. AMP
3. Genset
4. Dump Truck
5. Asp. Finisher
6. Tandem Roller
7. Pneumatic Tyre Roller
6.3(6a) Laston Lapis Antara (AC-BC)
A. TENAGA
1. Pekerja
2. Mandor
B. BAHAN
1. Agr Pch Mesin 5-10 & 10-20
2. Agr Pch Mesin 0-5
3. Semen
4. Aspal
C. PERALATAN
1. Wheel Loader
2. AMP
3. Genset
4. Dump Truck
5. Asphalt Finisher
6. Tandem Roller
7. Pneumatic Tyre Roller
6.3.(8) Bahan anti pengelupasan
A. BAHAN
1. Bahan anti pengelupasan
DIVISI 7. STRUKTUR
7.1 (5a) Beton struktur fc’ 30 Mpa
A. TENAGA
1. Pekerja
2. Tukang
3. Mandor
B. BAHAN
1. Semen
2. Agregat Halus Beton
3. Agregat Kasar
4. Kayu Perancah
5. Paku
6. Air
7. Super Plastizier
C. PERALATAN
1. Wheel Loader
2. Concrete Batching Plant
3. Truck Mixer
4. Concrete Pump
5. Concrete Vibrator
6. Water Tank Truck
7.1 (8) Beton , fc’15 Mpa
A. TENAGA
1. Pekerja
2. Tukang
3. Mandor
B. BAHAN
1. Semen
2. Agregat Halus Beton
3. Agregat Kasar
4. Air
5. Super Plastizier
C. PERALATAN
1. Concrete Batching Plant
2. Truck Mixer
3. Concrete Vibrator
4. Water Tank Truck
5. Alat Bantu
7.1 (9) Beton struktur fc’15 Mpa
A. TENAGA
1. Pekerja
2. Tukang
3. Mandor
B. BAHAN
1. Semen
2. Agregat Halus Beton
3. Agregat Kasar
4. Kayu Perancah
5. Paku
6. Air
7. Super Plastizier
C. PERALATAN
1. Wheel Loader
2. Concrete Batching Plant
3. Truck Mixer
4. Concrete Mixer
5. Water Tank Truck
6. Concrete Vibrator
7. Alat Bantu
7.3 (2) Baja Tulangan Sirip BjTS 280
A. TENAGA
1. Pekerja
2. Tukang
3. Mandor
B. BAHAN
1. Baja Tulangan Sirip BjTS 280
2. Kawat Beton
C. PERALATAN
1. Alat bantu
7.9.(1) Pasangan Batu
A. TENAGA
1. Pekerja
2. Tukang
3. Mandor
B. BAHAN
1. Batu Kali
2. Semen (PC)
3. Pasir
C. PERALATAN
1. Concrete Mixer
2. Water Tanker
3. Excavator
4. Dump Truck
5. Alat Bantu
7.14.(1) Papan Nama Jembatan
A. TENAGA
1. Pekerja
2. Tukang
3. Mandor
B. BAHAN
1. Marmer
2. Adukan Semen
C. PERALATAN
1. Alat Bantu
7.15.(1) Pembongkaran Pasangan Batu
A. TENAGA
1. Pekerja
2. Mandor
B. PERALATAN
1. Jack Hammer; 1 m2 / 5 menit
2. Wheel Loader 1,5 m3; 96 HP
3. Dump Truck 3-4 M3
4. Alat bantu
7.15.(1) Pembongkaran Pasangan Batu
A. TENAGA
1. Pekerja
2. Mandor
B. PERALATAN
1. Jack Hammer; 1 m2 / 5 menit
2. Wheel Loader 1,5 m3; 96 HP
3. Dump Truck 3-4 M3
4. Alat bantu
SKh-7.17.(1a) Leuning Jembatan (Finishing Cat)
A. BAHAN
1. Pasangan Batu dengan Mortar
2. Sponengan
3. Pengecatan Dinding Luar (Kualitas Dulux)
4. Ornamen Kuncup Melati
B. PERALATAN
1. Alat Bantu
DIVISI 8. REHABILITASI JEMBATAN
DIVISI 9. PEKERJAAN HARIAN & PEKERJAAN LAIN-LAIN
9.2.(1) Marka Jalan Termoplastik
A. TENAGA
1. Pekerja
2. Mandor
B. BAHAN
1. Cat Marka Thermoplastic
2. Glass Bead
C. PERALATAN
1. Dump Truck
2. Thermoplastic Road Marking Machine
3. Compressor
4. Alat Bantu
9.2.(5) Patok Pengarah
A. TENAGA
1. Pekerja
2. Tukang
3. Mandor
B. BAHAN
1. Beton fc 20 Mpa
2. Baja Tulangan
3. Cat
C. PERALATAN
1. Dump Truck
2. Alat Bantu| Authority | |||
|---|---|---|---|
| 25 February 2022 | Pemeliharaan Berkala Sungai Ws Pos (DIY) | Kementerian Pekerjaan Umum dan Perumahan Rakyat | Rp 8,000,000,000 |
| 24 March 2022 | Peningkatan Jalan Paket 6 Watuadeg - Plosorejo (Dak Tematik Dpp Dan Sikm) | Kab. Sleman | Rp 7,703,902,000 |
| 12 July 2021 | Belanja Modal Jembatan Pada Jalan Kabupaten Peningkatan Jembatan Rejondani : ( 22 X 8 M ) | Kab. Sleman | Rp 6,500,000,000 |
| 23 May 2023 | Peningkatan Jalan Paket 4 Nandan - Krikilan | Kab. Sleman | Rp 5,600,000,000 |
| 8 May 2019 | Rehab Di Gandok Tegal Umbulmartani Ngemplak | Pemerintah Daerah Kabupaten Sleman | Rp 2,750,000,000 |
| 9 October 2022 | Pembangunan Jalan Desa Ksct Paket 1: Gamping, Godean | Kab. Sleman | Rp 2,505,676,800 |
| 17 June 2019 | Peningkatan Jembatan Kenayan II (8 X 8M) | Pemerintah Daerah Kabupaten Sleman | Rp 2,350,070,000 |
| 5 February 2021 | Pemeliharaan Berkala Sabo Dam Ws Pos | Kementerian Pekerjaan Umum dan Perumahan Rakyat | Rp 2,000,000,000 |
| 19 July 2022 | Pembangunan Saluran Drainase Paket 4: Cangkringan | Kab. Sleman | Rp 1,928,770,000 |
| 4 December 2019 | Paket 7. Jl. Turgo ( 0.4 Km) | Kab. Sleman | Rp 1,430,000,000 |