| Reason | ||||
|---|---|---|---|---|
| 0751935354805000 | Rp 147,300,000 | 70.2 | - | |
CV Tata Indokarya | 0026367995814000 | - | - | - |
| 0032170243805000 | Rp 154,555,000 | 58.68 | Tidak lulus ambang batas (passing grade =70) | |
| 0026367037814000 | Rp 164,285,000 | 68.93 | Tidak lulus ambang batas (passing grade =70) | |
Exindo Consultant | 0030267876805000 | Rp 150,000,000 | 60.66 | Tidak lulus ambang batas (passing grade =70) |
CV Primavera Konsultan | 0020145652814000 | Rp 164,890,000 | 58.86 | Tidak lulus ambang batas (passing grade =70) |
| 0026179747726000 | - | - | - | |
| 0030916290822000 | - | - | - | |
| 0732042387813000 | - | - | - | |
| 0750122632803000 | - | - | - | |
Yasa Inti Consultant | 0019715606805000 | - | - | - |
| 0017912056813000 | - | - | - | |
| 0726278997814000 | - | - | - | |
| 0028562346814000 | - | - | - | |
| 0759270309813000 | - | - | - | |
PT Intra Persada Konsultan | 0028097103803000 | - | - | - |
| 0032651275814000 | - | - | - | |
CV Saboyang | 03*7**0****14**0 | - | - | - |
CV R' Lima Konsultan | 0756392783814000 | - | - | - |
CV Andifa Karya Desain | 0817873599805000 | - | - | - |
CV Putra Timur Consultant | 0801485111804000 | - | - | - |
| 0747284404814000 | - | - | - |
| Authority | |||
|---|---|---|---|
| 9 April 2018 | Perencanaan Pembangunan Gedung Perawatan | Kab. Takalar | Rp 360,000,000 |
| 22 May 2016 | Perencanaan Revitalisasi Pasar Rakyat Pontanakayyang | Pemerintah Kabupaten Mamuju | Rp 310,500,000 |
| 22 June 2021 | Jasa Konsultan Pengawas Kegiatan Kontruktual Penunjang Smp | Kab. Sidenreng Rappang | Rp 287,008,110 |
| 26 April 2017 | Perencanaan Teknis Kegiatan Break Water Pesisir | Pemerintah Daerah Kabupaten Takalar | Rp 276,000,000 |
| 17 August 2016 | Perencanaan Turap/Talud/Bronjong | Kab. Halmahera Tengah | Rp 185,000,000 |
| 20 June 2016 | Perencanaan Pembangunan Instalasi Farmasi Kabupaten (Gudang Obat) (Dak). | Pemerintah Kabupaten Mamuju | Rp 160,000,000 |