| Reason | |||
|---|---|---|---|
| 0961026473926000 | Rp 553,454,603 | - | |
| 0020904876926000 | Rp 555,555,000 | - | |
| 0027433036922000 | Rp 559,995,224 | Dok. RKK tdk sesuai dengan KAK dan MDP | |
| 0742605587926000 | Rp 560,055,461 | Evaluasi dilakukan pada tiga penawaran terendah | |
| 0014148241926000 | - | - | |
| 0029586229926000 | - | - | |
| 0021639919926000 | - | - | |
| 0024014631926000 | - | - | |
| 0749358891926000 | - | - | |
| 0659092191517000 | - | - | |
CV Kuda Mas | 0021637780926000 | - | - |
| 0029586526926000 | - | - | |
| 0316937234922000 | - | - | |
| 0721744340926000 | - | - | |
| 0029588381926000 | - | - | |
| 0029585346926000 | - | - | |
Mori Mawo | 09*6**5****26**0 | - | - |
| 0014154447926000 | - | - | |
| 0020691978922000 | - | - | |
| 0905827192926000 | - | - | |
| 0016460800926000 | - | - | |
| 0021640115926000 | - | - |
RENCANA ANGGARAN BIAYA
K/L/PD : PEMERINTAH DAERAH KABUPATEN SUMBA BARAT
SATUAN KERJA : DINAS PENDIDIKAN, KEPEMUDAAN DAN OLAHRAGA
JENIS PEKERJAAN : PEKERJAAN KONSTRUKSI
PROGRAM : PENGELOLAAN PENDIDIKAN
KEGIATAN : PENGELOLAAN PENDIDIKAN SEKOLAH MENENGAH PERTAMA
PEKERJAAN : PEMB. GEDUNG LAB. KOMPUTER BESERTA PERABOTNYA SMP NEGERI 3 TANA RIGHU (DAK)
NAMA SEKOLAH : SMPN 3 TANA RIGHU
LOKASI : KEC. TANA RIGHU
TAHUN ANGGARAN : 2023
PAGU DANA : Rp. 561.888.000
HPS : Rp. 561.888.000
SUMBER DANA : DANA ALOKASI KHUSUS (DAK)
KODE RUP : 39807071
KODE M. A. K : 1.01.02.2.02.06.5.2.03.01.01.0005.
No Uraian Sat Qty
A PEKERJAAN PERSIAPAN
1 Keselamatan dan Kesehatan Kerja (K3) Ls 1,00
2 Pengadaan Air Kerja Ls 1,00
3 Uitzet dan Bouwplank Ls 1 ,00
4 Dokumentasi & Pelaporan + Ass Build Drawing Ls 1,00
5 Prasasti Sumber Bantuan Ls 1,00
6 Papan Nama Proyek Ls 1,00
B PEKERJAAN UTAMA
B.1 PEKERJAAN GALIAN DAN URUGAN
1 Pekerjaan galian pondasi menerus M3 3 1,50
2 Pekerjaan urugan pasir di bawah pondasi menerus M3 3 ,97
3 Pekerjaan urugan pasir di bawah lantai M3 10,97
4 Pekerjaan aanstamping batu karang pondasi menerus M3 11,34
5 Pekerjaan urugan Sirtu peninggian lantai M3 5 7,11
B.2 PEKERJAAN PASANGAN PONDASI & DINDING
1 Pasangan Pondasi batu karang camp.1Pc : 5 Psr M3 37,80
2 Pasangan dinding batu potong camp.1Pc : 5 Psr M2 1 55,56
3 Plesteran dinding camp.1Pc : 5 Psr M2 3 11,13
4 Acian dinding M2 311,13
B.3 PEKERJAAN BETON STRUKTUR
1 Pekerjaan Beton Sloof Struktur 15/20
a Beton Site Mix K.225 M3 1,84
b Tul Pokok Kg 223,28
c Tul Sengkang Kg 57,82
d Begesting Sloof 2x Pakai M2 12,27
2 Pekerjaan Beton Kolom 15/20
a Beton Site Mix K.225 M3 1,26
b Tul Pokok Kg 159,84
c Tul Sengkang Kg 41,43
d Begesting Kolom 2x Pakai M2 15,75
3 Pekerjaan Beton Kolom Praktis 15/15
a Beton Site Mix K.175 M3 0,59
b Tul Pokok Kg 107,98
c Tul Sengkang Kg 23,51
d Begesting Kolom 2x Pakai M2 4,56
No Uraian Sat Qty
4 Pekerjaan Beton Kolom Praktis 20/20
a Beton Site Mix K.225 M3 0,61
b Tul Pokok Kg 59,14
c Tul Sengkang Kg 17,90
d Begesting Kolom 2x Pakai M2 6,66
5 Pekerjaan Ring Balk 15/20
a Beton Site Mix K.225 M3 1,84
b Tul Pokok Kg 217,95
c Tul Sengkang Kg 56,44
d Begesting Ringbalk 3x Pakai M2 8 ,18
6 Pekerjaan Balok Latei
a Beton Site Mix K.225 M3 0,39
b Tul Pokok Kg 42,61
c Tul Sengkang Kg 7 ,59
d Begesting Ringbalk M2 3,24
7 Pekerjaan Gewel 15/20
a Beton Site Mix K.225 M3 0,77
b Tul Pokok Kg 91,54
c Tul Sengkang Kg 23,78
d Begesting Gewel 3x Pakai M2 3,44
B.4 PEKERJAAN PINTU, JENDELA & KACA
1 Pek. Kusen Pintu, Panil Kayu Lapis HPL 2 Daun Unit 1 ,00
2 Pek. Kusen Pintu, Panil Kayu Lapis HPL 1 Daun Unit 1 ,00
3 Pek. Jendelah Aluminium 3 Daun Unit 7,00
4 Pek. Kusen Ventilasi 6/12 Kayu M3 0 ,21
5 Pek. Pasang Teralis Jendela + Finishing ( Lihat Gbr kerja) Bh 7,00
6 Pek. Pasang Pintu Trali Ls 1,00
B.5 PEKERJAAN LANTAI
1 Pek. Beton Rabat lantai 1 Pc : 3 Psr : 5Krl M3 10,97
2 Pek. Granit Polish ukuran (60 x 60) cm M2 9 2,00
3 Pek. Granit Unpolish ukuran (60 x 60) cm M2 21,69
B.6 PEKERJAAN ATAP
1 1 M2 Pek. Rangka Atap Baja Ringan M2 1 93,16
2 Pek. Atap Spandek Warna 0,35 M2 1 93,16
3 Pek. Bubungan Atap Spandek Warna 0.35 M 14,13
4 Pek. Lisplank GRC/Kalsiplank 8 x 300 mm M 41,93
B.7 PEKERJAAN PLAFOND
1 Pek. Rangka Plafond Hollow Aluminium M2 1 44,93
2 Pek. Penutup Plafond PVC 8mm uk 6X0,2m M2 1 44,93
3 Pek. List Plafond PVC M1 125,56
B.8 PEKERJAAN INSTALASI LISTRIK
1 Pek. Stop Kontak + Instalasi Listrik Bh 4,00
2 Pek. Saklar Tunggal + Instalasi Listrik Bh 2 ,00
3 Pek. Saklar Ganda + Instalasi Listrik Bh 2 ,00
4 Pek. Lampu LED 18 Watt + Instalasi Listrik Bh 10,00
5 Pek. Lampu LED 200 Watt + Instalasi Listrik Philips Bh 1 ,00
6 Pasang AC 1/2 PK (Lengkap assesories) Bh 4,00
7 Pek Sekring MCB 6kA Bh 1 ,00
B.9 PEKERJAAN PENGECETAN
1 Pek. Cat Tembok, Cat plafond + Plamir M2 3 11,13
2 Pek. Cat Kayu ( Wood Plank ) M2 32,58
3 Pek. Menie Kayu M2 32,58
No Uraian Sat Qty
B.10 PEKERJAAN SALURAN DRAINASE
1 Pek Saluran Keliling M 51,00
C PENGADAAN MEUBELER
1 Meja Komputer lapis HPL BH 35,00
2 Meja Kerja Lapis HPL 1/2 Biro BH 2,00
3 Kursi Siswa BH 35,00
4 Kursi Kerja BH 2 ,00
5 Kursi Kerja /Sekretaris + Roda BH 2,00
6 Rak Tas Finis HPL BH 2,00
7 Lemari buku Finish HPL BH 2,00
8 Papan Tulis gantung BH 1,00
9 Kontak sampah BH 2,00
TOTAL PEKERJAAN| Authority | |||
|---|---|---|---|