| Reason | |||
|---|---|---|---|
| 0532012002926000 | Rp 570,000,000 | - | |
| 0662756386926000 | Rp 553,886,000 | Dokumen RKK Tidak Sesuai dgn KAK dan MDP | |
| 0016460800926000 | Rp 562,300,000 | Dokumen RKK Tidak Sesuai dgn KAK dan BOQ | |
| 0019981836922000 | Rp 573,814,890 | evaluasi dilakukan pada tiga penawaran terendah | |
CV Nyuka Bhedo | 0019965128926000 | - | - |
| 0749358891926000 | - | - | |
CV Tiga Saudagar | 05*6**6****22**0 | - | - |
| 0018123778517000 | - | - | |
| 0659092191517000 | - | - | |
CV Kuda Mas | 0021637780926000 | - | - |
| 0316937234922000 | - | - | |
| 0029588381926000 | - | - | |
| 0012375606926000 | - | - | |
| 0742605587926000 | - | - | |
| 0024014631926000 | - | - | |
| 0729566521926000 | - | - | |
| 0014154447926000 | - | - | |
| 0029588852926000 | - | - | |
| 0905827192926000 | - | - | |
| 0928978691926000 | - | - | |
| 0029586526926000 | - | - | |
| 0014148241926000 | - | - |
URAIAN SINGKAT PEKERJAAN
K/L/PD : PEMERINTAH DAERAH KABUPATEN SUMBA BARAT
SATUAN KERJA : DINAS PENDIDIKAN, KEPEMUDAAN DAN OLAHRAGA
JENIS PEKERJAAN : PEKERJAAN KONSTRUKSI
PROGRAM : PENGELOLAAN PENDIDIKAN
KEGIATAN : PENGELOLAAN PENDIDIKAN SEKOLAH DASAR
PEKERJAAN : Rehabilitasi Sedang/Berat Ruang Kelas SDM BARABEDANG
NAMA SEKOLAH : SDM BARABEDANG
LOKASI : Kec. Wanukaka
TAHUN ANGGARAN : 2023
PAGU DANA : Rp. 580.000.000,00
HPS : Rp. 579.999.578,00
SUMBER DANA : DANA ALOKASI KHUSUS (DAK)
KODE RUP : 42987474
KODE M. A. K : 1.01.02.2.01.08.5.2.03.01.01.0010.
No Uraian Volume Sat
A PEKERJAAN PERSIAPAN
1 Keselamatan dan Kesehatan Kerja (K3) 1 ,00 Ls
2 Pembongkaran Bangunan/Gedung 1 ,00 Ls
3 Pengadaan Air Kerja 1 ,00 Ls
4 Uitzet dan Bouwplank 1 ,00 lS
5 Dokumentasi & Pelaporan + Ass Build Drawing 1 ,00 Ls
6 Prasasti Sumber Bantuan 1 ,00 Ls
7 Papan Nama Proyek 1 ,00 Ls
B PEKERJAAN UTAMA
B.1 PEKERJAAN GALIAN DAN URUGAN
1 Pekerjaan galian pondasi menerus 1 0,98 M3
2 Pekerjaan urugan pasir di bawah pondasi menerus 0 ,92 M3
3 Pekerjaan urugan pasir di bawah lantai 1 3,50 M3
4 Pekerjaan aanstamping batu karang pondasi menerus 2 ,75 M3
5 Pekerjaan urugan Tanah Bekas Galian 2 ,75 M3
6 Pekerjaan urugan Sirtu peninggian lantai 6 ,30 M3
B.2 PEKERJAAN PASANGAN PONDASI & DINDING
1 Pasangan Pondasi batu karang camp.1Pc : 5 Psr 7 ,38 M3
2 Pasangan dinding batu potong camp.1Pc : 5 Psr 1 09,10 M2
3 Plesteran dinding camp.1Pc : 5 Psr 3 26,16 M2
4 Acian dinding 3 26,16 M2
B.3 PEKERJAAN BETON STRUKTUR
1 Pekerjaan Beton Sloof Struktur 15/20
a Beton Site Mix K.225 1 ,08 M3
b Tul Pokok 1 29,25 Kg
c Tul Sengkang 5 5,35 Kg
d Begesting Sloof 2x Pakai 7 ,20 M2
2 Pekerjaan Beton Kolom Struktur 20/20
a Beton Site Mix K.225 5 ,04 M3
b Tul Pokok 8 0,89 Kg
a Tul Sengkang 3 5,83 Kg
a Begesting Sloof 2x Pakai 1 6,80 M2
2 Pekerjaan Beton Kolom Praktis 15/15
a Beton Site Mix K.175 0 ,72 M3
b Tul Pokok 7 0,83 Kg
c Tul Sengkang 2 2,32 Kg
d Begesting Kolom 2x Pakai 1 ,34 M2
3 Pekerjaan Ring Balk 15/20
a Beton Site Mix K.225 5 ,71 M3
b Tul Pokok 6 79,19 Kg
c Tul Sengkang 2 90,87 Kg
d Begesting Ringbalk 3x Pakai 3 8,04 M2
4 Pekerjaan Gewel 15/20
a Beton Site Mix K.225 0 ,77 M3
b Tul Pokok 2 2,03 Kg
c Tul Sengkang 1 0,41 Kg
d Begesting Gewel 3x Pakai 3 ,40 M2
B.4 PEKERJAAN PINTU, JENDELA & KACA
1 Pek. Kusen Pintu, Jendela dan Ventilasi 6/12 Kayu Kelas II 1 ,28 M3
2 Pek. Daun Pintu Panil Papan Kayu + Rangka Papan Kayu Kelas II 9 ,45 M2
3 Pek. Daun Jendela Panil Kaca Polos 5 Mm + Rangka Papan Kayu Kelas II 1 0,45 M2
4 Pek. Pas. Kaca Mati ( Kaca Polos 5 Mm ) 1 ,85 M2
B.5 PEKERJAAN LANTAI
1 Pek. Beton Rabat lantai 1 Pc : 3 Psr : 5Krl 2 ,56 M3
2 Pek. Keramik lantai slip 40 X 40 1 36,00 M2
3 Pek. Keramik lantai teras 40 X 40 Anti Slip 7 2,00 M2
B.6 PEKERJAAN ATAP
1 1 M2 Pek. Rangka Atap Baja Ringan 3 55,60 M2
2 Pek. Atap Spandek Warna 0,35 3 55,60 M2
3 Pek. Bubungan Atap Spandek Warna 0.35 2 2,00 M
4 Pek. Lisplank GRC/Kalsiplank 8 x 300 mm 4 45,85 M
B.7 PEKERJAAN PLAFOND
1 Pek. Rangka Plafond Hollow Aluminium 3 55,60 M2
2 Pek. Penutup Plafond PVC 8mm uk 6X0,2m 3 55,60 M2
3 Pek. List Plafond PVC 2 40,40 M1
B.8 PEKERJAAN PENGUNCI & PENGGANTUNG
1 Pek. Pas. Kunci Tanam Double Slaag 3 ,00 Bh
2 Pek. Pas. Engsel Pintu (3 Bh/Daun) 3 ,00 Bh
3 Pek. Pasang Engsel Jendela (2 Bh/Daun) 1 2,00 Bh
4 Pek. Pasangan Grendel Jendela (1 Bh/Daun) 6 ,00 Bh
5 Pek. Pasangan Grendel Pintu (1 Bh/Unit) 1 ,00 Bh
6 Pek. Kait Angin (2 Bh/Daun) 1 2,00 Bh
B.9 PEKERJAAN INSTALASI LISTRIK
1 Pek. Stop Kontak + Instalasi Listrik 3 ,00 Bh
2 Pek. Saklar Ganda + Instalasi Listrik 3 ,00 Bh
3 Pek. Pasang Saklar tunggal + Instalasi 3 ,00 Bh
4 Pek. Lampu LED 18 Watt + Instalasi Listrik 2 1,00 Bh
5 Pek Sekring MCB 6kA 1 ,00 Bh
B.10 PEKERJAAN PENGECETAN
1 Pek. Cat Tembok, Cat plafond + Plamir 7 34,88 M2
2 Pek. Cat Kayu (Kusen Pintu Jendela, Daun Pintu Jendela, Wood Plank ) 1 70,56 M2
3 Pek. Menie Kayu (Kusen Pintu Jendela) 1 70,56 M2
C PENGADAAN MEUBELER
1 Meja Siswa Lapis HPL 10,00 Bh
2 Kursi Siswa Lapis HPL 10,00 Bh