| Reason | |||
|---|---|---|---|
| 0016460800926000 | Rp 837,200,000 | - | |
| 0021639919926000 | Rp 828,534,451 | Tidak ada Bukti kepemilikan peralatan | |
| 0024014631926000 | - | - | |
| 0018080408926000 | - | - | |
| 0029586229926000 | - | - | |
| 0029586526926000 | - | - | |
| 0014148241926000 | - | - | |
| 0946929866922000 | - | - | |
| 0021637178926000 | - | - | |
| 0021640115926000 | - | - | |
| 0437377492617000 | - | - | |
CV Tiga Saudagar | 05*6**6****22**0 | - | - |
| 0536504103922000 | - | - | |
| 0027432459922000 | - | - | |
| 0018123778517000 | - | - | |
| 0027433036922000 | - | - | |
CV Kuda Mas | 0021637780926000 | - | - |
| 0012375606926000 | - | - | |
| 0316937234922000 | - | - | |
| 0029588381926000 | - | - | |
| 0721744340926000 | - | - | |
| 0019981836922000 | - | - | |
| 0626737878925000 | - | - | |
| 0017201617922000 | - | - | |
| 0014154447926000 | - | - | |
| 0720652155922000 | - | - | |
| 0905827192926000 | - | - |
URAIAN SINGKAT PEKERJAAN
K/L/PD : PEMERINTAH DAERAH KABUPATEN SUMBA BARAT
SATUAN KERJA : DINAS PENDIDIKAN, KEPEMUDAAN DAN OLAHRAGA
JENIS PEKERJAAN : PEKERJAAN KONSTRUKSI
PROGRAM : PENGELOLAAN PENDIDIKAN
KEGIATAN : PENGELOLAAN PENDIDIKAN SEKOLAH DASAR
PEKERJAAN : Pembangunan Pagar SD Inpres SOBA RADE
NAMA SEKOLAH : SDN. SOBARADE
LOKASI : Kec. Loli
TAHUN ANGGARAN : 2023
PAGU DANA : Rp. 850.000.000,00
HPS : Rp. 850.000.000,00
SUMBER DANA : DANA ALOKASI UMUM (DAU)
KODE RUP : 40054647
KODE M. A. K : 1.01.02.2.01.06.5.2.03.04.01.0004.
No Uraian Volume Sat
A PEKERJAAN PERSIAPAN
1 Keselamatan dan Kesehatan Kerja (K3) 1 ,00 Ls
2 Pengadaan Air Kerja 1 ,00 Ls
3 Uitzet dan Bouwplank 1 ,00 Ls
4 Dokumentasi & Pelaporan + Ass Build Drawing 1 ,00 Ls
5 Papan Nama Proyek 1 ,00 Ls
B PEKERJAAN UTAMA
B.1 PEKERJAAN GALIAN DAN URUGAN
1 Pekerjaan galian pondasi menerus 2 08,71 M3
2 Pekerjaan galian pondasi footplat 4 ,58 M3
3 Pekerjaan urugan pasir di bawah pondasi menerus 2 3,94 M3
4 Pekerjaan urugan pasir di bawah pondasi footplat 0 ,16 M3
5 Pekerjaan aanstamping batu karang pondasi menerus 7 1,81 M3
6 Pekerjaan urugan Sirtu 3 ,15 M3
B.2 PEKERJAAN PASANGAN PONDASI & DINDING
1 Pasangan Pondasi batu karang camp.1Pc : 5 Psr 2 41,90 M3
2 Pasangan dinding batu potong camp.1Pc : 5 Psr 4 72,88 M2
3 Plesteran dinding camp.1Pc : 5 Psr 6 50,60 M2
4 Acian dinding 3 55,44 M2
B.3 PEKERJAAN BETON STRUKTUR
1 Pekerjaan Rabat Lantai
a Beton Site Mix K.175 0 ,16 M3
2 Pekerjaan Beton Footplat
a Beton Site Mix K.225 0 ,51 M3
b Tul Pokok 5 3,98 Kg
c Begesting Footplat 2x Pakai 1 ,44 M2
3 Pekerjaan Beton Pedestail 40/40
a Beton Site Mix K.225 1 ,66 M3
b Tul Pokok 4 2,90 Kg
c Tul Sengkang 4 4,49 Kg
d Begesting Pedestail 2x Pakai 8 ,32 M2
4 Pekerjaan Beton Sloof Struktur 15/20
a Beton Site Mix K.225 1 7,52 M3
b Tul Pokok 2 .047,00 Kg
c Tul Sengkang 9 32,19 Kg
d Begesting Sloof 2x Pakai 1 16,81 M2
5 Pekerjaan Beton Kolom 40/40
a Beton Site Mix K.225 1 ,41 M3
b Tul Pokok 3 2,67 Kg
c Tul Sengkang 3 3,88 Kg
d Begesting Kolom 2x Pakai 7 ,04 M2
6 Pekerjaan Beton Kolom 15/25
a Beton Site Mix K.225 1 1,16 M3
b Tul Pokok 1 .751,37 Kg
c Tul Sengkang 4 79,78 Kg
d Begesting Kolom 2x Pakai 1 04,16 M2
7 Pekerjaan Ring Balk 15/15
a Beton Site Mix K.225 4 ,90 M3
b Tul Pokok 6 97,89 Kg
c Tul Sengkang 2 87,48 Kg
d Begesting Ringbalk 3x Pakai 2 1,76 M2
8 Pekerjaan Ring Balk 15/20
a Beton Site Mix K.225 1 1,07 M3
b Tul Pokok 1 .337,85 Kg
c Tul Sengkang 1 01,90 Kg
d Begesting Ringbalk 3x Pakai 4 9,19 M2
B.4 PEKERJAAN PIPA GAPURA
1 Pek. Pipa Stainless 2 ,00 Unit
B.5 PEKERJAAN RELLING PAGAR DAN BATU ALAM
1 Pek. Pintu Pagar 2 5,92 m2
2 Pek. Relling Pagar 4 1,02 m2
3 Pek. Batu Alam 1 2,80 m2
B.6 PEKERJAAN PENGECETAN
1 Pek. Cat Tembok, Cat plafond + Plamir 3 55,44 M2