| Authority | |||
|---|---|---|---|
| 22 August 2025 | Peningkatan Sab Kotakawaw Sp.5 | Kementerian Transmigrasi | Rp 2,000,000,000 |
| 4 September 2025 | Pembangunan Sab Non Standar | Kementerian Transmigrasi | Rp 700,000,000 |
| 22 February 2023 | Perluasan Spam Jaringan Perpipaan Translok Weetana | Kab. Sumba Barat | Rp 500,000,000 |
| 17 March 2023 | Peningkatan Spam Jaringan Perpipaan Mata Air Menuju Tpa Weedabbo | Kab. Sumba Barat | Rp 400,000,000 |
| 26 July 2016 | Pembangunan Track Joging/ Tangga Turun/Pelataran Parkir/Papan Loncat | Kab. Sumba Barat Daya | Rp 350,823,000 |
| 20 September 2018 | Pengadaan Sumur Bor Dan Instalasi Jaringan Perpipaan Di Rs Pratama Nggongi Plus Tenaga Surya | Kab. Sumba Timur | Rp 250,000,000 |
| 2 July 2018 | Pengadaan Sumur Bor Dan Instalasi Jaringan Perpipaan Di Puskesmas Lewa Plus Pompa Dan Tenaga Surya (Dak Affirmasi) (Revisi Perbup I 2018) | Kab. Sumba Timur | Rp 250,000,000 |
| 26 April 2017 | Belanja Modal Peralatan Dan Mesin - Pengadaan Alat Angkut Apung Bermotor | Kab. Sumba Timur | Rp 244,100,000 |