| Reason | |||
|---|---|---|---|
| 0601270531609000 | Rp 1,475,745,403 | - | |
| 0812934321602000 | Rp 1,484,003,735 | - | |
| 0028405439609000 | Rp 1,493,642,729 | - | |
| 0025127416624000 | Rp 1,780,421,696 | - | |
| 0702871070626000 | Rp 1,531,382,400 | - | |
| 0967455049611000 | Rp 1,516,061,702 | - | |
| 0603923152609000 | Rp 1,603,148,250 | - | |
| 0949243869615000 | Rp 1,526,866,400 | - | |
| 0025997636608000 | - | - | |
| 0815761911629000 | Rp 1,523,356,151 | - | |
| 0938692407624000 | Rp 1,526,866,400 | - | |
| 0027774108619000 | Rp 1,518,369,227 | - | |
| 0020251609608000 | Rp 1,526,866,400 | - | |
| 0931277990626000 | Rp 1,531,377,350 | - | |
| 0840322895618000 | Rp 1,812,384,844 | - | |
CV Mitra Jaya Kreatindo | 08*0**0****09**0 | Rp 1,526,861,188 | - |
| 0316370147608000 | Rp 1,531,382,400 | - | |
CV Sekawan Abdi Karya | 06*4**3****42**0 | - | - |
| 0316393156721000 | - | - | |
CV Uli Citra Mandiri | 00*7**9****08**0 | - | - |
| 0019491422013000 | Rp 1,526,866,400 | - | |
| 0849665294626000 | Rp 1,531,382,400 | - | |
| 0032287930626000 | Rp 1,531,382,400 | - | |
| 0028405991609000 | Rp 1,875,628,551 | - | |
| 0848973350605000 | Rp 1,523,403,346 | - | |
| 0961923158629000 | - | - | |
| 0956658652644000 | Rp 1,515,000,000 | - | |
| 0761421643606000 | Rp 1,525,866,400 | - | |
| 0419157375614000 | Rp 1,526,866,400 | - | |
| 0947262192606000 | Rp 1,511,746,134 | - | |
| 0632225629623000 | Rp 1,526,866,400 | - | |
| 0657042362644000 | Rp 1,530,492,727 | - | |
| 0810391540604000 | Rp 1,502,592,647 | - | |
CV Jaya Mahe Steel | 00*1**7****43**0 | Rp 1,531,382,400 | - |
| 0709309579645000 | Rp 1,526,866,400 | - | |
CV Sukses Makmur Santosa | 04*1**8****02**0 | Rp 1,526,866,400 | - |
| 0016813214609000 | Rp 1,506,542,020 | - | |
| 0851463687609000 | Rp 1,489,959,996 | Identifikasi bahaya pada tabel IBPRP tidak sesuai dengan yang disyaratkan pada Dokumen Pemilihan | |
| 0903139236644000 | Rp 1,515,515,515 | - | |
| 0024579955604000 | Rp 1,497,923,526 | - | |
| 0021668454608000 | Rp 1,550,245,939 | - | |
| 0846482420609000 | Rp 1,674,003,278 | - | |
Thufalindo Jaya | 03*4**1****29**0 | - | - |
| 0759227580617000 | Rp 1,526,866,400 | - | |
PT Mas Karya Utama | 07*0**5****12**0 | Rp 1,526,866,400 | - |
| 0025773599645000 | Rp 1,531,403,400 | - | |
| 0318036225603000 | Rp 1,654,205,465 | - | |
| 0751056342616000 | Rp 1,531,382,400 | - | |
| 0015105927615000 | Rp 1,651,098,317 | - | |
| 0427117965655000 | Rp 1,521,072,903 | - | |
| 0704795970652000 | Rp 1,531,382,400 | - | |
Gede Bersama Konstruksi | 04*6**2****28**0 | Rp 1,622,295,550 | - |
CV Pranata Raya Mulya | 04*9**9****15**0 | - | - |
| 0020542676604000 | Rp 1,430,774,459 | Tidak hadir atau tidak memberikan tanggapan atas undangan klarifikasi dari Pokja Pemilihan | |
| 0841795511619000 | Rp 1,531,382,400 | - | |
| 0823385968615000 | Rp 1,526,866,400 | - | |
| 0029693363609000 | Rp 1,531,591,675 | - | |
CV Sumberpompapasuruan | 06*9**1****24**0 | Rp 1,527,088,519 | - |
| 0023134125624000 | Rp 1,526,866,440 | - | |
| 0317566321615000 | Rp 1,569,579,106 | - | |
| 0841446594618000 | Rp 1,536,828,010 | - | |
| 0857644827611000 | Rp 1,540,747,003 | - | |
PT Alfa Tata Griya | 04*4**1****55**0 | - | - |
| 0313746414542000 | Rp 1,529,304,144 | - | |
| 0016403800619000 | Rp 1,507,987,852 | - | |
| 0022683262627000 | - | - | |
| 0015352446608000 | - | - | |
CV Karya Mandiri | 00*9**2****09**0 | - | - |
| 0659507800626000 | - | - | |
| 0801522632624000 | - | - | |
CV Pilar Bangsa | 09*7**3****47**0 | - | - |
CV Mutiara Eka Perkasa | 0210208369617000 | - | - |
| 0864939012643000 | - | - | |
| 0836402438608000 | - | - | |
| 0714520889609000 | - | - | |
| 0752984542609000 | - | - | |
Aulia Rahma Santosa | 09*1**1****17**0 | - | - |
PT Delima Raya Merdeka | 00*2**2****31**0 | - | - |
| 0935041087626000 | - | - | |
CV Efendi Sukses Abadi | 06*7**8****03**0 | - | - |
| 0419653522627000 | - | - | |
CV Arfan.Barokah.Jaya | 09*0**1****45**0 | - | - |
| 0437377492617000 | - | - | |
| 0030087290617000 | - | - | |
Sapta Prima Utama | 04*0**1****12**0 | - | - |
| 0016825036615000 | - | - | |
Rexadaya Multi Cipta | 09*9**9****45**0 | - | - |
Firda Jaya Pattinama | 00*3**4****17**0 | - | - |
| 0023377658604000 | - | - | |
| 0531220812626000 | - | - | |
| 0025295874612000 | - | - | |
CV Abhizar Abadi | 08*7**6****19**0 | - | - |
Ananta Nusantara | 09*2**6****02**0 | - | - |
| 0637344508655000 | - | - | |
| 0015589948615000 | - | - | |
| 0919361915603000 | - | - | |
| 0016881484645000 | - | - | |
CV Pilar Pantura | 0312643679645000 | - | - |
| 0925265597648000 | - | - | |
| 0023974777602000 | - | - | |
CV Cahaya Nata Nusantara | 05*5**3****19**0 | - | - |
| 0509346573609000 | - | - | |
| 0033256058612000 | - | - | |
| 0860598804626000 | - | - | |
| 0621827088627000 | - | - | |
CV Achmad Bersaudara | 04*4**3****02**0 | - | - |
| 0800518631619000 | - | - | |
| 0032694143816000 | - | - | |
| 0012173688626000 | - | - | |
| 0028257632615000 | - | - | |
| 0012338489622000 | - | - | |
| 0316629930642000 | - | - | |
| 0713446490626000 | - | - | |
CV Imaka Indonesia | 0937076057643000 | - | - |
CV Rafifa Wiratama | 0028402816609000 | - | - |
Pawitra Surya Indonesia | 06*7**0****02**0 | - | - |
| 0753245943626000 | - | - | |
PT Satkus Makmur Sejahtera | 09*9**0****24**0 | - | - |
CV Karsa Muda Adhinata | 04*9**1****09**0 | - | - |
| 0955989421623000 | - | - | |
| 0931397236609000 | - | - | |
CV Nirankara Hanasta Ihatra | 09*4**4****08**0 | - | - |
| 0936282409655000 | - | - | |
CV Pola Cipta Prakarsa | 03*7**4****06**0 | - | - |
CV Muhana Manna | 00*5**6****42**0 | - | - |
| 0022301253612000 | - | - | |
Misi Persada Reborn | 09*8**1****26**0 | - | - |
| 0752701243604000 | - | - | |
| 0427470695624000 | - | - | |
PT Garuda Bagus Raya | 05*9**5****43**0 | - | - |
| 0663660975617000 | - | - | |
CV T Dua Utama | 09*3**1****08**0 | - | - |
| 0852909597908000 | - | - | |
| 0025147141609000 | - | - | |
| 0023339427912000 | - | - | |
PT Cahya Berkat Gemilang | 08*7**1****15**0 | - | - |
CV Jaya Konstruksi | 07*8**4****42**0 | - | - |
CV Wijaya Abadi Teknik | 05*4**2****26**0 | - | - |
| 0011228988626000 | - | - | |
| 0015463490617000 | - | - | |
| 0020801791657000 | - | - | |
CV Indoraya Surabaya | 08*1**2****04**0 | - | - |
| 0019757061615000 | - | - | |
CV Putri Inayah Sejahtera | 04*1**4****08**0 | - | - |
| 0404824948623000 | - | - | |
| 0809680192615000 | - | - | |
| 0742541345617000 | - | - | |
| 0018433219647000 | - | - | |
| 0317434405643000 | - | - | |
| 0715337994604000 | - | - | |
| 0015238975652000 | - | - | |
| 0956640304603000 | - | - | |
| 0410561153609000 | - | - | |
| 0022112361617000 | - | - | |
| 0025707605657000 | - | - | |
| 0314501883619000 | - | - | |
| 0027926112644000 | - | - | |
Focus Trading Contractor, CV | 07*7**3****04**0 | - | - |
| 0663345338657000 | - | - | |
| 0033216151644000 | - | - | |
| 0757412077624000 | - | - | |
| 0413300641402000 | - | - | |
| 0610241044602000 | - | - | |
| 0910962356624000 | - | - | |
| 0910397397602000 | - | - | |
PT Berdikari Teknologi Indonesia | 09*5**6****32**0 | - | - |
| 0211070495602000 | - | - | |
PT Epithu Logica Sembada | 09*5**4****15**0 | - | - |
PT Nicko Nusa Adiperkasa | 08*1**3****18**0 | - | - |
| 0313901340419000 | - | - | |
| 0031059603643000 | - | - | |
| 0029692555609000 | - | - | |
| 0749082434608000 | - | - | |
| 0311992887907000 | - | - | |
Insani Development | 08*9**6****26**0 | - | - |
| 0664656733602000 | - | - | |
Wikrama Mitra Sejahtera | 06*1**7****13**0 | - | - |
| 0027771658619000 | - | - | |
CV Nashwa | 06*7**9****08**0 | - | - |
PT Datu Nahima Teknik | 00*1**1****48**0 | - | - |
| 0900840042623000 | - | - | |
| 0943789818617000 | - | - | |
| 0027000975609000 | - | - | |
| 0028253466604000 | - | - | |
| 0024582108604000 | - | - | |
| 0948150990623000 | - | - | |
| 0763674066603000 | - | - | |
| 0843319161644000 | - | - | |
| 0019254218624000 | - | - | |
PT Putra Joko Tole Madura | 09*4**9****44**0 | - | - |
| 0967306937623000 | - | - |
REKAPITULASI
BILL OF QUANTITY (BQ)
NAMA SUB KEGIATAN : Pengubahsuaian Bangunan Gedung untuk Kepentingan Strategis Daerah Kabupaten/Kota
NAMA PEKERJAAN : Bangunan Bertingkat 2 Lantai (GEDUNG DIKLAT PRIGEN)
LOKASI : Kota Surabaya
TAHUN ANGGARAN : 2024
No. Jenis Pekerjaan Jumlah Harga (Rp.)
1 2 3
A BIAYA PENERAPAN SMKK
I PENYIAPAN RKK Rp -
II SOSIALISASI, PROMOSI DAN PELATIHAN Rp -
III ALAT PELINDUNG KERJA DAN ALAT PELINDUNG DIRI Rp -
IV ASURANSI DAN PERIJINAN Rp -
V PERSONIL KESELAMATAN KONSTRUKSI Rp -
VI FASILITAS SARANA, PRASARANA DAN ALAT KESEHATAN Rp -
VII RAMBU RAMBU YANG DIPERLUKAN Rp -
KEGIATAN DAN PERALATAN TERKAIT DENGAN
VIII Rp -
PENGENDALIAN RISIKO KESELAMATAN KONSTRUKSI
B PEKERJAAN GEDUNG LANTAI 1
I PEKERJAAN PENGECATAN Rp -
C PEKERJAAN GEDUNG LANTAI 2
I PEKERJAAN BETON DAN DINDING Rp -
II PEKERJAAN PLAFON DAN PARTISI Rp -
III PEKERJAAN PENGECATAN Rp -
IV PEKERJAAN KUSEN, PINTU DAN JENDELA Rp -
V PEKERJAAN KERAMIK, SANITAIR & PLUMBING Rp -
VI PEKERJAAN LISTRIK Rp -
D PEKERJAAN AREA ATAP
I PEKERJAAN BETON, RANGKA DAN PENUTUP ATAP Rp -
II PEKERJAAN PENGECATAN Rp -
E PEKERJAAN LAIN-LAIN
Rp -
TOTAL Rp -
PPN 11 % Rp -
JUMLAH Rp -
DIBULATKAN Rp -
Terbilang :
BILL OF QUANTITY (BQ)
NAMA SUB KEGIATAN : Pengubahsuaian Bangunan Gedung untuk Kepentingan Strategis Daerah Kabupaten/Kota
NAMA PEKERJAAN : Bangunan Bertingkat 2 Lantai (GEDUNG DIKLAT PRIGEN)
LOKASI : Kota Surabaya
TAHUN ANGGARAN : 2024
HARGA SATUAN JUMLAH HARGA
NO. URAIAN PEKERJAAN VOLUME
(Rp.) (Rp.)
1 2 3 4 5
A BIAYA PENERAPAN SMKK
I PENYIAPAN RKK
1 Pembuatan dokumen Rencana Keselamatan Konstruksi 1,00 buku - -
2 Pembuatan prosedur dan instruksi kerja 1,00 buku - -
JUMLAH -
II SOSIALISASI, PROMOSI DAN PELATIHAN
1 Safety Briefing 1,00 kegiatan - -
2 Spanduk K3 (Banner) 2,00 buah - -
3 Papan Informasi K3 1,00 buah - -
JUMLAH -
III ALAT PELINDUNG KERJA DAN ALAT PELINDUNG DIRI
APK antara lain:
1 Safety Net 1,00 roll - -
2 Pagar pengaman 1,00 buah - -
APD antara lain:
1 Helm Pelindung 10,00 pekerja - -
2 Tameng muka 1,00 buah - -
3 Sepatu Keselamatan 10,00 pekerja - -
4 Sarung Tangan 10,00 pekerja - -
5 Rompi Keselamatan 10,00 pekerja - -
JUMLAH -
IV ASURANSI DAN PERIJINAN
1 Jamsostek 10,00 pekerja - -
JUMLAH -
V PERSONIL KESELAMATAN KONSTRUKSI
1 Petugas Keselamatan Konstruksi (min. 30x kehadiran selama proyek berlangsung) 1,00 Paket - -
JUMLAH -
VI FASILITAS SARANA, PRASARANA DAN ALAT KESEHATAN
1 Peralatan P3K 1,00 set - -
JUMLAH -
VII RAMBU RAMBU YANG DIPERLUKAN
1 Rambu Petunjuk 1,00 set - -
JUMLAH -
VIII KEGIATAN DAN PERALATAN TERKAIT DENGAN PENGENDALIAN RISIKO KESELAMATAN KONSTRUKSI
1 Alat Pemadam Api Ringan( APAR ) 1,00 buah - -
JUMLAH -
B PEKERJAAN GEDUNG LANTAI 1
I PEKERJAAN PENGECATAN
1 Pengelupasan cat dinding existing 1469,318 m2 - -
2 Pengecatan interior 1600,543 m2 - -
3 Pengecatan eksterior 509,195 m2 - -
JUMLAH -
C PEKERJAAN GEDUNG LANTAI 2
I PEKERJAAN BETON DAN DINDING
1 Pembongkaran Dinding Existing 23,670 m2 - -
2 Pek. Balok Latei 15/20 BL1, Beton K-225 3,551 m3 - -
3 Pek. Benangan 446,060 m1 - -
4 Pek. Acian 80,800 m1 - -
JUMLAH -
II PEKERJAAN PLAFON DAN PARTISI
1 Pembongkaran Plafond Existing dengan pembersihan 713,440 m2 - -
2 Pemasangan Plafond Calcium Silicate Board 4,5 mm rangka hollow galvalum 20/40 & 40/40 76,130 m2 - -
3 Pemasangan Plafond Gypsum Board 9 mm rangka hollow galvalum 20/40 & 40/40 666,480 m2 - -
4 Pemasangan Drop Plafond Gypsum 629,950 m1 - -
5 Pemasangan list plafon gypsum tb. 7 cm 199,540 m1 - -
6 Pemasangan shadow line plafond 360,330 m1 - -
JUMLAH -
III PEKERJAAN PENGECATAN
1 Pengelupasan cat existing 2402,502 m2 - -
HARGA SATUAN JUMLAH HARGA
NO. URAIAN PEKERJAAN VOLUME
(Rp.) (Rp.)
1 2 3 4 5
2 Pengecatan interior 1750,004 m2 - -
3 Pengecatan eksterior 1863,636 m2 - -
JUMLAH -
IV PEKERJAAN KUSEN, PINTU DAN JENDELA
1 Pek. Pembongkarann Pintu existing 44,000 unit - -
2 Pek. Pintu jendela casement (PJ1) kusen alumiunium, daun pintu SWP 13,000 unit - -
3 Pek. Pintu swing (P1) kusen alumiunium, daun pintu SWP 14,000 unit - -
4 Pekerjaan pemasangan pintu (P2) kusen allumunium, daun pintu WPC Profile 16,000 unit - -
5 Pekerjaan pemasangan pintu (P3) Double Swing kusen allumunium, daun pintu SWP 1,000 unit - -
JUMLAH -
V PEKERJAAN KERAMIK, SANITAIR & PLUMBING
1 Pembongkaran Keramik Existing (R. Widyaswara 1-3 & R. Flamboyan 4) 93,500 m2 - -
2 Pas. Keramik Lantai 30x30cm motif/ unpolish (R. Widyaswara 1-3 & R. Flamboyan 4) 29,000 m2 - -
3 Pas. Keramik Dinding 30x60cm motif/ Polish (R. Widyaswara 1-3 & R. Flamboyan 4) 90,172 m2 - -
4 Pemasangan pipa air bersih dia. 1" type AW (R. Widyaswara 1-3) 25,000 m1 - -
JUMLAH -
VI PEKERJAAN LISTRIK
1 Pemasangan titik stop kontak 14,000 titik - -
2 Pemasangan titik lampu + fitting inbow 132,000 titik - -
3 Pemasangan saklar ganda 24,000 titik - -
4 Pemasangan saklar tunggal 48,000 titik - -
5 Lampu LED 13 watt 102,000 buah - -
6 Lampu LED 7watt 82,000 buah - -
7 Pas. Lampu LED Strip 351,250 m1 - -
JUMLAH -
D PEKERJAAN AREA ATAP
I PEKERJAAN BETON, RANGKA DAN PENUTUP ATAP
1 Pek. Pembongkaran atap & rangka existing tidak dipakai kembali 994,850 m2 - -
2 Gording CNP 150.50.20.2,3 7090,810 kg - -
3 Plat tebal 6mm (penahan gording) 335,590 kg - -
4 Pas. Baut Gording HTB M10 1772,000 bh - -
5 Ikatan gording Ø 10 mm 41,000 kg - -
6 Pengecatan Dasar Zincromate 450,780 m2 - -
7 Pengecatan Dasar Zincromate rangka atap eksisting (pembersihan dengan sikat kawat) 367,270 m2 - -
8 Pekerjaan cat kayu (listplank) 48,280 m2 - -
9 Pasang penutup atap UPVC motif genteng tebal 2,6mm 1006,190 m2 - -
10 Pas. Bubungan UPVC Motif Genteng (TOP RIDGE) 21,550 m1 - -
11 Pas. Bubungan UPVC Motif Genteng (DIAGONAL RIDGE) Jurai Luar 82,820 m1 - -
12 Pemasangan 3 Way Ridge UPVC Motif Genteng 4,000 bh - -
13 Pas. Ahiran Bubungan UPVC Motif Genteng (END RIDGE) 8,000 bh - -
14 Pemasangan listplank woodplank 0,8/30 cm 160,940 m1 - -
15 Pek. Pembersihan dak existing (lumut, waterproofing existing) 225,590 m2 - -
16 Pek. Screed atap (GROUTING) 225,590 m2 - -
17 Pek. Waterproofing cemetitious 225,590 m2 - -
18 Pas. Flashing 48,770 m1 - -
19 Pek. Plesteran 1Pc : 5Ps tebal 5 cm (ban-banan atap) 36,580 m2 - -
20 Pas. Penangkal Petir Konvensional 4 head 2,000 unit - -
21 Pemasangan talang pembuluh pipa PVC type AW diameter 4'' 48,000 m1 - -
22 Pas Roof drain cast iron 4,000 unit - -
23 Pemasangan Plafond Calcium Silicate Board 4,5 mm rangka hollow galvalum 20/40 & 40/40 36,800 m2 - -
JUMLAH -
II PEKERJAAN PENGECATAN
1 Pengelupasan cat existing 64,000 m2 - -
2 Pengecatan eksterior 64,000 m2 - -
JUMLAH -
E PEKERJAAN LAIN-LAIN
1 Pekerjaan pembersihan akhir lokasi 713,440 m2 - -
JUMLAH -
DAFTAR HARGA SATUAN POKOK KEGIATAN
(HSPK)
HARGA
NOMOR URAIAN KEGIATAN KOEF. SATUAN HARGA
SATUAN
A BANGUNAN GEDUNG
24,01 Pekerjaan Persiapan & Tanah
24.01.01 Pekerjaan Persiapan
Pengelupasan cat dinding existing m2
Upah:
23.06.01.01.04 Mandor 0,0250 O.H - -
23.02.04.01.04 Pembantu Tukang 0,0250 O.H - -
Jumlah: -
Overhead & Profit : -
Nilai HSPK : -
Pembongkaran plafond existing dengan pembersihan m2
Upah:
23.06.01.01.04 Mandor 0,0250 O.H - -
23.02.04.01.04 Pembantu Tukang 0,0500 O.H - -
Jumlah: -
Overhead & Profit : -
Nilai HSPK : -
Pembongkaran dinding, keramik existing dengan pembersihan m2
Upah:
23.06.01.01.04 Mandor 0,0800 O.H - -
23.02.04.01.04 Pembantu Tukang 0,0900 O.H - -
Jumlah: -
Overhead & Profit : -
Nilai HSPK : -
Pembongkaran Pintu Existing unit
Upah:
23.06.01.01.04 Mandor 0,4500 O.H - -
23.02.04.01.04 Pembantu Tukang 0,5000 O.H - -
Jumlah: -
Overhead & Profit : -
Nilai HSPK : -
Pembersihan Akhir m2
Upah:
23.06.01.01.04 Mandor 0,0200 O.H - -
23.02.04.01.04 Pembantu Tukang 0,0400 O.H - -
Jumlah: -
Overhead & Profit : -
Nilai HSPK : -
C STRUKTUR UTAMA
24.03.01 Beton
24.03.01.07 Pekerjaan Beton K-225 slump(12+2) cm w/c=0,58 m3
Tenaga:
23.06.01.01.04 Mandor 0 ,0830 O.H - -
23.06.01.01.01 Kepala Tukang Batu 0 ,0280 O.H - -
23.06.01.03.01 Tukang batu 0 ,2750 O.H - -
23.06.01.04.04 Pembantu Tukang 1 ,6500 O.H - -
Jumlah: -
Bahan:
20.01.01.02.02 Semen portland (40kg) 9 ,2750 zak - -
20.01.01.04.05 Pasir Beton 0 ,4363 m3 - -
20.01.01.05.05.03 Batu Pecah Mesin 1/2 cm 0 ,5511 m3 - -
23.04.01.02.03 Air (biaya air tawar) 2 15,0000 liter - -
Jumlah: -
Jumlah Total : -
Overhead & Profit : -
Nilai HSPK : -
24.03.01.13 Pekerjaan Pembesian dengan besi beton (polos/Ulir) kg
Tenaga:
23.06.01.01.04 Mandor 0 ,0004 O.H - -
23.06.02.01.01 Kepala Tukang Besi 0 ,0007 O.H - -
23.06.02.03.01 Tukang besi 0 ,0070 O.H - -
23.06.01.04.04 Pembantu Tukang 0 ,0070 O.H - -
Jumlah: -
Bahan:
Besi Beton (polos/ulir) 1 ,1000 kg - -
Kawat Beton 0 ,0150 kg - -
Jumlah: -
Jumlah Total : -
Overhead & Profit : -
HARGA
NOMOR URAIAN KEGIATAN KOEF. SATUAN HARGA
SATUAN
Nilai HSPK : -
Pekerjaan Bekisting sloof m2
Tenaga:
23.06.01.01.04 Mandor 0 ,0260 O.H - -
23.06.01.01.03 Kepala Tukang Kayu 0 ,0260 O.H - -
23.06.01.03.05 Tukang Kayu 0 ,2600 O.H - -
23.06.01.04.04 Pembantu Tukang 0 ,5200 O.H - -
Jumlah: -
Bahan:
20.01.05.02.04.06 Kayu meranti bekisting 0 ,0450 m3 - -
Paku usuk 0 ,3000 kg - -
Minyak bekesting 0 ,1000 liter - -
Jumlah: -
Jumlah Total : -
Overhead & Profit : -
Nilai HSPK : -
Pekerjaan Bekisting balok praktis dan non ekspos m2
Tenaga:
23.06.01.01.04 Mandor 0 ,0330 O.H - -
23.06.01.01.03 Kepala Tukang Kayu 0 ,0330 O.H - -
23.06.01.03.05 Tukang Kayu 0 ,3300 O.H - -
23.06.01.04.04 Pembantu Tukang 0 ,6600 O.H - -
Jumlah: -
Bahan:
20.01.05.02.04.06 Kayu meranti bekisting 0 ,0400 m3 - -
Paku usuk 0 ,4000 kg - -
Minyak bekesting 0 ,2000 liter - -
kayu kamper balok 0 ,0180 m3 - -
Multiplek tebal 12 mm 0 ,3500 lembar - -
Jumlah: -
Jumlah Total : -
Overhead & Profit : -
Nilai HSPK : -
24.03.01.19 Penyiraman dan Pembongkaran Bekisting Plat Beton m2
Tenaga:
23.06.01.01.04 Mandor 0 ,0050 O.H - -
23.06.01.03.05 Tukang Kayu 0 ,0180 O.H - -
23.06.01.04.04 Pembantu Tukang 0 ,0530 O.H - -
23.04.01.02.03 Air (biaya air tawar) 1 00,0000 liter - -
Jumlah: -
Overhead & Profit : -
Nilai HSPK : -
24.03.01.19 Penyiraman dan Pembongkaran Bekisting Balok m2
Tenaga:
23.06.01.01.04 Mandor 0 ,0050 O.H - -
23.06.01.03.05 Tukang Kayu 0 ,0300 O.H - -
23.06.01.04.04 Pembantu Tukang 0 ,0890 O.H - -
23.04.01.02.03 Air (biaya air tawar) 1 00,0000 liter - -
Jumlah: -
Overhead & Profit : -
Nilai HSPK : -
BALOK 15/20
Pekerjaan Pembesian dengan besi beton (polos/Ulir) 132,8267 kg - -
Pekerjaan Beton K-225 slump(12+2) cm w/c=0,58 1,0000 m3 - -
Bekisting 4,4444 m2 - -
Penyiraman dan Pembongkaran Bekisting Balok 4,4444 m2 - -
Jumlah: -
Nilai HSPK : -
24.04.02 FINISHING DINDING
24.04.02.09 Pengecatan Dinding Interior m2
Upah:
23.06.01.01.04 Mandor 0 ,0030 O.H - -
23.06.02.01.02 Kepala Tukang Cat 0,0063 O.H - -
23.06.01.03.01 Tukang Cat 0 ,0630 O.H - -
23.02.04.01.04 Pembantu Tukang 0 ,0200 O.H - -
Jumlah: -
Bahan:
20.01.01.04.03 Plamir Dinding 0 ,1000 kg - -
20.01.01.04.03 Cat Alkali Resisting Primer 0 ,1000 kg - -
20.01.01.04.04 Cat Dinding interior 0 ,1040 kaleng - -
20.01.01.05.06.03 Kertas Gosok no 150 0 ,1000 lembar - -
Jumlah: -
Jumlah Total : -
Overhead & Profit : -
Nilai HSPK : -
24.04.02.10 Pengecatan Dinding Eksterior m2
HARGA
NOMOR URAIAN KEGIATAN KOEF. SATUAN HARGA
SATUAN
Upah:
23.06.01.01.04 Mandor 0 ,0030 O.H - -
23.06.02.01.02 Kepala Tukang Cat 0,0063 O.H - -
23.06.01.03.01 Tukang Cat 0 ,0630 O.H - -
23.02.04.01.04 Pembantu Tukang 0 ,0200 O.H - -
Jumlah: -
Bahan:
20.01.01.04.03 Cat Alkali Resisting Primer 0 ,1000 kg - -
20.01.01.04.04 Cat dinding eksterior 0 ,1040 kaleng - -
20.01.01.05.06.03 Kertas Gosok no 150 0 ,1000 lembar - -
Jumlah: -
Jumlah Total : -
Overhead & Profit : -
Nilai HSPK : -
24.04.02.11 Pengecatan dak beton dan plafon m2
Upah:
23.06.01.01.04 Mandor 0 ,0030 O.H - -
23.06.02.01.02 Kepala Tukang Cat 0,0063 O.H - -
23.06.01.03.01 Tukang Cat 0 ,0630 O.H - -
23.02.04.01.04 Pembantu Tukang 0 ,0200 O.H - -
Jumlah: -
Bahan:
20.01.01.04.04 Cat Dinding/Plafond 0 ,1040 kaleng - -
20.01.01.05.06.03 Kertas Gosok no 150 0 ,1000 lembar - -
Jumlah: -
Jumlah Total : -
Overhead & Profit : -
Nilai HSPK : -
24.04.02.12 Pengecatan Dasar Zincromate m2
Tenaga:
23.06.01.01.04 Mandor 0 ,0200 O.H - -
23.06.01.03.01 Tukang Cat 0 ,2000 O.H - -
23.02.04.01.04 Pembantu Tukang 0 ,0200 O.H - -
Jumlah: -
Bahan:
20.01.01.06.01.02 Cat Meni (besi/kayu) 0 ,1000 kg - -
Kuas No. 4 0 ,0100 buah - -
Jumlah: -
Jumlah Total : -
Overhead & Profit : -
Nilai HSPK : -
Pengecatan Dasar Zincromate rangka atap eksisting (pembersihan dengan
sikat kawat) m2
Tenaga:
23.06.01.01.04 Mandor 0 ,0200 O.H - -
23.06.01.03.01 Tukang Cat 0 ,2000 O.H - -
23.02.04.01.04 Pembantu Tukang 0 ,0200 O.H - -
Jumlah: -
Bahan:
20.01.01.06.01.02 Cat Meni (besi/kayu) 0 ,1000 kg - -
Kuas No. 4 0 ,0100 buah - -
Sikat kawat 0 ,2000 buah - -
Jumlah: -
Jumlah Total : -
Overhead & Profit : -
Nilai HSPK : -
24.04.02.18 Pengecatan kayu (1plamir, 2 lapis cat dasar, 3 lapis cat penutup) m2
Tenaga:
23.06.01.01.04 Mandor 0,0025 O.H - -
23.06.02.01.02 Kepala Tukang Cat 0,0040 O.H - -
23.06.02.03.02 Tukang Cat 0,1050 O.H - -
23.06.01.04.04 Pembantu Tukang 0 ,0700 O.H - -
Jumlah: -
Bahan:
Cat meni kayu 0,1500 kg - -
Plamir 0,3000 kg - -
Cat Kayu 0,2000 kg - -
Cat penutup 0,3000 kg - -
Jumlah: -
Jumlah Total : -
Overhead & Profit : -
Nilai HSPK : -
Pelapisan Waterproofing Cementitious m2
Tenaga:
23.06.01.01.04 Mandor 0 ,0025 O.H - -
23.06.02.01.02 Kepala Tukang Cat 0 ,0075 O.H - -
HARGA
NOMOR URAIAN KEGIATAN KOEF. SATUAN HARGA
SATUAN
23.06.02.03.02 Tukang Cat 0 ,0750 O.H - -
23.06.01.04.04 Pembantu Tukang 0 ,0500 O.H - -
Jumlah: -
Bahan:
20.01.01.06.02.02 Waterproofing Cementitious 2 ,5000 kg - -
Jumlah: -
Jumlah Total : -
Overhead & Profit : -
Nilai HSPK : -
24.03.02 Pekerjaan Besi & Baja
Pekerjaan Besi Baja Profil kg
Tenaga:
Mandor 0,0030 O.H - -
Kepala Tukang 0,0060 O.H - -
Tukang Las 0,0600 O.H - -
Pembantu Tukang 0,0600 O.H - -
Jumlah: -
Bahan:
Besi profil 1,1500 kg - -
Elektroda Baja 0 ,0400 kg - -
Jumlah: -
Jumlah Total : -
Overhead & Profit : -
Nilai HSPK : -
Pasang Baut HTB Ø 10 BH
Tenaga:
Kepala Tukang 0 ,0300 O.H - -
Pembantu Tukang 0 ,0140 O.H - -
Jumlah: -
Bahan:
Baut HTB Ø 10 1 ,0000 buah - -
Elektroda baja 0 ,0400 kg - -
Jumlah: -
Jumlah Total : -
Overhead & Profit : -
Nilai HSPK : -
Pekerjaaan Fabrikasi dan Elektroda Besi Ikatan kg
Tenaga:
Mandor 0 ,0030 O.H - -
Kepala Tukang 0 ,0060 O.H - -
Tukang Las 0 ,0600 O.H - -
Pembantu Tukang 0 ,0600 O.H - -
Jumlah: -
Bahan:
Besi beton polos ulir 1,1500 kg - -
Elektroda Baja 0 ,0400 kg - -
Jumlah: -
Jumlah Total : -
Overhead & Profit : -
Nilai HSPK : -
D PEKERJAAN DINDING
24.04.01 Dinding & Plesteran
24.04.01.07 Pemasangan Batu Merah 1 Pc : 3 Ps (tebal 1/2 bata) m2
Upah:
23.06.01.01.04 Mandor 0 ,0150 O.H - -
23.06.01.01.01 Kepala Tukang Batu 0 ,0100 O.H - -
23.06.01.03.01 Tukang Batu 0 ,1000 O.H - -
23.02.04.01.04 Pembantu Tukang 0 ,3000 O.H - -
Jumlah: -
Bahan:
20.01.01.02.02 Semen portland (40kg) 0 ,3592 zak - -
20.01.01.04.03 Pasir Pasang 0 ,0400 m3 - -
20.01.01.21.03 Batu Bata Merah uk 22 x 11 x 4.5 cm 7 0,0000 buah - -
Jumlah: -
Jumlah Total : -
Overhead & Profit : -
Nilai HSPK : -
24.04.01.15 Plesteran Halus 1 Pc : 3 Ps tebal 1,5 cm m2
Upah:
23.06.01.01.04 Mandor 0 ,0150 O.H - -
23.06.01.01.01 Kepala Tukang Batu 0 ,0150 O.H - -
23.06.01.03.01 Tukang Batu 0 ,1500 O.H - -
23.02.04.01.04 Pembantu Tukang 0 ,3000 O.H - -
Jumlah: -
Bahan:
HARGA
NOMOR URAIAN KEGIATAN KOEF. SATUAN HARGA
SATUAN
20.01.01.02.02 Semen portland (40kg) 0 ,1944 zak - -
20.01.01.04.03 Pasir Pasang 0 ,0230 m3 - -
Jumlah: -
Jumlah Total : -
Overhead & Profit : -
Nilai HSPK : -
Plesteran Halus 1 Pc : 5 Ps tebal 5 cm m2
Upah:
23.06.01.01.04 Mandor 0 ,0150 O.H - -
23.06.01.01.01 Kepala Tukang Batu 0 ,0150 O.H - -
23.06.01.03.01 Tukang Batu 0 ,1500 O.H - -
23.02.04.01.04 Pembantu Tukang 0 ,3000 O.H - -
Jumlah: -
Bahan:
20.01.01.02.02 Semen portland (40kg) 0 ,3888 zak - -
20.01.01.04.03 Pasir Pasang 0 ,0780 m3 - -
Jumlah: -
Jumlah Total : -
Overhead & Profit : -
Nilai HSPK : -
Pek. Screed atap (GROUTING) m2
Upah:
23.06.01.01.04 Mandor 0 ,0150 O.H - -
23.06.01.01.01 Kepala Tukang Batu 0 ,0150 O.H - -
23.06.01.03.01 Tukang Batu 0 ,1500 O.H - -
23.02.04.01.04 Pembantu Tukang 0 ,3000 O.H - -
Jumlah: -
Bahan:
Sika floor 25kg 0 ,2430 zak - -
Jumlah: -
Jumlah Total : -
Overhead & Profit : -
Nilai HSPK : -
24.04.01.18 Pasang Benangan m
Upah:
23.06.01.01.04 Mandor 0 ,0040 O.H - -
23.06.01.01.01 Kepala Tukang Batu 0 ,0400 O.H - -
23.06.01.03.01 Tukang Batu 0 ,0400 O.H - -
23.02.04.01.04 Pembantu Tukang 0 ,0800 O.H - -
Jumlah: -
Bahan:
20.01.01.02.02 Semen portland (40kg) 0 ,0125 zak - -
20.01.01.04.03 Pasir Pasang 0 ,0130 m3 - -
Jumlah: -
Jumlah Total : -
Overhead & Profit : -
Nilai HSPK : -
24.04.01.21 Pekerjaan Acian m2
Tenaga:
23.06.01.01.04 Mandor 0 ,0100 O.H - -
23.06.01.01.01 Kepala Tukang Batu 0 ,0100 O.H - -
23.06.01.03.01 Tukang Batu 0 ,1000 O.H - -
23.02.04.01.04 Pembantu Tukang 0 ,2000 O.H - -
Jumlah: -
Bahan:
20.01.01.02.02 Semen portland (40kg) 0 ,0813 zak - -
Jumlah: -
Jumlah Total : -
Overhead & Profit : -
Nilai HSPK : -
E PEKERJAAN LANTAI
24.05.01 Lantai
24.05.01.06 Pemasangan Keramik 30x30 cm Motif/Warna/kasar m2
Tenaga:
23.06.01.01.04 Mandor 0 ,0350 O.H - -
23.06.01.01.01 Kepala Tukang Batu 0 ,0350 O.H - -
23.06.01.03.01 Tukang Batu 0 ,3500 O.H - -
23.06.01.04.04 Pembantu Tukang 0 ,7000 O.H - -
Jumlah: -
Bahan:
20.01.01.02.02 Semen portland (40kg) 0 ,2450 zak - -
20.01.01.02.05 Semen Berwarna Yiyitan 0 ,5000 kg - -
20.01.01.04.03 Pasir Pasang 0 ,0450 m3 - -
20.01.01.38.02.05 Keramik 30x 30cm motif/warna/kasar 1 ,0500 m2 - -
Jumlah: -
HARGA
NOMOR URAIAN KEGIATAN KOEF. SATUAN HARGA
SATUAN
Jumlah Total : -
Overhead & Profit : -
Nilai HSPK : -
24.05.01.07 Pemasangan Tegel Keramik 30x60 cm (Dinding) m2
Tenaga:
23.06.01.01.04 Mandor 0 ,0450 O.H - -
23.06.01.01.01 Kepala Tukang Batu 0 ,0450 O.H - -
23.06.01.03.01 Tukang Batu 0 ,4500 O.H - -
23.06.01.04.04 Pembantu Tukang 0 ,9000 O.H - -
Jumlah: -
Bahan:
20.01.01.02.02 Semen portland (40kg) 0 ,2325 zak - -
20.01.01.02.05 Semen Berwarna Yiyitan 1 ,9400 kg - -
20.01.01.04.03 Pasir Pasang 0 ,0180 m3 - -
20.01.01.38.02.01 Keramik Border 30x60 (dinding) 1 ,0500 m2 - -
Jumlah: -
Jumlah Total : -
Overhead & Profit : -
Nilai HSPK : -
F PEKERJAAN ATAP
Pasang penutup atap UPVC motif genteng m2
Tenaga:
Mandor 0 ,0080 O.H - -
Kepala Tukang 0 ,0080 O.H - -
Tukang Kayu 0 ,0750 O.H - -
Pembantu Tukang 0 ,1500 O.H - -
Jumlah: -
Bahan:
UPVC motif genteng 1,0500 m2 - -
Roof Seal dia. 32 mm 4,0000 buah - -
skrup UPVC Ø6-75 mm 4,0000 buah - -
Jumlah: -
Jumlah Total : -
Overhead & Profit : -
Nilai HSPK : -
Pas. Bubungan UPVC Motif Genteng (TOP RIDGE) m1
Tenaga:
Mandor 0 ,0080 O.H - -
Kepala Tukang 0 ,0080 O.H - -
Tukang Kayu 0 ,0750 O.H - -
Pembantu Tukang 0 ,1500 O.H - -
Jumlah: -
Bahan:
Bubungan UPVC Motif Genteng (TOP RIDGE) 1 ,0000 m1 - -
Roof Seal dia. 32 mm 2,0000 buah - -
skrup UPVC Ø6-75 mm 2,0000 buah - -
Jumlah: -
Jumlah Total : -
Overhead & Profit : -
Nilai HSPK : -
Pas. Bubungan UPVC Motif Genteng (DIAGONAL RIDGE) m1
Tenaga:
Mandor 0 ,0080 O.H - -
Kepala Tukang 0 ,0080 O.H - -
Tukang Kayu 0 ,0750 O.H - -
Pembantu Tukang 0 ,1500 O.H - -
Jumlah: -
Bahan:
Bubungan UPVC Motif Genteng (DIAGONAL RIDGE) 1 ,0000 m1 - -
Roof Seal dia. 32 mm 2,0000 buah - -
skrup UPVC Ø6-75 mm 2,0000 buah - -
Jumlah: -
Jumlah Total : -
Overhead & Profit : -
Nilai HSPK : -
Pemasangan 3 Way Ridge UPVC Motif Genteng bh
Tenaga:
Mandor 0 ,0080 O.H - -
Kepala Tukang 0 ,0080 O.H - -
Tukang Kayu 0 ,0750 O.H - -
Pembantu Tukang 0 ,1500 O.H - -
Jumlah: -
Bahan:
3 Way Ridge UPVC Motif Genteng 1 ,0000 bh - -
Roof Seal dia. 32 mm 2,0000 buah - -
HARGA
NOMOR URAIAN KEGIATAN KOEF. SATUAN HARGA
SATUAN
skrup UPVC Ø6-75 mm 2,0000 buah - -
Jumlah: -
Jumlah Total : -
Overhead & Profit : -
Nilai HSPK : -
Pemasangan End Ridge UPVC Motif Genteng bh
Tenaga:
Mandor 0 ,0080 O.H - -
Kepala Tukang 0 ,0080 O.H - -
Tukang Kayu 0 ,0750 O.H - -
Pembantu Tukang 0 ,1500 O.H - -
Jumlah: -
Bahan:
End Ridge UPVC Motif Genteng 1 ,0000 bh - -
Roof Seal dia. 32 mm 2,0000 buah - -
skrup UPVC Ø6-75 mm 2,0000 buah - -
Jumlah: -
Jumlah Total : -
Overhead & Profit : -
Nilai HSPK : -
Pemasangan Listplank 0.8x30 m1
Tenaga:
23.06.01.01.04 Mandor 0 ,0050 O.H - -
23.06.01.01.03 Kepala Tukang 0 ,0200 O.H - -
23.06.01.03.05 Tukang Kayu 0 ,2000 O.H - -
23.06.01.04.04 Pembantu Tukang 0 ,1000 O.H - -
Jumlah: -
Bahan:
20.01.01.41.01 Hollow besi 20x40x1,2 mm 2 ,6000 m - -
20.01.01.19.01.06 Listplank 0.8x30 0 ,3500 lembar - -
Paku reng 0 ,1000 kg - -
Jumlah: -
Jumlah Total : -
Overhead & Profit : -
Nilai HSPK : -
Pemasangan List plafond Gipsum m1
Upah:
23.06.01.01.04 Mandor 0 ,0010 O.H - -
23.06.01.01.03 Kepala Tukang Kayu 0 ,0020 O.H - -
23.06.01.03.05 Tukang Kayu 0 ,0210 O.H - -
23.06.01.04.04 Pembantu Tukang 0 ,1500 O.H - -
Jumlah: -
Bahan:
20.01.05.02.03.08 List Plafond Gipsum t=7 1 ,0500 buah - -
Jumlah: -
Jumlah Total : -
Overhead & Profit : -
Nilai HSPK : -
Pemasangan Shadow line plafond m1
Upah:
23.06.01.01.04 Mandor 0 ,0010 O.H - -
23.06.01.01.03 Kepala Tukang Kayu 0 ,0020 O.H - -
23.06.01.03.05 Tukang Kayu 0 ,0210 O.H - -
23.06.01.04.04 Pembantu Tukang 0 ,1500 O.H - -
Jumlah: -
Bahan:
shadow line plafond 1 ,0500 buah - -
Jumlah: -
Jumlah Total : -
Overhead & Profit : -
Nilai HSPK : -
Pemasangan Plafond Calcium Silicate Board + Rangka Hollow m2
Upah:
23.06.01.01.04 Mandor 0 ,0750 O.H - -
23.06.01.01.03 Kepala Tukang Kayu 0 ,0250 O.H - -
23.06.01.03.05 Tukang Kayu 0 ,2500 O.H - -
23.06.01.04.04 Pembantu Tukang 0 ,1500 O.H - -
Jumlah: -
Bahan:
Calcium Silicate Board Uk.240 x 120 x 4,5 mm 0 ,3472 lembar - -
Hollow Galvalum 4x4 cm (rangka) 2 ,0000 m - -
Hollow Galvalum 2x4 cm (rangka) 2 ,0000 m - -
Hollow Galvalum 2x4 cm (penggantung) 2 ,0000 m - -
root hanger 6mm 2 ,0000 m - -
Skrup 8 ,0000 buah - -
Kain kasa 1" 0 ,1600 roll - -
HARGA
NOMOR URAIAN KEGIATAN KOEF. SATUAN HARGA
SATUAN
Coumpond 0 ,1000 kg - -
Jumlah: -
Jumlah Total : -
Overhead & Profit : -
Nilai HSPK : -
Pemasangan Plafond Gypsum Board + Rangka Hollow m2
Upah:
23.06.01.01.04 Mandor 0 ,0750 O.H - -
23.06.01.01.03 Kepala Tukang Kayu 0 ,0250 O.H - -
23.06.01.03.05 Tukang Kayu 0 ,2500 O.H - -
23.06.01.04.04 Pembantu Tukang 0 ,1500 O.H - -
Jumlah: -
Bahan:
Gypsum Board 9 mm 0 ,3472 lembar - -
Hollow Galvalum 4x4 cm (rangka) 2 ,0000 m - -
Hollow Galvalum 2x4 cm (rangka) 2 ,0000 m - -
Hollow Galvalum 2x4 cm (penggantung) 2 ,0000 m - -
root hanger 6mm 2 ,0000 m - -
Skrup 8 ,0000 buah - -
Kain kasa 1" 0 ,1600 roll - -
Coumpond 0 ,1000 kg - -
Jumlah: -
Jumlah Total : -
Overhead & Profit : -
Nilai HSPK : -
Pemasangan drop Plafond tinggi 20cm Gypsum Board + Rangka Hollow m1
Upah:
23.06.01.01.04 Mandor 0 ,0250 O.H - -
23.06.01.01.03 Kepala Tukang Kayu 0 ,0750 O.H - -
23.06.01.03.05 Tukang Kayu 0 ,1500 O.H - -
23.06.01.04.04 Pembantu Tukang 0 ,2500 O.H - -
Jumlah: -
Bahan:
Gypsum Board 9 mm 0 ,0694 lembar - -
Hollow Galvalum 4x4 cm (rangka) 1 ,1500 m - -
Hollow Galvalum 2x4 cm (rangka) 0 ,5500 m - -
Skrup 0 ,0100 buah - -
Kain kasa 1" 0 ,1600 roll - -
Coumpond 0 ,1000 kg - -
Jumlah: -
Jumlah Total : -
Overhead & Profit : -
Nilai HSPK : -
G PEKERJAAN KUSEN, PINTU, DAN JENDELA
24.07.01.13 Pemasangan Kaca Mati tebal 5 mm m2
Tenaga:
23.06.01.01.04 Mandor 0 ,0008 O.H - -
23.06.01.01.03 Kepala Tukang Kayu 0 ,0150 O.H - -
23.06.01.03.05 Tukang Kayu 0 ,1500 O.H - -
23.06.01.04.04 Pembantu Tukang 0 ,0150 O.H - -
Jumlah: -
Bahan:
20.01.01.03.02.02 Kaca Polos Tebal 5 mm 1 ,1000 m2 - -
Jumlah: -
Jumlah Total : -
Overhead & Profit : -
Nilai HSPK : -
24.07.01.19 Pemasangan kunci tanam besar 2x putar Buah
Tenaga:
23.06.01.01.04 Mandor 0 ,0050 O.H - -
23.06.01.01.03 Kepala Tukang Kayu 0 ,0100 O.H - -
23.06.01.03.05 Tukang Kayu 0 ,5000 O.H - -
23.06.01.04.04 Pembantu Tukang 0 ,0100 O.H - -
Jumlah: -
Bahan:
Kunci tanam 1 ,0000 buah - -
Jumlah: -
Jumlah Total : -
Overhead & Profit : -
Nilai HSPK : -
Pemasangan kunci tanam kamar mandi (thumbturn silinder) Buah
Tenaga:
23.06.01.01.04 Mandor 0 ,0050 O.H - -
23.06.01.01.03 Kepala Tukang Kayu 0 ,0100 O.H - -
23.06.01.03.05 Tukang Kayu 0 ,5000 O.H - -
HARGA
NOMOR URAIAN KEGIATAN KOEF. SATUAN HARGA
SATUAN
23.06.01.04.04 Pembantu Tukang 0 ,0100 O.H - -
Jumlah: -
Bahan:
Kunci tanam (thumbturn silinder) 1 ,0000 buah - -
Jumlah: -
Jumlah Total : -
Overhead & Profit : -
Nilai HSPK : -
24.07.01.22 Pemasangan Engsel kuningan untuk pintu stel
Tenaga:
23.06.01.01.04 Mandor 0 ,0008 O.H - -
23.06.01.03.05 Tukang Kayu 0 ,1500 O.H - -
23.06.01.04.04 Pembantu Tukang 0 ,0150 O.H - -
Jumlah: -
Bahan:
Engsel kuningan 5" 1 ,0000 stel - -
Jumlah: -
Jumlah Total : -
Overhead & Profit : -
Nilai HSPK : -
24.07.01.26 Pemasangan grendel tanam (besar) buah
Upah:
23.06.01.01.04 Mandor 0 ,0008 O.H - -
23.06.01.03.05 Tukang Kayu 0 ,1400 O.H - -
23.06.01.04.04 Pembantu Tukang 0 ,0800 O.H - -
Jumlah: -
Bahan:
Grendel tanam (besar) 1 ,0000 buah - -
Jumlah: -
Jumlah Total : -
Overhead & Profit : -
Nilai HSPK : -
Pemasangan Friction Arm 24" buah
Tenaga:
23.06.01.01.04 Mandor 0 ,0008 O.H - -
23.06.01.03.05 Tukang Kayu 0 ,1200 O.H - -
23.06.01.04.04 Pembantu Tukang 0 ,0600 O.H - -
Jumlah: -
Bahan:
Friction Arm 24" 1 ,0000 stel - -
Jumlah: -
Jumlah Total : -
Overhead & Profit : -
Nilai HSPK : -
Pemasangan Handle + Grendel jendela casement buah
Tenaga:
23.06.01.01.04 Mandor 0 ,0008 O.H - -
23.06.01.03.05 Tukang Kayu 0 ,1200 O.H - -
23.06.01.04.04 Pembantu Tukang 0 ,0600 O.H - -
Jumlah: -
Bahan:
Handle + Grendel jendela casement 1 ,0000 buah - -
Jumlah: -
Jumlah Total : -
Overhead & Profit : -
Nilai HSPK : -
24.07.01.44 Pemasangan Kusen Alumunium Profil 4" m1
Tenaga:
23.06.01.01.04 Mandor 0 ,0021 O.H - -
23.06.01.01.03 Kepala Tukang Kayu 0 ,0043 O.H - -
23.06.01.03.05 Tukang Kayu 0 ,0430 O.H - -
23.06.01.02.01 Pembantu Tukang 0 ,0430 O.H - -
Jumlah: -
Bahan:
20.01.01.18.04 Aluminium Uk. 4 x 10, Profil 4" (powder coating) 1 ,1000 m - -
20.01.01.46.01.02 Skrup/Ripet 2 ,0000 buah - -
20.01.01.46.01.02 Sealent 0 ,0600 tube - -
Jumlah: -
Jumlah Total : -
Overhead & Profit : -
Nilai HSPK : -
24.07.01.45 Pemasangan Slimar Alumunium Casement m1
Tenaga:
23.06.01.01.04 Mandor 0 ,0022 O.H - -
23.06.01.01.03 Kepala Tukang Kayu 0 ,0043 O.H - -
23.06.01.03.05 Tukang Kayu 0 ,0430 O.H - -
HARGA
NOMOR URAIAN KEGIATAN KOEF. SATUAN HARGA
SATUAN
23.06.01.02.01 Pembantu Tukang 0 ,0430 O.H - -
Jumlah: -
Bahan:
20.01.01.18.04 Slimar Alumunium casement 1 ,1000 m - -
20.01.01.46.01.02 Skrup/Ripet 2 ,0000 buah - -
20.01.01.46.01.02 Sealant 0 ,0600 tube - -
Jumlah: -
Jumlah Total : -
Overhead & Profit : -
Nilai HSPK : -
Pemasangan Door Closer m2
Tenaga:
23.06.01.03.05 Tukang Kayu 0 ,1500 O.H - -
23.06.01.02.01 Pembantu Tukang 0 ,0150 O.H - -
Jumlah: -
Bahan:
door closer 1 ,0000 bh - -
Jumlah: -
Jumlah Total : -
Overhead & Profit : -
Nilai HSPK : -
Pemasangan Daun Pintu Solid Wood Panel uk. 820x2100 mm Unit
Tenaga:
23.06.01.01.04 Mandor 0 ,0300 O.H - -
23.06.01.01.03 Kepala Tukang Kayu 0 ,2000 O.H - -
23.06.01.03.05 Tukang Kayu 0 ,2500 O.H - -
23.06.01.02.01 Pembantu Tukang 0 ,6000 O.H - -
Jumlah: -
Bahan:
Daun pintu solid wood panel uk. 820x2100 mm 1 ,0000 buah - -
Jumlah: -
Jumlah Total : -
Overhead & Profit : -
Nilai HSPK : -
Pemasangan Daun Pintu WPC uk. 720x2100 mm Unit
Tenaga:
23.06.01.01.04 Mandor 0 ,0300 O.H - -
23.06.01.01.03 Kepala Tukang Kayu 0 ,2000 O.H - -
23.06.01.03.05 Tukang Kayu 0 ,2500 O.H - -
23.06.01.02.01 Pembantu Tukang 0 ,6000 O.H - -
Jumlah: -
Bahan:
Daun pintu WPC uk. 720x2100 mm 1 ,0000 buah - -
Jumlah: -
Jumlah Total : -
Overhead & Profit : -
Nilai HSPK : -
Pemasangan Daun Pintu SWP uk. 1030x2100 mm Unit
Tenaga:
23.06.01.01.04 Mandor 0 ,0300 O.H - -
23.06.01.01.03 Kepala Tukang Kayu 0 ,2000 O.H - -
23.06.01.03.05 Tukang Kayu 0 ,2500 O.H - -
23.06.01.02.01 Pembantu Tukang 0 ,6000 O.H - -
Jumlah: -
Bahan:
Daun pintu SWP uk. 1030x2100 mm 1 ,0000 buah - -
Jumlah: -
Jumlah Total : -
Overhead & Profit : -
Nilai HSPK : -
Pemasangan Daun Pintu SWP uk. 700x2100 mm Unit
Tenaga:
23.06.01.01.04 Mandor 0 ,0300 O.H - -
23.06.01.01.03 Kepala Tukang Kayu 0 ,2000 O.H - -
23.06.01.03.05 Tukang Kayu 0 ,2500 O.H - -
23.06.01.02.01 Pembantu Tukang 0 ,6000 O.H - -
Jumlah: -
Bahan:
Daun pintuSWP uk. 700x2100 mm 1 ,0000 buah - -
Jumlah: -
Jumlah Total : -
Overhead & Profit : -
Nilai HSPK : -
Pemasangan profil astragal 15x35mm m1
Tenaga:
23.06.01.01.04 Mandor 0 ,0021 O.H - -
HARGA
NOMOR URAIAN KEGIATAN KOEF. SATUAN HARGA
SATUAN
23.06.01.01.03 Kepala Tukang Kayu 0 ,0043 O.H - -
23.06.01.03.05 Tukang Kayu 0 ,0430 O.H - -
23.06.01.02.01 Pembantu Tukang 0 ,0430 O.H - -
Jumlah: -
Bahan:
profil astragal 15x35mm 1 ,1000 m - -
20.01.01.46.01.02 Skrup 3 ,0000 buah - -
Jumlah: -
Jumlah Total : -
Overhead & Profit : -
Nilai HSPK : -
24.04.02.15 Pekerjaan Lapis Melamin Duco (2x Lapis Sampai Rata) m2
Tenaga:
23.06.01.01.04 Mandor 0,0250 O.H - -
23.06.02.01.02 Kepala Tukang Cat 0,0090 O.H - -
23.06.02.03.02 Tukang Cat 0,0900 O.H - -
23.06.01.02.03 Pembantu Tukang 0,0750 O.H - -
Jumlah: -
Bahan:
20.01.01.06.03.10 Wood Filler 0,2000 kg - -
20.01.01.39.01 Kertas Gosok no 150 1,0000 lembar - -
20.01.01.39.01 Kertas Gosok no 280 1,0000 lembar - -
20.01.01.06.05.01 Shanding 0,5000 kg - -
20.01.01.06.05.06 Clear Doof 0,2000 kg - -
20.01.01.06.01.05 Thinner A 0,8370 liter - -
20.01.01.06.01.09 Coumpond 0,2000 kg - -
Jumlah: -
Sewa Peralatan
23.09.09.08.02 Sewa Compresor 0,5000 jam - -
Jumlah: -
Jumlah Total : -
Overhead & Profit : -
Nilai HSPK : -
Pek. Pintu jendela casement (PJ1) kusen alumiunium, daun pintu SWP UNIT
Pemasangan Kusen Alumunium Profil Sponing (Powder Coating) 1 6,5600 m - -
Pas. kaca mati t=5mm (jendela) 2 ,5900 m2 - -
Pemasangan Slimar Alumunium Casement 7 ,2000 m - -
Daun Pintu Solid Wood Panel UK. 820x2100 mm 1 ,0000 unit - -
kunci tanam besar 2x putar (termasuk handle) 1 ,0000 buah - -
engsel kuningan 5" untuk pintu 1 ,5000 stel - -
Pas. Friction Arm 24" 2 ,0000 stel - -
Handle + Grendel jendela casement 2 ,0000 buah - -
Pasang usuk kayu 3/5 (untuk penguat engsel pintu) 0 ,0130 m3 - -
Cat Melamine Duco 3 ,4400 m2 - -
Nilai HSPK : -
Pek. Pintu swing (P1) kusen alumiunium, daun pintu SWP UNIT
Pemasangan Kusen Alumunium Profil Sponing (Powder Coating) 5 ,2300 m - -
Daun pintu SWP 1030x2100cm 1 ,0000 unit - -
kunci tanam besar 2x putar (untuk pintu) 1 ,0000 buah - -
engsel kuningan 5" untuk pintu 1 ,5000 stel - -
Pasang usuk kayu 3/5 (untuk penguat engsel pintu) 0 ,0100 m3 - -
Cat Melamine Duco 3 ,9900 m2 - -
Pas. Door closer 1 ,0000 unit - -
Nilai HSPK : -
Pekerjaan pemasangan pintu (P2) kusen allumunium, daun pintu WPC
unit
Profile
Pemasangan Kusen Alumunium Profil Sponing (Powder Coating) 5 ,0000 m - -
Daun Pintu WPC UK. 720x2100 mm 1 ,0000 unit - -
kunci tanam besar (dengan thumbturn silinder) 1 ,0000 buah - -
engsel kuningan 5" untuk pintu 1 ,5000 stel - -
Pasang usuk kayu 3/5 (untuk penguat engsel pintu) 0 ,0100 m3 - -
Cat Melamine Duco 3 ,0200 m2 - -
HARGA
NOMOR URAIAN KEGIATAN KOEF. SATUAN HARGA
SATUAN
Nilai HSPK : -
pemasangan pintu (P3) Double Swing kusen allumunium, daun pintu SWP
Pemasangan Kusen Alumunium Profil Sponing (Powder Coating) 5 ,6000 m - -
Daun pintu SWP tb,35 mm uk. 2x210x70 2 ,0000 unit - -
kunci tanam besar 2x putar (untuk pintu) 1 ,0000 buah - -
engsel kuningan 5" untuk pintu 3 ,0000 stel - -
Pasang Grendel Tanam 1 ,0000 buah - -
Pasang usuk kayu 3/5 (untuk penguat engsel pintu) 0 ,0100 m3 - -
Cat Melamine Duco 6 ,0400 m2 - -
Profil astragal 15x35 mm 2 ,1000 m1 - -
Nilai HSPK : -
24.07.03 Sanitair
Pemasangan Pipa Air Bersih diameter 1'' m
Upah:
23.06.01.01.04 Mandor 0 ,0018 O.H - -
23.06.01.01.01 Kepala Tukang Batu 0 ,0060 O.H - -
23.06.01.03.01 Tukang Batu 0 ,0600 O.H - -
23.06.01.04.04 Pembantu Tukang 0 ,0360 O.H - -
Jumlah: -
Bahan:
Pipa PVC Ø1"Type AW 0 ,3000 batang - -
Perlengkapan 10.5% harga pipa 0 ,1050 Ls - -
Jumlah: -
Jumlah Total : -
Overhead & Profit : -
Nilai HSPK : -
Pemasangan talang pembuluh pipa PVC type AW diameter 4'' m
Upah:
23.06.01.01.04 Mandor 0 ,0041 O.H - -
23.06.01.01.01 Kepala Tukang Batu 0 ,0135 O.H - -
23.06.01.03.01 Tukang Batu 0 ,1350 O.H - -
23.06.01.04.04 Pembantu Tukang 0 ,0810 O.H - -
Jumlah: -
Bahan:
Pipa PVC 4" TYPE AW 0 ,3000 batang - -
Perlengkapan 10.5% harga pipa 0 ,1050 buah - -
klem pipa bahan besi strip 1 ,0000 buah - -
Jumlah: -
Jumlah Total : -
Overhead & Profit : -
Nilai HSPK : -
PEK. FLASHING m
Upah:
23.06.01.01.04 Mandor 0,0250 O.H - -
23.06.01.01.01 Kepala Tukang Batu 0,0250 O.H - -
23.06.01.03.01 Tukang Batu 0,2000 O.H - -
23.06.01.04.04 Pembantu Tukang 0,1000 O.H - -
Jumlah: -
Bahan:
Alumnunium sheet 0,6000 batang - -
Ripet 4,0000 buah - -
Jumlah: -
Jumlah Total : -
Overhead & Profit : -
Nilai HSPK : -
Pemasangan Roof drain iron cast buah
Upah:
23.06.01.01.04 Mandor 0 ,0025 O.H - -
HARGA
NOMOR URAIAN KEGIATAN KOEF. SATUAN HARGA
SATUAN
23.06.01.01.01 Kepala Tukang Pipa 0 ,0030 O.H - -
23.06.01.03.01 Tukang Pipa 0 ,0300 O.H - -
23.06.01.04.04 Pembantu Tukang 0 ,0600 O.H - -
Jumlah: -
Bahan:
Roof drain cast iron 1 ,0000 buah - -
Grouting 0 ,2500 m2 - -
kawat ayam 0,2500 m2 - -
Jumlah: -
Jumlah Total : -
Overhead & Profit : -
Nilai HSPK : -
Pekerjaan grouting m2
Tenaga:
Mandor 0 ,0125 O.H - -
Kepala Tukang Batu 0 ,1250 O.H - -
Tukang Batu 0 ,2500 O.H - -
Pembantu Tukang 0 ,5000 O.H - -
Jumlah: -
Bahan:
Semen Grouting 25kg 0 ,2326 zak - -
Jumlah: -
Jumlah Total : -
Overheat / Profit :
Nilai HSPK : -
24.07.02 Instalasi Listrik
24.07.02.01 Pemasangan Titik Stop Kontak Gedung Titik
Upah:
23.06.02.01.03 Kepala Tukang Listrik 0 ,0500 O.H - -
23.06.02.03.04 Tukang Listrik 0 ,2000 O.H - -
23.06.01.02.01 Pembantu Tukang 0 ,0010 O.H - -
Jumlah: -
Bahan
20.03.06.05.01.01 Stop Kontak 1 ,0000 buah - -
Kabel NYM 500 Volt 3 x 2,5 mm2 1 0,0000 m - -
20.05.04.01.02.01 Pipa Paralon 5/8 1 ,0000 lonjor - -
20.05.01.05.13 T Doos Pvc 1 ,0000 buah - -
Jumlah: -
Jumlah Total : -
Overhead & Profit : -
Nilai HSPK : -
Pemasangan Titik Stop Kontak AC Titik
Upah:
23.06.02.01.03 Kepala Tukang Listrik 0 ,0500 O.H - -
23.06.02.03.04 Tukang Listrik 0 ,2000 O.H - -
23.06.01.02.01 Pembantu Tukang 0 ,0010 O.H - -
Jumlah: -
Bahan
Stop Kontak AC 1 ,0000 buah - -
Kabel NYM 500 Volt 3 x 2,5 mm2 1 0,0000 m - -
20.05.04.01.02.01 Pipa Paralon 5/8 1 ,0000 lonjor - -
20.05.01.05.13 T Doos Pvc 1 ,0000 buah - -
Jumlah: -
Jumlah Total : -
Overhead & Profit : -
Nilai HSPK : -
Pemasangan Titik Lampu Gedung (Fitting Inbow) Titik
Upah:
23.06.02.01.03 Kepala Tukang Listrik 0 ,0500 O.H - -
23.06.02.03.04 Tukang Listrik 0 ,5000 O.H - -
23.06.01.02.01 Pembantu Tukang 0 ,3000 O.H - -
Jumlah: -
Bahan
Isolator 4 ,0000 buah - -
Kabel NYM 500 Volt 2 x 1,5 mm2 1 0,0000 m - -
Pipa Pralon 5/8 1 ,0000 lonjor - -
T Doos Pvc 1 ,0000 buah - -
Fitting Plafond (inbow) 1 ,0000 buah - -
Jumlah: -
Jumlah Total : -
Overhead & Profit : -
Nilai HSPK : -
24.07.02.03 Pemasangan Saklar Tunggal Titik
HARGA
NOMOR URAIAN KEGIATAN KOEF. SATUAN HARGA
SATUAN
Upah:
23.06.02.01.03 Kepala Tukang Listrik 0 ,0500 O.H - -
23.06.02.03.04 Tukang Listrik 0 ,2000 O.H - -
23.06.01.02.01 Pembantu Tukang 0 ,0010 O.H - -
Jumlah: -
Bahan
Saklar Tunggal 1 ,0000 buah - -
Jumlah: -
Jumlah Total : -
Overhead & Profit : -
Nilai HSPK : -
24.07.02.04 Pemasangan Saklar Ganda Titik
Upah:
23.06.02.01.03 Kepala Tukang Listrik 0 ,0500 O.H - -
23.06.02.03.04 Tukang Listrik 0 ,2000 O.H - -
23.06.01.02.01 Pembantu Tukang 0 ,0010 O.H - -
Jumlah: -
Bahan
20.03.06.05.02.20 Saklar Ganda 1 ,0000 buah - -
Jumlah: -
Jumlah Total : -
Overhead & Profit : -
Nilai HSPK : -
Pekerjaan Penangkal Petir 4 head Unit
Upah:
Mandor 0 ,0500 O.H - -
Kepala Tukang Listrik 0 ,0500 O.H - -
Tukang Listrik 0 ,2000 O.H - -
Pembantu Tukang 0 ,0010 O.H - -
Jumlah: -
Bahan:
Head Penangkal Petir modern konvensional 4 ,0000 buah - -
Down Conductor Ericor Cable BC 10 mm 4 5,5000 m - -
Klem Cable BC 2 3,0000 buah - -
Dudukan Tiang Penangkal Petir 4 ,0000 buah - -
Lighting Strike Counter 4 ,0000 buah - -
Grounding Penangkal Petir 1 ,0000 buah - -
Bak Kontrol 40X40 cm 1 ,0000 unit - -
Testing dan Comissioning 1 ,0000 ls - -
Jumlah: -
Jumlah Total : -
Overhead & Profit : -
Nilai HSPK : -
Pekerjaan bak kontrol 30x30x40 cm (Dengan Cover Beton) m
Item pek:
Pas. Batu bata 1PC:3ps 1 ,1300 m2 - -
Plesteran 1pc : 3ps 0 ,8800 m2 - -
Acian 0 ,8800 m2 - -
Tutup Plat Beton k-225 Pembesian 100kg 0 ,0242 m3 - -
Jumlah: -
Nilai HSPK : -
Pekerjaan Plat Tutup Beton (1Pc : 2Ps : 3Kr) besi 100 kg
upah:
Pekerjaan Beton Berstruktur K-225 1 ,0000 m3 - -
Pekerjaan Pembesian Pemakaian Besi 1 00,0000 kg - -
Acuan untuk Beton Struktur (Bekisting) 0 ,2500 m2 - -
Jumlah: -
Nilai HSPK : -
DAFTAR STANDAR HARGA SATUAN DASAR (SHSD)
NAMA SUB KEGIATAN : Pengubahsuaian Bangunan Gedung untuk Kepentingan Strategis Daerah Kabupaten/Kota
NAMA PEKERJAAN : Bangunan Bertingkat 2 Lantai (GEDUNG DIKLAT PRIGEN)
LOKASI : Kota Surabaya
TAHUN : 2024
No Nama dan Spesifikasi Satuan Harga(Rp) Keterangan
1 2 3 4 5
I MATERIAL.
1 Air (Biaya air tawar) liter
2 Kusen Aluminium Casement Profil 4" warna darkbrown (powder coating) m
3 Batu pecah mesin 1/2 m3
4 Bata merah (kelas 1) buah
5 baut mur HTB Ø 10 mm buah
6 Besi beton polos/ulir kg
7 Besi Hollow 20.40.1,2 mm m1
8 Besi profil (baja konstruksi) kg
9 Besi profil siku kg
10 Cat Alkali Resisting Primer kg
11 Cat Dinding Interior 2,5 L kaleng
12 Cat Dinding Eksterior Weathershield 2,5 L kaleng
13 Cat Besi / Kayu kg
14 Cat Meni Besi / kayu kg
15 Clear doof kg
16 Clem Cable BC m
17 Coumpond kg
18 Daun Pintu Solid Wood Panel UK. 820x2100 mm buah
19 Daun Pintu WPC UK. 720x2100 mm buah
20 Daun Pintu SWP UK. 1030x2100 mm buah
21 Daun Pintu SWP UK. 700x2100 mm buah
22 Down Conductor Ericor Cable BC 50 mm m
23 Dudukan Tiang Penangkal Petir buah
24 Engsel Kuningan ARCH u Pintu 5" stel
25 Elektroda baja kg
26 Fitting Plafond (inbow) buah
27 Friction Arm 24" stel
28 Grendel tanam (besar) buah
29 Grendel kait ukuran L buah
30 Grounding Penangkal Petir buah
31 Handle + Grendel jendela casement buah
32 Head Penangkal Petir buah
33 Hollow galvalum 4x4 cm m
34 Hollow galvalum 2x4 cm m
35 Isolator buah
36 Kain kasa 1" (perekat compound) roll
37 Kawat ayam lebar 90 cm m2
38 Kawat Bendrat kg
39 Kayu Kamper reng (balok 3/5) m3
40 Kayu Meranti Bekisting m3
41 Keramik lantai 30x 30cm motif/warna/kasar m2
42 Keramik dinding 30x 60cm motif/warna/halus m2
43 Kertas gosok No. 150 lembar
44 Kertas gosok No. 280 lembar
45 Kuas buah
46 Kunci Tanam besar 2x putar kuningan + Handle buah
47 Kunci tanam kamar mandi (thumbturn silinder) + handle buah
48 Kaca Polos t=5mm m2
49 Kabel NYM 2x1,5 m
50 Kabel NYM 3X2,5 m
No Nama dan Spesifikasi Satuan Harga(Rp) Keterangan
1 2 3 4 5
51 Klem buah
52 Lampu LED 13 watt buah
53 Lampu LED 7 Watt buah
54 Lampu LED Strip m1
55 Lighting Strike Counter buah
56 List plafond Gypsum buah
57 Minyak Bekisting liter
58 Multiplek Tebal 12 mm lembar
59 Paku Biasa 2"-5" kg
60 Paku reng kg
61 Paku usuk kg
62 Pasir Cor m3
63 Pasir Pasang m3
64 Pipa Pvc Conduit m
65 Pipa PVC Ø1"Type AW batang
66 Pipa PVC Ø4 "Type AW batang
67 Plafond Calcium Silicate Board Uk.240 x 120 x 4,5 mm lembar
68 Plafond Gypsum Board 9 mm lembar
69 Plamir Kayu kg
70 Plamir Dinding kg
71 Profil astragal kayu kamper 15x35 mm m1
72 Rol (Tba) roll
73 Roof Seal dia. 32 mm buah
74 Root hanger 6 mm m
75 Roof drain cast iron buah
76 Saklar Tunggal buah
77 Saklar Ganda buah
78 skrup / Ripet buah
79 Shanding kg
80 Semen Pc 40kg zak
81 Semen berwarna yiyitan kg
82 Semen grouting 25 kg zak
83 Slimar Alumunium3/8" m
84 Sealent tube
85 Stop Kontak Gedung buah
86 Stop Kontak AC buah
87 skrup UPVC Ø6-75 mm buah
88 skrup UPVC Ø6-90 mm buah
89 shadow line m1
90 T doos PVC buah
91 Thinner A liter
92 Waterproofing Cementitious kg
93 Wood filler kg
94 Listplank 0.8x30x300 lembar
95 UPVC Motif Genteng tebal 2,6mm m2
96 Bubungan UPVC Motif Genteng (TOP RIDGE) m1
97 Bubungan UPVC Motif Genteng (DIAGONAL RIDGE) m1
98 3 Way Ridge UPVC Motif Genteng m1
99 Ahiran Bubungan UPVC Motif Genteng (END RIDGE) m1
100 Alumnunium sheet m1
101 Door closer unit
102 Sika Floor 25kg zak
103 Sikat kawat buah
II SISTEM MANAJEMEN KESELAMATAN DAN KESEHATAN KERJA (SMK3)
1 Pembuatan dokumen Rencana Keselamatan Konstruksi buku
2 Pembuatan prosedur dan instruksi kerja buku
3 Safety Briefing kegiatan
4 Spanduk K3 (Banner) buah
5 Papan Informasi K3 buah
6 Safety Net roll
No Nama dan Spesifikasi Satuan Harga(Rp) Keterangan
1 2 3 4 5
7 Pagar pengaman buah
8 Helm Pelindung pekerja
9 Tameng muka buah
10 Sepatu Keselamatan pekerja
11 Sarung Tangan pekerja
12 Rompi Keselamatan pekerja
13 Jamsostek pekerja
14 Petugas Keselamatan Konstruksi Paket
15 Peralatan P3K set
16 Rambu Petunjuk set
17 Alat Pemadam Api Ringan( APAR ) buah
IV TENAGA
1 Mandor hari
2 KepalaTukang hari
3 Tukang hari
4 Pembantu Tukang hari
5 Operator Alat Konstruksi hari
6 Testing dan Comissioning ls
V PERALATAN
1 Sewa Compresor jam
2 Sewa Alat Bantu Tripot Katrol jam
3 Sewa Welding Set (min 5 jam) hari