| 0810391540604000 | Rp 2,354,942,553 | |
| 0709309579645000 | Rp 2,361,164,000 | |
| 0404824948623000 | Rp 2,364,088,500 | |
Aulia Rahma Santosa | 09*1**1****17**0 | - |
| 0027774108619000 | Rp 2,505,879,308 | |
| 0014506786653000 | - | |
| 0745164913645000 | - | |
| 0030087290617000 | Rp 2,619,348,022 | |
CV Sifa Indah Mandiri | 09*2**6****44**0 | - |
| 0761421643606000 | Rp 2,421,562,648 | |
| 0016813214609000 | Rp 2,447,976,065 | |
| 0947262192606000 | Rp 2,446,100,723 | |
| 0632225629623000 | Rp 2,482,846,036 | |
CV Jaya Konstruksi | 07*8**4****42**0 | Rp 2,595,258,679 |
| 0841795511619000 | - | |
| 0318036225603000 | - | |
| 0017076076606000 | - | |
| 0015238975652000 | - | |
| 0843319161644000 | - | |
| 0719094849612000 | - | |
| 0702871070626000 | - | |
| 0032115131656000 | - | |
CV Rifqy Nur Sejahtera | 06*7**8****05**0 | - |
CV Efendi Sukses Abadi | 06*7**8****03**0 | - |
| 0956640304603000 | - | |
| 0601270531609000 | - | |
| 0715848479612000 | - | |
CV Mekar Sari Utama | 09*6**6****57**0 | - |
CV Jaya Mahe Steel | 00*1**7****43**0 | - |
| 0707598769603000 | - | |
CV Genta Berlian Tekhnik | 00*6**3****09**0 | - |
| 0903139236644000 | - | |
| 0024579955604000 | - | |
CV Pusaka Bawean Sejahtera | 06*1**1****42**0 | - |
CV Amzun Abadi | 04*4**1****45**0 | - |
| 0313746414542000 | - | |
| 0022683262627000 | - | |
| 0025147141609000 | - | |
| 0029692555609000 | - | |
| 0919361915603000 | - | |
| 0663345338657000 | - | |
| 0031059603643000 | - | |
| 0957575293623000 | - | |
PT Epithu Logica Sembada | 09*5**4****15**0 | - |
| 0862725025403000 | - | |
CV Cahaya Nata Nusantara | 05*5**3****19**0 | - |
| 0968987362626000 | - | |
CV Akbar Bintang Persada | 09*3**7****52**0 | - |
Haisa Tata Karya | 04*7**6****03**0 | - |
| 0840433890642000 | - | |
CV Erva Maduri Cemerlang | 09*2**8****44**0 | - |
| 0534386727619000 | - | |
| 0948150990623000 | - | |
| 0931277990626000 | - | |
PT Elang Bhumi Persada | 07*1**4****04**0 | - |
PT Kreasi Global Perkasa | 07*4**3****24**0 | - |
| 0633840921627000 | - | |
| 0028257632615000 | - | |
| 0025295874612000 | - | |
| 0959003542627000 | - | |
CV Karsa Muda Adhinata | 04*9**1****09**0 | - |
| 0718003809619000 | - | |
| 0823385968615000 | - | |
| 0027771658619000 | - | |
CV Arfan.Barokah.Jaya | 09*0**1****45**0 | - |
| 0032794133626000 | - | |
CV Pranata Raya Mulya | 04*9**9****15**0 | - |
CV Dua Putra Jaya | 03*5**6****08**0 | - |
| 0929241818623000 | - | |
| 0027140284612000 | - | |
PT Beton Citra Abadi | 03*4**9****02**0 | - |
| 0210698247602000 | - | |
| 0012682043203000 | - | |
PT Graha Bara Lestari | 00*0**2****15**0 | - |
| 0749082434608000 | - | |
| 0763674066603000 | - | |
| 0315313460609000 | - | |
CV Indoraya Surabaya | 08*1**2****04**0 | - |
| 0659507800626000 | - | |
| 0822710059654000 | - | |
PT Medina Karya Cipta | 03*8**1****02**0 | - |
| 0939654216612000 | - | |
| 0020331344646000 | - | |
| 0313420069608000 | - | |
| 0967324328626000 | - | |
| 0023377658604000 | - | |
CV Dempo Agung | 06*2**7****08**0 | - |
| 0419157375614000 | - | |
| 0316629930642000 | - | |
| 0752701243604000 | - | |
CV Arke Putra | 06*6**0****23**0 | - |
| 0862862141609000 | - | |
| 0664656733602000 | - | |
| 0427117965655000 | - | |
| 0621827088627000 | - | |
| 0028405439609000 | - | |
| 0815342316914000 | - | |
CV Mandiri Cipta Yasa | 09*1**9****19**0 | - |
| 0211070495602000 | - | |
| 0022063713613000 | - | |
| 0619424930623000 | - | |
| 0019491422013000 | - | |
| 0911699049822000 | - | |
| 0033160334805000 | - | |
| 0021669072644000 | - | |
PT Alfa Tata Griya | 04*4**1****55**0 | - |
| 0314501883619000 | - | |
| 0023918881643000 | - | |
Cevana Utama | 09*7**1****17**0 | - |
| 0211395868513000 | - | |
| 0210030177629000 | - | |
| 0948299649423000 | - | |
| 0412479651115000 | - | |
| 0015463490617000 | - | |
| 0032206740622000 | - | |
| 0316393156721000 | - | |
| 0437377492617000 | - | |
| 0317566321615000 | - | |
| 0742541345617000 | - | |
| 0939312252644000 | - | |
| 0015615958611000 | - | |
| 0020251609608000 | - | |
| 0025127416624000 | - | |
| 0720266790601000 | - | |
| 0913932711606000 | - | |
| 0812934321602000 | - | |
| 0316370147608000 | - | |
| 0027000975609000 | - | |
| 0011228988626000 | - |
REKAPITULASI
BILL OF QUANTITY (BQ)
SUB KEGIATAN : Pengubahsuaian Bangunan Gedung untuk Kepentingan Strategis Daerah Kabupaten/Kota
PEKERJAAN : Bangunan Tidak Bertingkat (GEDUNG SERBAGUNA LONTAR)
LOKASI : Kota Surabaya
REKAPITULASI SELURUH PEKERJAAN
No. JENIS PEKERJAAN JUMLAH HARGA
A. BIAYA PENERAPAN SMKK
I SISTEM MANAJEMEN KESELAMATAN KONSTRUKSI (SMKK) Rp -
JUMLAH A Rp -
B. GEDUNG SERBA GUNA LONTAR
I PEKERJAAN PERSIAPAN Rp -
II PEKERJAAN GALIAN DAN URUGAN Rp -
III PEKERJAAN PASANGAN Rp -
IV PEKERJAAN BETON Rp -
V PEKERJAAN PLESTERAN Rp -
VI PEKERJAAN PELAPIS LANTAI DAN DINDING Rp -
VII PEKERJAAN KUSEN PINTU, DAN BOVEN Rp -
VIII PEKERJAAN RANGKA BESI DAN PENUTUP ATAP Rp -
IX PEKERJAAN PLAFOND Rp -
X PEKERJAAN PENGECATAN Rp -
XI PEKERJAAN MEKANIKAL, PLUMBING, DAN SANITAIR Rp -
XII PEKERJAAN LISTRIK Rp -
XIII PEKERJAAN PENANGKAL PETIR Rp -
XIV PEKERJAAN LAIN - LAIN Rp -
JUMLAH B Rp -
JUMLAH TOTAL Rp -
PPn 11 % Rp -
JUMLAH TOTAL + PPn 11% Rp -
DIBULATKAN Rp -
TERBILANG :
BILL OF QUANTITY (BQ)
SUB KEGIATAN : Pengubahsuaian Bangunan Gedung untuk Kepentingan Strategis Daerah Kabupaten/Kota
PEKERJAAN : Bangunan Tidak Bertingkat (GEDUNG SERBAGUNA LONTAR)
LOKASI : Kota Surabaya
No. URAIAN PEKERJAAN VOLUME HARGA SATUAN JUMLAH HARGA
( Rp ) ( Rp )
1 2 3 4 5
A. BIAYA PENERAPAN SMKK
I SISTEM MANAJEMEN KESELAMATAN KONSTRUKSI (SMKK)
1 Penyiapan RKK
- Pembuatan Dokumen Rencana Keselamatan Konstruksi 1.00 buku - -
- Pembuatan Prosedur dan Instruksi Kerja 1.00 buku - -
2 Sosialisasi, Promosi dan Pelatihan
-Safety Breafing 1.00 kegiatan - -
-Spanduk (Banner) 2.00 bh - -
-Papan Informasi K3 1.00 bh - -
3 Sosialisasi, Promosi dan Pelatihan
-Safety Net 1.00 roll - -
-Pagar Pengaman 1.00 bh - -
-Helm Pelindung 10.00 bh - -
-Tameng Muka 10.00 bh - -
-Sepatu Keselamatan 10.00 bh - -
-Sarung Tangan 10.00 bh - -
-Rompi Keselamatan 10.00 bh - -
4 Asuransi dan Perizinan
-Jamsostek 10.00 pkj - -
5 Personel Keselamatan Konstruksi
-Petugas Keselamatan Konstruksi 1.00 paket - -
6 Fasilistas Sarana, Prasarana dan Alat Kesehatan
-Peralatan P3K 1.00 set - -
7 Rambu-rambu yang diperlukan 1.00 set - -
8 Konsultasi dengan ahli terkait Keselamatan Konstruksi
-Verifikasi oleh Tenaga Ahli Narasumber K3 1.00 org/jam - -
9 Kegiatan dan Peralatan terkait dengan Pengendalian Resiko
- Apar 1.00 bh - -
JUMLAH -
JUMLAH A -
B. GEDUNG SERBA GUNA LONTAR
I PEKERJAAN PERSIAPAN
1 Pek. Pengukuran uitzet 882.10 m2 - -
2 Pek. Pemasangan bouwplank 48.00 titik - -
JUMLAH I -
II PEKERJAAN GALIAN DAN URUGAN
1 Pek. Galian tanah 24.65 m3 - -
2 Pek. Bor Pondasi Strous Dia. Ø 40 cm 270.00 m1 - -
3 Pek. Bor Pondasi Strous Dia. Ø 30 cm 30.00 m1 - -
4 Pek. Urug pasir tb. 10 cm 73.03 m3 - -
5 Pek. Urugan limestone pemadatan dengan alat berat 1358.73 m3 - -
JUMLAH II -
III PEKERJAAN PASANGAN
1 Pek. Pas. Bata rollag bata 1pc : 3ps 5.54 m2 - -
2 Pek. Pas. Bata merah 1 Pc : 5 Ps tebal 1/2 bata 704.43 m2 - -
3 Pek. Pas. Bata transram 1 Pc : 3 Ps 7.11 m2 - -
JUMLAH III -
IV PEKERJAAN BETON
1 Pek. Lantai kerja tb. 5 cm 8.30 m3 - -
2 Pek. Rabat lantai tb. 12 cm dengan wiremesh M6, Ready Mix K-300 f'c 24,9Mpa
(Non-Fly Ash)
a. Pekerjaan Beton K-300 f'c 24,9Mpa (Ready Mix) Non-Fly Ash 66.58 m3 - -
b. Wiremesh M6-150 554.91 m2 - -
3 Pek. Pondasi Strous Dia. Ø 40 cm beton, Ready Mix K-300 f'c 24,9Mpa (Non-Fly
Ash)
No. URAIAN PEKERJAAN VOLUME HARGA SATUAN JUMLAH HARGA
( Rp ) ( Rp )
1 2 3 4 5
a. Pekerjaan Beton K-300 f'c 24,9Mpa (Ready Mix) Non-Fly Ash 33.91 m3 - -
b. Pekerjaan Pembesian dengan besi beton ulir 2354.03 kg - -
c. Pekerjaan Pembesian dengan besi beton polos 574.20 kg - -
4 Pek. Pondasi Strous Dia. Ø 30 cm beton, Ready Mix K-300 f'c 24,9Mpa (Non-Fly
Ash)
a. Pekerjaan Beton K-300 f'c 24,9Mpa (Ready Mix) Non-Fly Ash 2.11 m3 - -
b. Pekerjaan Pembesian dengan besi beton ulir 173.35 kg - -
c. Pekerjaan Pembesian dengan besi beton polos 37.88 kg - -
5 Pek. Beton Poer pondasi 200x80x50 cm (P1), Ready Mix K-300 f'c 24,9Mpa (Non-
Fly Ash)
a. Pekerjaan Beton K-300 f'c 24,9Mpa (Ready Mix) Non-Fly Ash 9.60 m3 - -
b. Pekerjaan Pembesian dengan besi beton ulir 1151.31 kg - -
c. Pekerjaan Bekisting Pondasi 33.60 m2 - -
d. Pembongkaran Bekisting 33.60 m2 - -
6 Pek. Beton Poer pondasi 80x80x30 cm (P2), Ready Mix K-300 f'c 24,9Mpa (Non-Fly
Ash)
a. Pekerjaan Beton K-300 f'c 24,9Mpa (Ready Mix) Non-Fly Ash 4.03 m3 - -
b. Pekerjaan Pembesian dengan besi beton ulir 503.19 kg - -
c. Pekerjaan Bekisting Pondasi 20.16 m2 - -
d. Pembongkaran Bekisting 20.16 m2 - -
7 Pek. Beton Poer pondasi 70x70x25 cm (P3), Ready Mix K-300 f'c 24,9Mpa (Non-Fly
Ash)
a. Pekerjaan Beton K-300 f'c 24,9Mpa (Ready Mix) Non-Fly Ash 0.61 m3 - -
b. Pekerjaan Pembesian dengan besi beton ulir 84.24 kg - -
c. Pekerjaan Bekisting Pondasi 3.50 m2 - -
d. Pembongkaran Bekisting 3.50 m2 - -
8 Pek. Beton Sloof 20x40 cm (S1), Ready Mix K-300 f'c 24,9Mpa (Non-Fly Ash)
a. Pekerjaan Beton K-300 f'c 24,9Mpa (Ready Mix) Non-Fly Ash 1.50 m3 - -
b. Pekerjaan Pembesian dengan besi beton ulir 373.72 kg - -
c. Pekerjaan Bekisting 14.33 m2 - -
d. Pembongkaran Bekisting 14.33 m2 - -
9 Pek. Beton Sloof 20x40 cm (S2), Ready Mix K-300 f'c 24,9Mpa (Non-Fly Ash)
a. Pekerjaan Beton K-300 f'c 24,9Mpa (Ready Mix) Non-Fly Ash 8.93 m3 - -
b. Pekerjaan Pembesian dengan besi beton ulir 1629.74 kg - -
c. Pekerjaan Bekisting 84.85 m2 - -
d. Pembongkaran Bekisting 84.85 m2 - -
10 Pek. Beton Sloof 20x40 cm (S3), Ready Mix K-300 f'c 24,9Mpa (Non-Fly Ash)
a. Pekerjaan Beton K-300 f'c 24,9Mpa (Ready Mix) Non-Fly Ash 3.46 m3 - -
b. Pekerjaan Pembesian dengan besi beton ulir 590.34 kg - -
c. Pekerjaan Bekisting 32.88 m2 - -
d. Pembongkaran Bekisting 32.88 m2 - -
11 Pek. Beton Sloof 20x30 cm (S4), Ready Mix K-300 f'c 24,9Mpa (Non-Fly Ash)
a. Pekerjaan Beton K-300 f'c 24,9Mpa (Ready Mix) Non-Fly Ash 0.50 m3 - -
b. Pekerjaan Pembesian dengan besi beton ulir 95.72 kg - -
c. Pekerjaan Bekisting 4.70 m2 - -
d. Pembongkaran Bekisting 4.70 m2 - -
12 Pek. Beton Sloof 20x30 cm (S5), Ready Mix K-300 f'c 24,9Mpa (Non-Fly Ash)
a. Pekerjaan Beton K-300 f'c 24,9Mpa (Ready Mix) Non-Fly Ash 3.01 m3 - -
b. Pekerjaan Pembesian dengan besi beton ulir 526.34 kg - -
c. Pekerjaan Bekisting 28.11 m2 - -
d. Pembongkaran Bekisting 28.11 m2 - -
13 Pek. Beton Sloof 15x20 cm (S6), Ready Mix K-300 f'c 24,9Mpa (Non-Fly Ash)
a. Pekerjaan Beton K-300 f'c 24,9Mpa (Ready Mix) Non-Fly Ash 0.84 m3 - -
b. Pekerjaan Pembesian dengan besi beton ulir 122.92 kg - -
c. Pekerjaan Bekisting 9.56 m2 - -
d. Pembongkaran Bekisting 9.56 m2 - -
14 Pek. Beton Kolom 30x50 cm (K1), Ready Mix K-300 f'c 24,9Mpa (Non-Fly Ash)
No. URAIAN PEKERJAAN VOLUME HARGA SATUAN JUMLAH HARGA
( Rp ) ( Rp )
1 2 3 4 5
a. Pekerjaan Beton K-300 f'c 24,9Mpa (Ready Mix) Non-Fly Ash 4.74 m3 - -
b. Pekerjaan Pembesian dengan besi beton ulir 1535.26 kg - -
c. Pekerjaan Bekisting 50.64 m2 - -
d. Pembongkaran Bekisting 50.64 m2 - -
15 Pek. Beton Kolom 30x50 cm (K2), Ready Mix K-300 f'c 24,9Mpa (Non-Fly Ash)
a. Pekerjaan Beton K-300 f'c 24,9Mpa (Ready Mix) Non-Fly Ash 10.44 m3 - -
b. Pekerjaan Pembesian dengan besi beton ulir 2411.36 kg - -
c. Pekerjaan Bekisting 111.41 m2 - -
d. Pembongkaran Bekisting 111.41 m2 - -
16 Pek. Beton Kolom 30x30 cm (K3), Ready Mix K-300 f'c 24,9Mpa (Non-Fly Ash)
a. Pekerjaan Beton K-300 f'c 24,9Mpa (Ready Mix) Non-Fly Ash 1.04 m3 - -
b. Pekerjaan Pembesian dengan besi beton ulir 367.42 kg - -
c. Pekerjaan Bekisting 13.99 m2 - -
d. Pembongkaran Bekisting 13.99 m2 - -
17 Pek. Beton Kolom 30x30 cm (K4), Ready Mix K-300 f'c 24,9Mpa (Non-Fly Ash)
a. Pekerjaan Beton K-300 f'c 24,9Mpa (Ready Mix) Non-Fly Ash 3.41 m3 - -
b. Pekerjaan Pembesian dengan besi beton ulir 675.90 kg - -
c. Pekerjaan Bekisting 45.58 m2 - -
d. Pembongkaran Bekisting 45.58 m2 - -
18 Pek. Beton Kolom 20x30 cm (K5), Ready Mix K-300 f'c 24,9Mpa (Non-Fly Ash)
a. Pekerjaan Beton K-300 f'c 24,9Mpa (Ready Mix) Non-Fly Ash 3.79 m3 - -
b. Pekerjaan Pembesian dengan besi beton ulir 1049.84 kg - -
c. Pekerjaan Bekisting 63.30 m2 - -
d. Pembongkaran Bekisting 63.30 m2 - -
19 Pek. Beton Kolom 15x30 cm (K6), Ready Mix K-300 f'c 24,9Mpa (Non-Fly Ash)
a. Pekerjaan Beton K-300 f'c 24,9Mpa (Ready Mix) Non-Fly Ash 1.44 m3 - -
b. Pekerjaan Pembesian dengan besi beton ulir 233.50 kg - -
c. Pekerjaan Bekisting 28.78 m2 - -
d. Pembongkaran Bekisting 28.78 m2 - -
20 Pek. Beton Kolom 20x20 cm (K7), Ready Mix K-300 f'c 24,9Mpa (Non-Fly Ash)
a. Pekerjaan Beton K-300 f'c 24,9Mpa (Ready Mix) Non-Fly Ash 1.47 m3 - -
b. Pekerjaan Pembesian dengan besi beton ulir 191.96 kg - -
c. Pekerjaan Bekisting 29.57 m2 - -
d. Pembongkaran Bekisting 29.57 m2 - -
21 Pek. Beton Kolom praktis 15x15 cm (Kp), Mutu K-175 f'c 14,5Mpa
a. Pekerjaan Beton K-175 f'c 14,5Mpa 6.06 m3 - -
b. Pekerjaan Pembesian dengan besi beton polos 919.91 kg - -
c. Pekerjaan Bekisting 64.69 m2 - -
d. Pembongkaran Bekisting 64.69 m2 - -
22 Pek. Beton Balok 25x50 cm (B1), Ready Mix K-300 f'c 24,9Mpa (Non-Fly Ash)
a. Pekerjaan Beton K-300 f'c 24,9Mpa (Ready Mix) Non-Fly Ash 0.96 m3 - -
b. Pekerjaan Pembesian dengan besi beton ulir 196.92 kg - -
c. Pekerjaan Bekisting 7.78 m2 - -
d. Pembongkaran Bekisting 7.78 m2 - -
23 Pek. Beton Balok 25x50 cm (B1A), Ready Mix K-300 f'c 24,9Mpa (Non-Fly Ash)
a. Pekerjaan Beton K-300 f'c 24,9Mpa (Ready Mix) Non-Fly Ash 1.12 m3 - -
b. Pekerjaan Pembesian dengan besi beton ulir 218.05 kg - -
c. Pekerjaan Bekisting 7.78 m2 - -
d. Pembongkaran Bekisting 7.78 m2 - -
24 Pek. Beton Balok 25x50 cm (B2), Ready Mix K-300 f'c 24,9Mpa (Non-Fly Ash)
a. Pekerjaan Beton K-300 f'c 24,9Mpa (Ready Mix) Non-Fly Ash 4.39 m3 - -
b. Pekerjaan Pembesian dengan besi beton ulir 770.54 kg - -
c. Pekerjaan Bekisting 35.51 m2 - -
d. Pembongkaran Bekisting 35.51 m2 - -
No. URAIAN PEKERJAAN VOLUME HARGA SATUAN JUMLAH HARGA
( Rp ) ( Rp )
1 2 3 4 5
25 Pek. Beton Balok 20x40 cm (B3), Ready Mix K-300 f'c 24,9Mpa (Non-Fly Ash)
a. Pekerjaan Beton K-300 f'c 24,9Mpa (Ready Mix) Non-Fly Ash 1.53 m3 - -
b. Pekerjaan Pembesian dengan besi beton ulir 355.92 kg - -
c. Pekerjaan Bekisting 14.62 m2 - -
d. Pembongkaran Bekisting 14.62 m2 - -
26 Pek. Beton Balok 20x40 cm (B3A), Ready Mix K-300 f'c 24,9Mpa (Non-Fly Ash)
a. Pekerjaan Beton K-300 f'c 24,9Mpa (Ready Mix) Non-Fly Ash 1.60 m3 - -
b. Pekerjaan Pembesian dengan besi beton ulir 444.48 kg - -
c. Pekerjaan Bekisting 15.23 m2 - -
d. Pembongkaran Bekisting 15.23 m2 - -
27 Pek. Beton Balok 20x30 cm (B4), Ready Mix K-300 f'c 24,9Mpa (Non-Fly Ash)
a. Pekerjaan Beton K-300 f'c 24,9Mpa (Ready Mix) Non-Fly Ash 4.12 m3 - -
b. Pekerjaan Pembesian dengan besi beton ulir 1116.02 kg - -
c. Pekerjaan Bekisting 38.52 m2 - -
d. Pembongkaran Bekisting 38.52 m2 - -
28 Pek. Beton Balok 20x30 cm (B5), Ready Mix K-300 f'c 24,9Mpa (Non-Fly Ash)
a. Pekerjaan Beton K-300 f'c 24,9Mpa (Ready Mix) Non-Fly Ash 4.20 m3 - -
b. Pekerjaan Pembesian dengan besi beton ulir 804.72 kg - -
c. Pekerjaan Bekisting 39.20 m2 - -
d. Pembongkaran Bekisting 39.20 m2 - -
29 Pek. Beton Balok Latai 12x20 cm (BL), Mutu K-175 f'c 14,5Mpa
a. Pekerjaan Beton K-175 f'c 14,5Mpa 0.97 m3 - -
b. Pekerjaan Pembesian dengan besi beton polos 215.87 kg - -
c. Pekerjaan Bekisting 11.37 m2 - -
d. Pembongkaran Bekisting 11.37 m2 - -
30 Pek. Beton Balok Latai 20x20 cm (BL 2), Mutu K-175 f'c 14,5Mpa
a. Pekerjaan Beton K-175 f'c 14,5Mpa 0.63 m3 - -
b. Pekerjaan Pembesian dengan besi beton polos 92.44 kg - -
c. Pekerjaan Bekisting 5.69 m2 - -
d. Pembongkaran Bekisting 5.69 m2 - -
31 Pek. Beton Ring Balok 15x20 cm (RB), Mutu K-175 f'c 14,5Mpa
a. Pekerjaan Beton K-175 f'c 14,5Mpa 3.75 m3 - -
b. Pekerjaan Pembesian dengan besi beton ulir 791.79 kg - -
c. Pekerjaan Bekisting 38.78 m2 - -
d. Pembongkaran Bekisting 38.78 m2 - -
32 Pek. Beton plat kanopi tb. 7 cm, Mutu K-175 f'c 14,5Mpa
a. Pekerjaan Beton K-175 f'c 14,5Mpa 0.29 m3 - -
b. Pekerjaan Pembesian dengan besi beton polos 37.57 kg - -
c. Pekerjaan Bekisting 4.22 m2 - -
d. Pembongkaran Bekisting 4.22 m2 - -
33 Pek. Beton plat sirip tb. 7 cm, Mutu K-175 f'c 14,5Mpa
a. Pekerjaan Beton K-175 f'c 14,5Mpa 2.15 m3 - -
b. Pekerjaan Pembesian dengan besi beton polos 273.52 kg - -
c. Pekerjaan Bekisting 30.75 m2 - -
d. Pembongkaran Bekisting 30.75 m2 - -
34 Pek. Beton plat dudukan tb. 7 cm, Mutu K-175 f'c 14,5Mpa
a. Pekerjaan Beton K-175 f'c 14,5Mpa 1.60 m3 - -
b. Pekerjaan Pembesian dengan besi beton polos 203.11 kg - -
c. Pekerjaan Bekisting 22.84 m2 - -
d. Pembongkaran Bekisting 22.84 m2 - -
35 Pek. Beton plat dak tb. 12 cm, Ready Mix K-300 f'c 24,9Mpa (Non-Fly Ash)
a. Pekerjaan Beton K-300 f'c 24,9Mpa (Ready Mix) Non-Fly Ash 9.42 m3 - -
b. Pekerjaan Pembesian dengan besi beton polos 857.93 kg - -
No. URAIAN PEKERJAAN VOLUME HARGA SATUAN JUMLAH HARGA
( Rp ) ( Rp )
1 2 3 4 5
c. Pekerjaan Bekisting 78.54 m2 - -
d. Pembongkaran Bekisting 78.54 m2 - -
JUMLAH IV -
V PEKERJAAN PLESTERAN
1 Pek. Plesteran dinding 1165.81 m2 - -
2 Pek. Acian dinding 1165.81 m2 - -
3 Pek. Acian beton expose (15%) 75.33 m2 - -
4 Pek. Benangan Dinding dan Benangan Beton Expose (15%) 185.91 m1 - -
5 Pek. Tali air (atas keramik dinding toilet) 54.58 m1 - -
JUMLAH V -
VI PEKERJAAN PELAPIS LANTAI DAN DINDING
1 Pek. Homogenous Tile Lantai 60x60 cm (polish) 56.20 m2 - -
2 Pek. Keramik lantai 30x30 cm (unpolish) 12.05 m2 - -
3 Pek. Keramik dinding 30x60 cm 48.76 m2 - -
4 Pek. Keramik dinding 60x60 cm 49.48 m2 - -
5 Pek. Pasang pelapis dinding luar ACP PVDF (polos) tb.4 mm aluminium skin 32.55 m2 - -
ticknes 0,3 mm, aluminium alloy 5005 Rangka Hollow Galvanis 40.40 mm
6 Pek. Pasang pelapis dinding luar ACP PVDF (cutting) tb.4 mm aluminium skin 72.16 m2 - -
ticknes 0,3 mm, aluminium alloy 5005 Rangka Hollow Galvanis 40.40 mm
7 Pek. Pelapis dinding kalsiboard tb. 10 mm termasuk rangka hollow galvanis 40.40 102.30 m2 - -
mm
8 Pek. Pas. Glassblock 20x20 cm 6.24 m2 - -
9 Pek. Pas. Rooster dinding 20x40 cm 48.00 m2 - -
10 Pek. Bata tempel terakota 144.82 m2 - -
11 Pek. Pasang huruf letter timbul acrylic "GEDUNG SERBAGUNA" (Font = Arial 15.00 bh - -
tinggi 22 cm) tembus cahaya lampu LED Lengkap Rangka Besi Hollow
12 Pek. Pasang huruf letter timbul acrylic "KELURAHAN LONTAR", "KECAMATAN 46.00 bh - -
SAMBIKEREP", "KOTA SURABAYA" (Font = Arial tinggi 15 cm) tembus cahaya
lampu LED Lengkap Rangka Besi Hollow
JUMLAH VI -
VII PEKERJAAN KUSEN PINTU, DAN BOVEN
1 Pek. Pintu type P1 terdiri dari : hollow galvanis 50x100x1.2, hollow galvanis
40x40x0.8, plat besi tb. 3.2, engsel besi, grendel besi samping, grendel besi slot
bawah, gembok pintu, finish cat duco
a. hollow besi galvanis 50x100x1.2 144.60 m1 - -
b. hollow besi galvanis 40x40x0.8 69.12 m1 - -
c. plat besi tb. 3.2 mm 578.76 kg - -
d. engsel besi 36.00 bh - -
e. grendel besi samping 6.00 bh - -
f. grendel besi slot bawah 6.00 bh - -
g. gembok pintu 6.00 bh - -
h. finishing cat duco 100.52 m2 - -
2 Pek. Pintu type P2 terdiri dari : kusen WPC, daun pintu SWP 80x210, engsel pintu
, handle + kunci pintu
a. kusen WPC 20.40 m1 - -
b. daun pintu SWP 80x210 cm 4.00 unit - -
c. engsel pintu 12.00 stel - -
d. handle + kunci pintu 4.00 psg - -
3 Pek. Pintu type P3 terdiri dari : kusen WPC, daun pintu WPC 60x210, engsel
pintu, handle + kunci pintu
a. kusen WPC 28.20 m1 - -
b. daun pintu SWP 60x210 cm 6.00 unit - -
c. engsel pintu 18.00 stel - -
d. handle + kunci pintu 6.00 psg - -
4 Pek. Boven type BV1 terdiri dari : hollow galvanis 40x40, hollow galvanis 20x20,
finish cat mani + besi
a. hollow besi galvanis 40x40x 1.2 5.52 m' - -
b. hollow besi galvanis 20x20 x 1.2 7.00 m' - -
c. finish cat mani + besi 1.44 m2 - -
5 Pek. Boven type BV2 terdiri dari : kusen aluminium 4", kaca buram 5mm
a. kusen aluminium 4" 44.80 m' - -
No. URAIAN PEKERJAAN VOLUME HARGA SATUAN JUMLAH HARGA
( Rp ) ( Rp )
1 2 3 4 5
b. kaca buram 5mm 8.45 m2 - -
6 Pek. Sunscreen aluminium type SC 1
a. Pemasangan Louvre Sunscreen Warna coklat 288.08 m' - -
b. kusen aluminium 4" 66.72 m' - -
JUMLAH VII -
VIII PEKERJAAN RANGKA BESI DAN PENUTUP ATAP
1 Pek. Kolom baja WF 250.125.6.9 809.40 kg - -
2 Pek. Kuda-kuda WF 200.100.5.5.8 3130.88 kg - -
3 Pek. Konsol WF 150.75.5.7 189.84 kg - -
4 Pek. Irisan WF 200.100.5.5.8 381.44 kg - -
5 Pek. Irisan WF 150.75.5.7 53.76 kg - -
6 Pek. Gording C 150.50.20.2,3 3173.70 kg - -
7 Pek. Plat sambungan tb. 10 mm 222.87 kg - -
8 Pek. Plat landasan tb. 10 mm 94.20 kg - -
9 Pek. Plat penegar tb. 6 mm 335.72 kg - -
10 Pek. Plat penahan gording tb. 6 mm 95.37 kg - -
11 Pek. Kuda-kuda tipe 2
a. Hollow besi galvanis 150.75.3 mm 45.84 m1 - -
b. Hollow besi galvanis 100.50.3 mm 18.00 m1 - -
c. Dynabolt m12 36.00 bh - -
12 Pek. Kuda-kuda tipe 3
a. Hollow besi galvanis 150.75.3 mm 16.90 m1 - -
b. Hollow besi galvanis 100.50.3 mm 0.90 m1 - -
c. Dynabolt m12 30.00 bh - -
13 Pek. Kuda-kuda tipe 3A
a. Hollow besi galvanis 150.75.3 mm 22.62 m1 - -
b. Hollow besi galvanis 100.50.3 mm 1.08 m1 - -
c. Dynabolt m12 36.00 bh - -
14 Pek. Kuda-kuda tipe 4 (rangka atap baja ringan C75.0,75 + R30.0,45 Canal tinggi 66.12 m2 - -
75mm lebar 38mm)
15 Pek. Kuda-kuda tipe 5
a. Hollow besi galvanis 150.75.3 mm 34.32 m1 - -
b. Hollow besi galvanis 100.50.3 mm 1.08 m1 - -
c. Dynabolt m12 36.00 bh - -
16 Pek. Reng hollow besi galvanis 50.50 mm 47.40 m1 - -
17 Pek. Baut HTB Ø 12 mm 96.00 bh - -
18 Pek. Baut HTB Ø 16 mm 144.00 bh - -
19 Pek. Anchor bolt Ø 19 mm, h. 70 cm 96.00 bh - -
20 Pek. Pengikat gording besi Ø 12 mm 514.67 kg - -
21 Pek. Jarum keras (trekstang) Ø 12 mm 30.00 bh - -
22 Pek. Ikatan angin besi Ø 12 mm 212.44 kg - -
23 Pek. Penutup atap UPVC Double Layer 646.02 m2 - -
24 Pek. Penutup atap zincalume tb. 0,35 mm 104.33 m2 - -
25 Pek. Nok atap UPVC 31.95 m1 - -
26 Pek. Nok atap zincalume 8.77 m1 - -
27 Pek. Talang seng galvalume tb. 0,35 mm + rangka hollow galvanis 40.40
(bangunan utama)
a. Talang galvalume tb. 0,35mm 63.90 m1 - -
b. Hollow besi galvanis 40.40 mm 387.60 m1 - -
28 Pek. Talang seng galvalume tb. 0,35 mm + rangka hollow galvanis 40.40 (area
kuda-kuda tipe 5)
a. Talang galvalume tb. 0,35mm 17.64 m1 - -
b. Hollow besi galvanis 40.40 mm 106.54 m1 - -
29 Pek. Talang seng galvalume tb. 0,35 mm + rangka hollow galvanis 40.40 (area
kuda-kuda tipe 4)
a. Talang galvalume tb. 0,35mm 17.54 m1 - -
b. Hollow besi galvanis 40.40 mm 84.36 m1 - -
30 Pek. Listplank zincalume (penutup talang bangunan utama)
a. Penutup Dinding zincalume tb. 0,35 mm 54.31 m2 - -
b. Hollow besi galvanis 40.40 mm 100.86 m1 - -
31 Pek. Listplank ACP PVDF (polos) tb.4 mm aluminium skin ticknes 0,3 mm 17.02 m2 - -
(penutup talang area konsol)
No. URAIAN PEKERJAAN VOLUME HARGA SATUAN JUMLAH HARGA
( Rp ) ( Rp )
1 2 3 4 5
JUMLAH VIII -
IX PEKERJAAN PLAFOND
1 Pek. Plafond gypsumboard tb. 9 mm termasuk rangka hollow galvalume 40.40 mm 209.86 m2 - -
+ penggantung hollow galvalume 40.40 mm
2 Pek. Drop ceilling gypsumboard tb. 9 mm tinggi 20 cm termasuk rangka hollow 17.00 m1 - -
galvalume 40.40 mm
JUMLAH IX -
X PEKERJAAN PENGECATAN
1 Pek. Pengecatan dinding luar dan dalam 1241.14 m2 - -
2 Pek. Pengecatan dinding kalsiboard dan plafond gypsumboard 312.16 m2 - -
3 Pek. Pelapisan baja dan besi dengan meni + cat besi 511.58 m2 - -
4 Pek. Pengecatan waterproofing + serat fiber 108.00 m2 - -
5 Pek. Pengecatan epoxy lantai 2000 micron lengkap dengan garis lapangan 554.91 m2 - -
JUMLAH X -
XI PEKERJAAN MEKANIKAL, PLUMBING, DAN SANITAIR
1 Pek. Closet jongkok 4.00 unit - -
2 Pek. Wastafel + Kran wastafel Stainless Steel 4.00 bh - -
3 Pek. Kran Air Uk. Dia. 3/4" 5.00 bh - -
4 Pek. Floor Drain Stainless Steel 5.00 bh - -
5 Pek. Roof Drain Stainless Steel 32.00 bh - -
6 Pek. Instalasi pipa air bersih PVC AW Ø 3/4" 46.21 m1 - -
7 Pek. Instalasi pipa air bersih PVC AW Ø 1/2" 2.70 m1 - -
8 Pek. Instalasi pipa air bersih PVC AW Ø 1" 45.48 m1 - -
9 Pek. Instalasi pipa air bekas PVC AW Ø 3" 30.54 m1 - -
10 Pek. Instalasi pipa air hujan dan air kotor PVC AW Ø 4" 236.08 m1 - -
11 Pek. Septiktank meliputi :
a. Galian tanah 9.80 m3 - -
b. Rabat beton tb. 10 cm 1.22 m3 - -
c. Sloof 15x20 cm
c.1 Beton B Nol (K-175) 0.19 m3 - -
c.2 Pekerjaan Pembesian dengan besi beton polos 33.01 kg - -
c.3 Pekerjaan Bekisting Sloof 1.98 m2 - -
c.4 Pembongkaran Bekisitng 0.77 m2 - -
d. Kolom 15x15 cm
d.1 Beton B Nol (K-175) 0.20 m3 - -
d.2 Pekerjaan Pembesian dengan besi beton polos 30.72 kg - -
d.3 Pekerjaan Bekisting Kolom Praktis 2.16 m2 - -
d.4 Pembongkaran Bekisitng 2.16 m2 - -
e. Ring balok 15x15 cm
e.1 Beton B Nol (K-175) 0.14 m3 - -
e.2 Pekerjaan Pembesian dengan besi beton polos 32.26 kg - -
e.3 Pekerjaan Bekisting Balok 1.34 m2 - -
e.4 Pembongkaran Bekisitng 1.34 m2 - -
f. Plat beton tb. 10 cm
f.1 Beton B Nol (K-175) 0.36 m3 - -
f.2 Pekerjaan Pembesian dengan besi beton polos 43.43 kg - -
f.3 Pekerjaan Bekisting Plat 4.51 m2 - -
f.4 Pembongkaran Bekisitng 4.51 m2 - -
g. Pasangan bata trasram 1Pc : 3Ps 12.10 m2 - -
h. Bio septiktank Kap.2m3 1.00 unit - -
12 Pek. Pembuatan sumur resapan meliputi :
a. Galian tanah 2.83 m3 - -
b. Urug kerikil 7cm 0.08 m3 - -
c. Buis beton Ø 80cm 4.00 unit - -
d. Plat beton tb. 10cm
d.1 Beton B Nol (K-175) 0.11 m3 - -
d.2 Pekerjaan Pembesian dengan besi beton polos 13.60 kg - -
d.3 Pekerjaan Bekisting Plat 1.41 m2 - -
d.4 Pembongkaran Bekisitng 1.41 m2 - -
13 Pek. Tandon air bawah meliputi :
a. Galian tanah 8.57 m3 - -
b. Keramik lantai 40x40 3.75 m2 - -
c. Keramik dinding 30x60 11.20 m2 - -
No. URAIAN PEKERJAAN VOLUME HARGA SATUAN JUMLAH HARGA
( Rp ) ( Rp )
1 2 3 4 5
d. Rabat lantai tb. 5cm 0.25 m3 - -
e. Beton plat lantai tb. 15cm
e.1 Pekerjaan Beton K-300 (Ready Mix) Non-Fly Ash 0.76 m3 - -
e.2 Pekerjaan Pembesian dengan besi beton polos 68.82 kg - -
e.3 Pekerjaan Bekisting Plat 6.30 m2 - -
e.4 Pembongkaran Bekisitng 6.30 m2 - -
f. Beton dinding tb. 10cm
f.1 Pekerjaan Beton K-300 (Ready Mix) Non-Fly Ash 1.67 m3 - -
f.2 Pekerjaan Pembesian dengan besi beton polos 343.58 kg - -
f.3 Pekerjaan Bekisting Plat 16.66 m2 - -
f.4 Pembongkaran Bekisitng 16.66 m2 - -
g. Penutup beton bertulang tb. 7cm
g.1 Pekerjaan Beton K-300 (Ready Mix) Non-Fly Ash 0.02 m3 - -
g.2 Pekerjaan Pembesian dengan besi beton polos 2.22 kg - -
g.3 Pekerjaan Bekisting Plat 0.25 m2 - -
g.4 Pembongkaran Bekisitng 0.25 m2 - -
h. Pipa PVC 1" 1.50 m1 - -
i. Union Filter Air Filter Polyurethane P902550 1pc 1.00 bh - -
j. Kran pelampung 1.00 bh - -
14 Pek. Rumah pompa meliputi :
a. Galian tanah 1.73 m3 - -
b. Rabat lantai tb. 5cm 0.06 m3 - -
c. Pas. Bata rollag 1.10 m2 - -
d. Pas. Bata trasram 1pc : 3ps 5.34 m2 - -
e. Plesteran 1Pc : 3Ps 3.77 m2 - -
f. Penutup siku + plat bordes 22.94 kg - -
15 Pek. Tandon Air (Rooftank) Kap. 800 L 2.00 unit - -
16 Pek. Pompa Air Jet Pump Head maks. 100 m, Hisap maks. 50 m, kapasitas maks. 1.00 unit - -
32 L/min
JUMLAH XI -
XII PEKERJAAN LISTRIK
1 Pek. Instalasi titik lampu 46.00 ttk - -
2 Pek. Instalasi stop kontak + titik stop kontak 9.00 ttk - -
3 Pek. Pasang lampu LED 5 watt + WD Fitting 9.00 bh - -
4 Pek. Pasang lampu Down Light M Slim 8 Inch LED 11 watt 19.00 bh - -
5 Pek. Pasang lampu sorot clear white 100 watt 18.00 bh - -
6 Pek. Pasang saklar tunggal 8.00 bh - -
7 Pek. Pasang saklar ganda 11.00 bh - -
8 Pek. Panel LVMDP Lengkap Dengan Box Panel dan Asesories 1.00 unit - -
9 Pasang Baru Daya Listrik PLN Kapasitas 6.600 VA, Termasuk yaitu: 1.00 set - -
-. Biaya Penyambungan (BP)
-. Biaya Uang Jaminan Langganan (UJL) Pasca Bayar PLN
-. Biaya Sertifikat Layak Operasional (SLO) PLN
-. Biaya Materai
-. Meter Listrik
-. Instalasi Kelistrikan
-. Tes Commisioning
JUMLAH XII -
XIII PEKERJAAN PENANGKAL PETIR
1 Pemasangan Penangkal Petir Viking Radius 50 M 1.00 unit - -
2 Pemasangan Kabel BC 1 x 70 mm2 10.00 m1 - -
3 Pemasangan Kabel NYY 1 x 70 mm2 37.17 m1 - -
4 Pemasangan Grounding rod dia 1 " panjang 6 meter 1.00 unit - -
5 Pekerjaan Bak kontrol 60x60x85 cm 1.00 unit - -
6 Testing dan Commissioning termasuk ijin-ijin penangkal petir 1.00 unit - -
JUMLAH XIII -
XIV PEKERJAAN LAIN - LAIN
1 Pembersihan Akhir 1.00 ls - -
JUMLAH XIV -
JUMLAH B -
ANALISA HARGA SATUAN PEKERJAAN
PEKERJAAN UMUM
Pengukuran Uitzet dengan Waterpass / Theodolite NILAI HSPK: - KOEF. SAT HARSAT HARGA
SATUAN: m2 (Rp.) (Rp.)
Upah:
Surveyor 0 .0080 O.H - -
Pekerja 0 .0120 O.H - -
Jumlah: -
Alat:
Sewa Water Pass 0 .0040 hari - -
Sewa Theodolite 0 .0040 hari - -
Jumlah: -
Jumlah: -
Biaya Keuntungan & Overhead: -
JUMLAH TOTAL: -
Pemasangan Bouwplank NILAI HSPK: - KOEF. SAT HARSAT HARGA
SATUAN: ttk (Rp.) (Rp.)
Upah:
Mandor 0 .0050 O.H - -
Kepala Tukang 0 .0100 O.H - -
Tukang 0 .1000 O.H - -
Pekerja 0 .1000 O.H - -
Jumlah: -
Bahan/Material:
Kayu Meranti Balok 0 .0120 m3 - -
Kayu Meranti Bekisting 0 .0070 m3 - -
Paku Biasa uk. 2-5 inch 0 .0200 Kg - -
Jumlah: -
Jumlah: -
Biaya Keuntungan & Overhead: -
JUMLAH TOTAL: -
Penggalian Tanah untuk Konstruksi NILAI HSPK: - KOEF. SAT HARSAT HARGA
SATUAN: m3 (Rp.) (Rp.)
Upah:
Mandor 0.0250 O.H - -
Pekerja 0.7500 O.H - -
Jumlah: -
Jumlah: -
Biaya Keuntungan & Overhead: -
JUMLAH TOTAL: -
Pekerjaan Boring Ø 30 cm dengan Alat Bantu NILAI HSPK: - KOEF. SAT HARSAT HARGA
Mesin
SATUAN: m1 (Rp.) (Rp.)
Upah:
Mandor 0 .0206 O.H - -
Pekerja 0 .4114 O.H - -
Jumlah: -
Alat:
Sewa alat bantu Bor Strouss Mesin Mini Crane 0.4000 jam - -
Jumlah: -
Jumlah: -
Biaya Keuntungan & Overhead: -
JUMLAH TOTAL: -
Pekerjaan Boring Ø 40 cm dengan Alat Bantu NILAI HSPK: - KOEF. SAT HARSAT HARGA
Mesin
SATUAN: m1 (Rp.) (Rp.)
Upah:
Mandor 0 .0240 O.H - -
Pekerja 0 .4800 O.H - -
Jumlah: -
Alat:
Sewa alat bantu Bor Strouss Mesin Mini Crane 0.4000 jam - -
Jumlah: -
Jumlah: -
Biaya Keuntungan & Overhead: -
JUMLAH TOTAL: -
Pengurugan Pasir Padat Bawah Pondasi Dan NILAI HSPK: - KOEF. SAT HARSAT HARGA
Sloof
SATUAN: m3 (Rp.) (Rp.)
Upah:
Mandor 0.0100 O.H - -
Pekerja 0.3000 O.H - -
Jumlah: -
Bahan:
Pasir Urug 1.2000 m3 - -
Jumlah: -
Jumlah: -
Biaya Keuntungan & Overhead: -
JUMLAH TOTAL: -
Pengurugan Pasir Padat Bawah Lantai NILAI HSPK: - KOEF. SAT HARSAT HARGA
SATUAN: m3 (Rp.) (Rp.)
Upah:
Mandor 0.0100 O.H - -
Pekerja 0.3000 O.H - -
Jumlah: -
Bahan:
Pasir Urug 1.2000 m3 - -
Jumlah: -
Jumlah: -
Biaya Keuntungan & Overhead: -
JUMLAH TOTAL: -
Pengurugan Koral NILAI HSPK: - KOEF. SAT HARSAT HARGA
SATUAN: m3 (Rp.) (Rp.)
Upah:
Mandor 0.0100 O.H - -
Pekerja 0.3000 O.H - -
Jumlah: -
Bahan:
Batu pecah mesin uk. 1/2 1.2000 m3 - -
Jumlah: -
Jumlah: -
Biaya Keuntungan & Overhead: -
JUMLAH TOTAL: -
Pengurugan Limestone Urug Pemadatan NILAI HSPK: - KOEF. SAT HARSAT HARGA
Dengan Alat Berat
SATUAN: m3 (Rp.) (Rp.)
Upah:
Mandor 0 .0210 O.H - -
Pekerja 0 .2500 O.H - -
Jumlah: -
Bahan:
Limestone 1.2000 m3 - -
Jumlah: -
Peralatan :
Baby Roller termasuk Mob & Demob,operator,BBM 0.0088 jam - -
Jumlah: -
Jumlah: -
Biaya Keuntungan & Overhead: -
JUMLAH TOTAL: -
Pekerjaan Pemasangan Batu Kali Belah 15/20 NILAI HSPK: - KOEF. SAT HARSAT HARGA
cm (1 Pc : 4 Ps)
SATUAN: m3 (Rp.) (Rp.)
Upah:
Mandor 0.0150 O.H - -
Kepala Tukang 0 .0100 O.H - -
Tukang 0.1000 O.H - -
Pekerja 0.3000 O.H - -
Jumlah: -
Bahan:
Semen Pc 40kg 4.0750 Zak - -
Pasir Pasang 0.5200 m3 - -
Batu Kali Belah uk. 15/20 1.2000 m3 - -
Jumlah: -
Jumlah: -
Biaya Keuntungan & Overhead: -
JUMLAH TOTAL: -
Pekerjaan Pemasangan 1m³ pondasi batu NILAI HSPK: - KOEF. SAT HARSAT HARGA
kumbung campuran 1SP :3PP
SATUAN: m3 (Rp.) (Rp.)
Upah:
Mandor 0.0750 O.H - -
Kepala Tukang 0 .0600 O.H - -
Tukang 0.6000 O.H - -
Pekerja 1.5000 O.H - -
Jumlah: -
Bahan:
Semen Pc 40kg 136.0000 kg - -
Pasir Pasang 0.2460 m3 - -
Batu kumbung 27.0000 bh - -
Jumlah: -
Jumlah: -
Biaya Keuntungan & Overhead: -
JUMLAH TOTAL: -
Pemasangan Dinding Trasram 1 Pc : 3 Ps tebal NILAI HSPK: - KOEF. SAT HARSAT HARGA
1/2 bata
SATUAN: m2 (Rp.) (Rp.)
Upah:
Mandor 0.0150 O.H - -
Kepala Tukang 0 .0100 O.H - -
Tukang 0.1000 O.H - -
Pekerja 0.3000 O.H - -
Jumlah: -
Bahan:
Semen Pc 40kg 0.2874 Zak - -
Pasir Pasang 0 .0400 m3 - -
Bata merah (kelas 1) 6 5.0000 Buah - -
Jumlah: -
Jumlah: -
Biaya Keuntungan & Overhead: -
JUMLAH TOTAL: -
Pemasangan Rolag 1 Pc : 3 Ps tebal 1 bata NILAI HSPK: - KOEF. SAT HARSAT HARGA
SATUAN: m2 (Rp.) (Rp.)
Upah:
Mandor 0.0300 O.H - -
Kepala Tukang 0 .0200 O.H - -
Tukang 0.2000 O.H - -
Pekerja 0.6000 O.H - -
Jumlah: -
Bahan:
Semen Pc 40kg 0.8238 Zak - -
Pasir Pasang 0 .0910 m3 - -
Bata merah (kelas 1) 1 35.0000 Buah - -
Jumlah: -
Jumlah: -
Biaya Keuntungan & Overhead: -
JUMLAH TOTAL: -
Pemasangan Dinding Biasa 1 Pc : 5 Ps tebal NILAI HSPK: - KOEF. SAT HARSAT HARGA
1/2 bata
SATUAN: m2 (Rp.) (Rp.)
Upah:
Mandor 0.0150 O.H - -
Kepala Tukang 0 .0100 O.H - -
Tukang 0.1000 O.H - -
Pekerja 0.3000 O.H - -
Jumlah: -
Bahan:
Semen Pc 40kg 0.1936 Zak - -
Pasir Pasang 0 .0450 m3 - -
Bata merah (kelas 1) 6 5.0000 Buah - -
Jumlah: -
Jumlah: -
Biaya Keuntungan & Overhead: -
JUMLAH TOTAL: -
Pemasangan Glass blok 20x20 cm NILAI HSPK: - KOEF. SAT HARSAT HARGA
SATUAN: m2 (Rp.) (Rp.)
Upah:
Mandor 0.0150 O.H - -
Kepala Tukang 0 .0100 O.H - -
Tukang 0.1000 O.H - -
Pekerja 0.3000 O.H - -
Jumlah: -
Bahan:
Glass blok 20x20 cm 2 5.0000 bh - -
Semen Pc 40kg 1 2.8000 kg - -
Pasir Pasang 0 .0350 m3 - -
Jumlah: -
Jumlah: -
Biaya Keuntungan & Overhead: -
JUMLAH TOTAL: -
Pemasangan Roster Beton 20x40 cm NILAI HSPK: - KOEF. SAT HARSAT HARGA
SATUAN: m2 (Rp.) (Rp.)
Upah:
Mandor 0.0150 O.H - -
Kepala Tukang 0 .0100 O.H - -
Tukang 0.1000 O.H - -
Pekerja 0.3000 O.H - -
Jumlah: -
Bahan:
Rooster beton 20x40 cm 1 2.5000 bh - -
Semen Pc 40kg 1 2.8000 kg - -
Pasir Pasang 0 .0350 m3 - -
Jumlah: -
Jumlah: -
Biaya Keuntungan & Overhead: -
JUMLAH TOTAL: -
Plesteran Halus Trasram 1 Pc : 3 Ps tebal 1.5 NILAI HSPK: - KOEF. SAT HARSAT HARGA
cm
SATUAN: m2 (Rp.) (Rp.)
Upah:
Mandor 0.0150 O.H - -
Kepala Tukang 0 .0150 O.H - -
Tukang 0.1500 O.H - -
Pekerja 0.3000 O.H - -
Jumlah: -
Bahan:
Semen Pc 40kg 0.1944 Zak - -
Pasir Pasang 0 .0230 m3 - -
Jumlah: -
Jumlah: -
Biaya Keuntungan & Overhead: -
JUMLAH TOTAL: -
Plesteran Halus Biasa 1 Pc : 5 Ps tebal 1.5 cm NILAI HSPK: - KOEF. SAT HARSAT HARGA
SATUAN: m2 (Rp.) (Rp.)
Upah:
Mandor 0.0150 O.H - -
Kepala Tukang 0 .0100 O.H - -
Tukang 0.1000 O.H - -
Pekerja 0.3000 O.H - -
Jumlah: -
Bahan:
Semen Pc 40kg 0.1037 Zak - -
Pasir Pasang 0 .0260 m3 - -
Jumlah: -
Jumlah: -
Biaya Keuntungan & Overhead: -
JUMLAH TOTAL: -
Pekerjaan Benangan Beton 1 Pc: 2Ps (volume NILAI HSPK: - KOEF. SAT HARSAT HARGA
dihitung 15%)
SATUAN: m1 (Rp.) (Rp.)
Upah:
Mandor 0.0040 O.H - -
Kepala Tukang 0 .0403 O.H - -
Tukang 0.0400 O.H - -
Pekerja 0.0800 O.H - -
Jumlah: -
Bahan:
Semen Pc 40kg 0.0125 Zak - -
Pasir Pasang 0 .0130 m3 - -
Jumlah: -
Jumlah: -
Biaya Keuntungan & Overhead: -
JUMLAH TOTAL: -
Pekerjaan Tali Air NILAI HSPK: - KOEF. SAT HARSAT HARGA
SATUAN: m1 (Rp.) (Rp.)
Upah:
Kepala Tukang 0 .1200 O.H - -
Jumlah: -
Bahan:
Semen Pc 40kg 0.1300 kg - -
Pasir Pasang 0 .0090 m3 - -
Jumlah: -
Jumlah: -
Biaya Keuntungan & Overhead: -
JUMLAH TOTAL: -
Pekerjaan Acian Dinding NILAI HSPK: - KOEF. SAT HARSAT HARGA
SATUAN: m2 (Rp.) (Rp.)
Upah:
Mandor 0 .0100 O.H - -
Kepala Tukang 0 .0100 O.H - -
Tukang 0 .1000 O.H - -
Pekerja 0 .2000 O.H - -
Jumlah: -
Bahan:
Semen Pc 40kg 0 .0650 Zak - -
Jumlah: -
Jumlah: -
Biaya Keuntungan & Overhead: -
JUMLAH TOTAL: -
Pekerjaan Acian Beton (volume dihitung 15%) NILAI HSPK: - KOEF. SAT HARSAT HARGA
SATUAN: m2 (Rp.) (Rp.)
Upah:
Mandor 0 .0100 O.H - -
Kepala Tukang 0 .0100 O.H - -
Tukang 0 .1000 O.H - -
Pekerja 0 .2000 O.H - -
Jumlah: -
Bahan:
Semen Pc 40kg 0 .0650 Zak - -
Jumlah: -
Jumlah: -
Biaya Keuntungan & Overhead: -
JUMLAH TOTAL: -
Pemasangan Bata Tempel Terakota NILAI HSPK: - KOEF. SAT HARSAT HARGA
SATUAN: m2 (Rp.) (Rp.)
Upah:
Mandor 0.0240 O.H - -
Kepala Tukang 0 .0120 O.H - -
Tukang 0.1200 O.H - -
Pekerja 0.2400 O.H - -
Jumlah: -
Bahan:
Semen Pc 40kg 1 2.4400 Kg - -
Semen berwarna yiyitan 0.2750 Kg - -
Pasir Pasang 0 .0250 m3 - -
Bata tempel terakota 1.0500 m2 - -
Jumlah: -
Jumlah: -
Biaya Keuntungan & Overhead: -
JUMLAH TOTAL: -
Pemasangan Lantai Keramik 30x30 cm NILAI HSPK: - KOEF. SAT HARSAT HARGA
(Unpolished)
SATUAN: m2 (Rp.) (Rp.)
Upah:
Mandor 0.0350 O.H - -
Kepala Tukang 0 .0350 O.H - -
Tukang 0.3500 O.H - -
Pekerja 0.7000 O.H - -
Jumlah: -
Bahan:
Semen Pc 40kg 1 0.0000 Kg - -
Semen berwarna yiyitan 0.5000 Kg - -
Pasir Pasang 0 .0450 m3 - -
Keramik Lantai Toilet 30x30cm (motif; warna; Unpolished) 1 .0500 m2 - -
Jumlah: -
Jumlah: -
Biaya Keuntungan & Overhead: -
JUMLAH TOTAL: -
Pemasangan Homogenous Tile Lantai Uk. NILAI HSPK: - KOEF. SAT HARSAT HARGA
60x60 cm (polished)
SATUAN: m2 (Rp.) (Rp.)
Upah:
Mandor 0.0350 O.H - -
Kepala Tukang 0 .0350 O.H - -
Tukang 0.3500 O.H - -
Pekerja 0.7000 O.H - -
Jumlah: -
Bahan:
Semen Pc 40kg 1 0.0000 Kg - -
Semen berwarna yiyitan 0.5000 Kg - -
Pasir Pasang 0 .0450 m3 - -
Homogenous Tile Lantai Uk. 60x60 cm (polished) 1 .0500 m2 - -
Jumlah: -
Jumlah: -
Biaya Keuntungan & Overhead: -
JUMLAH TOTAL: -
Pemasangan Keramik Dinding 60x60 cm NILAI HSPK: - KOEF. SAT HARSAT HARGA
SATUAN: m2 (Rp.) (Rp.)
Upah:
Mandor 0.0450 O.H - -
Kepala Tukang 0 .0450 O.H - -
Tukang 0.4500 O.H - -
Pekerja 0.9000 O.H - -
Jumlah: -
Bahan:
Semen Pc 40kg 9.3000 kg - -
Semen berwarna yiyitan 1.9400 Kg - -
Pasir Pasang 0 .0180 m3 - -
Keramik Dinding 60x60cm (motif; warna; polished) 1 .0500 Buah - -
Jumlah: -
Jumlah: -
Biaya Keuntungan & Overhead: -
JUMLAH TOTAL: -
Pemasangan Keramik Dinding 30x60 cm NILAI HSPK: - KOEF. SAT HARSAT HARGA
SATUAN: m2 (Rp.) (Rp.)
Upah:
Mandor 0.0450 O.H - -
Kepala Tukang 0 .0450 O.H - -
Tukang 0.4500 O.H - -
Pekerja 0.9000 O.H - -
Jumlah: -
Bahan:
Semen Pc 40kg 0.2325 Kg - -
Semen berwarna yiyitan 1.9400 Kg - -
Pasir Pasang 0 .0180 m3 - -
Keramik Dinding 30x60cm (motif; warna; Unpolished) 1 .0500 Buah - -
Jumlah: -
Jumlah: -
Biaya Keuntungan & Overhead: -
JUMLAH TOTAL: -
Memasang Pelapis Listplank ACP PVDF tb.4 NILAI HSPK: - KOEF. SAT HARSAT HARGA
mm (Aluminium Composite Panel) tanpa
rangka
SATUAN: m2 (Rp.) (Rp.)
Upah:
Mandor 0.1000 O.H - -
Kepala Tukang 0 .0100 O.H - -
Tukang 0.1000 O.H - -
Pekerja 0.1000 O.H - -
Jumlah: -
Alat:
Sewa scafoding 0.1700 set - -
Jumlah: -
Bahan:
Aluminium Composite Panel PVDF tb. 4 mm 0 .3359 lbr - -
Paku Sekrup 2 5.0000 bh - -
Sealant 1 .0000 tube - -
Jumlah: -
Jumlah: -
Biaya Keuntungan & Overhead: -
JUMLAH TOTAL: -
Memasang Pelapis Dinding ACP ( Aluminium NILAI HSPK: - KOEF. SAT HARSAT HARGA
Composite Panel ) PVDF polos
SATUAN: m2 (Rp.) (Rp.)
Upah:
Mandor 0.2000 O.H - -
Kepala Tukang 0 .0200 O.H - -
Tukang 0.2000 O.H - -
Pekerja 0.2000 O.H - -
Jumlah: -
Alat:
Sewa scafoding 0.1700 set - -
Jumlah: -
Bahan:
Aluminium Composite Panel PVDF tb. 4 mm 0 .3359 lbr - -
Bracket siku / spigot / stiffner 0 .6000 btg - -
Paku / Sekrup Beton 0 .5000 kg - -
Paku Sekrup 2 5.0000 bh - -
Sealant 1 .0000 tube - -
Jumlah: -
Jumlah: -
Biaya Keuntungan & Overhead: -
JUMLAH TOTAL: -
Memasang Pelapis Dinding ACP ( Aluminium NILAI HSPK: - KOEF. SAT HARSAT HARGA
Composite Panel ) PVDF cutting
SATUAN: m2 (Rp.) (Rp.)
Upah:
Mandor 0.2000 O.H - -
Kepala Tukang 0 .0200 O.H - -
Tukang 0.2000 O.H - -
Pekerja 0.2000 O.H - -
Jasa Cutting ACP 1 .0000 m2 - -
Jumlah: -
Alat:
Sewa scafoding 0.1700 set - -
Jumlah: -
Bahan:
Aluminium Composite Panel PVDF tb. 4 mm 0 .3359 lbr - -
Bracket siku / spigot / stiffner 0 .6000 btg - -
Paku / Sekrup Beton 0 .5000 kg - -
Paku Sekrup 2 5.0000 bh - -
Sealant 1 .0000 tube - -
Jumlah: -
Jumlah: -
Biaya Keuntungan & Overhead: -
JUMLAH TOTAL: -
Memasang Pelapis dinding kalsiboard tb. 10 NILAI HSPK: - KOEF. SAT HARSAT HARGA
mm termasuk rangka hollow galvanis 40.40
mm
SATUAN: m2 (Rp.) (Rp.)
Upah:
Mandor 0.0500 O.H - -
Kepala Tukang 0 .0500 O.H - -
Tukang 0.4000 O.H - -
Pekerja 0.3000 O.H - -
Jumlah: -
Bahan:
Hollow galvanis 40.40.1,2 6 .0000 m¹ - -
Kalsiboard 10mm 1 .0500 m2 - -
Sekrup 2 0.0000 bh - -
Semen Compound 20kg 0 .0750 Zak - -
Tape Plafond / Plasband 2 .0000 m' - -
Jumlah: -
Jumlah: -
Biaya Keuntungan & Overhead: -
JUMLAH TOTAL: -
Pemasangan Kaca Buram tebal 5 mm NILAI HSPK: - KOEF. SAT HARSAT HARGA
SATUAN: m2 (Rp.) (Rp.)
Upah:
Mandor 0.0150 O.H - -
Kepala Tukang 0 .0150 O.H - -
Tukang 0.1500 O.H - -
Pekerja 0.0150 O.H - -
Jumlah: -
Bahan:
Kaca Buram t =5mm 1.1000 m2 - -
Sealent 0 .2700 tube - -
Jumlah: -
Jumlah: -
Biaya Keuntungan & Overhead: -
JUMLAH TOTAL: -
Pemasangan Handle + Kunci Tanam Besar 2x NILAI HSPK: - KOEF. SAT HARSAT HARGA
Putar
SATUAN: bh (Rp.) (Rp.)
Upah:
Mandor 0.0050 O.H - -
Kepala Tukang 0 .0100 O.H - -
Tukang 0.5000 O.H - -
Pekerja 0.0100 O.H - -
Jumlah: -
Bahan:
Handle +Kunci Tanam besar 2x putar 1 .0000 Buah - -
Jumlah: -
Jumlah: -
Biaya Keuntungan & Overhead: -
JUMLAH TOTAL: -
Pemasangan Engsel Untuk Pintu NILAI HSPK: - KOEF. SAT HARSAT HARGA
SATUAN: stel (Rp.) (Rp.)
Upah:
Mandor 0.0008 O.H - -
Kepala Tukang 0 .0150 O.H - -
Tukang 0.1500 O.H - -
Pekerja 0.0150 O.H - -
Jumlah: -
Bahan:
Engsel untuk Pintu 1 .0000 stel - -
Jumlah: -
Jumlah: -
Biaya Keuntungan & Overhead: -
JUMLAH TOTAL: -
Pemasangan Engsel Untuk Pintu Besi NILAI HSPK: - KOEF. SAT HARSAT HARGA
SATUAN: bh (Rp.) (Rp.)
Upah:
Mandor 0.0008 O.H - -
Kepala Tukang 0 .0150 O.H - -
Tukang 0.1500 O.H - -
Pekerja 0.0150 O.H - -
Jumlah: -
Bahan:
Engsel untuk Pintu Besi 1 .0000 bh - -
Jumlah: -
Jumlah: -
Biaya Keuntungan & Overhead: -
JUMLAH TOTAL: -
Pemasangan grendel besi samping NILAI HSPK: - KOEF. SAT HARSAT HARGA
SATUAN: bh (Rp.) (Rp.)
Upah:
Tukang 0.1200 O.H - -
Pekerja 0.0600 O.H - -
Jumlah: -
Bahan:
Grendel Besi Samping 1 .0000 Buah - -
Jumlah: -
Jumlah: -
Biaya Keuntungan & Overhead: -
JUMLAH TOTAL: -
Pemasangan grendel besi slot bawah NILAI HSPK: - KOEF. SAT HARSAT HARGA
SATUAN: bh (Rp.) (Rp.)
Upah:
Tukang 0.1200 O.H - -
Pekerja 0.0600 O.H - -
Jumlah: -
Bahan:
Grendel Besi Slot Bawah 1 .0000 Buah - -
Jumlah: -
Jumlah: -
Biaya Keuntungan & Overhead: -
JUMLAH TOTAL: -
Pemasangan gembok pintu NILAI HSPK: - KOEF. SAT HARSAT HARGA
SATUAN: bh (Rp.) (Rp.)
Upah:
Tukang 0.0600 O.H - -
Pekerja 0.0300 O.H - -
Jumlah: -
Bahan:
Gembok pintu 1.0000 Buah - -
Jumlah: -
Jumlah: -
Biaya Keuntungan & Overhead: -
JUMLAH TOTAL: -
Pemasangan Kusen Aluminium Powder NILAI HSPK: - KOEF. SAT HARSAT HARGA
Coating Profil 4" tebal 1.2mm warna coklat
SATUAN: m1 (Rp.) (Rp.)
Upah:
Mandor 0.0021 O.H - -
Kepala Tukang 0 .0043 O.H - -
Tukang 0.0430 O.H - -
Pekerja 0.0430 O.H - -
Jumlah: -
Bahan:
Kusen Aluminium Powder Coating 4" tebal 1.2 mm Warna coklat 1 .1000 m1 - -
Skrup 1 0.0000 Buah - -
Sealent 0 .0600 tube - -
Jumlah: -
Jumlah: -
Biaya Keuntungan & Overhead: -
JUMLAH TOTAL: -
Pemasangan Kusen WPC NILAI HSPK: - KOEF. SAT HARSAT HARGA
SATUAN: m1 (Rp.) (Rp.)
Upah:
Mandor 0.0021 O.H - -
Kepala Tukang 0 .0043 O.H - -
Tukang 0.0430 O.H - -
Pekerja 0.0430 O.H - -
Jumlah: -
Bahan:
Kusen WPC 1.1000 m1 - -
Skrup 1 0.0000 Buah - -
Sealent 0 .0600 tube - -
Jumlah: -
Jumlah: -
Biaya Keuntungan & Overhead: -
JUMLAH TOTAL: -
Pemasangan Louvre Sunscreen Warna coklat NILAI HSPK: - KOEF. SAT HARSAT HARGA
SATUAN: m1 (Rp.) (Rp.)
Upah:
Mandor 0.0043 O.H - -
Kepala Tukang 0 .0022 O.H - -
Tukang 0.0430 O.H - -
Pekerja 0.0430 O.H - -
Jumlah: -
Bahan:
Louvre Aluminium 4" tebal 1.5mm Warna coklat 1 .1000 m1 - -
Sealent 0 .0600 tube - -
Skrup 2 .0000 Buah - -
Jumlah: -
Jumlah: -
Biaya Keuntungan & Overhead: -
JUMLAH TOTAL: -
Pemasangan Daun Pintu Wood Plastic NILAI HSPK: - KOEF. SAT HARSAT HARGA
Composite Ukuran 82 x 210 cm
SATUAN: unit (Rp.) (Rp.)
Upah:
Tukang 0.0800 O.H - -
Pekerja 0.0800 O.H - -
Jumlah: -
Bahan:
Daun Pintu SWP + Finishing Politur (82x210 cm) 1 .0000 unit - -
Jumlah: -
Jumlah: -
Biaya Keuntungan & Overhead: -
JUMLAH TOTAL: -
Pemasangan Wood Plastic Composite Ukuran NILAI HSPK: - KOEF. SAT HARSAT HARGA
62 x 210 cm
SATUAN: unit (Rp.) (Rp.)
Upah:
Tukang 0.0800 O.H - -
Pekerja 0.0800 O.H - -
Jumlah: -
Bahan:
Daun Pintu Wood Plastic Composite (62x210 cm) 1 .0000 unit - -
Jumlah: -
Jumlah: -
Biaya Keuntungan & Overhead: -
JUMLAH TOTAL: -
Pemasangan Hollow galvanis 75.150.3,0 NILAI HSPK: - KOEF. SAT HARSAT HARGA
SATUAN: m1 (Rp.) (Rp.)
Upah:
Mandor 0 .0054 O.H - -
Kepala Tukang 0 .0180 O.H - -
Tukang 0 .1800 O.H - -
Pekerja 0 .1080 O.H - -
Jumlah: -
Bahan:
Hollow galvanis 75x150 mm tebal 3mm 1 .1000 m' - -
Perlengkapan 15 % harga bahan 1 .0000 ls - -
Jumlah: -
Jumlah: -
Biaya Keuntungan & Overhead: -
JUMLAH TOTAL: -
Pemasangan Hollow galvanis 50.100.3,0 NILAI HSPK: - KOEF. SAT HARSAT HARGA
SATUAN: m1 (Rp.) (Rp.)
Upah:
Mandor 0 .0054 O.H - -
Kepala Tukang 0 .0180 O.H - -
Tukang 0 .1800 O.H - -
Pekerja 0 .1080 O.H - -
Jumlah: -
Bahan:
Hollow galvanis 50x100 mm tebal 3mm 1 .1000 m' - -
Perlengkapan 15 % harga bahan 1 .0000 ls - -
Jumlah: -
Jumlah: -
Biaya Keuntungan & Overhead: -
JUMLAH TOTAL: -
Pemasangan Hollow galvanis 50.100.1,2 NILAI HSPK: - KOEF. SAT HARSAT HARGA
SATUAN: m1 (Rp.) (Rp.)
Upah:
Mandor 0 .0054 O.H - -
Kepala Tukang 0 .0180 O.H - -
Tukang 0 .1800 O.H - -
Pekerja 0 .1080 O.H - -
Jumlah: -
Bahan:
Hollow galvanis 50x100 mm tebal 1,2mm 1 .1000 m' - -
Perlengkapan 15 % harga bahan 1 .0000 ls - -
Jumlah: -
Jumlah: -
Biaya Keuntungan & Overhead: -
JUMLAH TOTAL: -
Pemasangan Hollow galvanis 50.50.1,2 NILAI HSPK: - KOEF. SAT HARSAT HARGA
SATUAN: m1 (Rp.) (Rp.)
Upah:
Mandor 0 .0054 O.H - -
Kepala Tukang 0 .0180 O.H - -
Tukang 0 .1800 O.H - -
Pekerja 0 .1080 O.H - -
Jumlah: -
Bahan:
Hollow galvanis 50x50 mm tebal 1,2mm 1 .1000 m' - -
Perlengkapan 15 % harga bahan 1 .0000 ls - -
Jumlah: -
Jumlah: -
Biaya Keuntungan & Overhead: -
JUMLAH TOTAL: -
Pekerjaan Hollow galvanis 40.40.1,2 NILAI HSPK: - KOEF. SAT HARSAT HARGA
SATUAN: m1 (Rp.) (Rp.)
Upah:
Mandor 0 .0054 O.H - -
Kepala Tukang 0 .0180 O.H - -
Tukang 0 .1800 O.H - -
Pekerja 0 .1080 O.H - -
Jumlah: -
Bahan:
Hollow galvanis 40x40 mm tebal 1,2mm 1 .1000 m' - -
Perlengkapan 15 % harga bahan 1 .0000 ls - -
Jumlah: -
Jumlah: -
Biaya Keuntungan & Overhead: -
JUMLAH TOTAL: -
Pekerjaan Hollow galvanis 40.40.0,8 NILAI HSPK: - KOEF. SAT HARSAT HARGA
SATUAN: m1 (Rp.) (Rp.)
Upah:
Mandor 0 .0054 O.H - -
Kepala Tukang 0 .0180 O.H - -
Tukang 0 .1800 O.H - -
Pekerja 0 .1080 O.H - -
Jumlah: -
Bahan:
Hollow galvanis 40x40 mm tebal 0,8mm 1 .1000 m' - -
Perlengkapan 15 % harga bahan 1 .0000 ls - -
Jumlah: -
Jumlah: -
Biaya Keuntungan & Overhead: -
JUMLAH TOTAL: -
Pekerjaan Hollow galvanis 20.20.1,2 NILAI HSPK: - KOEF. SAT HARSAT HARGA
SATUAN: m1 (Rp.) (Rp.)
Upah:
Mandor 0 .0054 O.H - -
Kepala Tukang 0 .0180 O.H - -
Tukang 0 .1800 O.H - -
Pekerja 0 .1080 O.H - -
Jumlah: -
Bahan:
Hollow galvanis 20x20 mm tebal 1,2mm 1 .1000 m' - -
Perlengkapan 15 % harga bahan 1 .0000 ls - -
Jumlah: -
Jumlah: -
Biaya Keuntungan & Overhead: -
JUMLAH TOTAL: -
Pemasangan Plafond Gypsumboard 9 mm, NILAI HSPK: - KOEF. SAT HARSAT HARGA
Rangka Hollow Galvalume 40x40mm +
Penggantung 40x40mm
SATUAN: m2 (Rp.) (Rp.)
Upah:
Mandor 0.0250 O.H - -
Kepala Tukang 0 .0500 O.H - -
Tukang 0.1000 O.H - -
Pekerja 0.1000 O.H - -
Jumlah: -
Bahan:
Hollow Galvalum 40x40mm tebal 0,4 mm 4 .0000 m' - -
Penggantung Hollow Galvalum 40x40mm tebal 0,4 mm 3 .0000 m' - -
Rod Hanger dia 8mm 6 .0000 m - -
Gypsumboard uk. 240x120 cm tebal 9 mm 0 .3819 Lembar - -
Skrup 1 2.0000 Buah - -
Semen Compound 20kg 0 .0750 Zak - -
Tape Plafond / Plasband 2 .0000 m' - -
Jumlah: -
Jumlah: -
Biaya Keuntungan & Overhead: -
JUMLAH TOTAL: -
Pemasangan Plafond Gypsumboard 9 mm, NILAI HSPK: - KOEF. SAT HARSAT HARGA
Rangka Hollow Galvalume 40x40mm +
Penggantung 40x40mm (Drop ceilling)
SATUAN: m2 (Rp.) (Rp.)
Upah:
Mandor 0.0050 O.H - -
Kepala Tukang 0 .0050 O.H - -
Tukang 0.0500 O.H - -
Pekerja 0.1500 O.H - -
Jumlah: -
Bahan:
Hollow Galvalum 40x40mm tebal 0,4 mm 3 .0000 m' - -
Gypsumboard uk. 240x120 cm tebal 9 mm 0 .1008 Lembar - -
Skrup 8 .0000 Buah - -
Semen Compound 20kg 0 .0750 Zak - -
Tape Plafond / Plasband 1 .0000 m' - -
Jumlah: -
Jumlah: -
Biaya Keuntungan & Overhead: -
JUMLAH TOTAL: -
Pengecatan Dinding Interior NILAI HSPK: - KOEF. SAT HARSAT HARGA
SATUAN: m2 (Rp.) (Rp.)
Upah:
Mandor 0.0063 O.H - -
Tukang 0.0630 O.H - -
Pekerja 0.0200 O.H - -
Jumlah: -
Bahan:
Cat Dinding Interior Spotless/Washable (2.5 ltr) 0 .1040 kaleng - -
Plamir Dinding 0 .1000 kg - -
Kertas gosok 0.1000 lbr - -
Jumlah: -
Jumlah: -
Biaya Keuntungan & Overhead: -
JUMLAH TOTAL: -
Pengecatan Besi + Menie NILAI HSPK: - KOEF. SAT HARSAT HARGA
SATUAN: m2 (Rp.) (Rp.)
Upah:
Mandor 0.0202 O.H - -
Tukang 0.2018 O.H - -
Pekerja 0.0202 O.H - -
Jumlah: -
Bahan:
Cat Meni Besi 0.1000 Kg - -
Cat Besi 0.1000 Kg - -
Kuas 0 .0200 bh - -
Jumlah: -
Jumlah: -
Biaya Keuntungan & Overhead: -
JUMLAH TOTAL: -
Pelapisan Waterproofing + Serat fiber NILAI HSPK: - KOEF. SAT HARSAT HARGA
SATUAN: m2 (Rp.) (Rp.)
Upah:
Mandor 0.0025 O.H - -
Kepala Tukang 0 .0075 O.H - -
Tukang 0.0750 O.H - -
Pekerja 0.0500 O.H - -
Jumlah: -
Bahan:
Waterproofing 0.3500 Kg - -
Serat fiber 1 .0000 m2 - -
Jumlah: -
Jumlah: -
Biaya Keuntungan & Overhead: -
JUMLAH TOTAL: -
Pelapisan Cat Epoxy 2000 micron lengkap NILAI HSPK: - KOEF. SAT HARSAT HARGA
dengan garis lapangan
SATUAN: m2 (Rp.) (Rp.)
Upah:
Mandor 0.0025 O.H - -
Kepala Tukang 0 .0075 O.H - -
Tukang 0.0750 O.H - -
Pekerja 0.0500 O.H - -
Jumlah: -
Bahan:
Cat Epoxy 1 .0000 Kg - -
Jumlah: -
Jumlah: -
Biaya Keuntungan & Overhead: -
JUMLAH TOTAL: -
Pemasangan Instalasi Titik Stop Kontak NILAI HSPK: - KOEF. SAT HARSAT HARGA
Gedung (elv. 30cm dari lantai)
SATUAN: titik (Rp.) (Rp.)
Upah:
Kepala Tukang 0 .0500 O.H - -
Tukang 0.2000 O.H - -
Pekerja 0.0010 O.H - -
Jumlah: -
Bahan
Stop Kontak Dinding 1 .0000 Buah - -
Kabel NYM 3 x 2,5 mm 1 0.0000 m1 - -
Pipa Conduit Ø 5/8" 1 .0000 Lonjor - -
T doos PVC 1 .0000 Buah - -
Jumlah: -
Jumlah: -
Biaya Keuntungan & Overhead: -
JUMLAH TOTAL: -
Pemasangan Instalasi Titik Lampu Gedung NILAI HSPK: - KOEF. SAT HARSAT HARGA
SATUAN: titik (Rp.) (Rp.)
Upah:
Kepala Tukang 0 .0500 O.H - -
Tukang 0.5000 O.H - -
Pekerja 0.3000 O.H - -
Jumlah: -
Bahan
Isolator 4.0000 Buah - -
Kabel NYM 2 x 2,5 mm 1 0.0000 m1 - -
Pipa Conduit Ø 5/8" 1 .0000 Lonjor - -
T doos PVC 1 .0000 Buah - -
Jumlah: -
Jumlah: -
Biaya Keuntungan & Overhead: -
JUMLAH TOTAL: -
Pemasangan Saklar Tunggal (elv. 1.5m dari NILAI HSPK: - KOEF. SAT HARSAT HARGA
lantai)
SATUAN: bh (Rp.) (Rp.)
Upah:
Kepala Tukang 0 .0500 O.H - -
Tukang 0.2000 O.H - -
Pekerja 0.0010 O.H - -
Jumlah: -
Bahan
Saklar Tunggal 1 .0000 Buah - -
Jumlah: -
Jumlah: -
Biaya Keuntungan & Overhead: -
JUMLAH TOTAL: -
Pemasangan Saklar Ganda (elv. 1.5m dari NILAI HSPK: - KOEF. SAT HARSAT HARGA
lantai)
SATUAN: bh (Rp.) (Rp.)
Upah:
Kepala Tukang 0 .0500 O.H - -
Tukang 0.2000 O.H - -
Pekerja 0.0010 O.H - -
Jumlah: -
Bahan
Saklar Ganda 1 .0000 Buah - -
Jumlah: -
Jumlah: -
Biaya Keuntungan & Overhead: -
JUMLAH TOTAL: -
Pemasangan Lampu Down Light M Slim 8 Inch NILAI HSPK: - KOEF. SAT HARSAT HARGA
LED 11 watt
SATUAN: bh (Rp.) (Rp.)
Upah:
Tukang 0.1000 O.H - -
Pekerja 0.1000 O.H - -
Jumlah: -
Bahan
Lampu Down Light M Slim 8 Inch LED 11 watt 1 .0000 Buah - -
Jumlah: -
Jumlah: -
Biaya Keuntungan & Overhead: -
JUMLAH TOTAL: -
Pemasangan Lampu LED 5 Watt + WD Fitting NILAI HSPK: - KOEF. SAT HARSAT HARGA
SATUAN: bh (Rp.) (Rp.)
Upah:
Tukang 0.1000 O.H - -
Pekerja 0.1000 O.H - -
Jumlah: -
Bahan
Lampu LED 5 Watt 1 .0000 Buah - -
WD Fitting 1.0000 Buah - -
Jumlah: -
Jumlah: -
Biaya Keuntungan & Overhead: -
JUMLAH TOTAL: -
Pemasangan Lampu sorot clear white 100 watt NILAI HSPK: - KOEF. SAT HARSAT HARGA
SATUAN: bh (Rp.) (Rp.)
Upah:
Tukang 0.5000 O.H - -
Pekerja 0.5000 O.H - -
Jumlah: -
Bahan
Lampu Sorot Floodlight BVP151 100W 4000K Neutral White 1 .0000 Buah - -
Jumlah: -
Jumlah: -
Biaya Keuntungan & Overhead: -
JUMLAH TOTAL: -
Pemasangan Closet Jongkok NILAI HSPK: - KOEF. SAT HARSAT HARGA
SATUAN: unit (Rp.) (Rp.)
Upah:
Mandor 0.1600 O.H - -
Kepala Tukang 0 .1500 O.H - -
Tukang 1.5000 O.H - -
Pekerja 1.0000 O.H - -
Jumlah: -
Bahan:
Kloset Jongkok 1.0000 Buah - -
Perlengkapan 6 % Harga closed 0 .0600 % - -
Jumlah: -
Jumlah: -
Biaya Keuntungan & Overhead: -
JUMLAH TOTAL: -
Pemasangan Wastafel Dinding + Kran NILAI HSPK: - KOEF. SAT HARSAT HARGA
Stainless Steel
SATUAN: unit (Rp.) (Rp.)
Upah:
Mandor 0 .0600 O.H - -
Kepala Tukang 0 .1500 O.H - -
Tukang 1 .4500 O.H - -
Pekerja 1 .2000 O.H - -
Jumlah: -
Bahan:
Wastafel Dinding 1 .0000 Buah - -
Perlengkapan Wastafel (12% harga) 0 .1200 % - -
Kran Wastafel Stainless Steel 1 .0000 Buah - -
Sealtape 1 .0000 Buah - -
Semen Pc 40kg 6 .0000 kg - -
Pasir Pasang 0 .0100 m3 - -
Jumlah: -
Jumlah: -
Biaya Keuntungan & Overhead: -
JUMLAH TOTAL: -
Pemasangan Floor Drain Stainless Steel NILAI HSPK: - KOEF. SAT HARSAT HARGA
SATUAN: bh (Rp.) (Rp.)
Upah:
Kepala Tukang 0 .0300 O.H - -
Tukang 0.1500 O.H - -
Jumlah: -
Bahan:
Floor Drain Stainless Steel 1 .0000 Buah - -
Jumlah: -
Jumlah: -
Biaya Keuntungan & Overhead: -
JUMLAH TOTAL: -
Pemasangan Kran Air Kuningan Ø 3/4" NILAI HSPK: - KOEF. SAT HARSAT HARGA
SATUAN: bh (Rp.) (Rp.)
Upah:
Kepala Tukang 0 .0300 O.H - -
Tukang 0.1500 O.H - -
Jumlah: -
Bahan:
Kran air Kuningan Ø 3/4" 1 .0000 Buah - -
Rol TBA 1 .0000 Buah - -
Jumlah: -
Jumlah: -
Biaya Keuntungan & Overhead: -
JUMLAH TOTAL: -
Pemasangan Pipa Air Kotor PVC AW Ø 4" NILAI HSPK: - KOEF. SAT HARSAT HARGA
SATUAN: m1 (Rp.) (Rp.)
Upah:
Mandor 0.0018 O.H - -
Kepala Tukang 0.0060 O.H - -
Tukang 0.0600 O.H - -
Pekerja 0.0360 O.H - -
Jumlah: -
Bahan:
Pipa PVC AW Ø 4" (@4 meter) 0.3000 btg - -
Jumlah: -
Jumlah: -
Biaya Keuntungan & Overhead: -
JUMLAH TOTAL: -
Pemasangan Pipa Air Bekas PVC AW Ø 3" NILAI HSPK: - KOEF. SAT HARSAT HARGA
SATUAN: m1 (Rp.) (Rp.)
Upah:
Mandor 0.0018 O.H - -
Kepala Tukang 0.0060 O.H - -
Tukang 0.0600 O.H - -
Pekerja 0.0360 O.H - -
Jumlah: -
Bahan:
Pipa PVC AW Ø 3" (@4 meter) 0.3000 btg - -
Jumlah: -
Jumlah: -
Biaya Keuntungan & Overhead: -
JUMLAH TOTAL: -
Pemasangan Pipa Air Bersih PVC AW Ø 1" NILAI HSPK: - KOEF. SAT HARSAT HARGA
SATUAN: m1 (Rp.) (Rp.)
Upah:
Mandor 0.0018 O.H - -
Kepala Tukang 0.0060 O.H - -
Tukang 0.0600 O.H - -
Pekerja 0.0360 O.H - -
Jumlah: -
Bahan:
Pipa PVC AW Ø 1" (@4 meter) 0.3000 btg - -
Jumlah: -
Jumlah: -
Biaya Keuntungan & Overhead: -
JUMLAH TOTAL: -
Pemasangan Pipa Air Bersih PVC AW Ø 1/2" NILAI HSPK: - KOEF. SAT HARSAT HARGA
SATUAN: m1 (Rp.) (Rp.)
Upah:
Mandor 0.0018 O.H - -
Kepala Tukang 0.0060 O.H - -
Tukang 0.0600 O.H - -
Pekerja 0.0360 O.H - -
Jumlah: -
Bahan:
Pipa PVC AW Ø 1/2" (@4 meter) 0.3000 btg - -
Jumlah: -
Jumlah: -
Biaya Keuntungan & Overhead: -
JUMLAH TOTAL: -
Pemasangan Pipa Air Bersih PVC AW Ø 3/4" NILAI HSPK: - KOEF. SAT HARSAT HARGA
SATUAN: m1 (Rp.) (Rp.)
Upah:
Mandor 0.0018 O.H - -
Kepala Tukang 0.0060 O.H - -
Tukang 0.0600 O.H - -
Pekerja 0.0360 O.H - -
Jumlah: -
Bahan:
Pipa PVC AW Ø 3/4" (@4 meter) 0.3000 btg - -
Jumlah: -
Jumlah: -
Biaya Keuntungan & Overhead: -
JUMLAH TOTAL: -
Pemasangan Roof Drain Stainless Steel NILAI HSPK: - KOEF. SAT HARSAT HARGA
SATUAN: bh (Rp.) (Rp.)
Upah:
Mandor 0.0018 O.H - -
Kepala Tukang 0.0060 O.H - -
Tukang 0.0600 O.H - -
Pekerja 0.0360 O.H - -
Jumlah: -
Bahan:
Roof Drain Stainless Steel 1.0000 bh - -
Jumlah: -
Jumlah: -
Biaya Keuntungan & Overhead: -
JUMLAH TOTAL: -
Pemasangan Tandon Air (Rooftank) Kap. 800 L NILAI HSPK: - KOEF. SAT HARSAT HARGA
SATUAN: unit (Rp.) (Rp.)
Upah:
Mandor 0.0018 O.H - -
Kepala Tukang 0.0060 O.H - -
Tukang 0.0600 O.H - -
Pekerja 0.0360 O.H - -
Jumlah: -
Bahan:
Tandon Air (Rooftank) Kap. 800 L 1.0000 unit - -
Jumlah: -
Jumlah: -
Biaya Keuntungan & Overhead: -
JUMLAH TOTAL: -
Pemasangan Pompa Air Transfer NILAI HSPK: - KOEF. SAT HARSAT HARGA
SATUAN: unit (Rp.) (Rp.)
Upah:
Mandor 0.0018 O.H - -
Kepala Tukang 0.0060 O.H - -
Tukang 0.0600 O.H - -
Pekerja 0.0360 O.H - -
Jumlah: -
Bahan:
Pompa Air Jet Pump PC-503 BIT 1.0000 unit - -
Jumlah: -
Jumlah: -
Biaya Keuntungan & Overhead: -
JUMLAH TOTAL: -
Pemasangan Penangkal Petir Viking Radius 50 NILAI HSPK: - KOEF. SAT HARSAT HARGA
M
SATUAN: unit (Rp.) (Rp.)
Upah:
Mandor 0.2000 O.H - -
Kepala Tukang 0.5000 O.H - -
Tukang 0.5000 O.H - -
Pekerja 2.0000 O.H - -
Jumlah: -
Bahan:
Head Penangkal Petir non radioaktif radius 50 m ( VIKING ) 1.0000 unit - -
Jumlah: -
Jumlah: -
Biaya Keuntungan & Overhead: -
JUMLAH TOTAL: -
Pemasangan Down Conductor Kabel BC 1 x 70 NILAI HSPK: - KOEF. SAT HARSAT HARGA
mm2
SATUAN: m1 (Rp.) (Rp.)
Upah:
Mandor 0.0170 O.H - -
Kepala Tukang 0.0330 O.H - -
Tukang 0.1660 O.H - -
Pekerja 0.1660 O.H - -
Jumlah: -
Bahan:
Kabel BC 1 x 70 mm2 ( SUPREME ) 1.0000 bh - -
Pipa PVC type aw Ø 3/4" 2.0000 m1 - -
Material bantu 15% dari kabel 0.1500 % - -
Jumlah: -
Jumlah: -
Biaya Keuntungan & Overhead: -
JUMLAH TOTAL: -
Pemasangan Down Conductor Kabel NYY 1 x NILAI HSPK: - KOEF. SAT HARSAT HARGA
70 mm2
SATUAN: m1 (Rp.) (Rp.)
Upah:
Mandor 0.0170 O.H - -
Kepala Tukang 0.0330 O.H - -
Tukang 0.1660 O.H - -
Pekerja 0.1660 O.H - -
Jumlah: -
Bahan:
Kabel NYY 1 x 70 mm2 ( SUPREME ) 1.0000 bh - -
Pipa PVC type aw Ø 3/4" 2.0000 m1 - -
Material bantu 15% dari kabel 0.1500 % - -
Jumlah: -
Jumlah: -
Biaya Keuntungan & Overhead: -
JUMLAH TOTAL: -
Pemasangan Dudukan Tiang, Tiang Penangkal NILAI HSPK: - KOEF. SAT HARSAT HARGA
Petir (2 Meter)
SATUAN: bh (Rp.) (Rp.)
Upah:
Mandor 0.0170 O.H - -
Kepala Tukang 0.0330 O.H - -
Tukang 0.1660 O.H - -
Pekerja 0.1660 O.H - -
Jumlah: -
Bahan:
Dudukan tiang penangkal petir 1.0000 bh - -
Pipa PVC type aw Ø 3/4" 3.0000 m1 - -
Material bantu 15% dari kabel 0.1500 % - -
Jumlah: -
Jumlah: -
Biaya Keuntungan & Overhead: -
JUMLAH TOTAL: -
Pemasangan Grounding rod dia 1 " panjang 6 NILAI HSPK: - KOEF. SAT HARSAT HARGA
meter
SATUAN: bh (Rp.) (Rp.)
Upah:
Mandor 0.2000 O.H - -
Kepala Tukang 0.5000 O.H - -
Tukang 0.5000 O.H - -
Pekerja 2.0000 O.H - -
Jumlah: -
Bahan:
Grounding rod dia 1 " panjang 6 meter 1.0000 bh - -
Jumlah: -
Jumlah: -
Biaya Keuntungan & Overhead: -
JUMLAH TOTAL: -
Pekerjaan Bak kontrol 60x60x85 (penangkal NILAI HSPK: - KOEF. SAT HARSAT HARGA
petir)
SATUAN: unit (Rp.) (Rp.)
Upah:
Galian tanah 0.3060 m3 - -
Urug pasir tb. 20 cm 0.0720 m3 - -
Urug kerikil 0.0360 m3 - -
Pas. Bata trasram 1pc : 3ps 1.9200 m2 - -
Plesteran 1Pc : 3Ps 1.9200 m2 - -
Beton B Nol (K-175) 0.0252 m3 - -
Pembesian dengan besi beton polos 3.2021 Kg - -
Bekisting Plat 0.3600 m2 - -
Pembongkaran Bekisitng 0.3600 m2 - -
Jumlah: -
Jumlah: -
JUMLAH TOTAL: -
ANALISA HARGA SATUAN PEKERJAAN
PEKERJAAN BETON
Rabat Beton Bawah Pondasi & Sloof NILAI HSPK: - HARSAT HARGA
KOEF. SAT
SATUAN: m3 (Rp.) (Rp.)
Upah:
Mandor 0 .0083 O.H - -
Kepala Tukang 0 .0028 O.H - -
Tukang 0 .2750 O.H - -
Pekerja 1 .6500 O.H - -
Jumlah: -
Bahan:
Semen Pc 40kg 8 .1500 Zak - -
Pasir Cor 0 .4806 m3 - -
Batu pecah mesin uk. 1/2 0 .5416 m3 - -
Jumlah: -
Jumlah: -
Biaya Keuntungan & Overhead: -
JUMLAH TOTAL: -
Beton B Nol (K-175) NILAI HSPK: - HARSAT HARGA
KOEF. SAT
SATUAN: m3 (Rp.) (Rp.)
Upah:
Mandor 0 .0083 O.H - -
Kepala Tukang 0 .0028 O.H - -
Tukang 0 .2750 O.H - -
Pekerja 1 .6500 O.H - -
Jumlah: -
Bahan:
Semen Pc 40kg 8 .1500 Zak - -
Pasir Cor 0 .4806 m3 - -
Batu pecah mesin uk. 1/2 0 .5416 m3 - -
Jumlah: -
Jumlah: -
Biaya Keuntungan & Overhead: -
JUMLAH TOTAL: -
Pekerjaan Beton K-300 (Ready Mix) Non-Fly
NILAI HSPK: - HARSAT HARGA
Ash KOEF. SAT
SATUAN: m3 (Rp.) (Rp.)
Upah:
Mandor 0 .0830 O.H - -
Kepala Tukang 0 .0280 O.H - -
Tukang 0 .2750 O.H - -
Pekerja 1 .6500 O.H - -
Jumlah: -
Bahan:
Beton Ready Mix K-300 (Non-Fly Ash) 1 .0200 m3 - -
Jumlah: -
Alat:
Sewa Concrete Pump (min. 3 jam) 0 .1200 jam - -
Jumlah: -
Jumlah: -
Biaya Keuntungan & Overhead: -
JUMLAH TOTAL: -
Pekerjaan Pembesian dengan besi beton ulir NILAI HSPK: - HARSAT HARGA
KOEF. SAT
SATUAN: kg (Rp.) (Rp.)
Upah:
Mandor 0 .0004 O.H - -
Kepala Tukang 0 .0007 O.H - -
Tukang 0 .0070 O.H - -
Pekerja 0 .0070 O.H - -
Jumlah: -
Bahan:
Besi beton ulir 1 .0500 Kg - -
Kawat Bendrat 0 .0150 Kg - -
Jumlah: -
Jumlah: -
Biaya Keuntungan & Overhead: -
JUMLAH TOTAL: -
Pekerjaan Pembesian dengan besi beton polos NILAI HSPK: - HARSAT HARGA
KOEF. SAT
SATUAN: kg (Rp.) (Rp.)
Upah:
Mandor 0 .0004 O.H - -
Kepala Tukang 0 .0007 O.H - -
Tukang 0 .0070 O.H - -
Pekerja 0 .0070 O.H - -
Jumlah: -
Bahan:
Besi beton polos 1 .0500 Kg - -
Kawat Bendrat 0 .0150 Kg - -
Jumlah: -
Jumlah: -
Biaya Keuntungan & Overhead: -
JUMLAH TOTAL: -
Pekerjaan Pembesian dengan Wiremesh NILAI HSPK: - HARSAT HARGA
KOEF. SAT
SATUAN: m2 (Rp.) (Rp.)
Upah:
Mandor 0 .0013 O.H - -
Kepala Tukang 0 .0022 O.H - -
Tukang 0 .0253 O.H - -
Pekerja 0 .0253 O.H - -
Jumlah: -
Bahan:
Wiremesh M6 0 .0970 lembar - -
Kawat Bendrat 0 .0500 Kg - -
Jumlah: -
Jumlah: -
Biaya Keuntungan & Overhead: -
JUMLAH TOTAL: -
Pekerjaan Bekisting Pondasi NILAI HSPK: - HARSAT HARGA
KOEF. SAT
SATUAN: m2 (Rp.) (Rp.)
Upah:
Mandor 0 .0260 O.H - -
Kepala Tukang 0 .2600 O.H - -
Pekerja 0 .5200 O.H - -
Upah 1x Pakai Jumlah: -
Bahan:
Kayu Meranti Bekisting 0 .0450 m3 - -
Paku Biasa uk. 2-5 inch 0 .3000 Kg - -
Minyak Bekisting 0 .1000 ltr - -
Bahan 1x Pakai Jumlah: -
Bahan 3x Pakai = (Total bahan x 0.333) 0 .3333 x - -
Jumlah: -
Bekisting 3x Pakai
Upah 1 .0000 m2 - -
Bahan 1 .0000 m2 - -
Jumlah: -
Jumlah: -
Biaya Keuntungan & Overhead: -
JUMLAH TOTAL: -
Pekerjaan Bekisting Sloof NILAI HSPK: - HARSAT HARGA
KOEF. SAT
KOEF. SAT
SATUAN: m2 (Rp.) (Rp.)
Upah:
Mandor 0 .0260 O.H - -
Kepala Tukang 0 .0260 O.H - -
Tukang 0 .2600 O.H - -
Pekerja 0 .5200 O.H - -
Upah 1x Pakai Jumlah: -
Bahan:
Kayu Meranti Bekisting 0 .0450 m3 - -
Paku Biasa uk. 2-5 inch 0 .3000 Kg - -
Minyak Bekisting 0 .1000 ltr - -
Bahan 1x Pakai Jumlah: -
Bahan 3x Pakai = (Total bahan x 0.333) 0 .3333 x - -
Jumlah: -
Bekisting 3x Pakai
Upah 1 .0000 m2 - -
Bahan 1 .0000 m2 - -
Jumlah: -
Jumlah: -
Biaya Keuntungan & Overhead: -
JUMLAH TOTAL: -
Pekerjaan Bekisting Kolom NILAI HSPK: - HARSAT HARGA
KOEF. SAT
SATUAN: m2 (Rp.) (Rp.)
Upah:
Mandor 0 .0330 O.H - -
Kepala Tukang 0 .0330 O.H - -
Tukang 0 .3300 O.H - -
Pekerja 0 .6600 O.H - -
Upah 1x Pakai Jumlah: -
Bahan:
Kayu Meranti Bekisting 0 .0400 m3 - -
Paku Biasa uk. 2-5 inch 0 .4000 Kg - -
Minyak Bekisting 0 .2000 ltr - -
Kayu Meranti Balok 0 .0150 m3 - -
Triplek Phenolic 1 sisi 12 mm uk. 122 x 244 cm 0 .3500 lembar - -
Dolken Kayu Gelam Ø 8-10cm p=4m 2 .0000 btg - -
Bahan 1x Pakai Jumlah: -
Bahan 2x Pakai = (Total bahan x 0.50) 0 .5000 x - -
Jumlah: -
Bekisting 2x Pakai
Upah 1 .0000 m2 - -
Bahan 1 .0000 m2 - -
Jumlah: -
Jumlah: -
Biaya Keuntungan & Overhead: -
JUMLAH TOTAL: -
Pekerjaan Bekisting Balok NILAI HSPK: - HARSAT HARGA
KOEF. SAT
SATUAN: m2 (Rp.) (Rp.)
Upah:
Mandor 0 .0330 O.H - -
Kepala Tukang 0 .0330 O.H - -
Tukang 0 .3300 O.H - -
Pekerja 0 .6600 O.H - -
Upah 1x Pakai Jumlah: -
Bahan:
Kayu Meranti Bekisting 0 .0400 m3 - -
Paku Biasa uk. 2-5 inch 0 .4000 Kg - -
Minyak Bekisting 0 .2000 ltr - -
Kayu Meranti Balok 0 .0180 m3 - -
Triplek Phenolic 1 sisi 12 mm uk. 122 x 244 cm 0 .3500 lembar - -
Dolken Kayu Gelam Ø 8-10cm p=4m 2 .0000 btg - -
Bahan 1x Pakai Jumlah: -
Bahan 2x Pakai = (Total bahan x 0.50) 0 .5000 x - -
Jumlah: -
Bekisting 2x Pakai
Upah 1 .0000 m2 - -
Bahan 1 .0000 m2 - -
Jumlah: -
Jumlah: -
Biaya Keuntungan & Overhead: -
JUMLAH TOTAL: -
Pekerjaan Bekisting Plat NILAI HSPK: - HARSAT HARGA
KOEF. SAT
SATUAN: m2 (Rp.) (Rp.)
Upah:
Mandor 0 .0330 O.H - -
Kepala Tukang 0 .0330 O.H - -
Tukang 0 .3300 O.H - -
Pekerja 0 .6600 O.H - -
Upah 1x Pakai Jumlah: -
Bahan:
Kayu Meranti Bekisting 0 .0400 m3 - -
Paku Biasa uk. 2-5 inch 0 .4000 Kg - -
Minyak Bekisting 0 .2000 ltr - -
Kayu Meranti Balok 0 .0150 m3 - -
Triplek Phenolic 1 sisi 12 mm uk. 122 x 244 cm 0 .3500 lembar - -
Dolken Kayu Gelam Ø 8-10cm p=4m 6 .0000 btg - -
Bahan 1x Pakai Jumlah: -
Bahan 3x Pakai = (Total bahan x 0.333) 0 .3333 x - -
Jumlah: -
Bekisting 3x Pakai
Upah 1 .0000 m2 - -
Bahan 1 .0000 m2 - -
Jumlah: -
Jumlah: -
Biaya Keuntungan & Overhead: -
JUMLAH TOTAL: -
Pekerjaan Bekisting Kolom Praktis, NILAI HSPK: - HARSAT HARGA
KOEF. SAT
Balok Praktis, dan Plat Praktis SATUAN: m2 (Rp.) (Rp.)
Upah:
Mandor 0 .0260 O.H - -
Kepala Tukang 0 .0260 O.H - -
Tukang 0 .2600 O.H - -
Pekerja 0 .5200 O.H - -
Upah 1x Pakai Jumlah: -
Bahan:
Kayu Meranti Bekisting 0 .0450 m3 - -
Paku Biasa uk. 2-5 inch 0 .3000 Kg - -
Minyak Bekisting 0 .1000 ltr - -
Bahan 1x Pakai Jumlah: -
Bahan 3x Pakai = (Total bahan x 0.333) 0 .3333 x - -
Jumlah: -
Bekisting 3x Pakai
Upah 1 .0000 m2 - -
Bahan 1 .0000 m2 - -
Jumlah: -
Jumlah: -
Biaya Keuntungan & Overhead: -
JUMLAH TOTAL: -
Pembongkaran Bekisitng NILAI HSPK: - HARSAT HARGA
KOEF. SAT
SATUAN: m1 (Rp.) (Rp.)
Upah:
Mandor 0 .0060 O.H - -
Pekerja 0 .0600 O.H - -
Jumlah: -
Jumlah: -
Biaya Keuntungan & Overhead: -
JUMLAH TOTAL: -
ANALISA HARGA SATUAN PEKERJAAN
PEKERJAAN ATAP
Pemasangan Kuda-kuda Baja WF NILAI HSPK: #REF! HARSAT HARGA
KOEF. SAT
SATUAN: kg (Rp.) (Rp.)
Upah:
Mandor 0.0030 O.H - -
Kepala Tukang 0.0060 O.H - -
Tukang 0.0600 O.H - -
Pekerja 0.0600 O.H - -
Jumlah: -
Bahan:
Baja profil WF 1.1500 kg - -
Elektroda baja 0.0200 kg - -
Sewa Welding Set (min 5 jam) 0.0140 Hari - -
Jumlah: -
Jumlah: -
Biaya Keuntungan & Overhead: -
JUMLAH TOTAL: -
Pemasangan Gording Baja CNP NILAI HSPK: #REF! HARSAT HARGA
KOEF. SAT
SATUAN: kg (Rp.) (Rp.)
Upah:
Mandor 0.0030 O.H - -
Kepala Tukang 0.0060 O.H - -
Tukang 0.0600 O.H - -
Pekerja 0.0600 O.H - -
Jumlah: -
Bahan:
Baja Profil CNP 1.1500 kg - -
Elektroda baja 0.0200 kg - -
Sewa Welding Set (min 5 jam) 0.0140 Hari - -
Jumlah: -
Jumlah: -
Biaya Keuntungan & Overhead: -
JUMLAH TOTAL: -
Pemasangan Baja Plat NILAI HSPK: #REF! HARSAT HARGA
KOEF. SAT
SATUAN: kg (Rp.) (Rp.)
Upah:
Mandor 0.0030 O.H - -
Kepala Tukang 0.0060 O.H - -
Tukang 0.0600 O.H - -
Pekerja 0.0600 O.H - -
Jumlah: -
Bahan:
Baja Plat 1.1500 kg - -
Elektroda baja 0.0200 kg - -
Sewa Welding Set (min 5 jam) 0.0140 Hari - -
Jumlah: -
Jumlah: -
Biaya Keuntungan & Overhead: -
JUMLAH TOTAL: -
Pemasangan Besi Ikatan Angin, pengikat
NILAI HSPK: #REF! HARSAT HARGA
gording KOEF. SAT
SATUAN: kg (Rp.) (Rp.)
Upah:
Mandor 0.0030 O.H - -
Kepala Tukang 0.0060 O.H - -
Tukang 0.0600 O.H - -
Pekerja 0.0600 O.H - -
Jumlah: -
Bahan:
Besi beton 1.1500 kg - -
Jumlah: -
Jumlah: -
Biaya Keuntungan & Overhead: -
JUMLAH TOTAL: -
Pemasangan Angkur Bolt dia 19 mm NILAI HSPK: #REF! HARSAT HARGA
KOEF. SAT
SATUAN: bh (Rp.) (Rp.)
Upah:
Mandor 0.0030 O.H - -
Kepala Tukang 0.0060 O.H - -
Pekerja 0.0600 O.H - -
Jumlah: -
Bahan:
Angkur dia 19mm 1.0000 buah - -
Jumlah: -
Jumlah: -
Biaya Keuntungan & Overhead: -
JUMLAH TOTAL: -
Pemasangan Dynabolt m12 NILAI HSPK: #REF! HARSAT HARGA
KOEF. SAT
SATUAN: bh (Rp.) (Rp.)
Upah:
Mandor 0.0003 O.H - -
Kepala Tukang 0.0015 O.H - -
Pekerja 0.0030 O.H - -
Jumlah: -
Bahan:
Dynabolt m12 1.0000 buah - -
Jumlah: -
Jumlah: -
Biaya Keuntungan & Overhead: -
JUMLAH TOTAL: -
Pemasangan jarum keras (waltermoor) Ø 12 NILAI HSPK: #REF! HARSAT HARGA
KOEF. SAT
SATUAN: bh (Rp.) (Rp.)
Upah:
Mandor 0.0030 O.H - -
Kepala Tukang 0.0060 O.H - -
Pekerja 0.0600 O.H - -
Jumlah: -
Bahan:
Jarum keras (waltermoor) Ø 12 1.0000 buah - -
Jumlah: -
Jumlah: -
Biaya Keuntungan & Overhead: -
JUMLAH TOTAL: -
Pemasangan Mur Baut HTB 16 mm NILAI HSPK: #REF! HARSAT HARGA
KOEF. SAT
SATUAN: bh (Rp.) (Rp.)
Upah:
Mandor 0.0015 O.H - -
Kepala Tukang 0.0030 O.H - -
Pekerja 0.0030 O.H - -
Jumlah: -
Bahan:
Baut HTB 16 mm 1.0000 buah - -
Jumlah: -
Jumlah: -
Biaya Keuntungan & Overhead: -
JUMLAH TOTAL: -
Pemasangan Mur Baut HTB 12 mm NILAI HSPK: #REF! HARSAT HARGA
KOEF. SAT
SATUAN: bh (Rp.) (Rp.)
Upah:
Mandor 0.0015 O.H - -
Kepala Tukang 0.0030 O.H - -
Pekerja 0.0030 O.H - -
Jumlah: -
Bahan:
Baut HTB 12 mm 1.0000 buah - -
Jumlah: -
Jumlah: -
Biaya Keuntungan & Overhead: -
JUMLAH TOTAL: -
Pemasangan Penutup Atap UPVC NILAI HSPK: #REF! HARSAT HARGA
KOEF. SAT
SATUAN: m2 (Rp.) (Rp.)
Upah:
Mandor 0.0080 O.H - -
Kepala Tukang 0.0080 O.H - -
Tukang 0.0750 O.H - -
Pekerja 0.1500 O.H - -
Jumlah: -
Bahan:
Atap UPVC double layer polos 1.1000 m2 - -
Skrup SDS 6x75 mm 4.0000 bh - -
Skrup SDS 6x95 mm 2.0000 bh - -
Roof Seal 6.0000 set - -
Jumlah: -
Jumlah: -
Biaya Keuntungan & Overhead: -
JUMLAH TOTAL: -
Pemasangan Penutup atap zincalume NILAI HSPK: #REF! HARSAT HARGA
KOEF. SAT
SATUAN: m2 (Rp.) (Rp.)
Upah:
Mandor 0.0080 O.H - -
Kepala Tukang 0.0080 O.H - -
Tukang 0.0750 O.H - -
Pekerja 0.1500 O.H - -
Jumlah: -
Bahan:
Penutup atap zincalume 1.1000 m2 - -
Skrup SDS 6x75 mm 4.0000 bh - -
Skrup SDS 6x95 mm 2.0000 bh - -
Roof Seal 6.0000 set - -
Jumlah: -
Jumlah: -
Biaya Keuntungan & Overhead: -
JUMLAH TOTAL: -
Pekerjaan Rangka Atap Baja Ringan NILAI HSPK: #REF! HARSAT HARGA
KOEF. SAT
SATUAN: m2 (Rp.) (Rp.)
Upah & Bahan:
Usuk Galvalume C75.0,75 + Reng Galvalume R30.0,45 + Skrew + Asesories 1.1000 m2 - -
Jumlah: -
Jumlah: -
Biaya Keuntungan & Overhead: -
JUMLAH TOTAL: -
Pemasangan Wuwung UPVC (Top Ridge) NILAI HSPK: #REF! HARSAT HARGA
KOEF. SAT
SATUAN: m1 (Rp.) (Rp.)
Upah:
Mandor 0.0040 O.H - -
Kepala Tukang 0.0130 O.H - -
Tukang 0.1250 O.H - -
Pekerja 0.0840 O.H - -
Jumlah: -
Bahan:
Wuwungan UPVC (Top Ridge) 1.1000 m' - -
Skrup SDS 6x95 mm 6.0000 bh - -
Jumlah: -
Jumlah: -
Biaya Keuntungan & Overhead: -
JUMLAH TOTAL: -
Pemasangan nok spandek NILAI HSPK: #REF! HARSAT HARGA
KOEF. SAT
SATUAN: m1 (Rp.) (Rp.)
Upah:
Mandor 0.0040 O.H - -
Kepala Tukang 0.0130 O.H - -
Tukang 0.1250 O.H - -
Pekerja 0.0840 O.H - -
Jumlah: -
Bahan:
Nok spandek 1.1000 m' - -
Skrup SDS 6x95 mm 6.0000 bh - -
Jumlah: -
Jumlah: -
Biaya Keuntungan & Overhead: -
JUMLAH TOTAL: -
Pemasangan Talang Datar/ Seng Talang
GALVALUM Tinggi 120 CM Seng Anti Karat / NILAI HSPK: #REF! HARSAT HARGA
KOEF. SAT
m1
SATUAN: m1 (Rp.) (Rp.)
Upah:
Mandor 0.0100 O.H - -
Kepala Tukang 0.0250 O.H - -
Tukang 0.4000 O.H - -
Pekerja 0.2000 O.H - -
Jumlah: -
Bahan:
Seng Talang GALVALUM Tinggi 120 CM Seng Anti Karat 1.0500 m1 - -
Skrup 10.0000 bh - -
Jumlah: -
Jumlah: -
Biaya Keuntungan & Overhead: -
JUMLAH TOTAL: -
DAFTAR STANDAR HATGA SATUAN DASAR (SHSD)
No. MATERIAL & SPESIFIKASI SATUAN HARGA SATUAN
( Rp )
1 2 3 4
I UPAH TENAGA
1 Mandor hr
2 Kepala Tukang hr
3 Tukang hr
4 Pekerja hr
5 Surveyor hr
6 Jasa Cutting ACP m2
II MATERIAL
1 Batu Kali Belah uk. 15/20 m3
2 Batu pecah mesin uk. 1/2 m3
3 Batu kumbung uk. 25/25 bh
4 Bata merah (kelas 1) bh
5 Rooster beton 20x40 cm bh
6 Glass blok 20x20 cm bh
7 Limestone m3
8 Pasir Cor m3
9 Pasir Urug m3
10 Pasir Pasang m3
11 Dolken Kayu Gelam Ø 8-10cm p=4m btg
12 Kayu Meranti Balok m3
13 Kayu Meranti Bekisting m3
14 Triplek Phenolic 1 sisi 12 mm uk. 122 x 244 cm lbr
15 Minyak Bekisting Ltr
16 Skrup bh
17 Paku Biasa uk. 2-5 inch kg
18 Paku Beton kg
19 Bracket siku btg
20 Semen Pc 50kg Zak
21 Semen Pc 40kg Zak
22 Semen Compound 20kg Zak
23 Semen berwarna yiyitan kg
24 Beton Ready Mix K-300 (Non-Fly Ash) m3
25 Besi beton polos Kg
26 Besi beton ulir Kg
27 Kawat Bendrat Kg
28 Wiremesh M6 lbr
29 Hollow galvanis 75x150 mm tebal 3mm m1
30 Hollow galvanis 50x100 mm tebal 3mm m1
31 Hollow galvanis 50x100 mm tebal 1,2mm m1
32 Hollow galvanis 50x50 mm tebal 1,2mm m1
33 Hollow galvanis 40x40 mm tebal 1,2mm m1
34 Hollow galvanis 40x40 mm tebal 0,8mm m1
35 Hollow galvanis 20x20 mm tebal 1,2mm m1
36 Besi profil WF Kg
37 Besi Profil C Kg
38 Besi Plat kg
39 Talang seng galvalume tb 0,35 mm 120cm m¹
40 Kusen Aluminium 4" tebal 1.2 mm Warna coklat m1
41 Kusen WPC m1
No. MATERIAL & SPESIFIKASI SATUAN HARGA SATUAN
( Rp )
1 2 3 4
42 Louvre Aluminium 4" tebal 1.5mm Warna coklat m1
43 Daun Pintu Wood Plastic Composite (82x210) bh
44 Daun Pintu Wood Plastic Composite (62x210) bh
45 Engsel untuk Pintu Stel
46 Engsel untuk Pintu Besi 1" 8cm bh
47 Grendel besi samping bh
48 Grendel besi slot bawah bh
49 Gembok pintu bh
50 Handle +Kunci Tanam besar 2x putar bh
51 Kaca Buram t =5mm m2
52 Sealent tube
53 Cat Besi kg
54 Cat Dinding Interior Spotless/Washable (2.5 ltr) kaleng
55 Cat Meni Besi Kg
56 Kertas gosok Lbr
57 Kuas bh
58 Serat fiber m2
59 Cat Waterproofing kg
60 Cat Epoxy kg
61 Plamir Dinding kg
62 Bata Tempel Terakota m2
63 Homogenous Tile Lantai Uk. 60x60 cm (polished) m2
64 Keramik Lantai Toilet 30x30cm (motif; warna; Unpolished) m2
65 Keramik Dinding 60x60cm m2
66 Keramik Dinding 30x60cm m2
67 Aluminium Composit Panil PVDF tb. 4 mm lbr
68 Hollow Galvalum 40x40mm tebal 0,4 mm m1
69 Spandek zincalume tb. 0,35 mm P.6m lbr
70 Rod Hanger dia 8mm m1
71 Gypsumboard uk. 240x120 cm tebal 9 mm Lembar
72 Kalsiboard uk. 240x120 cm tebal 10 mm Lembar
73 Tape Plafond / Plasband m'
74 Atap UPVC single layer polos m2
75 Atap UPVC double layer polos m2
76 Wuwungan UPVC (Top Ridge) m
77 Nok spandek m
78 Usuk C75.75+ reng galvalume R30.045 m2
79 Skrup SDS 6x75 mm bh
80 Skrup SDS 6x95 mm bh
81 Roof Seal set
82 Kabel NYM 2 x 2,5 mm m
83 Kabel NYM 3 x 2,5 mm m
84 Lampu LED 5 Watt bh
85 Lampu Down Light M Slim 8 Inch LED 11 watt bh
86 Lampu Sorot Floodlight BVP151 100W 4000K Neutral White bh
87 WD Fitting bh
88 Box Panel LVMDP uk. 400 x 600 x 180 mm, lengkap dengan perlengkapan unit
89 Penyambungan baru listrik daya 6600 watt, jaminan layanan, materai set
90 Saklar Tunggal bh
91 Saklar Ganda bh
92 Stop Kontak Dinding bh
93 T doos PVC bh
94 Isolator bh
95 Kloset Jongkok bh
96 Floor Drain Stainless Steel bh| Authority | |||
|---|---|---|---|
| 29 March 2023 | Kantor Dan Parkir Thp Kenjeran Serta Parkir Sentra Ikan Bulak | Kota Surabaya | Rp 5,240,224,532 |
| 21 February 2019 | Pembangunan Gedung Type B2 ((Smp Negeri 14) ) | Pemerintah Daerah Kota Surabaya | Rp 3,000,000,000 |
| 28 May 2021 | Bangunan Bertingkat Tambahan Tanpa Pondasi Baru ((Sdn Warugunung 1) ) | Kota Surabaya | Rp 2,516,181,200 |
| 9 August 2021 | Bangunan Tidak Bertingkat (((Gedung Serba Guna Sememi)) ) | Kota Surabaya | Rp 2,100,000,000 |
| 22 January 2019 | Pembangunan Gedung Type C3 ((Pasar Kutisari) ) | Pemerintah Daerah Kota Surabaya | Rp 2,000,000,000 |
| 5 March 2018 | Pembangunan Gedung Type B2 ((Sdn Sumberejo II) ) | LPSE Kota Surabaya | Rp 2,000,000,000 |
| 28 August 2018 | Bahan Bangunan Satgas 35 | LPSE Kota Surabaya | Rp 1,607,602,645 |
| 17 April 2018 | Bahan Bangunan Satgas 12 | LPSE Kota Surabaya | Rp 1,500,784,340 |
| 30 January 2020 | Pembangunan Gedung Type C2 ((Sentra Wisata Kuliner Wiyung) ) | Kota Surabaya | Rp 1,479,291,297 |
| 11 October 2019 | Pembangunan Gedung Type C3 ((Kawasan Makam Taman Bungkul) ) | Pemerintah Daerah Kota Surabaya | Rp 1,444,480,000 |