Belanja Konstruksi Penataan Plaza Gor Indoor Manahan (Dpupr)

Basic Information
Type: Public Tender
Tender Code: 10086104
Date: 14 June 2024
Year: 2024
KLPD: Kementerian Dalam Negeri
Work Unit: Ditjen Bina Pembangunan Daerah
Procurement Type: Pekerjaan Konstruksi
Method: Tender - Pascakualifikasi Satu File - Harga Terendah Sistem Gugur
Contract Type: Harga Satuan
Financial Information
Value (Nilai Pagu): Rp 2,730,503,880
Estimated Value (Nilai HPS): Rp 2,666,200,000
Winner (Pemenang): CV Jaya Teknik
NPWP: 015155104526000
RUP Code: 49572099
Work Location: Surakarta - Surakarta (Kota)
Participants: 48
Applicants
Reason
0015155104526000Rp 2,309,882,694-
0210158598526000Rp 2,477,945,148-
0312755374526000Rp 2,305,000,000Bukti kepemilikan alat dump truck tidak valid
CV Laras Gendhis
04*9**2****46**0--
0702650359545000--
PT Sinar Inti Persada
00*6**5****19**0--
PT Andalan Intiprima Rekatama
04*9**6****03**0--
0210095162526000--
0845426444211000--
0712928035528000--
CV Tiga Sekawan Perkasa
00*9**5****05**0--
0746117035521000--
0639420561542000--
Twins-Co Teknikal
07*6**7****02**0--
0316195429505000--
0315895425525000--
PT Regita Buana Utama
07*3**3****32**0--
0014355556541000--
0665384996526000--
0626732408542000--
0750724114526000--
0026260281122000--
CV Pesona Cahaya Keberuntungan
06*6**3****03**0--
0833082407525000--
0020159562626000--
0015155930526000--
0017522160526000--
0911814788526000--
0012024626526000--
0424921559427000--
CV Kusuma Karya Amanah
04*4**9****26**0--
0018973818532000--
PT Donxon Mahika Nusantara
00*9**4****26**0--
0853492999323000--
0752827279322000--
0968533059528000--
CV Griya Karya
00*5**9****25**0--
0020440962505000--
Anugrah Kirana Perkasa
08*2**2****24**0--
CV Adjie Karya Sejahtera
04*9**0****26**0--
0012459517532000--
CV Nusa Karya Konstruksi
05*6**0****55**0--
0316936194526000--
0967217878435000--
0930123849526000--
0022980841655000--
0014446066526000--
0705395143526000--
Attachment
BQ ( BILL OF QUANTITY )                          
                                                                              
KEGIATAN : PENATAAN PLAZA MANAHAN                                             
PEKERJAAN : PERENCANAAN PENATAAN PLAZA GOR INDOOR MANAHAN KOTA SURAKARTA      
TAHUN   : 2024                                                                
LOKASI  : Surakarta                                                           
NO                   URAIAN PEKERJAAN            VOLUME SAT HARGA SATUAN JUMLAH HARGA
                                                             Rp.     Rp.      
 1                       2                         3    4    5        6       
 A PEKERJAAN PERSIAPAN                                                        
 1 Penyiapan Lokasi Pekerjaan                       1,00 Ls                   
 2 Bouwplank dan Pengukuran                         1,00 Ls                   
 3 Pekerjaan Bongkaran keseluruhan pada area yang di kerjakan 1,00 Ls         
 4 Pemindahan tiang listrik                         2,00 titik                
 5 Pemindahan tiang baliho                          1,00 titik                
 6 Pemindahan pohon                                 1,00 Ls                   
 7 Perapihan dahan pohon                            1,00 Ls                   
 8 Biaya Penerapan SMKK                             1,00 Ls                   
 9 Pembersihan Lokasi                               1,00 Ls                   
                                                            JUMLAH            
 B PEKERJAAN KAWASAN                                                          
 I PEKERJAAN SALURAN                                                          
 1 Galian Tanah                                    3 6,72 m3                  
 2 Urugan Tanah Kembali                            1 2,24 m3                  
 3 Urugan Pasir                                     6,12 m3                   
 4 Pek. Membuat lantai kerja Beton Mutu fc = 7.4 Mpa ( K-100 ), slump ( 3 - 6 ) cm 3,06 m3
 5 Saluran Beton                                                              
  - Beton mutu f’c = 31,2 MPa (K 350), slump (12 ± 2) cm, w/c = 0,48 2 4,48 m3
  - Pembesian                                     1.584,65 kg                 
  - Bekisting                                      326,40 m2                  
 6 Tutup saluran Beton                                                        
  - Beton mutu f’c = 31,2 MPa (K 350), slump (12 ± 2) cm, w/c = 0,48 1 1,22 m3
  - Pembesian                                      726,30 kg                  
  - Bekisting                                      122,40 m2                  
 7 Tutup saluran Beton berlubang                                              
  - Beton mutu f’c = 31,2 MPa (K 350), slump (12 ± 2) cm, w/c = 0,48 4,62 m3  
  - Pembesian                                      299,06 kg                  
  - Bekisting                                      5 0,40 m2                  
 8 Pasang Skah Inlet dengan tutup berlubang ( IL1 ) 6,00 unit                 
 9 Bongkar tutup saluran existing                   1,00 Ls                   
 10 pembuatan dudukan tutup saluran existing rangka siku 50.50.5 atas bawah dengan angkur fins.cat 3,00 titik
 11 Tutup saluran cor beton fins.lapis granit tera ( tul tunggal ) 3,00 titik 
                                                            JUMLAH            
 II PEKERJAAN KANSTEN                                                         
 1 Pasang kansten beton type 1 ( sambungan fins.plester acian ) 316,00 m1     
 2 Pasang kansten beton type 2 ( sambungan fins.plester acian ) 227,00 m1     
 3 Pasang kansten beton type 3 ram ( sambungan fins.plester acian ) 3 4,00 m1 
 4 Cat kansten                                     325,80 m2                  
                                                            JUMLAH            
 III PEKERJAAN LISTRIK DAN LAMPU PENERANGAN                                   
 1 Pemindahan lampu existing                        1,00 Ls                   
 2 Sambung Daya baru Listrik 3500 VA Lengkap dengan panel PJU (isi:Box Panel, 1,00 unit
  Kontaktor,Timer,MCB Induk+Pembagi,Terminal boostbar,dan aksesoris lainnya)  
 3 Lampu TL LED Tube dengan penutup tabung akrilik lapis sunblasting lengkap dengan aksesoris lainnya. 9,00 unit
 4 Pondasi tiang lampu                              9,00 unit                 
 5 Lampu spotlight BCP 411, 100-240v (LSL)         1 8,00 unit                
 6 Instalasi kabel NYY 3x6 + pipa conduit high impact 297,00 m1               
 7 Instalasi kabel NYM 3x2.5 + pipa conduit high impact 121,50 m1             
 8 Pasang lampu selang 800 LM 3000K L5000          7 5,00 m1                  
                                                            JUMLAH            
 IV PEKERJAAN LANTAI BETON                                                    
 1 Pasang Plastik Cor                             1.572,80 m2                 
 2 Lantai Kerja beton t = 5 cm                     7 6,40 m3                  
 3 Cor beton t : 25 cm ( di bawah granit )                                    
  - Beton Mutu fc = 31.2 Mpa ( K-350 ), slump ( 12 ± 2 ) cm, w/c = 0.48 382,00 m3
  - Pembesian                                    1 6.051,88 kg                
  - Begesting                                      216,98 m2                  
 3 Cor beton t : 25 cm ( di bawah aspal )                                     
  - Beton Mutu fc = 31.2 Mpa ( K-350 ), slump ( 12 ± 2 ) cm, w/c = 0.48 1 1,20 m3
 4 Lapis Resap Pengikat - Aspal Cair ( prime coat ) 3 8,40 Liter              
 5 Lapis Perekat - Aspal Cair ( tack coat )        2 5,60 Liter               
 6 Laston Lapis Aus (AC-WC) (gradasi halus/kasar)   5,88 Ton                  
 7 Laston Lapis Antara (AC-BC) (gradasi halus/kasar) 5,88 Ton                 
                                                            JUMLAH            
 V PEKERJAAN LANTAI DAN TEMPAT DUDUK                                          
 1 Tempat duduk beton t : 12 cm                                               
  - Beton Mutu fc = 19.3 Mpa ( K-225 ), slump ( 12 ± 2 ) cm, w/c = 0.58 1 1,63 m3
  - Pembesian                                      865,07 kg                  
  - Begesting                                      111,23 m2                  
 2 Pasang papan kayu trembesi t : 5 cm, baut dia 12 mm atas tutup dempul kayu,fins.cat 1,00 Ls
 3 Cat tempat duduk                                6 5,00 m2                  
 4 Pasang List kecil Granit terra Coarse P4 30x60 dengan Perekat Porcelain Tile area out door 6 5,10 m2
  beban tinggi dua komponen ( Semen mortar )                                  
 5 Pasang List besar Granit terra Coarse P4 30x60 dengan Perekat Porcelain Tile area out door 292,80 m2
  beban tinggi dua komponen ( Semen mortar )                                  
 6 Pasang Granit terra Coarse P4 60x60 dengan Perekat Porcelain Tile area out door 1.531,50 m2
  beban tinggi dua komponen ( Semen mortar )                                  
                                                            JUMLAH            
 VI PEKERJAAN TANAMAN                                                         
 1 Tanaman andong merah                            198,00 Plbg                
 2 Tanaman miyana merah                            198,00 Plbg                
 3 Tanaman grasena golden                          198,00 Plbg                
 4 Tanaman sabrina hijau                           198,00 Plbg                
 5 Rumput gajah mini                               7 9,20 m2                  
 6 Galian rumput sintetis                          4 4,40 m3                  
 7 Rumput Sintetis dengan sambung jahit            222,00 m2                  
 8 Drainase Cell Rumput Sintetis lubang besar tebal : 3 cm 222,00 m2          
 9 Urugan sirtu                                    3 4,45 m3                  
 10 Urugan Media tanam tanah subur organik         7 9,20 m3                  
                                                            JUMLAH            
                                                  JUMLAH   =    Rp. ...........................
                                                  PPn 11%  =    Rp. ...........................
                                               JUMLAH TOTAL =   Rp. ...........................
                                                DIBULATKAN =    Rp. ...........................
                  Terbilang : .....................................................................................................................
                                                            Surakarta, 2024   
                                                              Penyedia Jasa   
                                                          PT/CV.....................................
                                                           .............................................
                                                               Direktur       
                             REKAPITULASI BQ                                  
                                                                              
   KEGIATAN  : PENATAAN PLAZA MANAHAN                                         
   PEKERJAAN : PERENCANAAN PENATAAN PLAZA GOR INDOOR MANAHAN KOTA SURAKARTA   
   TAHUN     : 2024                                                           
   LOKASI    : Surakarta                                                      
    NO            URAIAN PEKERJAAN                   JUMLAH HARGA ( RP )      
    1                  2                                   3                  
    A PEKERJAAN PERSIAPAN                                                     
    B PEKERJAAN KAWASAN                                                       
     I PEKERJAAN SALURAN                                                      
     II PEKERJAAN KANSTEN                                                     
     III PEKERJAAN LISTRIK DAN LAMPU PENERANGAN                               
     IV PEKERJAAN LANTAI BETON                                                
     V PEKERJAAN LANTAI DAN TEMPAT DUDUK                                      
     VI PEKERJAAN TANAMAN                                                     
                                         JUMLAH                               
                                           JUMLAH      = Rp. ....................................
                                           PPn 11%     = Rp. ....................................
                                        JUMLAH TOTAL   = Rp. ....................................
                                         DIBULATKAN    = Rp. ....................................
             Terbilang : ...........................................................................................................................
                                                   Surakarta, 2024            
                                                      Penyedia Jasa           
                                                 PT/CV........................................
                                                                              
                                                                              
                                                                              
                                                                              
                                                  ..............................................
                                                        Direktur
Tenders also won by CV Jaya Teknik
Authority
21 August 2020Pembangunan/Revitalisasi Pasar Rakyat MasaranKementerian PerdaganganRp 2,287,136,000
28 April 2021Belanja Modal Bangunan Gedung Kantor Pembangunan GudangKota SurakartaRp 2,105,535,500
2 June 2022Pembangunan Jalan Lingkungan Dan Drainase Lingkungan Eks. Hp 10 Kel. Tipes Kec. Serengan (Dak Reguler)Kota SurakartaRp 1,940,560,000
31 July 2019Konstruksi Pembuatan Gedung Data CenterKementerian Riset, Teknologi, dan Pendidikan TinggiRp 1,745,640,000
27 December 2023Penataan Saluran Drainase Jl Dr.Rajiman (Penanganan Banjir Lingkungan Pokoh)Kab. KaranganyarRp 1,225,000,000
17 October 2017Konstruksi Perbaikan Jalan Lingkungan Paket 6Pemerintah Daerah Kota SurakartaRp 1,145,000,000
7 February 2024Peningkatan Kualitas Drainase Lingkungan Paket IIKota SurakartaRp 1,000,000,000
3 July 2018Penataan Kawasan Permukiman Kumuh Paket IIIKota SurakartaRp 905,000,000
21 February 2024Pembangunan Bangunan Gedung Tempat KerjaKota SurakartaRp 871,940,000
10 July 2015Pembangunan Saluran Drainase Kawasan Banyuanyar / Kali NayuRp 600,000,000