DAFTAR HARGA SATUAN UPAH DAN BAHAN
SATUAN KERJA DINAS KESEHATAN KABUPATEN PULAU TALIABU
KEGIATAN LANJUTAN PEMBANGUNAN PUSKESMAS SAMUYA
PEKERJAAN LANJUTAN PEMBANGUNAN PUSKESMAS SAMUYA
LOKASI PKM SAMUYA
SUMBER DANA DAU
TAHUN ANGGARAN 2023
HARGA
NO. UPAH KERJA / BAHAN SATUAN KETERANGAN
(Rp)
1 2 3 4 5
I. UPAH KERJA
1 Mandor Hari 150.000,00 21.428,57
2 Kepala Tukang Hari 150.000,00 21.428,57
3 Tukang Kayu, Batu, Besi, Cat Hari 150.000,00 21.428,57
4 Pekerja Hari 125.000,00 17.857,14
II. BAHAN MATERIAL
1. Tanah dan Pasir
Pasir Urug M3 200.000,00
Pasir Pasang M3 200.000,00
Pasir Beton/ Cor M3 200.000,00 142,857 /Kg
Sirtu M3 160.000,00
Pasir Plester M3 200.000,00
Material Pilihan M3 150.000,00
Material Timbunan M3 150.000,00 71.000,00
2. Kerikil
Kerikil Sungai Pilihan/ Koral M3 410.000,00 303,70
Kerikil Sungai Tersaring M3 410.000,00
Kerikil Sungai Tak Tersaring M3 410.000,00
Batu Pecah 0,5 - 1 Cm (Spilt) M3 450.000,00
Batu Pecah 1 - 2 (Spilt) M3 450.000,00
Batu Pecah 2 - 3 (Spilt) M3 450.000,00
Batu Pecah 3 - 5 (Spilt) M3 450.000,00
Batu Pecah 5 - 7 (Spilt) M3 450.000,00
3. Batu - Batuan
Batu Utuh, Batu Kali, Batu Gunung M3 412.000,00
4. Batu Cetak :
Batu Bata Ukuran 5 x 11 x 22 cm Bh 3.000,00
Batu Bata Ukuran 5 x 9 x 22 cm Bh 2.500,00
Batu Bata Ukuran 5 x 7 x 22 cm Bh 2.000,00
Batako 10 x 20 x 40 cm Bh 5.000,00
Batako 11 x 20 x 40 cm Bh 5.750,00 700 Bh
Paving Block T 6 cm ( 6 x 10 x 21) Bh 3.500,00
Paving Block T 6 cm ( 6 x 10 x 21) M2 250.000,00 5000
Paving Block T 8 cm ( 8 x 10 x 20) M2 250.000,00 5000
Batu Alam Andesit M2 250.000,00
List Profil Beton 10 - 20 cm M1 50.000,00
List Profil Beton 45 - 50 cm M1 75.000,00
Granit Uk. 60 x 60 Cm (Unpolish) Dos 275.000,00 68.750,00 /Bh
Tegel Keramik Uk. 40 x 40 Cm Dos 117.000,00 29.250,00 /Bh
III. BAHAN BANGUNAN
1 Kapur
Kapur Pasang (Mil) Kg 1.700,00 195.313 Zak
Kapur Bakar Kg 1.350,00 150.000
Kapur M3 195.313,00
2 Semen
Semen Pc (50 Kg) Zak 180.000,00 3.600 /Kg
Semen Warna/ Putih Kg 3.600,00 88.367 /Zak
25.000,00
3 Bahan Kayu
Balok 6/16 x 4 m (Kayu Kelas I), Kayu Lasi M3 4.325.000,00
Balok 6/16 x 4 m (Kayu Kelas II) M3 2.178.000,00
Balok 8/12 x 4 m (Kayu Kelas II) M3 2.178.000,00
Balok 6/10 x 4 m (Kayu Kelas II) M3 2.178.000,00
Balok 5/7 x 4 m (Kayu Kelas II) M3 2.178.000,00
Balok 5/7 x 4 m (Kayu Kelas III) M3 2.178.000,00
Kayu Bakesting (Kayu Kelas III) M3 2.178.000,00
Papan Palapi M3 2.178.000,00
Papan (Kayu Kelas II) M3 2.178.000,00
Papan Mall (Kayu Kelas III) M3 2.178.000,00
Dolken Kayu Galam Ø 8 -10 Cm/ 4 M' Btg 15.000,00
HARGA
NO. UPAH KERJA / BAHAN SATUAN KETERANGAN
(Rp)
1 2 3 4 5
4 Bahan Besi dan Alumunium
Bahan Besi :
Besi Beton Polos Uk. Ǿ 4 mm Kg 9.469,70 25.000,00 /Btg
Besi Beton Polos Uk. Ǿ 6 mm Kg 13.313,61 45.000,00 /Btg
Besi Beton Polos Uk. Ǿ 8 mm Kg 14.843,09 70.000,00 /Btg
Besi Beton Polos Uk. Ǿ 10 mm Kg 12.830,90 95.000,00 /Btg
Besi Beton Polos Uk. Ǿ 12 mm Kg 14.562,19 155.000,00 /Btg
Besi Beton Polos Uk. Ǿ 14 mm Kg 15.034,48 218.000,00
Besi Beton Polos Uk. Ǿ 16 mm Kg 15.311,51 290.000,00
Wiremesh DM 8 M2 140.000,00
Boundeck M2 248.000,00
Besi Hollow 20 x 20 x 2 mm x 6 mm Btg 89.100,00 41.333,33 M1
Besi Hollow 20 x 20 x 1,2 mm x 6 mm Btg 61.600,00 - M1
Besi Hollow 30 x 30 x 2 mm x 6 mm Btg 95.000,00 14.850,00 M1
Besi Hollow 20 x 40 x 1,7 mm x 6 mm Btg 100.000,00 10.266,67 M1
Besi Hollow 40 x 40 x 1,7 mm x 6 mm Btg 155.000,00 15.833,33 M1
Besi Hollow 50 x 50 x 2 mm x 6 mm Btg 180.000,00 16.666,67 M1
Hollow Galvalum 2 x 2 cm M1 6.325,00 25.300,00
Hollow Galvalum 2 x 4 cm M1 6.600,00 26.400,00
Hollow Galvalum 4 x 4 cm M1 7.700,00 30.800,00
Pipa Penguapan Septictank Bh 150.000,00
Besi Plat 10 mm Kg 14.375,44 3.250.000,00 226,08
Besi Plat 5 mm Kg 694.444,44 2.000.000,00
Besi Plat Stainlees, Tebal 5 mm Kg 859.375,00 2.475.000,00
Besi Plat 3 mm Kg 564.236,11 1.625.000,00
Besi Plat 2 mm Kg 451.388,89 1.300.000,00
Besi Plat 2 mm Kg 28.750,88 1.300.000,00 45,216
Besi Plat 1,4 mm M2 279.296,88 804.375,00
Besi Plat 1,2 mm M2 260.416,67 750.000,00
Besi Siku Ukuran 30 x 3 mm - 6 M' M1 20.312,50 121.875,00 Btg
Besi Siku Ukuran 50 x 4 mm - 6 M' M1 43.333,33 260.000,00 ######
Besi Siku Ukuran 50 x 5 mm - 6 M' M1 14.083,33 316.875,00 Btg
Besi Siku Ukuran Besi Siku 70.70.7 - 6 M' Kg 6.210,48 275.000,00 44,28
Besi Strip Btg 56.875,00 Btg
Besi Strip Kg 10.000,00
Cord - Kanal C Tebal = 1 mm Btg 120.000,00 1.666,67
Reng - Kanal U Tebal = 0,6 mm Btg 60.000,00 -
Braket L Bh 2.000,00 550.000,00
Alcopanel (Alumunium Composite Panel), Seven Type PPDF M2 190.972,22 20.833,33
Jendela Nako Unit 150.000,00 190.972,22
Sealent GE Dow Coming Non Asam Bh 30.000,00
Bracket steel Galvanish Bh 30.000,00
5 Bahan Kawat
Kawat Ikat Beton/ Bendrat Kg 25.000,00
Kawat Duri (50 m) 4 Kg Roll 156.250,00 -
Kawat Las Dos 150.000,00
Kawat Las LB (5 Kg) Kg 128.000,00 640.000,00 /5 Kg
Kawat Las Listrik Kg 40.000,00
Kawat Las RB (5 Kg) Kg 60.000,00 460.000,00 /5 Kg
6 Bahan Langit - Langit dan Atap
Tripleks Uk. 122 Cm x 244 Cm x 3 mm Lbr 65.000,00
Teakwood 90 Cm x 210 Cm x 3 mm Lbr 120.000,00
Playwood 122 Cm x 244 Cm x 12 mm Lbr 296.000,00
Seng Gelombang BJLS 0.20 Lbr 60.000,00
Seng Plat BJLS 0.20 M1 12.000,00
Atap Zincalume T= 0,30 mm Lbr 105.000,00
GRC 20 cm Lbr 80.000,00 80.000,00
Nok Zincalume, Tebal 0,30 mm M1 50.000,00
Talang Datar Zincalume Lebar 90 cm T = 0.3 mm M1 80.000,00
7 Bahan Sanitair/ Saluran Air
Pipa Gip :
Kloset Duduk Monoblock (Type Toto EURO CW 660 J/SW 660) Bh 3.605.000
Diameter 1/2" Btg 44.365,00 7.394,17 /M1
Diameter 3/4" Btg 66.607,00 10.633,33 /M1
Diameter 1" Btg 126.000,00 15.491,67 /M1
Diameter 1,5" Btg 135.000,00 11.101,17 /M1
Diameter 3" Btg 155.000,00 21.000,00 /M1
Knie Gip 1/2" Bh 9.500,00 22.500,00 /M1
Double Niple 1" Bh 8.900,00 25.833,33 /M1
Clame Sadle 1/2"-3" Bh 51.500,00 1.583,33 /M1
Tee Gip 1/2" Bh 5.900,00 2.225,00
Diameter 4" Btg 116.000,00 12.875,00 /M1
HARGA
NO. UPAH KERJA / BAHAN SATUAN KETERANGAN
(Rp)
1 2 3 4 5
8 Bahan Finishing
Cat Kayu :
Minyak Cat/ Afduner Ltr 36.000,00
Meny Kayu Kg 46.000,00
Cat Kayu Kg 67.200,00
Cat Residu Kg 61.500,00
Meni Besi/ Seng Kg 61.500,00
Minyak Bekisting Ltr 10.000,00
Plamur Kayu Kg 61.000,00
Dempul Jadi Kg 41.600,00
Cat Tembok :
Cat Tembok Wathersield (Exterior) Kg 75.000,00
Plamur Tembok Kg 31.600,00 30.500,00 Klg
Dempul Tembok Kg 31.600,00
Polimer Mortar Kg 30.000,00
EAL Water Proofing Epoxy (02) Kg 276.000,00
Cat Batu Alam Ltr 90.000,00
Cat Besi :
Meny Seng Kg 65.000,00
Meny Besi Kg 65.000,00
Cat Besi Kg 65.000,00
Cat Coating Clear (Glotex) Kg 28.000,00
Cat Dicco Kg 58.800,00
9 Bahan Penggantung
Kunci - Kunci :
Grendel Pintu Bh 10.400,00
Hengsel Pintu Buah 31.200,00
Slot Pintu Bh 90.000,00
Paku dan Sekrup :
Paku Beton 1" - 2" Bh 3.000,00
Paku Beton 2,5" - 3,5" Bh 3.900,00
Paku Beton 4" - 6" Bh 4.950,00
Paku Biasa 1/2" - 1" Kg 20.000,00
Paku Biasa 2" - 5" Kg 23.400,00
Paku Biasa 2,5" - 3,5" Kg 23.400,00
Paku Biasa 4" - 10" Kg 21.450,00
Paku Tripleks Kg 27.300,00
Paku Sekrup 3 - 5" Dos 15.000,00
Screw 12 - 14 x 20 Bh 980,00
Screw 10 - 16 x 16 Bh 700,00
Screw 1" Bh 700,00
Lahar Pintu Besi Bh 100.000,00
Baut Mur Bh 2.520,00
10 Bahan Listrik
NYM 2 x 1,5 mm M1 15.288,00 - Roll
NYM 2 x 2,5 mm M1 21.840,00 - Roll
NYM 2 x 4 mm M1 27.408,00 764.400,00 Roll
NYM 2 x 6 mm M1 36.558,00 1.092.000,00 Roll
NYM 2 x 10 mm M1 60.300,00 1.370.400,00 Roll
NYM 3 x 2,5 mm M1 28.080,00 1.827.900,00 Roll
NYM 4 x 2,5 mm M1 31.200,00 3.015.000,00 Roll
NYY 2 x 1,5 mm M1 15.060,00 1.404.000,00 Roll
NYY 2 x 2,5 mm M1 18.306,00 1.560.000,00 Roll
NYY 2 x 4 mm M1 25.887,00 753.000,00 Roll
NYY 2 x 6 mm M1 35.026,00 915.300,00 Roll
NYA 2 x 1,5 mm M1 8.400,00 1.294.350,00 Roll
NYA 2 x 2,5 mm M1 10.800,00 1.751.300,00 Roll
Kabel Bc Grinding 16 mm M1 30.000,00 420.000,00
Tombak Anti Petir Buah 300.000,00 540.000,00
Stik Tembaga M1 150.000,00 1.500.000,00
Box Panel Buah 500.000,00
Mcb 3 Pas 32A Buah 300.000,00
Pipa Conduit Hight Impact Ø 20 mm Btg 4.650,00 125.000,00
HARGA
NO. UPAH KERJA / BAHAN SATUAN KETERANGAN
(Rp)
1 2 3 4 5
11 Bahan Lain - Lain
Solar Ltr 8.500,00 -
Minyak Pelumas/ Oli Ltr 27.000,00
Air M3 30.000,00 8,50 /Liter
Roda Pintu Besi Bh 55.000,00
Kwas No. 2" Bh 5.680,00
Kertas Pasir (Amplas) Lbr 4.875,00
Lem Kayu Kg 125.491,00
Sikat Besi Bh 14.500,00
Soda Api Kg 17.500,00
Foto Kopi A4 Lembar 300,00
Menjilid Bh 7.500,00
Foto Printing 3 R Lmbr 2.500,00
Kamera Digital OH 50.000,00
Tukang Foto OH 110.000,00
Drafter CAD OH 1.500.000,00
Kertas HVS Rim 50.000,00
Tinta Printer Dos 100.000,00
Sewa Komputer Unit 250.000,00
Sewa Printer Unit 120.000,00
Topi Pelindung Bh 50.000,00
Pelindung Pernafasan dan Mulut Bh 25.000,00
Sarung Tangan Psng 5.000,00
Rompi Bh 45.000,00
Sepatu Boot Karet Psg 75.000,00
12 Sewa Peralatan
Sewa Welding Hari 200.000,00
Sewa Excavator Jam 750.000,00
Sewa Mobil Dunp Truck Jam 650.000,00| Authority | |||
|---|---|---|---|
| 10 April 2022 | Pembangunan Dan Peningkatan Jalan Desa Strategis (5000 M) | Kab. Halmahera Timur | Rp 10,000,000,000 |
| 19 August 2019 | Pembangunan Kanal Galian Lingkar ( Bulan Sabit) | Pemerintah Daerah Kabupaten Halmahera Timur | Rp 8,649,000,000 |
| 21 June 2023 | Pembangunan Gedung Laboratorium Medik (Rumah Sakit Pratama) Di Kab. Halmahera Timur | Pemerintah Daerah Kabupaten Halmahera Timur | Rp 2,558,170,000 |
| 8 June 2021 | Pembangunan Puskesmas Nggele (Dak) | Kab. Pulau Taliabu | Rp 2,000,000,000 |
| 21 June 2023 | Pembangunan Gedung Sterilisasi (Rumah Sakit Pratama) Di Kab. Halmahera Timur | Pemerintah Daerah Kabupaten Halmahera Timur | Rp 1,930,600,000 |
| 4 June 2022 | Pembangunan Baru Ruang Puskesmas Mampu Poned Di Puskesmas Nusa Jaya | Kab. Halmahera Timur | Rp 1,800,000,000 |
| 7 May 2020 | Pembangunan Kanal Pelabuhan Sil Di Kecamatan Maba Selatan | Kab. Halmahera Timur | Rp 1,500,000,000 |
| 4 May 2023 | Pembangunan Bangunan Pengaman Pantai Wosi, Gane Timur | Provinsi Maluku Utara | Rp 1,189,608,981 |
| 28 June 2023 | Pembangunan Jalan Pemukiman Talimau Dorolamo Kayoa Kab.Halsel | Provinsi Maluku Utara | Rp 1,150,000,000 |
| 13 August 2019 | Normalisasi Kali Sangaji | Pemerintah Daerah Kabupaten Halmahera Timur | Rp 1,088,100,000 |