| 0663587848006000 | Rp 9,667,603,045 | |
| 0017751876418000 | - | |
| 0210512778451000 | - | |
| 0024200511402000 | - | |
| 0020935433418000 | - | |
| 0020217212451000 | - | |
| 0316606961451000 | - | |
| 0926257130711000 | - | |
| 0022878391451000 | - | |
| 0011360575451000 | - | |
| 0417427226416000 | - | |
CV Anugrah Dwimitra Abadi | 00*1**3****86**0 | - |
| 0948299649423000 | - | |
| 0024467763451000 | - | |
| 0753129303009000 | - | |
| 0030792436009000 | - | |
Navasena Ananda | 04*5**1****54**0 | - |
PT Dewakarya Indomitra Andalan | 08*9**2****18**0 | - |
| 0012173084627000 | - | |
| 0821262722418000 | - | |
Rebekka Gemilang | 0021438759009000 | - |
| 0535083968323000 | - | |
| 0838477875402000 | - | |
| 0720275114419000 | - | |
| 0313609950416000 | - | |
PT Agrotech Mitra Utama | 07*2**6****63**0 | - |
| 0908421415101000 | - | |
Sesfranvio Putra Mandiri | 04*7**4****47**0 | - |
| 0026908566437000 | - | |
| 0614948222009000 | - | |
| 0022395214416000 | - |
RENCANA ANGGARAN BIAYA (RAB) BLANK
JUDUL KEGIATAN : Pembangunan Gedung Beladiri Bersama Kabupaten Tangerang
ANGGARAN : APBD Th. 2024
LOKASI : Kab. Tangerang
HARGA SATUAN JUMLAH HARGA PPN 11%
NO URAIAN PEKERJAAN KODE ANALISA VOLUME SAT
PEKERJAAN
(a) (b)
A PEKERJAAN PERSIAPAN
1 Pembuatan Papan Nama Proyek A.2.2.1.0 1,00 Unit
2 Pek. Pembersihan dan Perataan lapangan A.2.3.1.16.c 1.496,00 m2
3 Pengukuran dan Bowuplank A.2.2.1.4. 166,00 m1
4 Pembuatan Direksi Keet sementara A.2.2.1.5.a 12,00 m2
5 Pembuatan Gudang sementara A.2.2.1.7.a 12,00 m2
6 Pagar Sementara dari Seng Gelombang Tinggi 2,00 m A.2.2.1.2. 110,00 m1
7 Sewa Scafolding F.1 192,00 m2
8 Biaya Mobilisasi dan Demobilisasi Lampiran 1 1,00 ls
B PEKERJAAN K3
I SOSIALISASI DAN PROMOSI K3
1 Spanduk (banner) ; - 1,00 Lb
2 Poster; - 1,00 Lb
II ALAT PELINDUNG DIRI
1 Topi Pelindung (Safety Helmet) ; - 50,00 Bh
2 Baju Safety 4 Line (Rompi Polyester); - 50,00 Psg
3 Tameng Muka (Face Shield); - 5,00 Bh
4 Pelindung Pernafasan Dan Mulut (Masker); - 50,00 box
5 Sarung Tangan (Safety Gloves); - 50,00 Psg
6 Sepatu Keselamatan (Safety Shoes); untuk Staf, Setara KING - 9,00 Psg
7 Sepatu Keselamatan, Setara TERRA - 50,00 Psg
III FASILITAS SARANA KESEHATAN
1 Peralatan P3K (Kotak P3K, Obat Luka, Perban, dll) - 2,00 unit
2 BPJS Ketenaga Kerjaan dan Kesehatan Kerja (ejakon.bpjsketenagakerjaan) - 1,00 Paket
IV LAIN-LAIN TERKAIT PENGENDALIAN RESIKO K3
1 APAR (Alat Pemadam Api Ringan) TONATA 3 KG - 4,00 bh
C PEKERJAAN STRUKTUR
I PEKERJAAN TANAH DAN URUGAN
1 Pek. Galian Tanah biasa A.2.3.1.1. 280,23 m3
2 Pek. Urugan Tanah Kembali Bekas Galian A.2.3.1.9. 84,12 m3
3 Pek. Urugan Tanah mendatangkan A.2.3.1.15. 268,80 m3
4 Lap. Pasir Urug Bawah Pondasi A.2.3.1.11. 32,31 m3
5 Lantai Kerja, Site Mix K 100 A.4.1.1.4. 12,09 m3
II PEKERJAAN PONDASI
1 Pek. Plat Pondasi 150 x 150 x 40 cm
- Pembesian (Besi Ulir) A.4.1.1.17.2 1.292,89 kg
- Beton f'c = 24,90 Mpa, (K-300) A.4.1.1.10. 14,40 m3
- Bekisting Pondasi (2x Pakai) A.4.1.1.24.1 38,40 m2
2 Pek. Plat Pondasi 120 x 120 x 30 cm
- Pembesian (Besi Ulir) A.4.1.1.17.2 1.791,62 kg
- Beton f'c = 24,90 Mpa, (K-300) A.4.1.1.10. 18,58 m3
- Bekisting Pondasi (2x Pakai) A.4.1.1.24.1 61,92 m2
3 Pondasi Batu Belah ad. 1:5 A.3.2.1.3. 91,50 m3
III PEKERJAAN STRUKTUR BETON
1 Pek. Pasangan Kolom 60 x 60 cm (K1)
- Pembesian Utama (Besi Ulir) A.4.1.1.17.2 693,92 kg
- Pembesian Sengkang (Besi Polos) A.4.1.1.17.1 303,81 kg
- Beton f'c = 24,90 Mpa, (K-300) A.4.1.1.10. 9,50 m3
- Bekisting Pondasi (2x Pakai) A.4.1.1.24.1 63,36 m2
2 Pek. Pasangan Kolom 50 x 50 cm (K2)
- Pembesian Utama (Besi Ulir) A.4.1.1.17.2 1.864,91 kg
- Pembesian Sengkang (Besi Polos) A.4.1.1.17.1 668,04 kg
- Beton f'c = 24,90 Mpa, (K-300) A.4.1.1.10. 17,74 m3
- Bekisting Pondasi (2x Pakai) A.4.1.1.24.1 141,90 m2
3 Pek. Pasangan Tie Beam 20 x 40 cm
- Pembesian Utama (Besi Ulir) A.4.1.1.17.2 2.032,13 kg
- Pembesian Sengkang (Besi Polos) A.4.1.1.17.1 1.397,53 kg
- Beton f'c = 24,90 Mpa, (K-300) A.4.1.1.10. 27,06 m3
- Bekisting Pondasi (2x Pakai) A.4.1.1.24.1 270,64 m2
4 Pek. Pasangan Sloof 15 x 20 cm
- Pembesian Utama (Besi Ulir) A.4.1.1.17.2 344,29 kg
- Pembesian Sengkang (Besi Polos) A.4.1.1.17.1 178,74 kg
- Beton f'c = 24,90 Mpa, (K-300) A.4.1.1.5. 4,07 m3
- Bekisting Pondasi (2x Pakai) A.4.1.1.24.1 54,22 m2
5 Pek. Plat Lantai Beton, t = 10 cm
- Lap. Pasir Urug Bawah lantai, t = 5 cm A.2.3.1.11. 63,00 m3
- Lantai Kerja, Site Mix K 100 A.4.1.1.4. 63,00 m3
- Pembesian A.4.1.1.17.1 8.694,00 kg
- Beton f'c = 24,90 Mpa, (K-300) A.4.1.1.10. 126,00 m3
6 Pek. Rabat beton t: 5 cm
- Lap. Pasir Urug Bawah lantai, t = 5 cm A.2.3.1.11. 6,53 m3
- Site Mix K 100 A.4.1.1.4. 6,53 m3
7 Pek. Plat Lantai Beton, t = 12 cm
- Pembesian A.4.1.1.17.1 6.463,93 kg
- Bondek t: 1 mm A.4.1.1.24.c 539,11 m2
- Beton f'c = 24,90 Mpa, (K-300) A.4.1.1.10. 64,69 m3
IV PEKERJAAN STRUKTUR BAJA
Wajib dengan bahan besi baja standar SNI, Baja WF SNI 07-7178-2006, H Beam SNI 07-2610-1992 & Plat Baja berlabel SNI
1 H BEAM 300.300.10.15 mm (K1) A.4.2.1.2. 9.024,00 kg
2 H BEAM 250.250.9.14 mm (K2) A.4.2.1.2. 14.555,75 kg
3 Base Plate t: 18 mm A.4.2.1.1. 844,97 kg
4 IWF 450.200.9.14 mm (B1) A.4.2.1.2. 18.164,00 kg
5 IWF 400.200.6.13 mm (B2) A.4.2.1.2. 11.206,80 kg
6 IWF 300.150.6,5.9 mm (B3) A.4.2.1.2. 9.524,17 kg
7 IWF 250.125.6.9 mm (B4) A.4.2.1.2. 2.866,63 kg
8 Plate t = 12 mm A.4.2.1.1. 2.262,65 kg
9 Plate Sirip t = 10 mm A.4.2.1.1. 254,34 kg
10 Stifner Plat t = 12 mm A.4.2.1.1. 7.895,20 kg
12 Pek. Grouting Beton T: 5 cm STR.2 0,29 m3
13 Angkur Bolt M22 mm ; P = 60 cm - 236,00 bh
V PEKERJAAN TANGGA
Wajib dengan bahan besi baja standar SNI, Baja WF SNI 07-7178-2006, H Beam SNI 07-2610-1992 & Plat Baja berlabel SNI
1 UNP 200.80.7,5 mm A.4.2.1.1. 5.243,64 kg
2 SIKU L 50.50.5 mm A.4.2.1.1. 210,00 kg
3 Plate t: 12 mm A.4.2.1.1. 153,73 kg
4 Plate Bordes t: 4,5 mm A.4.2.1.1. 3.285,23 kg
5 Angkur Bolt M16 mm ; P = 60 cm - 24,00 bh
VI PEKERJAAN STRUKTUR ATAP
Wajib dengan bahan besi baja standar SNI, Plat Baja berlabel SNI & Pipa Baja Karbon SNI 0068:2013
1 Pipa Baja 6" t: 5 mm A.4.2.1.1.a 601,92 kg
2 Pipa Baja 5" t: 6 mm A.4.2.1.1.a 11.988,35 kg
3 Pipa Baja 3" t: 3,2 mm A.4.2.1.1.a 3.254,94 kg
4 Gording CNP. 150.65.20.2,3 mm A.4.2.1.1. 6.187,50 kg
5 Base Plate t: 18 mm A.4.2.1.1. 231,51 kg
6 Sagrod diameter 16 mm A.4.1.1.17.1 594,68 kg
7 Trekstang diameter 12 mm A.4.1.1.17.1 432,52 kg
8 Jarum Keras M16 - 48,00 bh
D PEKERJAAN ARSITEKTUR
I PEKERJAN DINDING
1 Pek. Pasangan Dinding Hebel t: 10 cm A.4.4.1.26. 1.487,78 m2
2 Pek. Plesteran Dinding, ad 1 Pc : 5 Ps + Acian A.4.4.2.5. 2.248,44 m2
3 Pek. Dinding Roster 20x20 cm A.4.4.1.23. 20,80 m2
4 Pek. Kolom Praktis beton bertulang (11x11) cm BOW I.19 2,66 m3
5 Pek. Balok Lintail beton bertulang (10x15) cm BOW I.38 5,68 m3
II PEKERJAAN LANTAI
1 Pas. Lantai Keramik Uk. 40x40 A.4.4.3.36. 1.253,73 m2
2 Pas. Vinyl Simpurity Flooring 2 mm A.4.4.3.59. 643,95 m2
III PEKERJAAN ATAP
1 Pas. Atap Lengkung Bitumen Selulosa Setara Onduline/Onduline Tile A.4.5.2.31. 1.634,40 m2
2 Pas. Rangka Plafon Hollow , t=0,3mm, modul 60x60cm A.4.2.1.21. 67,62 m2
3 Pas. Plafon gypsum t = 9mm A.4.5.1.7. 67,62 m2
IV PEKERJAAN PINTU DAN JENDELA
1 Kusen Alumunium + Daun Pintu Tipe PJ1 2,00 Unit
- Pemasangan kusen allumunium 4" A.4.2.1.11. 62,00 m1
- Pemasangan Pintu/Jendela Kaca Rangka Allumunium A.4.2.1.9. 7,80 m2
- Pemasangan Kaca Rayban tebal 5 mm A.4.2.1.13.a 24,23 m2
- Pemasangan Engsel Pintu A.4.6.2.5. 12,00 bh
- Pemasangan Kunci Selinder A.4.6.2.2. 2,00 bh
- Pemasangan Handle Stainless Steel A.4.6.2.5.a 4,00 bh
- Pemasangan Kunci Slot A.4.6.2.11. 2,00 bh
2 Kusen Alumunium + Daun Pintu Tipe PJ5 2,00 Unit
- Pemasangan kusen allumunium 4" A.4.2.1.11. 58,80 m1
- Pemasangan Pintu/Jendela Kaca Rangka Allumunium A.4.2.1.9. 7,80 m2
- Pemasangan Kaca Rayban tebal 5 mm A.4.2.1.13.a 27,17 m2
- Pemasangan Engsel Pintu A.4.6.2.5. 12,00 bh
- Pemasangan Kunci Selinder A.4.6.2.2. 2,00 bh
- Pemasangan Handle Stainless Steel A.4.6.2.5.a 4,00 bh
- Pemasangan Kunci Slot A.4.6.2.11. 2,00 bh
3 Kusen Alumunium Kisi-kisi Tipe (LV1) 4,00 Unit
- Pemasangan kusen allumunium 4" A.4.2.1.11. 24,00 m1
- Pemasangan Kisi-kisi Alumunium - 36,00 m1
4 Kusen Alumunium Kisi-kisi Tipe (LV2) 4,00 Unit
- Pemasangan kusen allumunium 4" A.4.2.1.11. 16,80 m1
- Pemasangan Kisi-kisi Alumunium - 24,00 m1
5 Kusen Alumunium Kisi-kisi Tipe (LV3) 2,00 Unit
- Pemasangan kusen allumunium 4" A.4.2.1.11. 18,00 m1
- Pemasangan Kisi-kisi Alumunium - 37,80 m1
6 Kusen Alumunium Kisi-kisi Tipe (LV4) 18,00 Unit
- Pemasangan kusen allumunium 4" A.4.2.1.11. 262,80 m1
- Pemasangan Kisi-kisi Alumunium - 441,00 m1
7 Kusen Alumunium Jendela Kaca Tipe (J1) 4,00 Unit
- Pemasangan kusen allumunium 4" A.4.2.1.11. 51,00 m1
- Pemasangan Kaca Rayban tebal 5 mm A.4.2.1.13.a 14,57 m2
8 Kusen Alumunium Jendela Kaca Tipe (J2) 1,00 Unit
- Pemasangan kusen allumunium 4" A.4.2.1.11. 23,81 m1
- Pemasangan Kaca Rayban tebal 5 mm A.4.2.1.13.a 8,27 m2
9 Kusen Alumunium Jendela Kaca Tipe (J3) 2,00 Unit
- Pemasangan kusen allumunium 4" A.4.2.1.11. 36,20 m1
- Pemasangan Kaca Rayban tebal 5 mm A.4.2.1.13.a 11,70 m2
10 Kusen Alumunium Jendela Kaca Tipe (J4) 2,00 Unit
- Pemasangan kusen allumunium 4" A.4.2.1.11. 69,20 m1
- Pemasangan Kaca Rayban tebal 5 mm A.4.2.1.13.a 25,10 m2
11 Kusen Alumunium Jendela Kaca Tipe (J5) 4,00 Unit
- Pemasangan kusen allumunium 4" A.4.2.1.11. 59,93 m1
- Pemasangan Kaca Rayban tebal 5 mm A.4.2.1.13.a 20,07 m2
12 Kusen Alumunium Jendela Kaca Tipe (BV1) 24,00 Unit
- Pemasangan kusen allumunium 4" A.4.2.1.11. 57,60 m1
- Pemasangan Kaca Es, tebal 5 mm A.4.2.1.13.a 7,20 m2
13 Kusen Alumunium Jendela Kaca Tipe (BV2) 4,00 Unit
- Pemasangan kusen allumunium 4" A.4.2.1.11. 16,80 m1
- Pemasangan Kaca Es, tebal 5 mm A.4.2.1.13.a 2,40 m2
14 Kusen Alumunium Jendela Kaca Tipe (BV3) 6,00 Unit
- Pemasangan kusen allumunium 4" A.4.2.1.11. 36,00 m1
- Pemasangan Kaca Es, tebal 5 mm A.4.2.1.13.a 5,40 m2
V PEKERJAAN PENGECATAN
1 Pengecatan dinding Eksterior A.4.7.1.11.a 888,00 m2
2 Pengecatan plafon A.4.7.1.25. 67,62 m2
VI PEKERJAAN LAIN-LAIN
1 Pek. Railling Stainless Steel A.4.2.1.23. 121,60 m2
E PEKERJAAN MEKANIKAL, ELEKTRIKAL DAN PLUMBING
I PEKERJAAN PENERANGAN & STOP KONTAK
1 Panel MDP MK.1 1 ,00 unit
2 Kabel Feeder NYY 4 x 16 mm² + NYA 6 mm², Supreme / Kabelindo EL.14 1 0,00 m'
3 Instalasi listrik lampu, NYM 2x1,5 mm², Supreme / Kabelindo A.6.2.1.1.a 4 8,00 titik
4 Instalasi stop kontak / saklar, NYM 3x2,5 mm², Supreme / Kabelindo A.6.2.1.1.c 7 0,00 titik
5 Stop kontak Inbow, Clipsal A.6.2.1.9.a 3 4,00 bh
6 Saklar Seri, Clipsal A.6.2.1.7. 2 2,00 bh
7 Saklar Single, Clipsal A.6.2.1.6. 1 4,00 bh
8 Pas. Lampu Downlight LED Flat 15 Watt, setara phillips A.6.2.1.20.b 2 0,00 Unit
9 Pas. Lampu SL LED 10 Watt, Philips A.6.2.1.20.c 1 6,00 bh
10 Pas. Lampu Gantung + rangka LED Highbay 100 watt Philips EL.10 1 2,00 bh
II PEKERJAAN DISTRIBUSI AIR BERSIH
1 Pengeboran sumur dalam A.3.2.1.12.5 1 00,00 m1
2 Pompa Submersible - 1 ,00 unit
Model : SP 8-15ss
Power : 3 HP 1 Phase
Operasi : Automatic On - Off By Ls
3 Pompa Booster - 1 ,00 unit
Model : PLW-300BIT
Power : 250 Watt
Operasi : Automatic On - Off By Ls
4 Tangki Air 2000 Liter + Pelampung Otomatis - 1 ,00 unit
5 Menara Air Besi Siku T: 3 meter + Pondasi B.7 1 ,00 Unit
6 Kabel NYYHY 3 x 2,5 mm, Dari Mesin Pompa Ke Box Panel EL.12 9 0,00 m'
7 Pasang Pipa 1 inch (Pompa Booster) A.5.1.1.27. 1 68,00 m1
8 Pasang Pipa Hisap 1 1/2 inch (Pompa Submersible) A.5.1.1.28. 1 20,00 m1
9 Pasang Pipa PVC AW 4 inch ( Casing Pipa Sumur Dalam ) A.5.1.1.32. 1 00,00 m1
III PEKERJAAN PLUMBING
1 Instalasi Pemipaan Air Bersih
PVC AW merk Rucika, lengkap dengan material bantu
- Pipa 1/2" A.5.1.1.25. 5 9,50 m1
- Pipa 1" A.5.1.1.27. 2 6,00 m1
2 Stop Kran Kitz 1" - 4 ,00 bh
3 Pekerjaan Instalasi Pemipaan Air Kotor dan Air Bekas Tipe D
- Pipa PVC 3" A.5.1.1.31. 3 8,50 m1
- Pipa PVC 4" A.5.1.1.32. 4 7,00 m1
- Pipa PVC 6" A.5.1.1.32.b 3 2,40 m1
4 Pek. Septictank
a Pek. Galian Tanah biasa A.2.3.1.1. 12,00 m3
b Lap. Pasir Urug Bawah lantai A.2.3.1.11. 0,30 m3
c Lantai Kerja, K 100 A.4.1.1.4. 0,30 m3
d Pek. Pasangan Sloof 12 x 15 cm
- Pembesian A.4.1.1.17.1 45,90 kg
- Cor Beton Site Mix K.175 A.4.1.1.5. 0,31 m3
- Begesting Multiplek A.4.1.1.24.1 2,10 m2
e Pek. Pasangan Kolom 10 x 10 cm
- Pembesian A.4.1.1.17.1 36,00 kg
- Cor Beton Site Mix K.175 A.4.1.1.5. 0,24 m3
- Begesting Multiplek A.4.1.1.24.1 2,40 m2
f Pek. Pasangan Balok 12 x 15 cm
- Pembesian A.4.1.1.17.1 45,90 kg
- Cor Beton Site Mix K.175 A.4.1.1.5. 0,31 m3
- Begesting Multiplek A.4.1.1.24.1 2,10 m2
g Pek. Plat Dak Beton, t = 10 cm
- Pembesian A.4.1.1.17.1 45,00 kg
- Cor Beton Site Mix K.175 A.4.1.1.5. 0,60 m3
- Begesting Plat Lantai (2x pakai) A.4.1.1.24.1 6,00 m2
h Pek. Dinding Bata Merah, ad 1 Pc : 5 Ps A.4.4.1.10. 30,60 m2
i Pek. Plesteran Dinding, ad 1 Pc : 5 Ps A.4.4.2.5. 36,00 m2
j Pipa udara Galvanis 1" t: 1,6 mm A.5.1.1.21. 2,00 m1
JUMLAH
Penyambungan Listrik PLN - Baru / Penambahan Daya 22000 Watt (c)
TOTAL (a) + (b) + (c)
DIBULATKAN
Tigaraksa, .................................. 2024
PT/ CV …...................................
….........................................
DIREKTUR
REKAPITULASI HARGA (BLANK)
JUDUL KEGIATAN : Pembangunan Gedung Beladiri Bersama Kabupaten Tangerang
ANGGARAN : APBD Th. 2024
LOKASI : Kab. Tangerang
JUMLAH HARGA PPN 11%
NO URAIAN PEKERJAAN
(a) (b)
A PEKERJAAN PERSIAPAN
B PEKERJAAN K3
C PEKERJAAN STRUKTUR
D PEKERJAAN ARSITEKTUR
E PEKERJAAN MEKANIKAL, ELEKTRIKAL DAN PLUMBING
JUMLAH (a) + (b)
Penyambungan Listrik PLN - Baru / Penambahan Daya 22000 Watt (c)
TOTAL (a) + (b) + (c)
DIBULATKAN
Tigaraksa, .................................. 2024
PT/ CV …...................................
….........................................
DIREKTUR