| 0720274067418000 | Rp 1,253,830,892 | |
CV Mandiri Nusantara Konstruksi | 03*9**7****16**0 | - |
| 0824311401451000 | - | |
| 0934601923418000 | - | |
| 0022395214416000 | - | |
| 0417427226416000 | - | |
CV Anugrah Dwimitra Abadi | 00*1**3****86**0 | - |
| 0020935433418000 | - | |
PT Karyamas Prima Sempurna | 06*8**7****16**0 | - |
| 0210798070411000 | - | |
| 0024202798402000 | - | |
| 0028873750104000 | - | |
| 0032483281101000 | - | |
| 0026908566437000 | - | |
| 0026289504451000 | - | |
| 0838477875402000 | - | |
| 0837730878451000 | - | |
| 0438850315451000 | - | |
| 0532854122419000 | - | |
| 0438812356451000 | - | |
| 0313609950416000 | - | |
| 0926257130711000 | - | |
| 0316606961451000 | - | |
| 0022878391451000 | - | |
| 0658077227418000 | - | |
| 0011360575451000 | - |
RENCANA ANGGARAN BIAYA
Pembangunan Balai Warga Serba Guna RW.035 Perumahan Villa Rizki Ilhami Kelurahan Bojong
JUDUL KEGIATAN : Nangka
ANGGARAN : APBD Th. 2024
LOKASI : Kec. Kelapa Dua
KODE HARGA SATUAN JUMLAH HARGA PPN 11%
NO URAIAN PEKERJAAN VOLUME SATUAN
ANALISA PEKERJAAN (a) (b)
A PEKERJAAN PERSIAPAN
1 Pembuatan Papan Nama Proyek A.2.2.1.0 1,00 Unit
2 Biaya Operasional Listrik & Air Kerja Proyek - 1,00 ls
3 Penyelenggaraan K3 dan BPJS
- Helm Proyek SNI - 10,00 bh
- Sarung Tangan Pelindung - 10,00 bh
- Sepatu Karet (Sepatu Boot) - 5,00 bh
- Rompi Jaring - 10,00 bh
- Sabuk Pengaman Full Body Double Hook Setara Legion - 2,00 set
- Spanduk k3 - 1,00 Unit
- Bendera K3 - 1,00 Unit
- BPJS Ketenagakerjaan dan kesehatan kerja - 1,00 Paket
- Pengadaan Alat P3K - 1,00 Paket
4 Pek. Bongkaran - 1,00 ls
B PEKERJAAN STRUKTUR LANTAI 1
1 Pek. Pengukuran dan Pemasangan Bauwplank A.2.2.1.4. 51,80 m1
2 Pek. Pondasi Plat Beton Setempat uk. 120x120 cm
- Pek. Galian Tanah Pondasi A.2.3.1.1. 31,85 m3
- Pek. Lantai Kerja Bawah Pondasi, tebal 5 cm SNI G.04 25,48 m2
- Bekisting Pondasi dgn Pas. Bata ad. 1:5 A.4.4.1.10. 18,72 m2
- Pembesian (Besi Ulir) A.4.1.1.17.2 775,55 kg
- Beton f'c = 19,3 Mpa ( K-225 ) A.4.1.1.7. 5,62 m3
3 Pek. Kolom Pedestal Utama 30x30
- Bekisting Multiplek 9 mm A.4.1.1.24.1 12,48 m2
- Tul. Sudut (Besi Ulir) A.4.1.1.17.2 82,07 kg
- Tul. Tengah (Besi Ulir) A.4.1.1.17.2 82,07 kg
- Sengkang (Besi Polos) A.4.1.1.17.1 32,62 kg
- Beton f'c = 19,3 Mpa ( K-225 ) A.4.1.1.7. 0,94 m3
4 Pek. Pondasi Plat Beton Setempat uk. 80x80 cm
- Pek. Galian Tanah Pondasi A.2.3.1.1. 6,25 m3
- Pek. Lantai Kerja Bawah Pondasi, tebal 5 cm SNI G.04 5,00 m2
- Bekisting Pondasi dgn Pas. Bata ad. 1:5 A.4.4.1.10. 4,80 m2
- Pembesian (Besi Ulir) A.4.1.1.17.2 98,98 kg
- Beton f'c = 19,3 Mpa ( K-225 ) A.4.1.1.7. 0,96 m3
5 Pek. Kolom Pedestal Utama 25x25
- Bekisting Multiplek 9 mm A.4.1.1.24.1 4,00 m2
- Tul. Sudut (Besi Ulir) A.4.1.1.17.2 20,84 kg
- Tul. Tengah (Besi Ulir) A.4.1.1.17.2 20,84 kg
- Sengkang (Besi Polos) A.4.1.1.17.1 10,18 kg
- Beton f'c = 19,3 Mpa ( K-225 ) A.4.1.1.7. 0,25 m3
6 Pek. Sloof Beton 25/35
- Bekisting Multiplek 9 mm A.4.1.1.24.1 33,25 m2
- Tul. Sudut (Besi Ulir) A.4.1.1.17.2 462,58 kg
- Tul. Tengah (Besi Ulir) A.4.1.1.17.2 101,79 kg
- Sengkang (Besi Polos) A.4.1.1.17.1 132,16 kg
- Beton f'c = 19,3 Mpa ( K-225 ) A.4.1.1.7. 4,16 m3
7 Pek. Pondasi Batu Kali Keliling Rabat
- Pek. Galian Tanah Pondasi A.2.3.1.1. 1,52 m3
- Pas. Pondasi Batu Kali ad. 1:5 A.3.2.1.3. 6,08 m3
8 Pek. Lantai Beton (ELV. ± 0,00), tebal = 10 cm
- Pas. Lapis Plastik Cor - 119,31 m2
- Pas. Jaring Tulangan Baja (Wiremesh) 1 Lapis, type M8 A.4.1.1.19.a 119,31 m2
- Beton f'c = 19,3 Mpa ( K-225 ) A.4.1.1.7. 12,29 m3
9 Pek. Kolom Utama 30x30
- Bekisting Multiplek 9 mm A.4.1.1.24.1 65,52 m2
- Tul. Sudut (Besi Ulir) A.4.1.1.17.2 397,21 kg
- Tul. Tengah (Besi Ulir) A.4.1.1.17.2 397,21 kg
KODE HARGA SATUAN JUMLAH HARGA PPN 11%
NO URAIAN PEKERJAAN VOLUME SATUAN
ANALISA PEKERJAAN (a) (b)
- Sengkang (Besi Polos) A.4.1.1.17.1 157,67 kg
- Beton f'c = 19,3 Mpa ( K-225 ) A.4.1.1.7. 4,91 m3
KODE HARGA SATUAN JUMLAH HARGA PPN 11%
NO URAIAN PEKERJAAN VOLUME SATUAN
ANALISA PEKERJAAN (a) (b)
10 Pek. Kolom Selasar 25x25
- Bekisting Multiplek 9 mm A.4.1.1.24.1 21,00 m2
- Tul. Sudut (Besi Ulir) A.4.1.1.17.2 98,35 kg
- Tul. Tengah (Besi Ulir) A.4.1.1.17.2 98,35 kg
- Sengkang (Besi Polos) A.4.1.1.17.1 49,20 kg
- Beton f'c = 19,3 Mpa ( K-225 ) A.4.1.1.7. 1,31 m3
11 Pek. Kolom Praktis 15x15
- Bekisting Multiplek 9 mm A.4.1.1.24.1 3,71 m2
- Tul. Utama (Besi Polos) A.4.1.1.17.1 8,17 kg
- Sengkang (Besi Polos) A.4.1.1.17.1 15,79 kg
- Beton f'c = 19,3 Mpa ( K-225 ) A.4.1.1.5. 0,28 m3
12 Pek. Balok Induk 25/50
- Bekisting Multiplek 9 mm A.4.1.1.24.1 53,75 m2
- Tul. Utama (Besi Polos) A.4.1.1.17.1 600,99 kg
- Tul. Pinggang (Besi Ulir) A.4.1.1.17.2 99,19 kg
- Sengkang (Besi Polos) A.4.1.1.17.1 153,47 kg
- Beton f'c = 19,3 Mpa ( K-225 ) A.4.1.1.7. 5,38 m3
13 Pek. Balok Anak 25/35
- Bekisting Multiplek 9 mm A.4.1.1.24.1 39,00 m2
- Tul. Utama (Besi Polos) A.4.1.1.17.1 581,42 kg
- Tul. Pinggang (Besi Ulir) A.4.1.1.17.2 93,56 kg
- Sengkang (Besi Polos) A.4.1.1.17.1 113,34 kg
- Beton f'c = 19,3 Mpa ( K-225 ) A.4.1.1.7. 3,59 m3
14 Pek. Balok Lisplang Beton 20/30
- Bekisting Multiplek 9 mm A.4.1.1.24.1 4,64 m2
- Tul. Utama (Besi Ulir) A.4.1.1.17.2 166,70 kg
- Sengkang (Besi Polos) A.4.1.1.17.1 13,57 kg
- Beton f'c = 19,3 Mpa ( K-225 ) A.4.1.1.7. 0,35 m3
15 Pek. Plat Lantai Beton, tebal = 12 cm (ELV. + 4,2)
- Bekisting Bondek 880x5400 mm, tebal 1,00 mm A.4.1.1.24.c 105,98 m2
- Pas. Jaring Tulangan Baja (Wiremesh) 2 Lapis, type M10 A.4.1.1.19.d 105,98 m2
- Beton f'c = 19,3 Mpa ( K-225 ) A.4.1.1.7.b 9,53 m3
16 Pek. Plat Lisplang Beton, tebal = 10 cm
- Bekisting Multiplek 9 mm A.4.1.1.24.1 60,90 m2
- Tul. Utama (Besi Polos) A.4.1.1.17.1 209,30 kg
- Beton f'c = 19,3 Mpa ( K-225 ) A.4.1.1.7. 1,77 m3
17 Pek. Balok Praktis (Lintle) 13/15
- Bekisting Multiplek 9 mm A.4.1.1.24.1 11,18 m2
- Tul. Utama (Besi Polos) A.4.1.1.17.1 94,69 kg
- Sengkang (Besi Polos) A.4.1.1.17.1 28,83 kg
- Beton f'c = 19,3 Mpa ( K-225 ) A.4.1.1.5. 0,51 m3
18 Alat Bantu Stegger/Schafolding F.1 110,60 m2
C PEKERJAAN ARSITEKTUR LANTAI 1
1 Pas. Dinding Bata Ringan 60.20.10 + Semen Perekat A.4.4.1.26. 112,76 m2
2 Pek. Plesteran Dinding ad. 1:5 + acian A.4.4.2.5. 225,52 m2
3 Pek. Acian Permukaan Beton Kolom & Balok A.4.4.2.30. 150,55 m2
4 Pek. Rabat Beton BOW G.01 28,68 m2
5 Pek. Plafon PVC Shunda (Polos/Alur) + Rangka A.4.5.1.8.a 118,33 m2
6 Pas. List Plafon PVC A.4.5.1.13.a 114,96 m1
7 Pek. Kusen Pintu Type P.U - 1,00 Unit
8 Pek. Kusen Pintu Type P.1 - 1,00 Unit
9 Pek. Kusen Jendela Alumunium Type J.1 - 6,00 Unit
10 Pek. Kusen Jendela Alumunium Type J.2 - 1,00 Unit
11 Pek. Kusen BV.1 - 1,00 Unit
12 Pek. Kusen Pintu PVC + rangka berikut aksesoris (Kamar Mandi) - 1,00 Unit
13 Pas. Lantai Granit Double Loading (Polished), Uk. 60 x 60 cm A.4.4.3.66 88,83 m2
14 Pas. Lantai Keramik Uk. 30x30 (KM) A.4.4.3.35. 2,76 m2
D PEKERJAAN MEKANIKAL ELEKTRIKAL LANTAI 1
1 Pek. Instalasi Air Bersih - 1,00 ls
2 Pek. Instalasi Air Kotor - 1,00 ls
3 Pas. Kran Air A.5.1.1.19. 1,00 bh
4 Pas. Floor Drain A.5.1.1.14. 1,00 bh
5 Pas. Pipa PVC 3" A.5.1.1.31. 1,00 m1
6 Pas. Kloset Duduk Model Kodok KRIS Monoblok, Type 10009618 A.5.1.1.1.a 1,00 Unit
7 Pas. Jet Washer (Kran Bidet/Cebok) PALOMA, TSP 3101 A.5.1.1.37. 3,50 set
8 Pek. Septic Tank Uk. 2 x 1,5 x 1,5 m + Rembesannya Empiris . 15 1,00 Unit
KODE HARGA SATUAN JUMLAH HARGA PPN 11%
NO URAIAN PEKERJAAN VOLUME SATUAN
ANALISA PEKERJAAN (a) (b)
9 Pek. Instalasi Kabel NYM 2 x 1,5 mm A.6.2.1.1.a 1,00 titik
10 Pas. Lampu downlight LED Flat 15 Watt, setara phillips A.6.2.1.20.b 1,00 Unit
11 Pas. Saklar Lampu - Tunggal (Gudang & KM) A.6.2.1.6. 15,00 bh
12 Pas. Saklar Lampu - Seri/Double A.6.2.1.7. 15,00 bh
13 Pek. Instalasi Kabel NYM 3 x 2,5 mm (Untuk Stop Kontak) A.6.2.1.1.c 1,00 titik
14 Pas. Stop Kontak Tanam/Timbul, setara BROCO A.6.2.1.9.a 5,00 bh
E PEKERJAAN FINISHING LANTAI 1
1 Pengecatan Dinding Setara ICI/DULUX - EXTERIOR A.4.7.1.11.a 225,52 m2
2 Pengecatan Kolom & Balok Setara ICI/DULUX - EXTERIOR A.4.7.1.11.a 150,55 m2
3 Pas. Huruf Bahan Stainless E.5 360,00 cm
KODE HARGA SATUAN JUMLAH HARGA PPN 11%
NO URAIAN PEKERJAAN VOLUME SATUAN
ANALISA PEKERJAAN (a) (b)
F PEKERJAAN STRUKTUR TANGGA
1 Pek. Balok 15/25 (Bordes Tangga)
- Bekisting Multiplek 9 mm A.4.1.1.24.1 3,90 m2
- Tul. Utama (Besi Polos) A.4.1.1.17.1 34,09 kg
- Sengkang (Besi Polos) A.4.1.1.17.1 10,42 kg
- Beton f'c = 19,3 Mpa ( K-225 ) A.4.1.1.5. 0,23 m3
2 Pek. Plat Beton Tangga, tebal 12 cm
- Bekisting Multiplek 9 mm A.4.1.1.24.1 18,06 m2
- Tul. Utama (Besi Polos) A.4.1.1.17.1 240,82 kg
- Beton f'c = 19,3 Mpa ( K-225 ) A.4.1.1.7. 2,17 m3
G PEKERJAAN STRUKTUR 2
1 Pek. Kolom Utama 30x30
- Bekisting Multiplek 9 mm A.4.1.1.24.1 43,20 m2
- Tul. Sudut (Besi Ulir) A.4.1.1.17.2 239,89 kg
- Tul. Tengah (Besi Ulir) A.4.1.1.17.2 239,89 kg
- Sengkang (Besi Polos) A.4.1.1.17.1 104,56 kg
- Beton f'c = 19,3 Mpa ( K-225 ) A.4.1.1.7. 3,24 m3
2 Pek. Kolom Selasar 25x25
- Bekisting Multiplek 9 mm A.4.1.1.24.1 18,00 m2
- Tul. Sudut (Besi Ulir) A.4.1.1.17.2 79,18 kg
- Tul. Tengah (Besi Ulir) A.4.1.1.17.2 79,18 kg
- Sengkang (Besi Polos) A.4.1.1.17.1 42,42 kg
- Beton f'c = 19,3 Mpa ( K-225 ) A.4.1.1.7. 1,13 m3
3 Pek. Kolom Tengah dan Kolom Praktis 15x15
- Bekisting Multiplek 9 mm A.4.1.1.24.1 13,32 m2
- Tul. Utama (Besi Polos) A.4.1.1.17.1 134,94 kg
- Sengkang (Besi Polos) A.4.1.1.17.1 37,75 kg
- Beton f'c = 19,3 Mpa ( K-225 ) A.4.1.1.7. 0,68 m3
4 Pek. Ring Balok Beton 15/20
- Bekisting Multiplek 9 mm A.4.1.1.24.1 47,33 m2
- Tul. Utama (Besi Polos) A.4.1.1.17.1 340,90 kg
- Sengkang (Besi Polos) A.4.1.1.17.1 125,94 kg
- Beton f'c = 19,3 Mpa ( K-225 ) A.4.1.1.7. 2,58 m3
5 Pek. Balok Beton Selasar Melintang 15/25
- Bekisting Multiplek 9 mm A.4.1.1.24.1 2,40 m2
- Tul. Utama (Besi Polos) A.4.1.1.17.1 15,98 kg
- Tul. Pinggang (Besi Polos) A.4.1.1.17.1 7,99 kg
- Sengkang (Besi Polos) A.4.1.1.17.1 6,25 kg
- Beton f'c = 19,3 Mpa ( K-225 ) A.4.1.1.7. 0,14 m3
6 Pek. Balok Beton Selasar Memanjang 15/30
- Bekisting Multiplek 9 mm A.4.1.1.24.1 9,75 m2
- Tul. Utama (Besi Polos) A.4.1.1.17.1 63,92 kg
- Sengkang (Besi Polos) A.4.1.1.17.1 25,79 kg
- Beton f'c = 19,3 Mpa ( K-225 ) A.4.1.1.7. 0,59 m3
7 Rangka atap baja ringan zincalume C.75 . 0,75 mm A.4.5.2.43. 153,26 m2
8 Pasang Atap Model ASBES bitumen selulosa setara Onduline Tile A.4.5.2.31. 156,80 m2
9 Lisplang GRC, Superplank, lebar 30 cm, tebal 9 mm (Type Susun) A.4.5.2.44. 50,90 m1
H PEKERJAAN ARSITEKTUR LANTAI 2
1 Pas. Dinding Bata Ringan 60.20.10 + Semen Perekat A.4.4.1.26. 240,11 m2
2 Pek. Plesteran Dinding ad. 1:5 + acian A.4.4.2.5. 480,21 m2
3 Pek. Acian Permukaan Beton Kolom & Balok A.4.4.2.30. 105,84 m2
4 Pek. Plafon PVC Shunda (Polos/Alur) + Rangka A.4.5.1.8.a 105,62 m2
5 Pas. List Plafon PVC A.4.5.1.13.a 112,58 m1
6 Pek. Kusen Pintu Type P.1 3,00 Unit
7 Pek. Kusen Jendela Alumunium Type J.1 3,00 Unit
8 Pek. Kusen Jendela Alumunium Type J.2 1,00 Unit
9 Pek. Kusen BV.1 1,00 Unit
10 Pek. Kusen Pintu PVC + rangka berikut aksesoris (Kamar Mandi) 1,00 Unit
11 Pas. Lantai Granit Double Loading (Polished), Uk. 60 x 60 cm A.4.4.3.66 105,50 m2
12 Pas. Lantai Keramik Uk. 30x30 (KM) A.4.4.3.35. 2,40 m2
KODE HARGA SATUAN JUMLAH HARGA PPN 11%
NO URAIAN PEKERJAAN VOLUME SATUAN
ANALISA PEKERJAAN (a) (b)
I PEKERJAAN MEKANIKAL ELEKTRIKAL 2
1 Pas. Kran Air A.5.1.1.19. 1,00 bh
2 Pas. Floor Drain A.5.1.1.14. 1,00 bh
3 Pas. Kloset Duduk Model Kodok KRIS Monoblok, Type 10009618 A.5.1.1.1.a 1,00 Unit
4 Pas. Jet Washer (Kran Bidet/Cebok) PALOMA, TSP 3101 A.5.1.1.37. 1,00 set
5 Pek. Instalasi Kabel NYM 2 x 1,5 mm A.6.2.1.1.a 18,00 titik
6 Pas. Lampu downlight LED Flat 15 Watt, setara phillips A.6.2.1.20.b 18,00 Unit
7 Pas. Saklar Lampu - Tunggal (Gudang & KM) A.6.2.1.6. 3,00 bh
8 Pas. Saklar Lampu - Seri/Double A.6.2.1.7. 3,00 bh
9 Pek. Instalasi Kabel NYM 3 x 2,5 mm (Untuk Stop Kontak) A.6.2.1.1.c 3,00 titik
10 Pas. Stop Kontak Tanam/Timbul, setara BROCO A.6.2.1.9.a 3,00 bh
J PEKERJAAN FINISHING LANTAI 2
1 Pengecatan Dinding Setara ICI/DULUX - EXTERIOR A.4.7.1.11.a 480,21 m2
2 Pengecatan Kolom & Balok Setara ICI/DULUX - EXTERIOR A.4.7.1.11.a 105,84 m2
3 Pek. Perapihan dan Pembersihan - 1,00 ls
REKAPITULASI TOTAL
A PEKERJAAN PERSIAPAN
B PEKERJAAN STRUKTUR LANTAI 1
C PEKERJAAN ARSITEKTUR LANTAI 1
D PEKERJAAN MEKANIKAL ELEKTRIKAL LANTAI 1
E PEKERJAAN FINISHING LANTAI 1
F PEKERJAAN STRUKTUR TANGGA
G PEKERJAAN STRUKTUR 2
H PEKERJAAN ARSITEKTUR LANTAI 2
I PEKERJAAN MEKANIKAL ELEKTRIKAL 2
J PEKERJAAN FINISHING LANTAI 2
JUMLAH
Pemasangan Listrik PLN 1300 Watt (Token)
TOTAL (a) + (b) + (Pemasangan Listrik PLN)
DIBULATKAN
Tigaraksa, .................................. 2024
PT. / CV. …...............
…..............................
DIREKTUR
KUSEN TYPE : P. U
HARGA
No. ITEM PEKERJAAN SATUAN TOTAL HARGA
PEKERJAAN
1 Frame Atas-Bawah Aluminium Daun Pintu Tempered 6,08 m1
2 Pas. Patch Fitting 2,00 bh
3 Pas. Kaca Polos 12 mm (Tempered) 1,80 m2
4 Pas. Floor hinges dan Top hinges 2,00 bh
5 Pas. Handle stainless dengan escutcheon 2,00 Set
6 Pas. Kunci (Patch Lock) 1,00 Set
7 Ongkos Pasang 1,00 ls
HARGA 1 UNIT KUSEN TYPE : P. U
KUSEN TYPE : P.1
HARGA
No. ITEM PEKERJAAN SATUAN TOTAL HARGA
PEKERJAAN
1 Pas. Rangka Kusen Alumunium 4" Warna Hitam 7,66 m1
2 Pasang Daun Pintu Aluminium Casement (Tanpa Kaca) 5,36 m1
3 Pasang Kaca Es 5 mm untuk Kusen Aluminium 1,34 m2
4 Pasangan Engsel Pintu Stainless 2,00 bh
5 Pas. Handle Pintu Alumunium 1,00 bh
6 Pas. Kunci Kwalitas Baik 1,00 bh
HARGA 1 UNIT KUSEN TYPE : P.1
KUSEN TYPE : P.2
HARGA
No. ITEM PEKERJAAN SATUAN TOTAL HARGA
PEKERJAAN
1 Pas. Rangka Kusen Alumunium 4" Warna Hitam 4,80 m1
2 Pasang Daun Pintu Aluminium Casement (Tanpa Kaca) 5,32 m1
3 Pasang Kaca Es 5 mm untuk Kusen Aluminium 1,30 m2
4 Pasangan Engsel Pintu Stainless 2,00 bh
5 Pas. Handle Pintu Alumunium 1,00 bh
6 Pas. Kunci Kwalitas Baik 1,00 bh
HARGA 1 UNIT KUSEN TYPE : P.2
KUSEN TYPE : J.1
HARGA
No. ITEM PEKERJAAN SATUAN TOTAL HARGA
PEKERJAAN
1 Pas. Rangka Kusen Alumunium 4" Warna Hitam 13,00 m1
2 Pas. Daun Jendela Alumunium Warna Hitam 15,72 m1
3 Pas. Kaca Bening 5 mm 2,34 m2
4 Pas. Engsel Jendela Swing Casement 2,00 bh
5 Pas. Rambuncis/Spring Knip Jendela 2,00 bh
6 Pas. Jalusi Aluminium 1,27 m2
HARGA 1 UNIT KUSEN TYPE : J.1
KUSEN TYPE : J.2
HARGA
No. ITEM PEKERJAAN SATUAN TOTAL HARGA
PEKERJAAN
1 Pas. Rangka Kusen Alumunium 4" Warna Hitam 9,28 m1
2 Pas. Daun Jendela Alumunium Warna Hitam 10,48 m1
3 Pas. Kaca Bening 5 mm 2,34 m2
4 Pas. Engsel Jendela Swing Casement 2,00 bh
5 Pas. Rambuncis/Spring Knip Jendela 2,00 bh
HARGA 1 UNIT KUSEN TYPE : J.2
KUSEN TYPE : BV.1
HARGA
No. ITEM PEKERJAAN SATUAN TOTAL HARGA
PEKERJAAN
1 Pas. Rangka Kusen Alumunium 4" Warna Hitam 2,56 m1
2 Pas. Kaca Es 5 mm untuk Kusen Aluminium 0,27 m2
HARGA 1 UNIT KUSEN TYPE : BV.1| Authority | |||
|---|---|---|---|
| 22 March 2025 | 34. Pembangunan Ruang Kelas Baru Sdn Gintung II Kec. Sukadiri | Kab. Tangerang | Rp 1,727,586,150 |
| 22 April 2024 | 72. Pembangunan Trk Smpn 5 Tigaraksa | Kab. Tangerang | Rp 1,323,135,000 |
| 22 March 2025 | 49. Pembangunan Ruang Kelas Baru Sdn Perum Mustika Kec, Tigaraksa | Kab. Tangerang | Rp 1,151,724,100 |
| 22 March 2025 | 63. Penambahan Ruang Kelas Sdn Balaraja 03 Kec. Balaraja | Kab. Tangerang | Rp 1,050,000,000 |
| 8 July 2022 | Rehab Gsg Dan Aula Kecmatan Sepatan Timur | Kab. Tangerang | Rp 1,003,005,000 |
| 22 March 2025 | 227. Trk Suntik Smpn 3 Tigaraksa | Kab. Tangerang | Rp 1,000,000,000 |
| 25 September 2025 | Pembangunan Ruang Kelas Baru Sdn Blimbing 1 Kec. Kosambi | Kab. Tangerang | Rp 850,000,000 |
| 11 August 2020 | Rehab Sdn Peusar Kec.Tigaraksa | Kab. Tangerang | Rp 500,000,000 |
| 15 April 2016 | [Apbd.16_63] Normalisasi Pembuang Sungai Kronjo | Rp 500,000,000 | |
| 28 June 2021 | Rehab Aula Rapat Kantor Dinas Pertanian Dan Ketahanan Pangan | Kab. Tangerang | Rp 500,000,000 |