| 0717772198416000 | Rp 1,168,791,682 | |
| 0015287675451000 | - | |
| 0020935433418000 | - | |
| 0316606961451000 | - | |
| 0020217212451000 | - | |
| 0926257130711000 | - | |
| 0022878391451000 | - | |
| 0017751876418000 | - | |
| 0011360575451000 | - | |
| 0417427226416000 | - | |
| 0422445858451000 | - | |
CV Anugrah Dwimitra Abadi | 00*1**3****86**0 | - |
| 0313609950416000 | - | |
| 0311845408451000 | - | |
| 0835260829411000 | - | |
| 0026908566437000 | - | |
Pulau Intan Sejahtera | 06*5**3****16**0 | - |
| 0838477875402000 | - | |
| 0022395214416000 | - | |
| 0837730878451000 | - | |
| 0024200511402000 | - |
RENCANA ANGGARAN BIAYA
JUDUL KEGIATAN :PEMBANGUNAN GSG WARGA RW.008 DESA KADU KEC. CURUG
ANGGARAN :APBD Th. 2024
LOKASI :Kab. Tangerang
KODE ANALISA HARGA SATUAN JUMLAH HARGA PPN 11%
NO URAIAN PEKERJAAN VOLUME SATUAN
PEKERJAAN
(a) (b)
I PEKERJAAN PERSIAPAN
1 Papan Nama Proyek, bahan triplek 6 mm, uk. 60x90 cm Finish Cat A.2.2.1.0 1,00 Unit
2 Pek. Pasangan Bowplank Kayu Meranti Jambi (75%) A.2.2.1.4. 78,00 m1
3 Mobilisasi bahan - 1,00 ls
4 Pembersihan lahan - 1,00 ls
5 Air Kerja+Listrik kerja - 1,00 ls
Biaya Penyelenggaraan K3 (Biaya Iuran BPJS
6 - 1,00 ls
Ketenagakerjaan,APD,Penangan Covid)
II PEKERJAAN PONDASI FAN STRUKTUR BETON
1 Pek.Pondasi beton Setempat 90x120cm
- Galian Tanah Pondasi A.2.3.1.1. 11,88 m3
- Urugan Pasir Bawah Pondasi A.2.3.1.11. 0,54 m3
- Membuat Lantai Kerja 1 pc : 3 ps : 5 krl SNI G.04 10,80 m2
- Pek Pembesian ( Besi Ulir) A.4.1.1.17.2 402,45 kg
- Beton K-225 (Fc. 18,68 Mpa) A.4.1.1.7. 3,24 m3
- Urugan Kembali Tanah Bekas Galian A.2.3.1.9. 8,64 m3
2 Pek.Pondasi beton Setempat 80x80cm
- Galian Tanah Pondasi A.2.3.1.1. 2,56 m3
- Urugan Pasir Bawah Pondasi A.2.3.1.11. 0,13 m3
- Membuat Lantai Kerja 1 pc : 3 ps : 5 krl SNI G.04 2,56 m2
- Pek Pembesian ( Besi Ulir) A.4.1.1.17.2 132,57 kg
- Beton K-225 (Fc. 18,68 Mpa) A.4.1.1.7. 0,77 m3
- Urugan Kembali Tanah Bekas Galian A.2.3.1.9. 8,64 m3
3 Pek.Sloop beton 25X35 A.4.7.1.25.
- Bekisting Multiplex 9 mm (2 x pakai) A.4.1.1.24.1 49,00 m2
- Tulangan Utama Besi beton (Ulir) A.4.1.1.17.2 437,59 kg
- Tulangan Besi Beton (Polos) A.4.1.1.17.1 203,99 kg
- Beton K-225 (Fc. 18,68 Mpa) A.4.1.1.7. 6,13 m3
4 Pek.Kolom beton (K1) 30X30cm
- Bekisting Multiplex 9 mm (2 x pakai) A.4.1.1.24.1 33,60 m2
- Tulangan Besi beton (Ulir) A.4.1.1.17.2 866,14 kg
- Tulangan Sengkang Besi Beton (Polos) A.4.1.1.17.1 145,83 kg
- Beton K-225 (Fc. 18,68 Mpa) A.4.1.1.7. 2,52 m3
5 Pek.Kolom beton Praktis (Kp)11x11cm
- Bekisting Multiplex 9 mm (2 x pakai) A.4.1.1.24.1 0,66 m2
- Tulangan Besi Beton (Polos) A.4.1.1.17.1 16,83 kg
- Beton K-175 (Fc. 14,53 Mpa) A.4.1.1.5. 0,04 m3
6 Pek.Ringbalok(RB.1) 15x20cm
- Bekisting Multiplex 9 mm (2 x pakai) A.4.1.1.24.1 5,64 m2
- Tulangan Besi Beton (Polos) A.4.1.1.17.1 63,92 kg
- Beton K-225 (Fc. 18,68 Mpa) A.4.1.1.5. 0,54 m3
III PEKERJAAN ARSITEKTUR
a. Pekerjaan Dinding
1 Dinding bata ringan dengan spesi mortar t=5mm A.4.4.1.26. 11,28 m2
2 Plesteran + Acian Dinding A.4.4.2.5. 22,56 m2
b. Pekerjaan Lantai -
1 Pek.Cor beton lantai lapangan
- Pas. Jaring Tulangan Baja (Wiremesh) 1 Lapis, type M8 A.4.1.1.19.a 300,00 m2
- Beton f'c = 18,68 Mpa, (K-225) A.4.1.1.7. 30,00 m3
2 Pek. Acian Permukaan Beton Kolom dan lantai A.4.4.2.30. 320,80 m2
3 Urugan Tanah Peninggian Lantai A.2.3.1.16.a 90,00 m3
4 Rabat Beton 7 cm + Plester Acian 6 mm, ad. 1Pc : 3Ps : 6Kr BOW G.01 50,96 m2
Saluran Dari Pasangan Batu Bata uk. 30/40 + Finish Plesteran Empiris . 14 26,48 m1
IV PEKERJAAN KONSTRUKSI ATAP
1 Pek.Kolom baja IWF 200.100 A.4.2.1.2. 1280,00 kg
2 Pek.Kolom baja IWF 150.75 A.4.2.1.2. 420,00 kg
3 Pek.Kuda-kuda baja IWF 200.100 A.4.2.1.2. 1888,00 kg
5 Pek.Gording CNP.125.50.20 A.4.2.1.1. 1885,88 kg
6 Pek.balok reugel Wf,200,100 ( Sokong Tiang) A.4.2.1.2. 853,33 kg
7 Pek.Angkur dia 16mm,L=60cm - 76,00 bh
8 Pek.Base plat,stiffener t=12mm,8mm A.4.2.1.2. 356,55 kg
9 Pek.Trekstank dia 12mm A.4.1.1.17.1 202,41 kg
10 Pek.Ikatan angin dia 16mm A.4.1.1.17.2 252,52 kg
11 Pek.baut/mur - 212,00 bh
12 Pelapisan Permukaan Baja dengan Cat Zinchromate A.4.7.1.24. 299,40 m2
13 Pas. Atap Zincalume , tebal 0.50 mm A.4.5.2.40.a 415,80 m2
12 Pas. Alumunium Foil + Kawat Ram A.4.5.2.42. 415,80 m2
14 Pasang nok Zincalume PERKASADEK, A.4.5.2.41.a 22,00 m1
15 Pek.Konstruksi dinding Sopi sopi+samping
- Rangka besi Siku 50.50 A.4.2.1.1. 1426,32 kg
- Pelapisan Permukaan Besi dengan Cat Zinchromate A.4.7.1.24. 75,40 m2
16 Pas. Dinding Zincalume , tebal 0.50 mm A.4.5.2.40.a 186,40 m2
17 Pek.Konstruksi list (profil) Timber Plank GRC
- Rangka besi Siku 50.50 A.4.2.1.1. 300,78 kg
- Pas.Penutup Timber plank GRC Dinding fasad - 19,80 m2
- Pelapisan Permukaan Besi dengan Cat Zinchromate A.4.7.1.24. 3,75 m2
18 Pek.Konstruksi Listplank
- Rangka besi Siku 50.50 A.4.2.1.1. 544,04 kg
19 Pas.Listplank Zincalume , tebal 0.50 mm A.4.5.2.40.a 25,08 m2
- Pelapisan Permukaan Besi dengan Cat Zinchromate A.4.7.1.24. 12,70 m2
20 Pek.Konstruksi dinding Fasad
- Rangka besi Siku 50,50 A.4.2.1.1. 634,91 kg
- Pelapisan Permukaan Besi dengan Cat Zinchromate A.4.7.1.24. 33,56 m2
- Pas.Penutup Timber plank GRC Dinding fasad - 79,20 m2
- Pas. Jaring Tulangan Baja (Wiremesh) 1 Lapis, type M8 A.4.1.1.19.a 79,20 m2
V PEKERJAAN INSTALASI LISTRIK
1 Pemasangan Box MCB L.11 1,00 Unit
2 Instalasi Penerangan kabel NYM 2 x 2,5 mm (tidak termasuk lampu) A.6.2.1.1.b 10,00 titik
3 Stop Kontak Dalam Tembok (BROCO) kabel NYM 3 x 2,5 mm A.6.2.1.1.c 4,00 titik
4 Pas. Lampu Sorot Flood Light LED 30-50 Watt (Letter sign/out door) A.6.2.1.22.1 10,00 Unit
5 Pas. Lampu Sorot Spot Light LED 5-10 Watt (Dinding/Pilar/Taman) A.6.2.1.22.3 2,00 Unit
6 Pas.saklar Double/Seri, L.11 2,00 Unit
7 Pas. Stop Kontak Dalam Tembok (BROCO) kabel NYM 3 x 2,5 mm A.6.2.1.9.a 4,00 bh
VI PEKERJAAN PENGECATAN
Pengecatan Tembok Baru Setara Jotun & Propan (INTERIOR &
1 A.4.7.1.11.d 22,16 m2
EXTERIOR)
2 Pengecatan Dinding Timber plank GRC A.4.7.1.25.b 79,20 m2
- Pek.Pengecatan Permukaan lapangan Dengan Cat Profan
3 Technocote termasuk Line Lapangan, grinding(perataan dan - 158,40 m2
pembersihan permukaan),prime coat
VII PEKERJAAN LAIN-LAIN
Pembuatan papan nama Identitas bahan Acrylic + Lampu Tinggi
1 - 1,00 ls
Huruf 30cm ,20cm
2 Pembuatan LOGO Kabupaten T=60cm bahan acrylic+lampu - 1,00 ls
3 Pekerjaan Perapihan dan pembersihan - 1,00 ls
REKAPITULASI TOTAL
I PEKERJAAN PERSIAPAN
II PEKERJAAN PONDASI FAN STRUKTUR BETON
III PEKERJAAN ARSITEKTUR
IV PEKERJAAN KONSTRUKSI ATAP
V PEKERJAAN INSTALASI LISTRIK
VI PEKERJAAN PENGECATAN
VII PEKERJAAN LAIN-LAIN
JUMLAH
Pemasangan Listrik PLN 2200 Watt (Token)
TOTAL (a) + (b)
DIBULATKAN
Tigaraksa, .................................. 2024
PT. / CV. ………….……………….
…………………...………….
DIREKTUR / DIREKTRIS
KUSEN TYPE : P. 1
No. ITEM PEKERJAAN SATUAN HARGA PEKERJAAN TOTAL HARGA
1 Pas. Rangka Kusen Alumunium 4" Warna Hitam 6,60 m¹
2 Pasang Daun Pintu Aluminium Casement (Tanpa Kaca) 12,08 m¹
3 Pasang Kaca 5 mm Clear Glass untuk Kusen Aluminium 2,49 m²
4 Pasangan Engsel Pintu Casement 4,00 bh
5 Pas. Kunci Kwalitas Baik 1,00 bh
6 Pasang Pegangan/Handle, Pintu Biasa/Pintu Aluminium 2,00 bh
7 Pasang ornamen profil kaca 2,00
HARGA 1 UNIT KUSEN TYPE : P. 1 -
KUSEN TYPE : J.1
No. ITEM PEKERJAAN SATUAN HARGA PEKERJAAN TOTAL HARGA
1 Pas. Rangka Kusen Alumunium 4" Warna Hitam 7,50 m¹
2 Pasang Daun Jendela Aluminium Casement Close/Open 4,22
m¹
(Tanpa Kaca)
3 Pasang Kaca 5 mm Clear Glass untuk Kusen Aluminium 1,96 m²
4 Pas. Engsel Jendela Casement 2,00 bh
5 Pas. Rambuncis 1,00 bh
6 Pasang ornamen profil kaca 1,00
HARGA 1 UNIT KUSEN TYPE : J.1 -
KUSEN TYPE : J.2
No. ITEM PEKERJAAN SATUAN HARGA PEKERJAAN TOTAL HARGA
1 Pas. Rangka Kusen Alumunium 4" Warna Hitam 12,80 m¹
2 Pasang Daun Jendela Aluminium Casement Close/Open
m¹
(Tanpa Kaca) 5,56
3 Pasang Kaca 5 mm Clear Glass untuk Kusen Aluminium 3,73 m²
4 Pas. Engsel Jendela Casement 2,00 bh
5 Pas. Rambuncis 1,00 bh
6 Pasang ornamen profil kaca 3,00
HARGA 1 UNIT KUSEN TYPE : J.2 -
KUSEN TYPE : PJ.1
No. ITEM PEKERJAAN SATUAN HARGA PEKERJAAN TOTAL HARGA
1 Pas. Rangka Kusen Alumunium 4" Warna Hitam 55,42 m¹
2 Pasang Daun Pintu Aluminium Casement (Tanpa Kaca) 10,20 m¹
3 Pasang Kaca 5 mm Clear Glass untuk Kusen Aluminium 17,49 m²
4 Pas. Engsel Pintu 4,00 bh
5 Pas. Kunci Kwalitas Baik 2,00 bh
HARGA 1 UNIT KUSEN TYPE : PJ.1 -
KUSEN TYPE : PJ.2a
No. ITEM PEKERJAAN SATUAN HARGA PEKERJAAN TOTAL HARGA
1 Pas. Rangka Kusen Alumunium 4" Warna Hitam 31,14 m¹
2 Pasang Daun Pintu Aluminium Casement (Tanpa Kaca) 5,90 m¹
3 Pasang Kaca 5 mm Clear Glass untuk Kusen Aluminium 9,86 m²
4 Pas. Engsel Pintu 2,00 bh
5 Pas. Kunci Kwalitas Baik 1,00 bh
HARGA 1 UNIT KUSEN TYPE : PJ.2 -
KUSEN TYPE : PJ.2b
No. ITEM PEKERJAAN SATUAN HARGA PEKERJAAN TOTAL HARGA
1 Pas. Rangka Kusen Alumunium 4" Warna Hitam 26,99 m¹
2 Pasang Daun Pintu Aluminium Casement (Tanpa Kaca) 5,90 m¹
3 Pasang Kaca 5 mm Clear Glass untuk Kusen Aluminium 9,08 m²
4 Pas. Engsel Pintu 2,00 bh
5 Pas. Kunci Kwalitas Baik 1,00 bh
HARGA 1 UNIT KUSEN TYPE : PJ.2 -
KUSEN TYPE : P.2
No. ITEM PEKERJAAN SATUAN HARGA PEKERJAAN TOTAL HARGA
1 Pas. Rangka Kusen Alumunium 4" Warna Hitam 5,18 m¹
2 Pasang Daun Pintu Aluminium Casement (Tanpa Kaca) 5,90 m¹
3 Pasang Kaca 5 mm Clear Glass untuk Kusen Aluminium 1,26 m²
4 Pas. Engsel Pintu 2,00 bh
5 Pas. Kunci Kwalitas Baik 1,00 bh
HARGA 1 UNIT KUSEN TYPE : P.2 -
KUSEN TYPE : BV.1
No. ITEM PEKERJAAN SATUAN HARGA PEKERJAAN TOTAL HARGA
1 Pas. Rangka Kusen Alumunium 4" Warna Hitam 2,90 m¹
2 Pasang Daun Pintu Aluminium Casement (Tanpa Kaca) 0,70 m²
3 Pek. Plesteran Skoningan (Openingan Kusen) 2,40 m¹
HARGA 1 UNIT KUSEN TYPE : BV.1 -| Authority | |||
|---|---|---|---|
| 20 October 2023 | Peningkatan Ruas Jalan Kabupaten Gandu - Sindang Jaya | Pemerintah Daerah Kabupaten Tangerang | Rp 1,890,000,000 |
| 20 October 2023 | Rehabilitasi Jalan Kedaung Barat - Kalibaru | Pemerintah Daerah Kabupaten Tangerang | Rp 1,800,000,000 |
| 16 September 2025 | 7. Lanjutan Pembangunan Gsg RW.04 Perumahan Teratai Griya Asri Kec. Legok | Kab. Tangerang | Rp 1,200,000,000 |