| 0020935433418000 | Rp 486,495,186 | |
PT Parlan Pra Muda Mudi | 06*4**3****16**0 | - |
| 0024200511402000 | - | |
| 0020217212451000 | - | |
| 0022878391451000 | - | |
| 0658077227418000 | - | |
| 0011360575451000 | - | |
| 0417427226416000 | - | |
| 0026908566437000 | - | |
| 0313901340419000 | - | |
| 0944836097315000 | - | |
| 0838477875402000 | - | |
| 0313609950416000 | - | |
| 0316606961451000 | - | |
| 0022395214416000 | - | |
| 0818495210432000 | - | |
| 0392834883412000 | - |
RENCANA ANGGARAN BIAYA (BLANK)
JUDUL KEGIATAN : Penataan Ruang dan Sarpras Kantor Kelurahan Sepatan
ANGGARAN : APBD Th. 2024
LOKASI : Kab. Tangerang
HARGA SATUAN JUMLAH HARGA PPN 11%
NO URAIAN PEKERJAAN KODE ANALISA VOLUME SATUAN
PEKERJAAN
(a) (b)
A PEK. PENAMBAHAN RUANG
I PEKERJAAN PERSIAPAN
1 Papan Nama Proyek Ukuran 60 x 90 Cm A.2.2.1.0 1,00 Unit
Biaya K3 (Biaya Iuran BPJS Keteragakerjaan, APD &
2 - 1,00 paket
Penanganan Covid)
3 Pek. Air Kerja dan Listrik Kerja - 1,00 ls
4 Pek. Bongkaran - 1,00 ls
II PEKERJAAN TANAH & PONDASI
1 Pek. Pembuatan Bauwplank A.2.2.1.4. 16,20 m1
2 Pek. Pondasi Plat Beton Setempat uk. 80x80cm
- Pek. Galian Tanah Pondasi A.2.3.1.2. 12,94 m3
- Pek. Lantai Kerja Bawah Pondasi, tebal 5 cm SNI G.04 11,76 m2
- Pembesian (Besi Ulir) A.4.1.1.17.2 318,17 kg
- Beton f'c = 19,3 Mpa ( K-225 ) A.4.1.1.7. 1,73 m3
3 Pek. Kolom Pedestal 30x30cm
- Bekisting Multiplek 9 mm A.4.1.1.24.1 7,20 m2
- Tul. Pokok (Besi Ulir) A.4.1.1.17.2 124,24 kg
- Sengkang (Besi Polos) A.4.1.1.17.1 70,26 kg
- Beton f'c = 19,3 Mpa ( K-225 ) A.4.1.1.7. 0,54 m3
4 Pek. Pondasi Batu kali
- Pek. Galian Tanah Pondasi A.2.3.1.2. 2,15 m3
- Pek. Urugan PASIR A.2.3.1.11. 0,22 m3
- Pas. Pondasi batu kali ad.1;5 A.3.2.1.3. 1,61 m3
III PEK. BETON BERTULANG :
1 Pek. Sloof Beton 20/25
- Bekisting Multiplek 9 mm A.4.1.1.24.1 7,35 m2
- Tul. Pokok (Besi Polos) A.4.1.1.17.1 52,20 kg
- Sengkang (Besi Polos) A.4.1.1.17.1 18,59 kg
- Beton f'c = 19,3 Mpa ( K-225 ) A.4.1.1.7. 0,74 m3
2 Pek. Kolom utama 30x30cm
- Bekisting Multiplek 9 mm A.4.1.1.24.1 25,92 m2
- Tul. Pokok (Besi Ulir) A.4.1.1.17.1 280,30 kg
- Sengkang (Besi Polos) A.4.1.1.17.1 113,71 kg
- Beton f'c = 19,3 Mpa ( K-225 ) A.4.1.1.7. 1,94 m3
3 Pek. Kolom Kp.12x12cm
- Bekisting Multiplek 9 mm A.4.1.1.24.1 2,45 m2
- Tul. Pokok (Besi Polos) A.4.1.1.17.1 21,52 kg
- Sengkang (Besi Polos) A.4.1.1.17.1 6,29 kg
- Beton f'c = 19,3 Mpa ( K-225 ) A.4.1.1.7. 0,07 m3
4 Pek. Balok 20x45cm
- Bekisting Multiplek 9 mm A.4.1.1.24.1 13,23 m2
- Tul. Pokok (Besi Polos) A.4.1.1.17.1 161,93 kg
- Sengkang (Besi Polos) A.4.1.1.17.1 31,58 kg
- Beton f'c = 19,3 Mpa ( K-225 ) A.4.1.1.7. 1,32 m3
5 Pek. Plat atap Beton, tebal = 12 cm
- Bekisting Multiplek 9 mm A.4.1.1.24.1 18,00 m2
- Pas. Jaring Tulangan Baja (Wiremesh) 2 Lapis, type
A.4.1.1.19.d 18,00 m2
M10
- Beton f'c = 14,5 Mpa ( K-175 ) A.4.1.1.7. 1,08 m3
6 Pek. Lisplang beton, K-225
- Bekisting Multiplek 9 mm A.4.1.1.24.1 6,71 m2
- Tul. Pokok (Besi Polos) A.4.1.1.17.1 74,16 kg
- Beton f'c = 14,5 Mpa ( K-175 ) A.4.1.1.7. 0,67 m3
IV PEKERJAAN PASANGAN :
1 Pas. Dinding Bata Ringan a.d 1:5 A.4.4.1.26. 16,62 m2
2 Pas. Plesteran Biasa 1:5 A.4.4.2.5. 33,24 m2
3 Pek. Partisi Gypsum + Rangka A.4.5.1.12.a 7,15 m2
4 Pek. Acian Permukaan Beton expose A.4.4.2.30. 74,01 m2
Pas. ACP Eksterior, Polos, Coating PVDF + Rangka +
5 Empiris . 7a 50,00 m2
Stegger (Schafolding)
6 Pas. Profil Ban/Plint Plesteran - 11,00 m¹
Pas. Lantai Granit Double Loading (Polished), Uk. 60
7 A.4.4.3.66 14,52 m2
x 60 cm
8 Pas. Rabat Beton BOW G.01 8,54 m2
V PEK. PLAFOND :
1 Pek. Plafon PVC Shunda (Polos/Alur) + Rangka A.4.5.1.8.a 14,52 m2
2 Pasang List Plafon PVC A.4.5.1.13.a 22,00 m1
VI PEKERJAAN KUSEN ALUMUNIUM :
Pek. Kusen Pintu Type PJ.1 lengkap dengan
1 Terlampir 2,00 unt
aksesoris
Pek. Kusen + Jendela alumunium Lengkap Berikut
2 Terlampir 3,00 unt
Asesoris.Type J1
VII PEKERJAAN INSTALASI LISTRIK :
1 Pas. Box Sikring (MCB), Standard L.11 1,00 Unit
2 Pek. Instalasi Listrik Lampu, Kabel NYM 2 x 1,5 mm A.6.2.1.1.a 8,00 titik
3 Instalasi Kabel NYM 3 x 2,5 mm (Untuk Stop Kontak) A.6.2.1.1.c 4,00 titik
4 Pas. Saklar Ganda A.6.2.1.7. 2,00 bh
Pas. Lampu downlight LED Flat 15 Watt, setara
5 A.6.2.1.20.b 8,00 Unit
phillips
6 Pas. Stop Kontak Tanam A.6.2.1.9.a 4,00 bh
VIII PEKERJAAN LAIN - LAIN :
Pengecatan Tembok Baru Setara Jotun & Propan
1 A.4.7.1.11.d 107,08 m2
(INTERIOR & EXTERIOR)
Pengecatan Plafond Setara Vinilex/Metrolith - Cat
2 A.4.7.1.25. 7,15 m2
Dasar Finish Cat Penutup
3 Pekerjaan Pembersihan Dan Perapihan - 1,00 ls
B PEK. PAGAR SAMPING
I PEKERJAAN TANAH & PONDASI
1 Pek. Pembuatan Bauwplank A.2.2.1.4. 54,80 m1
2 Pek. Pondasi Plat Beton Setempat uk. 80x80cm
- Pek. Galian Tanah Pondasi A.2.3.1.2. 20,09 m3
- Pek. Lantai Kerja Bawah Pondasi, tebal 5 cm SNI G.04 18,27 m2
- Pembesian (Besi Ulir) A.4.1.1.17.2 152,25 kg
- Beton f'c = 19,3 Mpa ( K-225 ) A.4.1.1.7. 2,34 m3
3 Pek. Kolom Pedestal 30x30cm
- Bekisting Multiplek 9 mm A.4.1.1.24.1 14,61 m2
- Tul. Pokok (Besi Ulir) A.4.1.1.17.2 192,00 kg
- Sengkang (Besi Polos) A.4.1.1.17.1 33,30 kg
- Beton f'c = 19,3 Mpa ( K-225 ) A.4.1.1.7. 0,73 m3
4 Pek. Pondasi Batu kali
- Pek. Galian Tanah Pondasi A.2.3.1.2. 12,95 m3
- Pek. Urugan PASIR A.2.3.1.11. 1,30 m3
- Pas. Pondasi batu kali ad.1;5 A.3.2.1.3. 9,71 m3
II PEK. BETON BERTULANG :
1 Pek. Sloof Beton 20/25
- Bekisting Multiplek 9 mm A.4.1.1.24.1 19,34 m2
- Tul. Pokok (Besi Polos) A.4.1.1.17.1 171,68 kg
- Sengkang (Besi Polos) A.4.1.1.17.1 57,23 kg
- Beton f'c = 19,3 Mpa ( K-225 ) A.4.1.1.7. 1,45 m3
2 Pek. Kolom utama 30x30cm
- Bekisting Multiplek 9 mm A.4.1.1.24.1 29,23 m2
- Tul. Pokok (Besi Ulir) A.4.1.1.17.1 272,44 kg
- Sengkang (Besi Polos) A.4.1.1.17.1 137,95 kg
- Beton f'c = 19,3 Mpa ( K-225 ) A.4.1.1.7. 1,46 m3
4 Pek. Ring Balok 20/25
- Bekisting Multiplek 9 mm A.4.1.1.24.1 19,34 m2
- Tul. Pokok (Besi Polos) A.4.1.1.17.1 171,68 kg
- Sengkang (Besi Polos) A.4.1.1.17.1 57,23 kg
- Beton f'c = 19,3 Mpa ( K-225 ) A.4.1.1.7. 1,45 m3
III PEKERJAAN PASANGAN :
1 Pas. Dinding Bata Ringan a.d 1:5 A.4.4.1.26. 77,35 m2
2 Pas. Plesteran Biasa 1:5 A.4.4.2.5. 154,71 m2
3 Pek. Acian Permukaan Beton expose A.4.4.2.30. 55,82 m2
Pas. Dinding Batu Tempel Andesit, 20/40 cm +
4 A.4.4.3.71.b 64,98 m2
Finishing Vernis
5 Pas. Profil Ban/Plint Plesteran - 62,96 m¹
IV PEKERJAAN LAIN - LAIN :
Pengecatan Tembok Baru Setara Jotun & Propan
1 A.4.7.1.11.d 210,53 m2
(INTERIOR & EXTERIOR)
2 Pek. Perapihan Taman
Pas. Kanstin Model DKI uk.15.30.40, K-300, warna
- A.7.1.1.2.1 54,00 m1
Abu-Abu
- Lapis Pondasi Macadam / Stell Slag A.7.1.1.6.b 8,40 m3
Pas. Rumput Sintetis Swiss 30 mm, Outdoor &
- A.4.4.3.44.a 56,00 m2
Indoor
Pas. Drainage Cell (pelapis bawah Lantai Rumput
- A.4.4.3.45.a 56,00 m2
Sintetis)
3 Pekerjaan Pembersihan Dan Perapihan - 1,00 ls
C PEK. MUSHOLLA
I PEKERJAAN PERSIAPAN
1 Pek. Bongkaran - 1,00 ls
II PEKERJAAN PASANGAN :
Pas. Lantai Granit Double Loading (Polished), Uk. 60
1 A.4.4.3.66 36,00 m2
x 60 cm
REKAPITULASI TOTAL PEKERJAAN
A PEK. PENAMBAHAN RUANG
B PEK. PAGAR SAMPING
C PEK. MUSHOLLA
JUMLAH
TOTAL (a) + (b)
DIBULATKAN
Tigaraksa, …....................... 2024
KUSEN TYPE : PJ. 1
No. ITEM PEKERJAAN KODE SATUAN HARGA PEKERJAAN TOTAL HARGA
ANALISA
1 Pasang Rangka Kusen Aluminium 4" Coated Black/Brown A.4.2.1.11. 23,80 m1
2 Daun Pintu Panel Kayu Kayu Meranti Jambi Double Teakwood 3 mmA F.4in.6is.1h. 5H.PL 1,68 m2
3 Pas. Engsel Pintu A.4.6.2.5. 3,00 bh
4 Pas. Kaca Bening 5 mm A.4.2.1.13. 5,36 m2
5 Pas. Kunci Kwalitas Baik A.4.6.2.11. 1,00 bh
6 Politur + Impra Daun Pintu Panel & Kusen A.4.7.1.7. 2,60 m2
HARGA 1 UNIT KUSEN TYPE : PJ. 1 -
KUSEN TYPE : P. 1
No. ITEM PEKERJAAN KODE SATUAN HARGA PEKERJAAN TOTAL HARGA
ANALISA
1 Pasang Rangka Kusen Aluminium 4" Coated Black/Brown A.4.2.1.11. 5,90 m1
2 Daun Pintu Panel Kayu Kayu Meranti Jambi Double Teakwood 3 mmA F.4in.6is.1h. 5H.PL 3,57 m2
3 Pas. Engsel Pintu A.4.6.2.5. 6,00 bh
4 Pas. Kunci Kwalitas Baik A.4.6.2.11. 2,00 bh
5 Politur + Impra Daun Pintu Panel & Kusen A.4.7.1.7. 5,20 m2
HARGA 1 UNIT KUSEN TYPE : P. 1 -
KUSEN TYPE : J.1
No. ITEM PEKERJAAN KODE SATUAN HARGA PEKERJAAN TOTAL HARGA
ANALISA
1 Pas. Rangka Kusen Alumunium 4" Warna Hitam A.4.2.1.11. 16,70 m1
2 Pas. Daun Jendela Alumunium Warna Hitam A.4.2.1.12.a 6,40 m1
3 Pas. Kaca Bening 5 mm A.4.2.1.13. 2,54 m2
4 Pasangan Engsel Jendela, Setara Nillon A.4.6.2.6. 2,00 bh
5 Pas. Rambuncis A.4.6.2.8. 2,00 bh
HARGA 1 UNIT KUSEN TYPE : J.1 -
KUSEN TYPE : J.2
No. ITEM PEKERJAAN KODE SATUAN HARGA PEKERJAAN TOTAL HARGA
ANALISA
1 Pas. Rangka Kusen Alumunium 4" Warna Hitam A.4.2.1.11. 9,24 m1
2 Pas. Daun Jendela Alumunium Warna Hitam A.4.2.1.12.a 3,20 m1
3 Pas. Kaca Bening 5 mm A.4.2.1.13. 0,91 m2
4 Pasangan Engsel Jendela, Setara Nillon A.4.6.2.6. 2,00 bh
5 Pas. Rambuncis A.4.6.2.8. 2,00 bh
HARGA 1 UNIT KUSEN TYPE : J.2 -| Authority | |||
|---|---|---|---|
| 10 July 2019 | Lanjutan Peningkatan Jl. Karawaci - Legok | Pemerintah Daerah Kabupaten Tangerang | Rp 7,749,620,000 |
| 13 April 2017 | Peningkatan Jl. Kp. Gardu - Kp. Cibayana Bts. Bogor Ds. Cikasungka Kec. Solear | Pemerintah Daerah Kabupaten Tangerang | Rp 2,000,000,000 |
| 21 March 2025 | 48. Rehab Gsg Kecamatan Sepatan | Kab. Tangerang | Rp 1,500,000,000 |
| 7 July 2022 | Lanjutan Pembangunan Balai Serba Guna Jl. Delima Raya RW 7 Pondok Makmur Kuta Baru Kec. Pasar Kemis | Kab. Tangerang | Rp 1,200,000,000 |
| 28 June 2019 | Rehab Smpn 1 Gunung Kaler | Pemerintah Daerah Kabupaten Tangerang | Rp 1,000,000,000 |
| 17 May 2017 | Trk Sdn Cangkudu IV Balaraja | Pemerintah Daerah Kabupaten Tangerang | Rp 950,000,000 |
| 22 June 2016 | Trk Tingkat Sdn Bakung 2 Kec. Kronjo | Pemerintah Daerah Kabupaten Tangerang | Rp 936,000,000 |
| 19 September 2025 | Peningkatan Jalan Kelapa Kidul - Sindang Jaya | Kab. Tangerang | Rp 824,168,000 |
| 3 October 2017 | Lanjutan Peningkatan Jl. Pekong Desa Saga Kec. Balaraja | Pemerintah Daerah Kabupaten Tangerang | Rp 800,000,000 |
| 16 June 2017 | Pembangunan Saluran Drainase/Gorong-Gorong RW 012, 013 Kel. Tanah Tinggi | Pemerintah Daerah Kota Tangerang | Rp 540,000,000 |