| 0535436976418000 | Rp 2,899,909,320 | |
| 0753129303009000 | - | |
| 0824311401451000 | - | |
| 0024200511402000 | - | |
| 0020935433418000 | - | |
| 0020217212451000 | - | |
| 0928485648452000 | - | |
| 0926257130711000 | - | |
| 0022878391451000 | - | |
| 0658077227418000 | - | |
| 0011360575451000 | - | |
| 0417427226416000 | - | |
| 0314018813451000 | - | |
| 0022888242451000 | - | |
| 0614948222009000 | - | |
CV Anugrah Dwimitra Abadi | 00*1**3****86**0 | - |
Pulau Intan Sejahtera | 06*5**3****16**0 | - |
| 0013977178021000 | - | |
| 0026908566437000 | - | |
| 0934601923418000 | - | |
| 0532854122419000 | - | |
PT Dewakarya Indomitra Andalan | 08*9**2****18**0 | - |
| 0868222126009000 | - | |
| 0838477875402000 | - | |
| 0313609950416000 | - | |
PT Agrotech Mitra Utama | 07*2**6****63**0 | - |
| 0316606961451000 | - | |
| 0022395214416000 | - | |
| 0725694020009000 | - |
RENCANA ANGGARAN BIAYA
JUDUL KEGIATAN : Penataan Ruangan dan Renovasi Gedung kantor Kejati Banten
ANGGARAN : APBD Th. 2024
LOKASI : Prov. Banten
HARGA SATUAN JUMLAH HARGA PPN 11%
NO URAIAN PEKERJAAN KODE ANALISA VOLUME SAT
PEKERJAAN
(a) (b)
A PEKERJAAN PERSIAPAN
1 Papan Nama Proyek A.2.2.1.0 1,00 Unit
2 Pengukuran dan Bowuplank A.2.2.1.4. 52,30 m1
3 Bongkaran Pagar Existing BOW B.19 7,89 m3
4 Listrik dan air kerja - 5,00 bln
5 Pembuatan Direksi Keet sementara A.2.2.1.5.a 12,00 m2
6 Pembuatan Gudang sementara A.2.2.1.7.a 16,00 m2
7 Stegger / Schafolding, ketinggian 4 s/d 5 meter F.1 43,00 m2
8 Pagar sementara dari seng gelombang rangka kayu t: 2 meter A.2.2.1.2. 49,60 m1
B PEKERJAAN K3
B.1 SOSIALISASI DAN PROMOSI K3
1 Spanduk (banner) ; - 4,00 Lb
2 Poster; - 4,00 Lb
B.2 ALAT PELINDUNG DIRI
1 Topi Pelindung (Safety Helmet) ; - 20,00 Bh
2 Baju Safety 4 Line (Rompi Polyester); - 20,00 Psg
3 Tameng Muka (Face Shield); - 5,00 Bh
4 Pelindung Pernafasan Dan Mulut (Masker); - 20,00 box
5 Sarung Tangan (Safety Gloves); - 20,00 Psg
6 Sepatu Keselamatan (Safety Shoes); untuk Staf, Setara KING - 10,00 Psg
7 Sepatu Keselamatan, Setara TERRA - 20,00 Psg
B.3 FASILITAS SARANA KESEHATAN
1 Peralatan P3K (Kotak P3K, Obat Luka, Perban, dll) - 1,00 unit
2 BPJS Ketenaga Kerjaan dan Kesehatan Kerja (ejakon.bpjsketenagakerjaan) - 1,00 Paket
B.4 LAIN-LAIN TERKAIT PENGENDALIAN RESIKO K3
1 APAR (Alat Pemadam Api Ringan) TONATA 3 KG - 1,00 bh
C GEDUNG MINI MARKET KEJATI BANTEN
C.1 PEKERJAAN TANAH DAN PASANGAN PONDASI
1 Pek. Galian Tanah Pondasi A.2.3.1.1. 39,67 m3
2 Pek. Urugan Tanah Kembali Bekas Galian A.2.3.1.9. 23,68 m3
3 Pek. Timbunan Tanah Urug Mendatangkan (Dipadatkan) A.2.3.1.16.a 50,17 m3
5 Lap. Pasir Urug Bawah Pondasi t = 5 cm A.2.3.1.11. 1,69 m3
6 Pasangan pondasi Batu belah, ad 1 : 4 A.3.2.1.3. 11,42 m3
Pek. Bore Pile Ø 40 cm + Pengeboran, Beton K-250 (Besi D13 - 12 bh,
7 A.3.2.1.12.2 27,00 m1
Sengkang Spiral Ø 6)
8 Pemotongan/Bobokan Tiang Pancang untuk Pilecap A.4.1.1.24.a 18,00 m2
C.2 PEKERJAAN STRUKTUR
C.2.1 PEKERJAAN STRUKTUR LANTAI 1
1 Lantai kerja Beton Site Mix K.125 A.4.1.1.4. 3,19 m3
2 Pek. Plat Pondasi 120 x 120 x 40 cm (P1)
- Pek. Besi Tulangan A.4.1.1.17.1 256,90 kg
- Beton f'c = 20,75 Mpa, (K-250) + Vibrator A.4.1.1.8. 2,30 m3
- Pek. Bekisting Multiplex 9 mm (3 x pakai) - 7,68 m2
3 Pek. Plat Pondasi 80 x 80 x 40 cm (P2)
- Pek. Besi Tulangan A.4.1.1.17.1 132,99 kg
- Beton f'c = 20,75 Mpa, (K-250) + Vibrator A.4.1.1.8. 1,02 m3
- Pek. Bekisting Multiplex 9 mm (3 x pakai) - 5,12 m2
4 Pek. Pasangan Sloof 20 x 30 cm
- Pek. Besi Tulangan A.4.1.1.17.1 680,70 kg
- Beton f'c = 20,75 Mpa, (K-250) + Vibrator A.4.1.1.8. 3,68 m3
- Pek. Bekisting Multiplex 9 mm (3 x pakai) - 49,04 m2
5 Pek. Pasangan Sloof 15 x 20 cm
- Pek. Besi Tulangan A.4.1.1.17.1 45,40 kg
- Beton f'c = 20,75 Mpa, (K-250) + Vibrator A.4.1.1.8. 0,05 m3
- Pek. Bekisting Multiplex 9 mm (3 x pakai) - 0,68 m2
6 Pek. Pasangan Kolom 40 x 50 cm
- Pek. Besi Tulangan A.4.1.1.17.1 907,74 kg
- Beton f'c = 20,75 Mpa, (K-250) + Vibrator + Pompa A.4.1.1.8. 5,57 m3
- Pek. Bekisting Multiplex 9 mm (3 x pakai) - 50,11 m2
7 Pek. Pasangan Kolom 30 x 30 cm
- Pek. Besi Tulangan A.4.1.1.17.1 145,76 kg
- Beton f'c = 20,75 Mpa, (K-250) + Vibrator + Pompa A.4.1.1.8. 0,84 m3
- Pek. Bekisting Multiplex 9 mm (3 x pakai) - 11,14 m2
8 Pek. Plat Lantai Beton, t = 10 cm
- Pembesian wiremesh A.4.1.1.17.1 548,26 kg
- Beton f'c = 20,75 Mpa, (K-250) + Vibrator + Pompa A.4.1.1.8.a 10,06 m3
9 Pek. Kolom Praktis 11/11 cm, Site Mix K.175 BOW I.19 0,44 m3
10 Pek. Balok Lintail 10/15 cm, Site Mix K.175 BOW I.24 0,01 m3
PEKERJAAN TANGGA BETON
11 Pek. Pasang Pondasi Tangga
- Pek. Besi Tulangan A.4.1.1.17.1 29,59 kg
- Beton f'c = 20,75 Mpa, (K-250) + Vibrator A.4.1.1.8.a 0,43 m3
- Pek. Bekisting Multiplex 9 mm (3 x pakai) - 1,56 m2
12 Pek. Plat tangga
- Pek. Besi Tulangan A.4.1.1.17.1 458,53 kg
- Beton f'c = 20,75 Mpa, (K-250) + Vibrator A.4.1.1.8.a 2,77 m3
- Pek. Bekisting Multiplex 9 mm (3 x pakai) - 24,83 m2
13 Pek. Pasangan Balok Bordes BB
- Pek. Besi Tulangan A.4.1.1.17.1 15,59 kg
- Beton f'c = 20,75 Mpa, (K-250) + Vibrator A.4.1.1.8.a 0,09 m3
- Pek. Bekisting Multiplex 9 mm (3 x pakai) - 1,07 m2
C.2.2 PEKERJAAN STRUKTUR LANTAI 2
1 Pek. Balok beton bertulang 35x65 cm (B1)
- Pek. Besi Tulangan A.4.1.1.17.1 645,29 kg
- Beton f'c = 20,75 Mpa, (K-250) + Vibrator A.4.1.1.8. 5,48 m3
- Pek. Bekisting Multiplex 9 mm (3 x pakai) - 43,40 m2
2 Pek. Balok beton bertulang 30x60 cm (B2)
- Pek. Besi Tulangan A.4.1.1.17.1 656,83 kg
- Beton f'c = 20,75 Mpa, (K-250) + Vibrator + Pompa A.4.1.1.8.a 4,77 m3
- Pek. Bekisting Multiplex 9 mm (3 x pakai) - 42,00 m2
3 Pek. Balok beton bertulang 25x45 cm (BA)
- Pek. Besi Tulangan A.4.1.1.17.1 128,37 kg
- Beton f'c = 20,75 Mpa, (K-250) + Vibrator + Pompa A.4.1.1.8.a 0,75 m3
- Pek. Bekisting Multiplex 9 mm (3 x pakai) - 8,05 m2
4 Pek. Pasangan Kolom 40 x 50 cm
- Pek. Besi Tulangan A.4.1.1.17.1 426,02 kg
- Beton f'c = 20,75 Mpa, (K-250) + Vibrator + Pompa A.4.1.1.8.a 4,80 m3
- Pek. Bekisting Multiplex 9 mm (3 x pakai) - 43,20 m2
5 Pek. Pasangan Kolom 30 x 30 cm
- Pek. Besi Tulangan A.4.1.1.17.1 114,64 kg
- Beton f'c = 20,75 Mpa, (K-250) + Vibrator + Pompa A.4.1.1.8.a 0,72 m3
- Pek. Bekisting Multiplex 9 mm (3 x pakai) - 9,60 m2
6 Pek. Plat Lantai Beton, t = 12 cm
- Pek. Besi Tulangan A.4.1.1.17.1 844,31 kg
- Beton f'c = 20,75 Mpa, (K-250) + Vibrator + Pompa A.4.1.1.8.a 6,32 m3
- Pek. Bekisting Multiplex 9 mm (3 x pakai) - 52,67 m2
7 Pek. Kolom Praktis 11/11 cm, Site Mix K.175 BOW I.19 0,23 m3
8 Pek. Balok Lintail 10/15 cm, Site Mix K.175 BOW I.24 0,01 m3
PEKERJAAN TANGGA BETON
9 Pek. Pasang Pondasi Tangga
- Pek. Besi Tulangan A.4.1.1.17.1 29,59 kg
- Beton f'c = 20,75 Mpa, (K-250) + Vibrator A.4.1.1.8.a 0,43 m3
- Pek. Bekisting Multiplex 9 mm (3 x pakai) - 1,56 m2
10 Pek. Plat tangga
- Pek. Besi Tulangan A.4.1.1.17.1 458,53 kg
- Beton f'c = 20,75 Mpa, (K-250) + Vibrator A.4.1.1.8.a 2,77 m3
- Pek. Bekisting Multiplex 9 mm (3 x pakai) - 24,83 m2
11 Pek. Pasangan Balok Bordes BB
- Pek. Besi Tulangan A.4.1.1.17.1 15,59 kg
- Beton f'c = 20,75 Mpa, (K-250) + Vibrator A.4.1.1.8.a 0,09 m3
- Pek. Bekisting Multiplex 9 mm (3 x pakai) - 1,07 m2
C.2.3 PEKERJAAN STRUKTUR LANTAI ROOFTOP
1 Pek. Balok beton bertulang 35x65 cm (B1)
- Pek. Besi Tulangan A.4.1.1.17.1 645,29 kg
- Beton f'c = 20,75 Mpa, (K-250) + Vibrator + Pompa A.4.1.1.8.a 5,48 m3
- Pek. Bekisting Multiplex 9 mm (3 x pakai) - 43,40 m2
2 Pek. Balok beton bertulang 30x60 cm (B2)
- Pek. Besi Tulangan A.4.1.1.17.1 656,83 kg
- Beton f'c = 20,75 Mpa, (K-250) + Vibrator + Pompa A.4.1.1.8.a 4,77 m3
- Pek. Bekisting Multiplex 9 mm (3 x pakai) - 42,00 m2
3 Pek. Balok beton bertulang 25x45 cm (BA)
- Pek. Besi Tulangan A.4.1.1.17.1 128,37 kg
- Beton f'c = 20,75 Mpa, (K-250) + Vibrator + Pompa A.4.1.1.8.a 0,75 m3
- Pek. Bekisting Multiplex 9 mm (3 x pakai) - 8,05 m2
4 Pek. Pasangan Kolom 30 x 30 cm
- Pek. Besi Tulangan A.4.1.1.17.1 229,27 kg
- Beton f'c = 20,75 Mpa, (K-250) + Vibrator + Pompa A.4.1.1.8.a 1,44 m3
- Pek. Bekisting Multiplex 9 mm (3 x pakai) - 19,20 m2
5 Pek. Plat Lantai Beton, t = 12 cm
- Pek. Besi Tulangan A.4.1.1.17.1 844,31 kg
- Beton f'c = 20,75 Mpa, (K-250) + Vibrator + Pompa A.4.1.1.8.a 6,68 m3
- Pek. Bekisting Multiplex 9 mm (3 x pakai) - 5 5,69 m2
6 Pek. Ringbalk beton bertulang 20x40 cm (RB)
- Pek. Besi Tulangan A.4.1.1.17.1 2 14,43 kg
- Beton f'c = 20,75 Mpa, (K-250) + Vibrator + Pompa A.4.1.1.8.a 1 ,86 m3
- Pek. Bekisting Multiplex 9 mm (3 x pakai) - 2 4,50 m2
7 Pek. Dak Beton, t = 12 cm
- Pek. Besi Tulangan A.4.1.1.17.1 3 05,88 kg
- Beton f'c = 20,75 Mpa, (K-250) + Vibrator + Pompa A.4.1.1.8.a 2 ,60 m3
- Pek. Bekisting Multiplex 9 mm (3 x pakai) - 21,69 m2
8 Pek. Lisplank beton, t = 8 cm
- Pek. Besi Tulangan A.4.1.1.17.1 26,83 kg
- Beton f'c = 20,75 Mpa, (K-250) + Vibrator + Pompa A.4.1.1.8.a 0 ,36 m3
- Pek. Bekisting Multiplex 9 mm (3 x pakai) - 9,10 m2
9 Pek. Kolom Praktis 11/11 cm, Site Mix K.175 BOW I.19 0 ,22 m3
10 Pek. Balok Lintail 10/15 cm, Site Mix K.175 BOW I.24 0 ,41 m3
C.3 PEKERJAAN ARSITEKTUR
C.3.1 PEKERJAAN ARSITEKTUR LANTAI 1
a PEKERJAAN DINDING
1 Pas. Dinding Bata Ringan tebal; 10 cm + Semen Perekat A.4.4.1.25. 1 36,24 m2
2 Pek. Plesteran 1Pc : 5Ps, tebal 15 mm + acian A.4.4.2.23. 5 20,14 m2
3 Pek. Dinding Keramik 20/40 cm A.4.4.3.73.a 8 ,48 m2
b PEKERJAAN LANTAI
1 Pas. Lantai Granit Double Loading (Polished), Uk. 60 x 60 cm A.4.4.3.66 104,90 m2
2 Pas. Lantai Keramik Uk. 20 x 20 cm A.4.4.3.35. 2 ,13 m2
c PEKERJAAN KUSEN PINTU / JENDELA
1 Pintu Alumunium Type PJ1 1,00 unit
- Pemasangan kusen allumunium 4" A.4.2.1.11. 12,60 m1
- Pemasangan Kaca tempered tebal 12 mm + Sealent (Tanpa Rangka) A.4.6.2.24.a 2,60 m2
- Pemasangan Kaca tebal 5 mm A.4.2.1.13. 5,70 m2
- Pemasangan Top patch fitting - 4,00 bh
- Pemasangan Bottom patch lock + cylinder - 1,00 set
- Pemasangan Engsel pintu floor hinge - 2,00 bh
- Pemasangan handle Stainless A.4.6.2.2. 2,00 bh
2 Pintu Alumunium Type P1 1,00 unit
- Pemasangan kusen allumunium 4" A.4.2.1.11. 5,00 m1
- Pemasangan Pintu kaca Rangka Aluminium A.4.2.1.12. 7,68 m1
- Pemasangan Kaca tebal 5 mm A.4.2.1.13. 7,68 m2
- Pemasangan Engsel pintu A.4.6.2.5. 2,00 bh
- Kunci IL 84030 Dekkson + Handle A.4.6.2.2. 1,00 bh
3 Pintu Kamar Mandi Alumunium Panel 70x200 - 1,00 unit
4 Jendela aluminium Warna Type J1 1,00 unit
- Pemasangan kusen allumunium 4" A.4.2.1.11. 29,50 m1
- Pemasangan Kaca tebal 5 mm A.4.2.1.13. 10,63 m2
5 Jendela aluminium Warna Type J2 1,00 unit
- Pemasangan kusen allumunium 4" A.4.2.1.11. 22,40 m1
- Pemasangan Kaca tebal 5 mm A.4.2.1.13. 7,75 m2
6 Jendela aluminium Warna Type J3 1,00 unit
- Pemasangan kusen allumunium 4" A.4.2.1.11. 24,80 m1
- Pemasangan Kaca tebal 5 mm A.4.2.1.13. 9,61 m2
7 Jendela aluminium Warna Type J4 1,00 Unit
- Pemasangan kusen allumunium 4" A.4.2.1.11. 20,80 m1
- Pemasangan Kaca tebal 5 mm A.4.2.1.13. 6,40 m2
8 Jendela aluminium Warna Type J5 1,00 Unit
- Pemasangan kusen allumunium 4" A.4.2.1.11. 8,20 m1
- Pemasangan Kaca tebal 5 mm A.4.2.1.13. 2,00 m2
9 Jendela aluminium Warna Type BV1 2,00 Unit
- Pemasangan kusen allumunium 4" A.4.2.1.11. 5,20 m1
- Pemasangan Kaca tebal 5 mm A.4.2.1.13. 0,84 m2
d PEKERJAAN PLAFOND
1 Pek. Rangka Plafon Hollow Galvanis 40/40 A.4.2.1.21. 92,05 m2
2 Pas. Plafon - Gypsum, tebal 9 mm (Tanpa Rangka) A.4.5.1.7. 89,92 m2
3 Pas. Plafon - GRC, tebal 4 mm (Tanpa Rangka) A.4.5.1.1. 2,13 m2
4 Pas. List Plafon - Gypsum Profil + Finish Cat A.4.5.1.13. 74,45 m1
e PEKERJAAN PENGECETAN
1 Pengecatan Tembok Baru INTERIOR, Semua Warna A.4.7.1.10. 128,78 m2
2 Pengecatan Tembok Baru EXTERIOR, Semua Warna A.4.7.1.10. 94,16 m2
Pengecatan Plafond Setara Vinilex/Metrolith - Cat Dasar Finish Cat
3 A.4.7.1.10. 89,92 m2
Penutup
f PEKERJAAN SANITAIR
1 Pas. Kran Air Dinding Ø ½" Stainless Setara ONDA A.5.1.1.19. 1,00 bh
2 Pas. Kloset Jongkok Porselein + Dudukan & Instalasi A.5.1.1.2. 1,00 Unit
3 Pas. Floor Drain Ø 3" Stainless A.5.1.1.14. 1,00 bh
4 Pemasangan Buis Beton 1/2 30 cm - 49,60 m'
C.3.2 PEKERJAAN ARSITEKTUR LANTAI 2
a PEKERJAAN DINDING
1 Pas. Dinding Bata Ringan tebal; 10 cm + Semen Perekat A.4.4.1.25. 114,37 m2
2 Pek. Plesteran 1Pc : 5Ps, tebal 15 mm + acian A.4.4.2.23. 301,93 m2
3 Pek. Dinding Keramik 20/40 cm A.4.4.3.73.a 6,88 m2
b PEKERJAAN LANTAI
1 Pas. Lantai Granit Double Loading (Polished), Uk. 60 x 60 cm A.4.4.3.66 93,64 m2
2 Pas. Lantai Keramik Uk. 20x20, Warna Standar A.4.4.3.35. 1,55 m2
c PEKERJAAN KUSEN PINTU / JENDELA
1 Pintu Alumunium Type P2
- Pemasangan kusen allumunium 4" A.4.2.1.11. 8,20 m1
- Pemasangan Pintu kaca Rangka Aluminium A.4.2.1.12. 2,60 m1
- Pemasangan Kaca tebal 5 mm A.4.2.1.13. 3,90 m2
- Pemasangan Engsel pintu A.4.6.2.5. 4,00 bh
- Kunci IL 84030 Dekkson + Handle A.4.6.2.2. 1,00 bh
2 Pintu Kamar Mandi Alumunium Panel 70x200 A.4.2.1.1. 1,00 kg
3 Jendela aluminium Warna Type J4 1,00 Unit
- Pemasangan kusen allumunium 4" A.4.2.1.11. 20,80 m1
- Pemasangan Kaca tebal 5 mm A.4.2.1.13. 6,40 m2
4 Jendela aluminium Warna Type J6 1,00 unit
- Pemasangan kusen allumunium 4" A.4.2.1.11. 28,30 m1
- Pemasangan Kaca tebal 8 mm A.4.2.1.13. 13,23 m2
5 Jendela aluminium Warna Type J7 1,00 unit
- Pemasangan kusen allumunium 4" A.4.2.1.11. 39,10 m1
- Pemasangan Kaca tebal 5 mm A.4.2.1.13. 13,23 m2
6 Jendela aluminium Warna Type J8 1,00 unit
- Pemasangan kusen allumunium 4" A.4.2.1.11. 21,60 m1
- Pemasangan Kaca tebal 5 mm A.4.2.1.13. 7,13 m2
7 Jendela aluminium Warna Type BV1 2,00 Unit
- Pemasangan kusen allumunium 4" A.4.2.1.11. 5,20 m1
- Pemasangan Kaca tebal 5 mm A.4.2.1.13. 0,84 m2
d PEKERJAAN PLAFOND
1 Pek. Rangka Plafon Hollow Galvanis 40/40 A.4.2.1.21. 92,05 m2
2 Pas. Plafon - Gypsum, tebal 9 mm (Tanpa Rangka) A.4.5.1.7. 90,50 m2
3 Pas. Plafon - GRC, tebal 4 mm (Tanpa Rangka) A.4.5.1.1. 1,55 m2
4 Pas. List Plafon - Gypsum Profil + Finish Cat A.4.5.1.13. 74,45 m1
e PEKERJAAN PENGECETAN
1 Pengecatan Tembok Baru INTERIOR, Semua Warna A.4.7.1.10. 152,22 m2
2 Pengecatan Tembok Baru EXTERIOR, Semua Warna A.4.7.1.10. 101,48 m2
Pengecatan Plafond Setara Vinilex/Metrolith - Cat Dasar Finish Cat
3 A.4.7.1.10. 92,05 m2
Penutup
4 Pek. Waterproofing Coating A.4.7.1.22.a 2,30 m2
C.3.3 PEKERJAAN ARSITEKTUR ROOFTOP
a PEKERJAAN DINDING
1 Pas. Dinding Bata Ringan tebal; 10 cm + Semen Perekat A.4.4.1.25. 243,84 m2
2 Pek. Plesteran 1Pc : 5Ps, tebal 15 mm + acian A.4.4.2.23. 243,84 m2
b PEKERJAAN LANTAI
1 Pas. Lantai Granit Double Loading (Polished), Uk. 60 x 60 cm A.4.4.3.66 10,00 m2
c PEKERJAAN KUSEN PINTU / JENDELA
1 Pintu Alumunium Type P2 1,00 unit
- Pemasangan kusen allumunium 4" A.4.2.1.11. 8,20 m1
- Pemasangan Pintu kaca Rangka Aluminium A.4.2.1.12. 2,60 m1
- Pemasangan Kaca tebal 5 mm A.4.2.1.13. 3,90 m2
- Pemasangan Engsel pintu A.4.6.2.5. 4,00 bh
- Kunci IL 84030 Dekkson + Handle A.4.6.2.2. 1,00 bh
2 Jendela aluminium Warna Type J4 2,00 Unit
- Pemasangan kusen allumunium 4" A.4.2.1.11. 41,60 m1
- Pemasangan Kaca tebal 5 mm A.4.2.1.13. 10,40 m2
d PEKERJAAN ATAP DAN PLAFOND
1 Pek. Rangka Plafon Hollow Galvanis 40/40 A.4.2.1.21. 26,78 m2
2 Pas. Plafon - Gypsum, tebal 9 mm (Tanpa Rangka) A.4.5.1.7. 26,78 m2
3 Pas. List Plafon - Gypsum Profil + Finish Cat A.4.5.1.13. 22,30 m1
e PEKERJAAN PENGECETAN
1 Pengecatan Tembok Baru INTERIOR, Semua Warna A.4.7.1.10. 121,92 m2
2 Pengecatan Tembok Baru EXTERIOR, Semua Warna A.4.7.1.10. 81,53 m2
Pengecatan Plafond Setara Vinilex/Metrolith - Cat Dasar Finish Cat
3 A.4.7.1.10. 26,78 m2
Penutup
4 Pek. Screed Dak Atap A.4.4.2.30. 92,05 m2
5 Kawat Ayam 0.5x0.5" - 92,05 m2
6 Pek. Waterproofing Membran Bakar A.4.7.1.22.a 92,05 m2
f PEKERJAAN SANITAIR
1 Roof drain Stainless Steel 4" - 4,00 bh
2 Water Tank Setara Pinguin Kap. 1000 Liter + Pelampung Otomatis B.10 1,00 Unit
C.4 PEKERJAAN FACADE
1 Pas. Lantai Keramik Motif Uk. 30 s.d. < 40 cm + Finishing Vernis A.4.4.3.36.a 41,77 m2
2 Pas. ACP Eksterior, Coating PVDF + Rangka + Stegger (Schafolding) Empiris . 7a 197,87 m2
3 Angkur Φ 16 mm ; P = 50 cm A.4.2.1.2. 15,80 kg
4 Base plate t: 6 mm A.4.2.1.1. 37,68 kg
5 Pipa Besi Dia. 2 1/2 t: 3.6 A.4.2.1.2. 1.213,89 kg
6 Pipa Besi Dia. 1 1/2 t: 3.2 A.4.2.1.2. 309,29 kg
7 Pipa Besi Dia. 1/2 t: 2.6 A.4.2.1.2. 29,04 kg
8 Pengecatan Permukaan Besi/Galvanis A.4.7.1.18. 10,14 m2
10 Pasang Membrane AGTex 850 GSM - 72,40 m2
11 Handrailling Hollow fin cat t: 60 cm A.5.1.1.23.a 15,00 m1
12 Railling Stainless Steel t: 1,2 m A.4.2.1.23. 28,80 m2
13 Huruf / Logo Timbul Acrylic E.3 652,00 cm
PEKERJAAN PAGAR
11 Pek. Galian Tanah Pondasi A.2.3.1.4. 8 ,82 m3
12 Pek. Urugan Tanah Kembali Bekas Galian A.2.3.1.9. 2 ,21 m3
13 Lap. Pasir Urug Bawah Pondasi t = 5 cm A.2.3.1.11. 0 ,95 m3
14 Pasangan pondasi Batu belah, ad 1 : 4 A.3.2.1.3. 5 ,67 m3
15 Pek. Pasangan Sloof 15 x 20 cm
- Pembesian A.4.1.1.17.1 1 26,00 kg
- Cor Beton Site Mix K.175 SNI G.01 0 ,63 m3
- Pek. Bekisting Multiplex 9 mm (2 x pakai) A.6.2.1.20.b 8 ,40 Unit
15 Pek. Kolom Praktis 11/11 cm, Site Mix K.175 BOW I.19 0 ,15 m3
16 Stek besi angkur ke pondasi D10-600 mm A.4.2.1.2. 7 ,81 kg
17 Pek. Plesteran 1Pc : 5Ps, tebal 15 mm + acian A.4.4.2.5. 7 ,20 m2
18 Pas. Batu Alam 30x30 + Finishing Vernis A.4.4.3.73.b 7,20 m2
19 Pekerjaan Pagar Hollow fin cat t: 1 m A.4.2.1.22. 21,00 m2
C.5 PEKERJAAN ELEKTRIKAL
1 Panel SDP-1 - 1,00 unit
2 Kabel NYFGBY 4 x 6 mm + NYA 6 mm (Kabel Tanam) L.4 1 2,00 m1
3 Panel SDP-2 - 1 ,00 unit
4 Kabel NYY 3 x 4 mm² - 1 6,00 m1
5 Penangkal Petir Head Terminal KURN R30 + Grounding A.5.1.1.27. 1 ,00 m1
6 Tiang Monopile Galvanis T:10 m A.5.1.1.28. 1 ,00 m1
7 Instalasi listrik lampu, NYM 3x1,5 mm² A.6.2.1.1.a 1 20,00 titik
8 Instalasi stop kontak / saklar, NYM 3x2,5 mm² A.6.2.1.1.c 120,00 titik
9 Stop kontak Inbow, Clipsal A.6.2.1.9.a 10,00 bh
10 Stop kontak AC, Clipsal A.5.1.1.25. 4 ,00 m1
11 Saklar Seri, Clipsal A.5.1.1.27. 4 ,00 m1
12 Saklar Single, Clipsal - 6 ,00 bh
13 Pas. Lampu Downlight LED 10 watt, Philips A.6.2.1.20. 2,00 set
14 Pas. Lampu Downlight LED 18 watt, Philips A.6.2.1.20. 1 4,00 set
15 Pas. Lampu LED Panel 30x120 cm 40 watt - 1 6,00 bh
C.6 PEKERJAAN PLUMBING
1 Instalasi Pemipaan Air Bersih
Pipa PPR-PN 10 merk Rucika, lengkap dengan material bantu
- Pipa 1/2" A.5.1.1.25. 12,00 m1
- Pipa 1" A.5.1.1.27. 20,00 m1
2 Pasang Ball Valve PPR 1 inch - 2,00 bh
3 Pekerjaan Instalasi Pemipaan Air Kotor dan Air Bekas
PVC Tipe D merk Rucika, lengkap dengan material bantu
- Pipa PVC 3" A.5.1.1.31. 32,00 m1
- Pipa PVC 4" A.5.1.1.31. 36,00 m1
4 Pekerjaan Instalasi Pemipaan Air Hujan
PVC Tipe AW merk Rucika, lengkap dengan material bantu
- Pipa PVC 4" A.5.1.1.32. 18,00 m1
C.7 PEKERJAAN SEPTIC TANK DAN RESAPAN
PEKERJAAN IPAL
1 Bio Septick Tank kap. 1000 Liter A.4.1.1.5. 1,00 m3
2 Galian tanah A.2.3.1.1. 4,50 m3
3 Urugan Pasir A.2.3.1.11. 1,13 m3
4 Pek. Plat dasar Cor Beton Site Mix K.175 SNI G.01 0,23 m3
5 Pas. Dinding Bata Ringan tebal; 10 cm + Semen Perekat A.4.4.1.26. 10,80 m2
6 Pek. Plesteran 1Pc : 5Ps, tebal 15 mm + acian A.4.4.2.5. 10,80 m2
7 Pek. Balok Lintail beton bertulang (10x15) cm BOW I.38 0,09 m3
8 Pek. Tutup Manhole
- Besi Wiremash A.4.1.1.17.1 12,26 kg
- Cor Beton Site Mix K.175 SNI G.01 0,23 m3
- Pek. Bekisting Multiplex 9 mm (3 x pakai) - 0,60 m2
PEKERJAAN BAK KONTROL
1 Galian tanah biasa A.2.3.1.1. 0,20 m3
2 Urugan Pasir A.2.3.1.11. 0,01 m3
3 Pek. Plat dasar Cor Beton Site Mix K.175 SNI G.01 0,03 m3
4 Pas. Dinding Bata Ringan tebal; 10 cm + Semen Perekat A.4.4.1.26. 1,20 m2
5 Pek. Plesteran 1Pc : 5Ps, tebal 15 mm + acian A.4.4.2.23. 1,20 m2
6 Pek. Balok Lintail beton bertulang (10x15) cm BOW I.38 0,03 m3
7 Pek. Tutup Manhole
- Besi Wiremash A.4.1.1.17.1 1,36 kg
- Cor Beton Site Mix K.175 SNI G.01 0,03 m3
- Pek. Bekisting Multiplex 9 mm (3 x pakai) - 0,20 m2
PEKERJAAN SUMUR RESAPAN
1 Galian tanah biasa A.2.3.1.1. 2,00 m3
2 Pek. Urugan Tanah Kembali Bekas Galian A.2.3.1.9. 28,87 m3
3 Pek. Pipa Beton dia. 60 cm A.3.2.1.11.c 2,00 m1
4 Urugan Pasir A.2.3.1.11. 0,28 m3
5 Urugan Agregat Pecah Mesin 20 - 30 mm A.7.1.1.6.a 0,14 m3
6 Urugan Ijuk Resapan - 0,14 m3
7 Pek. Tutup Manhole
- Besi Wiremash A.4.1.1.17.1 1,96 kg
- Cor Beton Site Mix K.175 SNI G.01 0,04 m3
- Pek. Bekisting Multiplex 9 mm (2 x pakai) - 0,24 m2
C.8 PEKERJAAN DISTRIBUSI AIR BERSIH
Pek. Pengeboran Sumber Air Bersih Kedalaman ± 40 m + Instalasi
1 B.1 1,00 ls
Pemipaan
2 Panel Pompa Submersible - 1,00 unit
3 Jet Pump B.5 1,00 Unit
Brand
Model
Type
Power
Operasi
4 Kabel NYYHY 3 x 2,5 mm, Dari Mesin Pompa Ke Panel Kontrol - 50,00 m1
5 Pasang Pipa Hisap PVC AW 1 1/2 inch A.5.1.1.25. 45,00 m1
6 Pasang Pipa PVC AW 4 inch ( Casing Pipa Sumur Dalam ) A.5.1.1.31. 40,00 m1
7 Gate Valve 1" - 1,00 bh
8 Water Level Control Switch - 1,00 bh
9 Check Foot valve 1 1/2" - 1,00 bh
D REHAB MASJID AL-MIZAN
1 Pek. Bongkaran Plafond BOW L 6 21,20 m2
2 Pek. Kubah Enamel Lengkap: - 1,00 Ls
- Kuda-kuda utama Keremona Tripod Pipa MRB
- Kuda-kuda ekstra sekunder (pipa air)
- Gording R primer (pipa air)
- Rangka plafond sama TSB diatas
- Alumunium Foil atau Plat galvalum
- Plafond
- Atap Plat Galvalum 04/05 Finishing oven warna
- Cat Plafond
- Penangkal Petir Standart
- Reng hollow Galvanis
3 Pas. Plafond GRC t: 4mm A.4.5.1.1. 212,00 m2
4 Pas. Plafon gypsum t = 9mm A.4.5.1.7. 343,00 m2
5 Pek. List Gypsum, t: 8 cm A.4.5.1.13. 197,00 m1
Pengecatan Plafond Setara Vinilex/Metrolith - Cat Dasar Finish Cat
6 A.4.7.1.10. 555,00 m2
Penutup
7 Pas. Dinding Granit Double Loading (Polished), Uk. 60/60 cm A.4.4.3.66 11,40 m2
8 Pas. Lampu Downlight LED Panel 18 watt A.6.2.1.20. 45,00 set
9 Pek. Waterproofing coating A.4.7.1.22.a 14,35 m2
JUMLAH
Penyambungan Listrik PLN - Baru / Penambahan Daya 6600 Watt (c)
TOTAL (a) + (b) + (c)
DIBULATKAN
Tigaraksa, .................................. 2024
PEJABAT PEMBUAT KOMITMEN
DINAS TATA RUANG & BANGUNAN
KABUPATEN TANGERANG
DEKI KUSUMAYADI, S.IP
NIP. 19771226 200312 1 004
REKAPITULASI HARGA
JUDUL KEGIATAN : Pembangunan Gedung Beladiri Bersama Kabupaten Tangerang
ANGGARAN : APBD Th. 2024
LOKASI : Kab. Tangerang
JUMLAH HARGA PPN 11%
NO URAIAN PEKERJAAN
(a) (b)
A PEKERJAAN PERSIAPAN
B PEKERJAAN K3
C PEKERJAAN STRUKTUR
D REHAB MASJID AL-MIZAN
JUMLAH (a) + (b)
Penyambungan Listrik PLN - Baru / Penambahan Daya 6600 Watt (c)
TOTAL (a) + (b) + (c)
DIBULATKAN
Tigaraksa, .................................. 2024
PEJABAT PEMBUAT KOMITMEN
DINAS TATA RUANG & BANGUNAN
KABUPATEN TANGERANG
DEKI KUSUMAYADI, S.IP
NIP. 19771226 200312 1 004