| 0024007205402000 | Rp 1,450,765,838 | |
| 0820351088418000 | - | |
| 0926257130711000 | - | |
| 0022878391451000 | - | |
| 0658077227418000 | - | |
| 0011360575451000 | - | |
| 0022395214416000 | - | |
| 0417427226416000 | - | |
CV Anugrah Dwimitra Abadi | 00*1**3****86**0 | - |
| 0532854122419000 | - | |
| 0020935433418000 | - | |
PT Karyamas Prima Sempurna | 06*8**7****16**0 | - |
| 0013977178021000 | - | |
| 0835260829411000 | - | |
| 0722947751034000 | - | |
| 0026908566437000 | - | |
| 0016286619008000 | - | |
| 0838477875402000 | - | |
| 0313609950416000 | - | |
| 0023390248412000 | - | |
| 0316606961451000 | - | |
| 0725694020009000 | - | |
| 0818495210432000 | - | |
| 0708013958451000 | - | |
| 0392834883412000 | - | |
| 0022881155418000 | - |
RENCANA ANGGARAN BIAYA (BLANK)
JUDUL KEGIATAN : Rehab dan Penataan Lingkup Kantor Kecamatan Curug
ANGGARAN : APBD Th. 2024
LOKASI : Kab. Tangerang
KODE HARGA SATUAN JUMLAH HARGA PPN 11%
NO URAIAN PEKERJAAN VOLUME SATUAN
ANALISA PEKERJAAN
(a) (b)
A PEKERJAAN PERSIAPAN
1 Pembuatan Papan Nama Proyek A.2.2.1.0 1,00 Unit
2 Biaya Operasional Listrik & Air Kerja Proyek - 1,00 ls
3 Mobilisasi - 1,00 ls
4 Biaya Penyelenggaraan K3 (Biaya Iuran BPJS Ketenagakerjaan, APD, & Penanganan Covid)
- Helm Proyek SNI - 25,00 bh
- Sarung Tangan Pelindung - 25,00 bh
- Masker Mulut - 25,00 bh
- Rompi Jaring - 25,00 bh
- BPJS Ketenagaketjaan dan kesehatan kerja - 1,00 Paket
5 Pekerjaan Direksi Keet dan Barak Kerja A.2.2.1.7.a 20,00 m2
6 Sewa Pompa Beton - 1,00 ls
B PEKERJAAN PERLUASAN AULA
1 Membongkar Dinding (Manual) BOW L 6 24,00 m2
2 Pek. Plat Besi T=10 mm ( base plate & Stifner ) A.4.2.1.1. 40,23 kg
3 Pek. Melubang dengan Bor A.4.2.1.5.2 40,00 titik
4 Pek. Pengelasan - 1,00 ls
5 Chemical Angkur - 40,00 bh
6 Rangka Baja IWF+ Erection (Besi Wf 250 ) A.4.2.1.2. 547,60 kg
7 Rangka Baja IWF + Erection (Besi Wf 150) A.4.2.1.2. 294,00 kg
8 Pek. Plat Beton f'c = 18,68 Mpa, (K-225) + Vibrator A.4.1.1.7.a 3,84 m3
9 Bekisting Plat Bondek Galvanis Gelombang 880x5400 mm, tebal 1,00 mA.m4.1.1.24.c 32,00 m2
10 Pas. Jaring Tulangan Baja (Wiremesh) 2 Lapis, type M10 A.4.1.1.19.d 32,00 m2
11 Pek. Ringbalk 15/20
- Bekisting Multiplek 9 mm A.4.1.1.24.1 9,60 m2
- Tulangan Besi(Besi Polos) A.4.1.1.17.1 59,18 kg
- Sengkang (Besi Polos) A.4.1.1.17.1 35,35 kg
- Beton f'c = 14,53 Mpa, (K-175) A.4.1.1.5. 0,72 m3
12 Pek. Balok Lintle 13/13
- Bekisting Multiplek 9 mm A.4.1.1.24.1 1,56 m2
- Tulangan Besi(Besi Polos) A.4.1.1.17.1 14,80 kg
- Sengkang (Besi Polos) A.4.1.1.17.1 5,85 kg
- Beton f'c = 14,53 Mpa, (K-175) A.4.1.1.5. 0,10 m3
13 Pas. Lantai Granit Double Loading (Polished), Uk. 60 x 60 cm A.4.4.3.66 32,00 m2
14 Pas. Dinding Bata Ringan tebal; 10 cm + Semen Perekat A.4.4.1.26. 39,14 m2
15 Pek. Plesteran 1Pc : 5Ps, + acian A.4.4.2.5. 78,28 m2
16 Pas. Plafon - Gyptile Board/Akustik + Rangka CrossTee A.4.5.1.8. 32,00 m2
17 Pengecatan Tembok Baru Setara ICI/DULUX - INTERIOR, Semua WarAn.a4.7.1.11.b 78,28 m2
18 Pasang Pintu P2 Terlampir 1,00 unit
19 Pasang Jendela J1 Terlampir 2,00 unit
20 Pek. Instalasi Kabel NYM 2 x 1,5 mm A.6.2.1.1.a 6,00 titik
21 Pas. Saklar Lampu - Seri/Double A.6.2.1.7. 1,00 bh
22 Pek. Instalasi Kabel NYM 3 x 2,5 mm (Untuk Stop Kontak) A.6.2.1.1.c 2,00 titik
23 Pas. Stop Kontak Tanam/Timbul, setara BROCO A.6.2.1.9.a 2,00 bh
24 Pas. Lampu Downlight inbow 10-18 Watt, setara Phillips + Cassing A.6.2.1.20. 6,00 set
C PEKERJAAN PENATAAN RUANG PELAYANAN
1 Bongkaran dinding manual (ruang Pelayanan, Bjb, belakang pelayanan )BOW L 6 90,00 m2
2 Pek. Backdrop Profil, Lapis Multiplek/MDF/Plywood Finish HPL + RangkEam (bpaircisk d. r3op Pelay3a0n,a0n0 2 tempatm) 2
3 Meja pelayanan 2 sisi (bahan Multiplek/Plywood Finish HPL + Rangka) - 50,00 m2
4 Cover tiang Beton (bahan Multiplek/Plywood Finish HPL + Rangka Empiris . 3 33,60 m2
5 Pemasangan Lantai Vinyl/Sticker, anti bacteria A.4.4.3.59. 190,00 m2
6 Pas. Dinding Panel GRC Motif Timbul, Fin. Pengecatan Empiris . 4 15,00 m2
7 Pasang Dinding Pemisah Gypsum Board 9 mm + Rangka (ruang LaktasAi).4.4.3.66 20,00 m2
8 Pas. Plafon Gyptile Board/Akustik + Rangka A.4.5.1.8. 32,00 m2
9 Pek. Plafon PVC Shunda (Motif/Warna/Serat Kayu) + Rangka (atas MeAja. 4P.e5l.a1y.8a.nban) 40,00 m2
10 Pek. Instalasi Kabel NYM 2 x 1,5 mm A.6.2.1.1.a 10,00 titik
11 Pas. Saklar Lampu - Seri/Double A.6.2.1.7. 2,00 bh
12 Pek. Instalasi Kabel NYM 3 x 2,5 mm (Untuk Stop Kontak) A.6.2.1.1.c 4,00 titik
13 Pas. Stop Kontak Tanam/Timbul, setara BROCO A.6.2.1.9.a 4,00 bh
14 Pas. Lampu Downlight inbow 10-18 Watt, setara Phillips + Cassing A.6.2.1.20. 10,00 set
D PEKERJAAN FASADE BELAKANG
D.1 DROP OFF BELAKANG
1 Pek. Pondasi Plat Beton Setempat uk. 80x80 cm
- Pek. Galian Tanah Pondasi A.2.3.1.1. 4,00 m3
- Bekisting Pondasi dgn Pas. Bata ad. 1:5 A.4.4.1.10. 2,56 m2
- Pembesian (Besi Ulir) A.4.1.1.17.2 82,07 kg
- Beton f'c = 19,3 Mpa ( K-225 ) A.4.1.1.7. 0,51 m3
2 Pek. Kolom Pedestal Utama 30x30
- Bekisting Multiplek 9 mm A.4.1.1.24.1 4,80 m2
- Tul. Sudut (Besi Ulir) A.4.1.1.17.2 60,60 kg
- Tul. Tengah (Besi Ulir) A.4.1.1.17.2 60,60 kg
- Sengkang (Besi Polos) A.4.1.1.17.1 13,38 kg
- Beton f'c = 19,3 Mpa ( K-225 ) A.4.1.1.7. 0,36 m3
3 Pas. Angkur dia 16 mm - 16,00 bh
4 Chemical Angkur - 18,00 bh
5 Pek. Plat Besi T=12 mm ( base plate ) A.4.2.1.1. 69,24 kg
6 Pas. Kolom Baja H.Beam 250.250.9.14 A.4.2.1.2. 1.013,83 kg
7 Pas. Balok Baja WF 250.125.6.9 A.4.2.1.2. 769,60 kg
8 Pas. Balok Baja WF 150.75.5.7 A.4.2.1.2. 336,00 kg
9 Pek. Melubang dengan Bor A.4.2.1.5.2 34,00 titik
10 Pek. Pengelasan A.4.2.1.5.1 1,00 ls
11 Pas. Baut Mur (dia) 16 mm - 34,00 bh
12 Bekisting Plat Bondek Galvanis Gelombang 880x5400 mm, tebal 1,00 mA.m4.1.1.24.c 48,00 m2
13 Pas. Jaring Tulangan Baja (Wiremesh) 1Lapis, type M10 A.4.1.1.19.b 48,00 m2
14 Pek. Plat Beton f'c = 18,68 Mpa, (K-225) + Vibrator A.4.1.1.7.a 4,80 m3
15 Pas. Dinding Bata Ringan tebal; 10 cm + Semen Perekat A.4.4.1.26. 14,40 m2
16 Pek. Plesteran 1Pc : 5Ps, + acian A.4.4.2.5. 28,80 m2
17 Pek. Pipa Outlet AW Ø. 4 " A.5.1.1.32. 8,00 m1
18 Pas. Lantai Granit Double Loading (Polished), Uk. 60 x 60 cm A.4.4.3.66 53,60 m2
19 Pas. Plafond PVC Motif Serat Kayu Dop + Rangka A.4.5.1.8.b 57,60 m2
20 Pek. Cover Kolom GRC motif Timbul Empiris . 4 33,30 m2
21 Pasang Pintu P1 - 1,00 unit
22 Pengecatan Tembok Baru Setara ICI/DULUX - EXTERIOR, Semua WaArn.4a.7.1.11.a 28,80 m2
23 Pek. Instalasi Kabel NYM 2 x 1,5 mm A.6.2.1.1.a 6,00 titik
24 Pas. Saklar Lampu - Seri/Double A.6.2.1.7. 2,00 bh
25 Pek. Instalasi Kabel NYM 3 x 2,5 mm (Untuk Stop Kontak) A.6.2.1.1.c 1,00 titik
26 Pas. Stop Kontak Tanam/Timbul, setara BROCO A.6.2.1.9.a 1,00 bh
27 Pas. Lampu Downlight inbow 10-18 Watt, setara Phillips + Cassing A.6.2.1.20. 6,00 set
28 Alat Bantu Stegger/Schafolding F.1 34,56 m2
E PEKERJAAN PENATAAN LUAR
1 Pek. Bongkaran Dinding Manual BOW L 6 68,40 m2
2 Pek. Bongkaran Beton Bertulang A.2.2.1.13. 3,32 m3
3 Pek. Bongkaran Paving Block Existing - 520,00 m2
4 Pek. LPB Agregat Kelas B A.7.1.1.5. 115,00 m3
5 Beton f'c = 29,05 Mpa, (K-350) + Vibrator A.4.1.1.12.b 157,50 m3
6 Bekisting Multiplex 9 mm A.4.1.1.24.1 72,00 m2
7 Pas. Jaring Tulangan Baja (Wiremesh), type M10 1 Lapis A.4.1.1.19.b 708,00 m2
8 Joint Sealent Pada Rigid Pavement Analisa EI-7115 a 165,00 m1
9 Lapis Plastik - 708,00 m2
10 Pas. Kanstin Model DKI uk.15.30.40, K-300, warna Abu-Abu A.7.1.1.2.1 320,00 m1
F PEKERJAAN FINISHING
1 Pekerjaan Perapihan & Pembersihan - 1,00 ls
JUMLAH
TOTAL
DIBULATKAN
Tigaraksa, .................................. 2024
PT/CV ….............
…......................................
Direktur
REKAPITULASI TOTAL
JUDUL KEGIATAN : Rehab dan Penataan Lingkup Kantor Kecamatan Curug
ANGGARAN : APBD Th. 2024
LOKASI : Kab. Tangerang
NO URAIAN JUMLAH HARGA (Rp) PPN 11%
A PEKERJAAN PERSIAPAN
B PEKERJAAN PERLUASAN AULA
C PEKERJAAN PENATAAN RUANG PELAYANAN
D PEKERJAAN FASADE BELAKANG
E PEKERJAAN PENATAAN LUAR
F PEKERJAAN FINISHING
JUMLAH
TOTAL
DIBULATKAN
KUSEN TYPE : P1
No. ITEM PEKERJAAN SATUAN HARGA PEKERJAAN TOTAL HARGA
1 Pas. Rangka Kusen Alumunium 4" Warna Hitam m¹ 312.910,00
9,50 2.972.645,00
2 Pemasangan 1 m² kaca tempered frameless tebal 12 mm m² 1 .868.530,00
3,78 7.063.043,40
3 Pasang Kaca Bening, tebal 5 mm m² 242.520,00
0,90 218.268,00
4 Pas. Floor Hinge + fath fitting setara Dorma set 3 .120.000,00
1,00 3.120.000,00
HARGA 1 UNIT KUSEN TYPE : P1 1 3.373.956,40
KUSEN TYPE : P.2
No. ITEM PEKERJAAN SATUAN HARGA PEKERJAAN TOTAL HARGA
1 Pas. Rangka Kusen Alumunium 4" Warna Hitam m¹ 312.910,00
9,52 2.978.903,20
2 Pas. Daun Pintu Aluminium Casement (Tanpa Kaca) m¹ 268.810,00
5,80 1.559.098,00
3 Pasang Kaca Rayban (Gelap) 5 mm m² 334.920,00
2,53 847.347,60
4 Pas. Jalusi Krepyak Aluminium diatas Kusen m² 757.460,00
0,96 727.161,60
5 Pasangan Engsel Pintu, Stainless Setara Dexon bh 105.300,00
6,00 631.800,00
6 Pasangan Kunci Tanam Pintu Doble Panel, Silinder + Handle bh 821.650,00
1,00 821.650,00
HARGA 1 UNIT KUSEN TYPE : P.2 7.565.960,40
KUSEN TYPE : J.1
No. ITEM PEKERJAAN SATUAN HARGA PEKERJAAN TOTAL HARGA
1 Pas. Rangka Kusen Alumunium 4" Warna Hitam m¹ 312.910,00
10,08 3.154.132,80
2 Pasang Kaca Rayban (Gelap) 5 mm 3,60 m² 334.920,00
1.205.712,00
HARGA 1 UNIT KUSEN TYPE : J.1 4.359.844,80| Authority | |||
|---|---|---|---|
| 23 September 2021 | Lanjutan Peningkatan Jalan Bojong Renged – Teluknaga | Kab. Tangerang | Rp 5,000,000,000 |
| 28 June 2021 | Pembangunan Gedung Pemberdayaan Pemuda Kec. Mauk | Kab. Tangerang | Rp 1,000,000,000 |
| 20 October 2023 | Rehabilitasi Jalan Gembong - Tobat Kec Balaraja | Pemerintah Daerah Kabupaten Tangerang | Rp 920,000,000 |
| 20 October 2023 | Lanjutan Peningkatan Drainase Jalan Kutabaru Kecamatan Pasar Kemis | Pemerintah Daerah Kabupaten Tangerang | Rp 920,000,000 |
| 21 March 2025 | 39. Pembangunan Gedung Kwaran Kelapa Dua | Kab. Tangerang | Rp 800,000,000 |
| 20 October 2023 | Lanjutan Peningkatan Jalan Kp Rawa Kalem Ds Gunung Sari | Pemerintah Daerah Kabupaten Tangerang | Rp 774,500,000 |
| 20 October 2023 | Peningkatan Jalan Kp Lamporan Rw05 Desa Pangadegan Kecpasar Kemis | Pemerintah Daerah Kabupaten Tangerang | Rp 629,000,000 |
| 17 June 2016 | [Apbd.16_264] Normalisasi Pembuang Cimauk Kec.Mauk | Pemerintah Daerah Kabupaten Tangerang | Rp 496,428,000 |
| 7 October 2025 | Rehab Jogging Track | Kab. Tangerang | Rp 464,408,260 |
| 20 October 2023 | Rehabilitasi Ruas Jalan Kabupaten Kp Patramanggala - Ds Patramanggala | Pemerintah Daerah Kabupaten Tangerang | Rp 435,000,000 |